FDOT contract T4688 bid tabulation
SR 817 (UNIVERSITY DR) FROM N OF SR 824 (PEMBROKE RD) TO N.. Let by Florida DOT on August 27, 2025, Broward, District 4. 7 bids received; low bid $42,867,938 by Central Civil Construction Co..
- Owner
- Florida DOT
- Letting
- 27 AUG 2025
- Pay items
- 285
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Central Civil Construction Co. | $42,867,938 | Low |
| 2 | Lead Engineering Contractors, LLC | $43,214,810 | +1.0% |
| 3 | Horizon Contractors, Inc. | $44,489,239 | +4.0% |
| 4 | Ohla USA Inc | $48,468,468 | +13% |
| 5 | General Asphalt Company, LLC | $52,839,615 | +23% |
| 6 | Ryan Inc. Southern | $55,729,883 | +30% |
| 7 | Asphalt Group, Inc. | $56,846,796 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Central Civil Construction Co. | 2. Lead Engineering Contractors, LLC | 3. Horizon Contractors, Inc. | 4. Ohla USA Inc | 5. General Asphalt Company, LLC | 6. Ryan Inc. Southern |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $4,151,993 | $4,200,000 | $3,300,000 | $4,840,000 | $3,000,000 | $5,500,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $482,385 | $395,000 | $760,000 | $3,000,000 | $5,200,000 | $3,840,000 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $68,027 | $35,000 | $15,000 | $1.00 | $16,500 | $300,000 |
| 0020 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $46,108 | $52,000 | $15,000 | $1.00 | $31,000 | $185,294 |
| 0025 | Traffic control officer (0102-14) | HR | 296 | $88.00 | $85.00 | $85.00 | $80.00 | $96.00 | $125.00 |
| 0030 | Work zone sign (0102-60) | ED | 81,147 | $0.22 | $0.19 | $0.20 | $0.20 | $0.22 | $0.21 |
| 0035 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 8,950 | $64.11 | $56.00 | $45.00 | $0.01 | $82.80 | $44.28 |
| 0040 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 3,168 | $17.28 | $16.00 | $15.00 | $0.01 | $21.60 | $14.04 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 395,740 | $0.08 | $0.07 | $0.10 | $0.10 | $0.11 | $0.08 |
| 0050 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 25,830 | $0.03 | $0.03 | $0.06 | $0.05 | $0.06 | $0.03 |
| 0055 | Arrow board / advance warning arrow panel (0102-76) | ED | 127 | $4.87 | $4.00 | $7.00 | $5.10 | $7.80 | $4.59 |
| 0060 | Portable changeable message sign, temporary (0102-99) | ED | 4,340 | $9.73 | $9.00 | $9.80 | $9.15 | $10.68 | $9.18 |
| 0065 | Temporary signalization and maintenance, intersection (0102-104) | ED | 5,320 | $10.80 | $17.00 | $20.00 | $15.00 | $21.96 | $10.80 |
| 0070 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 5,320 | $10.80 | $17.00 | $20.00 | $15.00 | $21.96 | $10.80 |
| 0075 | Existing ITS maintenance (0102-112) | DA | 1,064 | $213.84 | $250.00 | $200.00 | $250.00 | $234.12 | $213.84 |
| 0080 | Type III barricade (0102-115) | ED | 3,480 | $0.23 | $0.20 | $0.30 | $0.25 | $0.31 | $0.22 |
| 0085 | Sediment barrier (0104-10-3) | LF | 9,190 | $3.24 | $4.00 | $3.00 | $4.75 | $3.60 | $2.16 |
| 0090 | Floating turbidity barrier (0104-11) | LF | 2,923 | $10.80 | $13.00 | $14.00 | $25.00 | $30.00 | $10.80 |
| 0095 | Soil tracking prevention device (0104-15) | EACH | 4 | $1,720.03 | $4,500.00 | $1.00 | $2,500.00 | $4,800.00 | $4,371.30 |
| 0100 | Inlet protection system (0104-18) | EACH | 118 | $232.25 | $225.00 | $70.00 | $120.00 | $210.00 | $270.00 |
| 0105 | Litter removal (0107-1) | ACRE | 580.63 | $37.80 | $65.00 | $1.00 | $130.00 | $1.20 | $50.00 |
| 0110 | Mowing (0107-2) | ACRE | 334.28 | $81.00 | $115.00 | $1.00 | $250.00 | $1.20 | $100.00 |
| 0115 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $9,612.18 | $8,900.00 | $10,000 | $30,000 | $1.20 | $172,800 |
| 0120 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $7,452.14 | $6,900.00 | $10,000 | $55,000 | $1.20 | $56,808 |
| 0125 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $2,245,180 | $500,000 | $250,000 | $2,960,844 | $1,080,000 | $2,575,000 |
| 0130 | Selective clearing and areas with trees to remain (0110-2-2) | ACRE | 0.86 | $31,802 | $20,000 | $50,000 | $55,000 | $206,400 | $16,200 |
| 0135 | Removal of existing concrete (0110-4-10) | SY | 16,886 | $21.26 | $25.00 | $20.00 | $50.00 | $26.40 | $113.80 |
| 0140 | Tree protection barrier (0110-21) | LF | 4,119 | $7.50 | $6.50 | $5.00 | $3.00 | $12.00 | $7.02 |
| 0145 | Tree root and branch pruning (0110-22) | EACH | 8 | $2,700.05 | $5,080.00 | $500.00 | $550.00 | $1,800.00 | $284.57 |
| 0150 | Tree removal (0110-23) | EACH | 2 | $1,620.03 | $1,500.00 | $1,000.00 | $550.00 | $3,000.00 | $2,845.66 |
| 0155 | Regular excavation (0120-1) | CY | 6,808.60 | $26.65 | $10.00 | $10.00 | $35.00 | $12.00 | $42.90 |
| 0160 | Subsoil excavation (0120-4) | CY | 2,504.80 | $45.19 | $35.00 | $30.00 | $35.00 | $30.00 | $62.09 |
| 0165 | Channel excavation (0120-5) | CY | 33,222 | $27.74 | $21.00 | $23.00 | $25.00 | $30.00 | $36.25 |
| 0170 | Embankment (0120-6) | CY | 15,779 | $30.04 | $31.00 | $25.00 | $6.65 | $30.00 | $40.54 |
| 0175 | Type B stabilization (0160-4) | SY | 20,923 | $7.96 | $20.00 | $12.00 | $0.01 | $14.40 | $5.44 |
| 0180 | Optional base, base group 09 (0285-709) | SY | 15,764 | $32.37 | $24.50 | $36.00 | $35.00 | $43.20 | $33.35 |
| 0185 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 85,394 | $5.40 | $4.50 | $5.45 | $3.99 | $4.40 | $5.67 |
| 0190 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 2,742.70 | $232.20 | $217.00 | $235.00 | $160.00 | $208.09 | $232.00 |
| 0195 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 11,123.90 | $204.12 | $190.00 | $205.00 | $155.00 | $217.51 | $216.00 |
| 0200 | Miscellaneous asphalt (0339-1) | TN | 301.90 | $216.00 | $200.00 | $220.00 | $550.00 | $431.42 | $216.00 |
| 0205 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 2,034 | $626.41 | $494.00 | $920.00 | $900.00 | $954.00 | $626.40 |
| 0210 | Conc class IV, bulkhead (0400-4-8) | CY | 838.80 | $1,070.34 | $957.00 | $1,200.00 | $1,600.00 | $1,320.00 | $1,296.00 |
| 0215 | Reinforcing steel- miscellaneous (0415-1-6) | LB | 1,338 | $6.35 | $5.00 | $21.00 | $3.60 | $25.20 | $1.08 |
| 0220 | Reinforcing steel- bulkhead (0415-1-8) | LB | 59,054 | $1.85 | $2.78 | $2.00 | $6.00 | $2.40 | $2.16 |
| 0225 | Inlets, curb, type 9, <10' (0425-1201) | EACH | 2 | $8,089.27 | $8,500.00 | $6,600.00 | $8,555.00 | $8,400.00 | $8,085.10 |
| 0230 | Inlets, curb, type 10, <10' (0425-1211) | EACH | 2 | $8,869.38 | $10,800 | $6,700.00 | $8,555.00 | $8,640.00 | $8,473.45 |
| 0235 | Inlets, curb, type 10, J bot >10' (0425-1214) | EACH | 1 | $13,128 | $10,800 | $14,000 | $10,850 | $18,000 | $18,233 |
| 0240 | Inlets, curb, type P-3, <10' (0425-1331) | EACH | 1 | $11,773 | $6,800.00 | $8,500.00 | $10,200 | $10,800 | $9,492.69 |
| 0245 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 38 | $8,173.15 | $6,800.00 | $7,000.00 | $9,000.00 | $9,600.00 | $7,104.13 |
| 0250 | Inlets, curb, type P-5, >10' (0425-1352) | EACH | 2 | $13,595 | $7,500.00 | $11,000 | $11,300 | $13,200 | $17,406 |
| 0255 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 18 | $8,269.88 | $6,500.00 | $8,300.00 | $10,300 | $10,200 | $8,447.23 |
| 0260 | Inlets, curb, type J-5, <10' (0425-1451) | EACH | 4 | $10,848 | $6,500.00 | $8,700.00 | $10,300 | $10,440 | $13,611 |
| 0265 | Inlets, curb, type J-5, >10' (0425-1452) | EACH | 2 | $15,491 | $6,500.00 | $13,000 | $10,300 | $15,600 | $18,932 |
| 0270 | Inlets, curb, type J-6, <10' (0425-1461) | EACH | 3 | $10,570 | $6,500.00 | $9,000.00 | $20,000 | $10,800 | $13,581 |
| 0275 | Inlets, curb, type J-6, >10' (0425-1462) | EACH | 3 | $15,971 | $7,000.00 | $16,000 | $20,000 | $19,200 | $21,445 |
| 0280 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 3 | $8,115.32 | $6,500.00 | $6,400.00 | $11,000 | $7,800.00 | $10,685 |
| 0285 | Manholes, P-7, <10' (0425-2-41) | EACH | 8 | $7,692.40 | $6,500.00 | $5,800.00 | $11,000 | $7,200.00 | $10,009 |
| 0290 | Manholes, P-7, partial (0425-2-43) | EACH | 1 | $3,415.56 | $4,500.00 | $3,000.00 | $12,000 | $3,600.00 | $3,548.27 |
| 0295 | Manholes, J-7, <10' (0425-2-71) | EACH | 4 | $9,008.28 | $6,500.00 | $6,700.00 | $20,000 | $9,600.00 | $11,884 |
| 0300 | Manholes, J-7, >10' (0425-2-72) | EACH | 15 | $14,241 | $7,000.00 | $11,000 | $25,000 | $13,200 | $33,941 |
| 0305 | Manholes, J-7, partial (0425-2-73) | EACH | 1 | $5,478.98 | $6,500.00 | $4,000.00 | $12,500 | $4,800.00 | $4,227.78 |
| 0310 | Manholes, J-7, >10' control structure (0425-2-75) | EACH | 19 | $22,047 | $14,000 | $20,000 | $12,500 | $26,400 | $29,430 |
| 0315 | Manhole, adjust (0425-5) | EACH | 5 | $860.02 | $650.00 | $1,000.00 | $1,200.00 | $1,080.00 | $1,103.57 |
| 0320 | Valve boxes, adjust (0425-6) | EACH | 11 | $684.51 | $700.00 | $800.00 | $1,500.00 | $960.00 | $1,103.57 |
| 0325 | Drainage structures, miscellaneous, adjust (0425-8) | EACH | 2 | $1,145.52 | $2,500.00 | $2,500.00 | $2,000.00 | $3,000.00 | $2,460.44 |
| 0330 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 104 | $139.44 | $70.00 | $250.00 | $150.00 | $300.00 | $175.02 |
| 0335 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 4,607 | $107.30 | $90.00 | $125.00 | $185.00 | $162.00 | $197.87 |
| 0340 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 503 | $154.79 | $115.00 | $250.00 | $285.00 | $300.00 | $176.30 |
| 0345 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 42 | $204.71 | $148.00 | $250.00 | $435.00 | $300.00 | $290.80 |
| 0350 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 80 | $292.73 | $178.00 | $250.00 | $475.00 | $300.00 | $547.10 |
| 0355 | Pipe culvert, opt material, round, 54"S/CD (0430-175154) | LF | 18 | $693.72 | $550.00 | $700.00 | $1,005.00 | $840.00 | $1,147.68 |
| 0360 | Pipe culvert,optional material,other-elip/arch, (0430-175215) | LF | 18 | $214.04 | $390.00 | $250.00 | $225.00 | $300.00 | $494.13 |
| 0365 | Straight concrete endwalls, single, 0 degrees, round (0430-518100) | EACH | 4 | $5,748.17 | $4,000.00 | $5,300.00 | $2,855.00 | $6,600.00 | $5,520.19 |
| 0370 | Straight concrete endwalls, single, 0 degrees, round (0430-524100) | EACH | 11 | $6,388.12 | $4,500.00 | $6,100.00 | $5,500.00 | $7,440.00 | $9,173.96 |
| 0375 | Straight concrete endwalls, single, 0 degrees, round (0430-530100) | EACH | 1 | $9,231.46 | $5,000.00 | $10,000 | $8,555.00 | $12,000 | $18,151 |
| 0380 | Straight concrete endwalls, single, 0 degrees, round (0430-554100) | EACH | 1 | $19,294 | $19,000 | $19,000 | $15,400 | $22,800 | $34,300 |
| 0385 | French drain, 24" (0443-70-4) | LF | 1,508 | $254.87 | $195.00 | $210.00 | $350.00 | $252.00 | $422.47 |
| 0390 | Steel piling, HP 16 X 101 (0455-35-10) | LF | 105 | $202.48 | $480.00 | $305.00 | $315.00 | $267.34 | $329.40 |
| 0391 | Preformed pile holes, sheet (0455-15-40) | SF | 122,000 | $0.01 | $0.10 | $10.00 | $0.01 | $3.67 | $1.00 |
| 0395 | Steel piling, HP 16 X 88 (0455-35-12) | LF | 1,010 | $165.06 | $395.00 | $205.00 | $304.05 | $181.57 | $318.60 |
| 0400 | Sheet piling steel, F&I (0455-133-3) | SF | 120,660 | $74.41 | $100.00 | $104.00 | $86.35 | $98.33 | $108.27 |
| 0405 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 60 | $106.12 | $105.00 | $108.00 | $100.00 | $134.40 | $106.12 |
| 0410 | Pedestrian/ bicycle railing, aluminum only,42" type 1 (0515-2311) | LF | 2,449 | $122.10 | $118.00 | $124.00 | $115.00 | $153.60 | $122.10 |
| 0415 | Bullet rail, double rail (0515-4-2) | LF | 2,272 | $59.42 | $62.00 | $65.00 | $65.00 | $127.20 | $64.17 |
| 0420 | Concrete curb & gutter, type F (0520-1-10) | LF | 29,106 | $29.86 | $24.00 | $24.00 | $32.00 | $28.80 | $33.44 |
| 0425 | Concrete curb, type D (0520-2-4) | LF | 1,119 | $26.93 | $25.00 | $24.00 | $30.00 | $28.80 | $20.63 |
| 0430 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 3,390 | $39.96 | $64.00 | $65.00 | $115.00 | $90.00 | $39.96 |
| 0435 | Concrete traffic separator, special- variable width (0520-70) | SY | 279 | $50.76 | $66.00 | $150.00 | $175.00 | $198.00 | $95.74 |
| 0440 | Concrete traffic railing- 32" vertical face (0521-5-4) | LF | 1,341 | $159.94 | $145.00 | $170.00 | $150.00 | $180.00 | $200.88 |
| 0445 | Concrete traffic railing barrier, with junction slab, 32" vertical face (0521-8-3) | LF | 981 | $723.94 | $640.00 | $690.00 | $200.00 | $768.00 | $513.71 |
| 0450 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 10,945 | $63.06 | $55.00 | $55.00 | $65.00 | $67.20 | $55.89 |
| 0455 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 3,465 | $69.87 | $59.00 | $95.00 | $81.00 | $115.20 | $62.69 |
| 0460 | Bus shelter pad- concrete (0522-4) | SY | 184 | $156.47 | $300.00 | $130.00 | $105.00 | $127.20 | $133.52 |
| 0465 | Pavers, architectural, (0526-1-2) | SY | 186 | $120.40 | $200.00 | $105.00 | $65.00 | $127.20 | $122.06 |
| 0470 | Detectable warnings (0527-2) | SF | 1,528 | $33.59 | $50.00 | $30.00 | $52.00 | $36.00 | $33.59 |
| 0475 | Bedding stone (0530-74) | TN | 4,801 | $54.00 | $179.00 | $80.00 | $27.22 | $98.40 | $48.08 |
| 0480 | Guardrail -roadway, general (0536-1-1) | LF | 7,456 | $22.57 | $21.00 | $25.00 | $22.00 | $29.70 | $22.57 |
| 0485 | Pipe rail for guardrail (0536-6) | LF | 2,182 | $19.01 | $18.00 | $20.00 | $18.00 | $27.60 | $19.01 |
| 0490 | Special guardrail post- special steel post for concrete structure mount (0536-7-2) | EACH | 44 | $267.59 | $258.00 | $270.00 | $252.00 | $360.00 | $267.59 |
| 0495 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 162 | $72.85 | $70.00 | $74.00 | $70.00 | $234.00 | $72.85 |
| 0500 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 6 | $3,083.01 | $2,981.00 | $3,100.00 | $3,000.00 | $3,840.00 | $3,082.95 |
| 0505 | Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113) | EACH | 10 | $1,299.01 | $1,256.39 | $1,400.00 | $1,225.00 | $2,160.00 | $1,298.99 |
| 0510 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 9 | $1,354.48 | $1,310.00 | $1,300.00 | $1,275.00 | $2,100.00 | $1,354.45 |
| 0515 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 6 | $3,132.02 | $3,000.00 | $3,100.00 | $3,000.00 | $3,780.00 | $3,131.96 |
| 0520 | Fencing, type A, 6.1-7.0, standard (0550-10130) | LF | 1,081 | $15.07 | $39.00 | $0.01 | $15.00 | $24.00 | $15.07 |
| 0525 | Performance turf, sod (0570-1-2) | SY | 11,460 | $9.10 | $5.95 | $6.50 | $10.00 | $8.14 | $3.75 |
| 0530 | Irrigation system- modify existing system (0590-70-5) | LS | 1 | $192,643 | $240,000 | $130,000 | $250,000 | $156,000 | $255,422 |
| 0535 | Conduit, furnish & install, open trench (0630-2-11) | LF | 70 | $21.60 | $28.00 | $42.00 | $22.00 | $46.80 | $21.60 |
| 0540 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 100 | $32.40 | $59.00 | $42.00 | $32.00 | $46.80 | $32.40 |
| 0545 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 3 | $1,663.23 | $2,000.00 | $1,380.00 | $1,575.00 | $1,534.92 | $1,663.20 |
| 0550 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $22,000 | $22,000 | $22,000 | $22,000 | $22,000 | $22,000 |
| 0555 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 6 | $3,125.04 | $3,900.00 | $2,300.00 | $3,000.00 | $2,656.20 | $3,124.98 |
| 0560 | Traffic monitoring site speed/classification unit, furnish & install, volume speed and classification (0695-3-11) | AS | 1 | $9,331.37 | $4,000.00 | $8,000.00 | $8,820.00 | $8,988.48 | $9,331.20 |
| 0565 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 6 | $3,183.36 | $4,000.00 | $2,400.00 | $3,010.00 | $2,595.48 | $3,183.30 |
| 0570 | Traffic monitoring site cabinet, furnish & install, type 4, base mount (0695-7141) | EACH | 1 | $9,269.27 | $7,940.00 | $11,500 | $8,800.00 | $12,768 | $9,269.10 |
| 0575 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 1 | $1,069.22 | $580.00 | $800.00 | $1,015.00 | $875.64 | $1,069.20 |
| 0580 | Raised pavement marker, type B (0706-1-3) | EACH | 2,564 | $5.40 | $5.00 | $6.00 | $4.50 | $6.00 | $4.32 |
| 0585 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 26.85 | $1,458.03 | $1,624.00 | $1,450.00 | $2,150.00 | $1,620.00 | $2,160.00 |
| 0590 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 4,730 | $1.08 | $2.00 | $2.00 | $1.75 | $1.20 | $1.73 |
| 0595 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 4,605 | $2.16 | $4.00 | $3.00 | $1.85 | $2.40 | $1.84 |
| 0600 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 25.10 | $712.81 | $1,015.00 | $700.00 | $540.00 | $792.00 | $540.00 |
| 0605 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 183 | $37.80 | $45.00 | $38.00 | $50.00 | $42.00 | $48.60 |
| 0610 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 10.48 | $1,458.03 | $1,624.00 | $1,450.00 | $2,150.00 | $1,620.00 | $2,160.00 |
| 0615 | Painted pavement markings, durable, white, message or symbol (0710-12160) | EACH | 51 | $64.80 | $152.00 | $70.00 | $50.00 | $72.00 | $48.60 |
| 0620 | Directional indicators (0919-528100) | SF | 14 | $129.60 | $25.00 | $85.00 | $215.00 | $12.00 | $5.40 |
| 0625 | Fabric formed concrete riprap (0920-530100) | SY | 26,500 | $115.00 | $82.00 | $88.00 | $100.00 | $116.04 | $103.31 |
| 0630 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0635 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 15 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 0640 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 |
| 0645 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0650 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $21,511 | $21,511 | $21,511 | $21,511 | $21,511 | $21,511 |
| 0655 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 85 | $642.61 | $585.00 | $650.00 | $505.25 | $600.00 | $594.00 |
| 0660 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 16 | $3,078.06 | $1,890.00 | $3,100.00 | $1,530.00 | $2,160.00 | $1,614.60 |
| 0665 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 1 | $3,186.06 | $2,600.00 | $3,200.00 | $1,685.00 | $2,280.00 | $1,890.00 |
| 0670 | Single column ground sign assembly, relocate (0700-1500) | EACH | 14 | $594.01 | $455.00 | $600.00 | $255.20 | $360.00 | $270.00 |
| 0675 | Single column ground sign assembly, remove (0700-1600) | EACH | 53 | $10.80 | $50.00 | $11.00 | $31.00 | $180.00 | $32.40 |
| 0680 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 1 | $7,074.13 | $6,500.00 | $7,200.00 | $4,670.00 | $6,720.00 | $5,265.00 |
| 0685 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 5 | $4,266.08 | $7,500.00 | $4,300.00 | $7,040.00 | $7,320.00 | $7,554.60 |
| 0690 | Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115) | EACH | 4 | $10,638 | $9,900.00 | $11,000 | $9,135.00 | $9,840.00 | $9,666.00 |
| 0695 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 8 | $540.01 | $1,200.00 | $550.00 | $770.00 | $900.00 | $810.00 |
| 0700 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 7 | $1,103.78 | $1,090.00 | $550.00 | $1,050.00 | $600.00 | $1,103.76 |
| 0705 | Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205) | EACH | 5 | $4,409.72 | $5,100.00 | $3,000.00 | $4,170.00 | $5,040.00 | $4,409.64 |
| 0710 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 11 | $405.01 | $170.00 | $410.00 | $410.00 | $120.00 | $432.54 |
| 0715 | Sign panel, remove, 51-100 SF (0700-3605) | EACH | 5 | $453.61 | $800.00 | $460.00 | $890.00 | $1,200.00 | $936.90 |
| 0720 | Overhead static sign furnish & install, cantilever, 50 FT (0700-4114) | EACH | 1 | $327,845 | $232,000 | $280,000 | $240,000 | $264,000 | $327,838 |
| 0725 | Overhead static sign shallow foundation removal, cantilever (0700-4611) | EACH | 1 | $10,908 | $9,700.00 | $4,000.00 | $9,200.00 | $19,800 | $10,908 |
| 0730 | Front access dynamic message sign, furnish & install- W/UPS, full color, 101-200 SF (0700-8136) | EACH | 1 | $171,008 | $152,700 | $137,000 | $112,000 | $149,533 | $171,005 |
| 0735 | DMS support structure, cantilever, 31-40 FT (0700-10123) | EACH | 1 | $311,991 | $202,000 | $250,000 | $230,000 | $270,000 | $311,985 |
| 0740 | DMS support structure, (0700-10600) | EACH | 1 | $11,232 | $9,700.00 | $4,000.00 | $12,245 | $14,400 | $11,232 |
| 0745 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 50 | $129.60 | $125.00 | $130.00 | $103.00 | $126.00 | $10.80 |
| 0750 | Tubular marker, 36" yellow (0704-1-4) | EACH | 22 | $102.60 | $230.00 | $105.00 | $240.00 | $162.00 | $297.00 |
| 0755 | Raised pavement marker, type B (0706-1-3) | EACH | 2,519 | $5.40 | $5.00 | $6.00 | $4.30 | $6.00 | $4.32 |
| 0760 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 163 | $2.16 | $10.00 | $3.00 | $5.40 | $2.40 | $5.40 |
| 0765 | Painted pavement markings, surface (0710-90) | LS | 1 | $61,406 | $60,910 | $65,000 | $80,655 | $68,228 | $81,199 |
| 0770 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 4,728 | $3.24 | $4.00 | $3.50 | $3.40 | $3.60 | $3.38 |
| 0775 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 116 | $4.32 | $5.00 | $4.50 | $5.05 | $4.80 | $5.08 |
| 0780 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,604 | $5.40 | $7.00 | $5.50 | $6.80 | $6.00 | $6.76 |
| 0785 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.47 | $2,484.05 | $4,500.00 | $2,500.00 | $2,460.00 | $2,760.00 | $2,484.00 |
| 0790 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 10 | $129.60 | $228.00 | $130.00 | $70.00 | $144.00 | $70.20 |
| 0795 | Thermoplastic, standard, arrow (0711-11170) | EACH | 166 | $86.40 | $91.00 | $85.00 | $65.00 | $96.00 | $64.80 |
| 0800 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 67 | $3.24 | $7.00 | $4.00 | $4.60 | $3.60 | $4.59 |
| 0805 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.28 | $6,843.01 | $4,600.00 | $7,000.00 | $2,470.00 | $7,603.20 | $2,484.00 |
| 0810 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 3,001 | $20.52 | $18.00 | $21.00 | $18.00 | $22.80 | $17.18 |
| 0815 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 41 | $280.81 | $504.00 | $290.00 | $225.00 | $312.00 | $223.56 |
| 0820 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 17 | $162.00 | $126.00 | $160.00 | $95.00 | $180.00 | $92.88 |
| 0825 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 8.95 | $6,843.01 | $5,300.00 | $7,000.00 | $5,220.00 | $7,603.20 | $5,254.20 |
| 0830 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.07 | $7,128.13 | $5,900.00 | $7,200.00 | $6,055.00 | $7,920.00 | $7,005.94 |
| 0835 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 6.81 | $2,484.05 | $3,554.00 | $2,500.00 | $1,305.00 | $2,760.00 | $1,314.36 |
| 0840 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 3.49 | $6,843.01 | $5,200.00 | $7,000.00 | $5,215.00 | $7,603.20 | $5,254.20 |
| 0845 | Green-colored pavement markings, bike lane (0714-10) | SF | 3,098 | $10.80 | $13.00 | $11.00 | $9.00 | $12.00 | $8.82 |
| 0850 | Conduit, furnish & install, open trench (0630-2-11) | LF | 11,795 | $10.80 | $33.00 | $32.00 | $10.25 | $43.56 | $10.80 |
| 0855 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 4,274 | $32.40 | $47.00 | $32.00 | $31.00 | $43.56 | $32.40 |
| 0860 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 95 | $1,663.23 | $2,301.00 | $1,380.00 | $1,575.00 | $1,534.92 | $1,663.20 |
| 0865 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 3 | $6,244.14 | $8,400.00 | $8,100.00 | $5,900.00 | $9,086.40 | $6,244.02 |
| 0870 | Electrical service wire, & install (0639-2-1) | LF | 180 | $10.80 | $18.92 | $12.00 | $10.25 | $13.08 | $10.80 |
| 0875 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 3 | $3,278.94 | $2,862.00 | $2,900.00 | $3,100.00 | $3,146.76 | $3,278.88 |
| 0880 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 51,098 | $4.86 | $7.00 | $4.70 | $4.60 | $5.28 | $4.86 |
| 0885 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 6,229 | $0.32 | $1.40 | $0.11 | $0.35 | $0.12 | $0.32 |
| 0890 | Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51) | EACH | 2 | $213.84 | $747.00 | $200.00 | $202.05 | $219.00 | $213.84 |
| 0895 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 2 | $1,955.92 | $1,777.00 | $1,400.00 | $1,850.00 | $1,547.04 | $1,955.88 |
| 0900 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 15' arm length (0715-61452) | EACH | 19 | $8,904.77 | $13,400 | $7,900.00 | $8,420.00 | $8,805.60 | $8,907.84 |
| 0905 | Light pole complete, F&I, standard pole special foundation, 45' mounting height, 15' arm length (0715-62452) | EACH | 49 | $12,130 | $13,000 | $9,600.00 | $11,465 | $10,697 | $12,129 |
| 0910 | Light pole complete, F&I, utility conflict pole special foundation, 45' mounting height, 16' arm length (0715-66466) | EACH | 13 | $13,425 | $17,000 | $13,000 | $12,670 | $14,680 | $13,425 |
| 0915 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 52 | $683.11 | $2,900.00 | $590.00 | $650.00 | $656.76 | $683.10 |
| 0920 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 81 | $984.98 | $1,300.00 | $750.00 | $935.00 | $839.76 | $984.96 |
| 0925 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,289 | $10.80 | $32.00 | $57.00 | $10.25 | $63.60 | $10.80 |
| 0930 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,674 | $49.14 | $59.00 | $57.00 | $46.50 | $63.60 | $49.14 |
| 0935 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 4 | $13,538 | $11,200 | $9,800.00 | $12,800 | $10,884 | $13,538 |
| 0940 | Signal cable- repair/replace/other, furnish & install (0632-7-2) | LF | 60 | $11.77 | $20.00 | $12.00 | $11.15 | $13.08 | $11.77 |
| 0945 | Signal cable, remove- intersection (0632-7-6) | PI | 3 | $1,866.27 | $3,800.00 | $800.00 | $1,765.00 | $875.64 | $1,866.24 |
| 0950 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 1,050 | $4.21 | $4.80 | $5.00 | $4.00 | $5.40 | $4.21 |
| 0955 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 3 | $1,734.51 | $2,111.00 | $2,000.00 | $1,640.00 | $2,318.16 | $1,734.48 |
| 0960 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 3 | $63.72 | $70.00 | $70.00 | $60.25 | $76.08 | $63.72 |
| 0965 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 3 | $106.38 | $117.00 | $120.00 | $100.55 | $129.24 | $106.38 |
| 0970 | Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15) | EACH | 3 | $2,222.14 | $2,600.00 | $2,600.00 | $2,100.00 | $2,941.44 | $2,222.10 |
| 0975 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 94 | $1,663.23 | $2,000.00 | $1,300.00 | $1,575.00 | $1,534.92 | $1,663.20 |
| 0980 | Pull & splice box, install (0635-2-30) | EACH | 4 | $1,098.92 | $1,662.00 | $1,000.00 | $1,040.00 | $1,116.84 | $1,098.90 |
| 0985 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 3 | $6,040.01 | $7,070.00 | $9,000.00 | $5,710.00 | $10,068 | $6,039.90 |
| 0990 | Electrical service wire, & install (0639-2-1) | LF | 260 | $10.80 | $11.25 | $12.00 | $10.25 | $13.08 | $10.80 |
| 0995 | Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60) | EACH | 3 | $801.91 | $747.00 | $590.00 | $758.00 | $656.76 | $801.90 |
| 1000 | Prestressed concrete pole, type P-II pedestal (0641-2-11) | EACH | 1 | $2,208.42 | $2,680.00 | $2,700.00 | $2,090.00 | $3,065.40 | $2,208.38 |
| 1005 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $3,555.97 | $3,920.00 | $2,700.00 | $3,360.00 | $3,065.40 | $3,555.90 |
| 1010 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 3 | $1,176.14 | $620.00 | $600.00 | $1,115.00 | $656.76 | $1,176.12 |
| 1015 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 4 | $10,026 | $3,877.00 | $1,600.00 | $8,455.00 | $1,751.16 | $8,945.64 |
| 1020 | Aluminum signals pole, (0646-1-11) | EACH | 26 | $3,223.86 | $3,410.00 | $2,300.00 | $3,050.00 | $2,556.60 | $3,223.80 |
| 1025 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 4 | $2,773.49 | $3,017.00 | $2,200.00 | $2,625.00 | $2,524.08 | $2,773.44 |
| 1030 | Aluminum signals pole, remove (0646-1-60) | EACH | 11 | $288.37 | $864.00 | $590.00 | $275.00 | $656.76 | $288.36 |
| 1035 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 3 | $66,251 | $70,000 | $72,000 | $62,595 | $77,090 | $66,250 |
| 1040 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 4 | $81,813 | $81,886 | $82,000 | $77,300 | $89,309 | $81,811 |
| 1045 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 1 | $85,342 | $84,480 | $85,000 | $80,650 | $92,279 | $85,341 |
| 1050 | Steel mast arm assembly, and install, double arm 70'-70' (0649-21-20) | EACH | 1 | $113,655 | $114,500 | $115,000 | $108,000 | $125,931 | $113,653 |
| 1055 | Steel mast arm assembly, and install, single arm 78' (0649-21-21) | EACH | 1 | $104,378 | $101,605 | $100,000 | $99,000 | $109,770 | $104,376 |
| 1060 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 2 | $8,561.86 | $3,200.00 | $3,000.00 | $8,090.00 | $3,283.44 | $8,561.70 |
| 1065 | Steel mast arm assembly, remove, deep foundation- bolt on attachment (0649-26-5) | EACH | 3 | $3,424.74 | $5,500.00 | $3,500.00 | $3,300.00 | $3,940.08 | $3,424.68 |
| 1070 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 27 | $2,090.38 | $2,060.00 | $1,400.00 | $1,980.00 | $1,555.08 | $2,090.34 |
| 1075 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 6 | $2,453.27 | $2,560.00 | $1,800.00 | $2,320.00 | $2,023.80 | $2,453.22 |
| 1080 | Vehicular traffic signal, furnish & install aluminum, 5 section straight, 1 way (0650-1-18) | AS | 1 | $2,830.19 | $2,800.00 | $2,100.00 | $2,675.00 | $2,377.92 | $2,830.14 |
| 1085 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- black with reflect border (0650-2102) | EACH | 27 | $659.89 | $1,230.00 | $490.00 | $625.00 | $544.20 | $659.88 |
| 1090 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 24 | $1,187.48 | $1,300.00 | $750.00 | $1,125.00 | $837.00 | $1,187.46 |
| 1095 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 6 | $1,775.01 | $2,550.00 | $1,600.00 | $1,680.00 | $1,799.52 | $1,774.98 |
| 1100 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 8 | $193.32 | $467.00 | $100.00 | $185.00 | $109.56 | $193.32 |
| 1105 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 4 | $34,044 | $6,980.00 | $3,400.00 | $32,165 | $3,817.80 | $34,043 |
| 1110 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 15 | $6,543.30 | $16,000 | $10,900 | $6,185.00 | $12,123 | $6,543.18 |
| 1115 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 35 | $576.19 | $720.00 | $350.00 | $545.00 | $391.32 | $576.18 |
| 1120 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 13 | $81.00 | $280.00 | $100.00 | $80.00 | $109.56 | $81.00 |
| 1125 | Traffic controller assembly, F&I, NEMA W/standard lock (0670-5160) | AS | 3 | $52,901 | $54,000 | $51,000 | $55,000 | $57,939 | $52,899 |
| 1130 | Traffic controller assembly, remove controller with (0670-5600) | AS | 3 | $1,639.47 | $2,900.00 | $800.00 | $1,550.00 | $875.64 | $1,639.44 |
| 1135 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 1 | $5,913.11 | $6,900.00 | $7,200.00 | $5,590.00 | $8,006.28 | $5,913.00 |
| 1140 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 3 | $8,174.13 | $9,200.00 | $9,100.00 | $7,725.00 | $10,131 | $8,173.98 |
| 1145 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 12 | $3,938.83 | $4,900.00 | $3,300.00 | $3,725.00 | $3,746.04 | $3,938.76 |
| 1150 | Relocate trees and <14' of clear trunk, sabal palm only (0581-1-7) | EACH | 3 | $1,188.02 | $1,500.00 | $1,300.00 | $1,525.00 | $2,040.00 | $853.70 |
| 1155 | Relocate trees and palms, >=14' of clear trunk, sabal palm only (0581-1-8) | EACH | 5 | $1,080.02 | $1,500.00 | $1,400.00 | $1,525.00 | $2,280.00 | $1,024.44 |
| 1160 | Relocate trees and palms, 6.1" to 8.0" DBH (0581-1330) | EACH | 1 | $2,160.04 | $15,200 | $1,700.00 | $15,300 | $3,240.00 | $5,122.18 |
| 1165 | Relocate trees and palms, 8.1" to 14.0" DBH (0581-1340) | EACH | 1 | $2,700.05 | $25,400 | $3,800.00 | $25,400 | $4,800.00 | $8,536.97 |
| 1170 | Utility pipe,plug & place out of service, 50" or larger (1050-18006) | LF | 700 | $81.00 | $230.00 | $0.01 | $510.00 | $27.60 | $89.74 |
| 1175 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 12" (1050-31212) | LF | 20 | $195.42 | $310.00 | $580.00 | $260.00 | $696.00 | $542.08 |
| 1180 | Utility pipe- high density polyethylene, furnish & install, water/sewer, 14" (1050-42214) | LF | 720 | $271.57 | $135.00 | $470.00 | $355.00 | $564.00 | $69.55 |
| 1185 | Utility fittings for PE pipe, furnish & install, union, 14" (1055-41414) | EACH | 2 | $1,642.98 | $2,084.00 | $12,000 | $3,600.00 | $14,400 | $2,352.24 |
| 1190 | Utility fittings, ductile iron, furnish & install elbow, (1055-51112) | EACH | 2 | $4,465.72 | $4,200.00 | $8,000.00 | $3,600.00 | $9,600.00 | $4,004.05 |
| 1195 | Utility fittings, ductile iron, furnish & install elbow, (1055-51114) | EACH | 2 | $4,459.87 | $4,200.00 | $12,000 | $10,250 | $14,400 | $1,168.55 |
| 1200 | Utility fittings, ductile iron, furnish & install reducer, 14" (1055-51314) | EACH | 2 | $3,973.35 | $4,000.00 | $11,000 | $5,000.00 | $13,200 | $3,954.57 |
| 1205 | Utility fittings, ductile iron, furnish & install, 12" (1055-51512) | EACH | 2 | $2,082.80 | $3,000.00 | $8,000.00 | $5,000.00 | $9,600.00 | $2,292.05 |
| 1210 | Utility structure, below ground, F&I, water/sewer, 0 - 80 FT3, 0 - 6' (1060-11211) | EACH | 1 | $8,794.03 | $9,100.00 | $14,000 | $8,100.00 | $16,800 | $6,725.15 |
| 1215 | Utility fixture, valve/meter box, furnish & install, 12" (1080-21112) | EACH | 2 | $915.84 | $6,000.00 | $2,000.00 | $1,600.00 | $2,400.00 | $3,592.63 |
| 1220 | Utility fixture- tapping saddle/sleeve, furnish & 12" (1080-23112) | EACH | 2 | $7,533.40 | $2,000.00 | $17,000 | $15,200 | $20,400 | $9,288.52 |
| 1225 | Utility fixture, valve assembly, furnish and install, 12" (1080-24112) | EACH | 2 | $17,529 | $2,000.00 | $14,000 | $6,600.00 | $16,800 | $12,083 |
| 1230 | Utility fixture, vac/air furnish & install 2" (1080-26102) | EACH | 1 | $12,159 | $10,000 | $15,000 | $6,600.00 | $18,000 | $3,175.50 |
| 1235 | Utility fixture- line stop assembly, furnish and install, (1080-27112) | EACH | 2 | $31,524 | $4,000.00 | $22,000 | $49,000 | $26,400 | $10,800 |
| 1240 | Utility fixture, plug valve, furnish and install 12" (1080-33112) | EACH | 2 | $10,677 | $12,000 | $20,000 | $15,200 | $24,000 | $12,071 |
| 1245 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 1.75 | $3,780.07 | $4,200.00 | $3,900.00 | $3,600.00 | $4,368.24 | $3,780.00 |
| 1250 | Itsfm location documentation- intersection (0611-2-1) | EACH | 5 | $2,669.81 | $4,200.00 | $3,100.00 | $2,600.00 | $3,502.44 | $2,669.76 |
| 1255 | Itsfm location documentation- ITS site (0611-2-2) | EACH | 4 | $2,343.10 | $2,500.00 | $2,400.00 | $2,300.00 | $2,769.24 | $2,343.06 |
| 1260 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,385 | $49.14 | $50.00 | $46.00 | $50.00 | $51.48 | $49.14 |
| 1265 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 150 | $52.38 | $62.00 | $109.00 | $50.00 | $124.92 | $52.38 |
| 1270 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 1,735 | $4.32 | $5.00 | $4.90 | $4.15 | $5.52 | $4.32 |
| 1275 | Fiber optic cable, F&I, underground,49-96 fibers (0633-1123) | LF | 4,500 | $6.37 | $6.00 | $5.50 | $6.10 | $6.24 | $6.37 |
| 1280 | Fiber optic cable, remove, underground (0633-1620) | LF | 3,335 | $1.40 | $1.40 | $1.50 | $1.35 | $1.68 | $1.40 |
| 1285 | Fiber optic connection, install, splice (0633-2-31) | EACH | 12 | $59.40 | $63.00 | $62.00 | $56.50 | $70.32 | $59.40 |
| 1290 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 4 | $1,811.73 | $2,200.00 | $2,100.00 | $1,750.00 | $2,379.12 | $1,811.70 |
| 1295 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 4 | $65.34 | $70.00 | $70.00 | $65.00 | $78.12 | $65.34 |
| 1300 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 3 | $70.20 | $62.00 | $63.00 | $67.00 | $70.32 | $70.20 |
| 1305 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 3 | $106.38 | $117.00 | $120.00 | $100.60 | $132.72 | $106.38 |
| 1310 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 4 | $2,298.82 | $2,700.00 | $2,600.00 | $2,175.00 | $3,018.84 | $2,298.78 |
| 1315 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 3 | $135.00 | $138.00 | $140.00 | $130.00 | $156.12 | $135.00 |
| 1320 | Fiber optic cable locator (0633-6) | DA | 1,064 | $365.05 | $160.00 | $348.00 | $345.00 | $390.12 | $365.04 |
| 1325 | Multi-conductor cable, remove (0633-8-6) | LF | 650 | $1.40 | $2.80 | $1.00 | $1.40 | $0.72 | $1.40 |
| 1330 | Multi-conductor cable, furnish & install, cat 6 (0633-8-11) | LF | 705 | $6.91 | $7.00 | $4.00 | $6.60 | $4.56 | $6.91 |
| 1335 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 21 | $1,663.23 | $763.00 | $1,600.00 | $1,575.00 | $1,875.48 | $1,663.20 |
| 1340 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 14 | $3,101.82 | $3,114.00 | $2,900.00 | $3,000.00 | $3,402.48 | $3,101.76 |
| 1345 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 3 | $5,394.16 | $6,532.00 | $6,300.00 | $5,100.00 | $7,279.20 | $5,394.06 |
| 1350 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 3 | $8,701.18 | $9,755.00 | $8,700.00 | $8,300.00 | $9,937.68 | $8,701.02 |
| 1355 | Electrical service wire, & install (0639-2-1) | LF | 1,080 | $15.66 | $33.00 | $21.00 | $15.00 | $23.76 | $15.66 |
| 1360 | Electrical service wire, (0639-2-6) | LF | 1,080 | $1.08 | $1.80 | $1.00 | $1.05 | $0.24 | $1.08 |
| 1365 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 7 | $4,916.79 | $2,000.00 | $3,800.00 | $5,000.00 | $4,450.92 | $4,916.70 |
| 1370 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 3 | $3,148.26 | $2,580.00 | $2,800.00 | $3,000.00 | $3,295.80 | $3,148.20 |
| 1375 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 3 | $1,306.82 | $1,440.00 | $600.00 | $1,500.00 | $730.20 | $1,306.80 |
| 1380 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 1 | $10,936 | $962.00 | $21,000 | $10,400 | $23,401 | $10,936 |
| 1385 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 1 | $13,593 | $10,300 | $20,800 | $13,000 | $23,401 | $13,593 |
| 1390 | ITS cabinet, furnish & install, pole mount with sunshield, 24" W X 46" H X 22" D (0676-2122) | EACH | 1 | $8,897.21 | $9,980.00 | $8,500.00 | $8,500.00 | $9,847.56 | $8,897.04 |
| 1395 | ITS cabinet, furnish & install, base mount with sunshield, 24" W X 46" H X 22" D (0676-2142) | EACH | 1 | $10,064 | $17,200 | $13,500 | $9,600.00 | $15,299 | $10,064 |
| 1400 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 2 | $9,066.77 | $12,500 | $19,000 | $8,600.00 | $22,009 | $9,066.60 |
| 1405 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 4 | $4,791.51 | $35,000 | $15,500 | $4,600.00 | $17,409 | $4,791.42 |
| 1410 | Device server, furnish & install (0684-2-1) | EACH | 2 | $1,128.62 | $1,200.00 | $4,900.00 | $1,200.00 | $5,413.44 | $1,128.60 |
| 1415 | Uninterruptible power supply, furnish and install, line interactive (0685-1-11) | EACH | 3 | $8,389.06 | $13,500 | $4,000.00 | $8,000.00 | $4,505.04 | $8,388.90 |
| 1420 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 3 | $1,437.51 | $1,196.00 | $1,100.00 | $1,500.00 | $1,228.32 | $1,438.02 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of August 27, 2025. Compiled by Mirage Metrics.