Asphalt Group, Inc.: FDOT bid record
Asphalt Group, Inc. submitted 67 bids on Florida DOT contracts in the data, from 24 APR 2019 to 28 OCT 2026, and was the low bidder on 2 of them (3%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $15,255,144
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 1 | 0 | 0% |
| 2020 | 7 | 1 | 14% |
| 2021 | 14 | 0 | 0% |
| 2022 | 12 | 1 | 8% |
| 2023 | 10 | 0 | 0% |
| 2024 | 11 | 0 | 0% |
| 2025 | 5 | 0 | 0% |
| 2026 | 7 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 6 | 33 | 1 | 3% |
| District 4 | 30 | 1 | 3% |
| District 1 | 4 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Work zone sign | 0102-60 | ED | 66 | 51 (77%) | $0.19 | $0.25 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 82 | 50 (61%) | $3.80 | $5.00 |
| Portable changeable message sign, temporary | 0102-99 | ED | 67 | 49 (73%) | $9.00 | $12.00 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 138 | 39 (28%) | $1,411.00 | $1,150.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 61 | 39 (64%) | $5.00 | $5.90 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 67 | 36 (54%) | $0.09 | $0.13 |
| Type III barricade | 0102-115 | ED | 60 | 34 (57%) | $0.25 | $0.34 |
| Thermoplastic, standard, solid, 24" for stop line and crosswalk | 0711-11125 | LF | 62 | 33 (53%) | $4.00 | $6.09 |
| Performance turf, sod | 0570-1-2 | SY | 63 | 32 (51%) | $3.00 | $5.00 |
| Painted pavement markings, standard, white, solid, 6" | 0710-11101 | GM | 63 | 32 (51%) | $999.00 | $1,350.00 |
| Painted pavement markings, standard, yellow, solid, 6" | 0710-11201 | GM | 61 | 31 (51%) | $999.00 | $1,350.00 |
| Thermoplastic, standard-other surfaces, white, solid, 6" | 0711-16101 | GM | 56 | 31 (55%) | $4,652.00 | $5,220.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| General Asphalt Company, LLC | 51 | 40 of 51 |
| Ranger Construction Industries, Inc. | 43 | 19 of 43 |
| Ohla USA Inc | 35 | 29 of 35 |
| Halley Engineering Contractors, Inc. | 29 | 19 of 29 |
| Weekley Asphalt Paving, Inc. | 24 | 18 of 24 |
| Horizon Contractors, Inc. | 17 | 9 of 17 |
| The Stout Group LLC | 17 | 12 of 17 |
| Ohl USA Inc | 16 | 10 of 16 |
| Lead Engineering Contractors, LLC | 16 | 10 of 16 |
| Roadway Construction, LLC | 15 | 8 of 15 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T4765 | District 4 | SR 816 (OAKLAND PARK BLVD) FROM ROCK ISLAND RD TO E OF NW 31 AVE | 5 of 6 | $8,567,164 | +13% |
| 30 SEP 2026 | T6593 | District 6 | SR 5 (US 1 / OVERSEAS HWY) FROM W OF VENETIAN BLVD TO EXECUTIVE BAY | 2 of 5 | $3,425,838 | +15% |
| 29 JUL 2026 | T6595 | District 6 | SR 985 (SW 107 AVE) FROM SR 94 (SW 88 ST) TO N OF SW 56 ST | 10 of 12 | $5,069,430 | +16% |
| 20 MAY 2026 | T4666 | District 4 | SR 9 (I-95) AT CR 809A (NORTHLAKE BLVD) | 7 of 8 | $72,083,180 | +32% |
| 25 MAR 2026 | T4740 | District 4 | SR 5 (US 1) FROM CAMINO REAL TO NE 8TH ST (MIZNER BLVD) | 7 of 9 | $7,072,601 | +11% |
| 25 MAR 2026 | T6589 | District 6 | SR 90 (US 41/SW 7TH ST) FROM E OF SW 27 AVE TO BRICKELL AVE | 4 of 6 | $13,794,856 | +21% |
| 25 MAR 2026 | T6591 | District 6 | SR 25 (US 27 OKEECHOBEE RD) AND SR 9 (NW 27 AVE) FROM... | 6 of 7 | $7,863,501 | +24% |
| 03 DEC 2025 | T6615 | District 6 | SR 5 (US 1 / BISCAYNE BLVD) FROM S OF NE 38TH ST TO NE 61... | 8 of 8 | $7,863,373 | +25% |
| 27 AUG 2025 | T4688 | District 4 | SR 817 (UNIVERSITY DR) FROM N OF SR 824 (PEMBROKE RD) TO N.. | 7 of 7 | $56,846,796 | +33% |
| 30 JUL 2025 | T4736 | District 4 | SR 27 (US 27) AT I-75/US 27 INTERCHANGE | 7 of 7 | $28,681,335 | +37% |
| 30 APR 2025 | T6603 | District 6 | SR 5 (US 1 / N ROOSEVELT BLVD) FROM N OF EISENHOWER DR TO... | 4 of 4 | $9,323,020 | +34% |
| 26 FEB 2025 | T4693 | District 4 | SR 7 (US 441) FROM N OF GLADES RD TO N OF BRIDGE BROOK DR | 6 of 6 | $12,778,094 | +34% |
| 30 OCT 2024 | T6604 | District 6 | SR 860 (MIAMI GARDENS DR) FROM W OF NW 27 AVE TO W OF NW 2ND | 4 of 4 | $12,989,767 | +37% |
| 28 AUG 2024 | T4682 | District 4 | SR 7 (US 441) FROM S OF SR 848 (STIRLING RD) TO N OF ORAN... | 7 of 7 | $11,979,903 | +41% |
| 12 JUN 2024 | T4692 | District 4 | SR 870 (COMMERCIAL BLVD) FROM SR 845 (POWERLINE RD) TO SR... | 3 of 3 | $33,239,861 | +29% |
| 22 MAY 2024 | T1865 | District 1 | SR 82 FROM HENDRY CO LINE TO GATOR SLOUGH LN | 3 of 3 | $62,880,621 | +21% |
| 22 MAY 2024 | T4655 | District 4 | SR 806 (ATLANTIC AVE) FROM W OF SR 7 (US 441) TO SR 91 (FL.. | 4 of 4 | $31,914,970 | +23% |
| 22 MAY 2024 | T6566 | District 6 | SR 932 (NW 103 ST / W 49 ST) FROM W OF NW 82 AVE TO E... | 6 of 6 | $9,774,848 | +18% |
| 15 MAY 2024 | T6539 | District 6 | SR 25 (OKEECHOBEE RD) AND SR 826 (PALMETTO EXPRESSWAY)... | 2 of 3 | $257,876,801 | +1.0% |
| 27 MAR 2024 | T4676 | District 4 | SR 93 (I-75/ ALLIGATOR ALLEY) FROM BROWARD/COLLIER CO... | 2 of 4 | $32,259,494 | +15% |
| 28 FEB 2024 | T6557 | District 6 | SR 5 (US 1) (S DIXIE HWY) FORM S OF SW 264 ST TO S OF SW... | 5 of 5 | $14,562,403 | +17% |
| 31 JAN 2024 | T4643 | District 4 | SR 700 (CONNORS HWY) FROM N OF 1ST ST TO W OF SR 80 | 5 of 5 | $24,885,676 | +40% |
| 31 JAN 2024 | T6581 | District 6 | SR 5 (US 1/OVERSEAS HWY) FROM MM 108.4 TO MM 112.8 | 2 of 3 | $20,377,867 | +8.0% |
| 06 DEC 2023 | T4662 | District 4 | NORTH SHORE DR FROM S OF CARVER CANAL TO N OF CARVER CANAL | 4 of 4 | $4,677,774 | +73% |
| 06 DEC 2023 | T6573 | District 6 | SR 976 (SW 40 ST/BIRD RD) FROM E OF SW 87 AVE TO W OF SR 826 | 8 of 9 | $10,450,960 | +32% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.