FDOT contract T6603 bid tabulation

SR 5 (US 1 / N ROOSEVELT BLVD) FROM N OF EISENHOWER DR TO... Let by Florida DOT on April 30, 2025, Monroe, District 6. 4 bids received; low bid $6,947,337 by General Asphalt Company, LLC.

Owner
Florida DOT
Letting
30 APR 2025
Pay items
104
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1General Asphalt Company, LLC$6,947,337Low
2The Stout Group LLC$8,217,024+18%
3Ranger Construction Industries, Inc.$8,886,609+28%
4Asphalt Group, Inc.$9,323,020+34%
FDOT contract T6603: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. General Asphalt Company, LLC2. The Stout Group LLC3. Ranger Construction Industries, Inc.4. Asphalt Group, Inc.
0005Mobilization (0101-1)LS1$1,000,000$820,000$875,000$900,000
0010Maintenance of traffic (0102-1)DA1$540,000$1,595,000$1,000,000$900,000
0015Traffic control officer (0102-14)HR1,272$1.18$70.00$116.00$110.00
0020Work zone sign (0102-60)ED10,860$0.53$0.25$0.34$0.28
0025Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED40,800$0.30$0.25$0.17$0.14
0030Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD12,684$0.14$0.25$0.18$0.15
0035Arrow board / advance warning arrow panel (0102-76)ED420$11.80$8.00$9.77$8.00
0040Portable changeable message sign, temporary (0102-99)ED1,256$23.60$20.00$19.55$16.00
0045Temporary signalization and maintenance, intersection (0102-104)ED3,600$10.62$22.20$17.70$9.00
0050Temporary traffic detection and maintenance, intersection (0102-107-1)ED3,600$10.62$22.20$17.70$9.00
0055Type III barricade (0102-115)ED4,156$0.65$0.25$0.43$0.35
0060Inlet protection system (0104-18)EACH153$206.50$300.00$300.00$120.00
0065Litter removal (0107-1)ACRE74.95$1.18$1.00$40.65$50.00
0070Mowing (0107-2)ACRE3.61$1.18$1.00$58.10$500.00
0075Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$1.18$30,000$14,530$5,000.00
0080Clearing & grubbing (0110-1-1)ACRE1$59,000$350,000$962,150$556,000
0085Removal of existing concrete (0110-4-10)SY955$100.30$40.00$84.30$250.00
0090Tree protection barrier (0110-21)LF250$11.80$21.00$12.20$8.00
0095Regular excavation (3-R projects only) (0120-71)LS1$4,130.00$9,000.00$3,413.00$130,000
0100Optional base, base group 11 (0285-711)SY39$177.00$400.00$141.50$250.00
0105Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY84,069$5.00$9.00$6.45$15.00
0110Superpave asphaltic conc, traffic C (0334-1-13)TN6$1,666.73$500.00$421.25$1,000.00
0115Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN9,251.50$255.02$250.00$306.55$350.00
0120Miscellaneous asphalt (0339-1)TN3.70$1,957.19$2,500.00$699.50$1,000.00
0125Manhole, adjust (0425-5)EACH25$2,124.00$1,200.00$3,052.00$500.00
0130Bullet rail, single rail (0515-4-1)LF9$472.00$350.00$274.75$225.00
0135Concrete curb & gutter, type E (0520-1-7)LF51$118.00$90.00$92.30$45.10
0140Concrete curb & gutter, type F (0520-1-10)LF818$118.00$90.00$89.20$39.65
0145Concrete curb, type D (0520-2-4)LF40$118.00$90.00$69.80$35.34
0150Shoulder concrete barrier, curb and gutter barrier (0521-72-43)LF23$885.00$850.00$550.00$419.40
0155Concrete sidewalk and driveways, 4" thick (0522-1)SY294$277.30$150.00$111.00$66.73
0160Concrete sidewalk and driveways, 6" thick (0522-2)SY500$300.90$210.00$119.25$78.52
0165Detectable warnings (0527-2)SF411$50.15$60.00$54.40$50.47
0170Guardrail -roadway, general/low speed TL-2 (0536-1-0)LF138$53.10$45.00$36.65$30.00
0175Pipe rail for guardrail (0536-6)LF94$44.84$40.00$30.50$25.00
0180Special guardrail post- post for shallow mount (0536-7-3)EACH3$413.00$850.00$671.50$550.00
0185Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-2 (0536-8111)EACH1$4,720.00$4,500.00$3,663.00$3,000.00
0190Guardrail end treatment- parallel approach terminal (0536-85-24)EACH1$6,490.00$6,500.00$5,250.00$3,000.00
0195Performance turf, sod (0570-1-2)SY54$23.60$50.00$68.10$25.00
0200Initial contingency amount, DO not bid (0999-25)LS1$73,254$73,254$73,254$73,254
0205Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH16$472.00$950.00$763.00$1,000.00
0210Single column ground sign assembly, relocate (0700-1500)EACH2$354.00$400.00$305.25$1,000.00
0215Single column ground sign assembly, remove (0700-1600)EACH9$59.00$150.00$91.60$300.00
0220Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH2$236.00$800.00$549.50$2,000.00
0225Sign panel, remove, UP to 12 SF (0700-3601)EACH2$35.40$150.00$91.60$300.00
0230Tubular marker, 36" white post (0704-1-3)EACH58$141.60$350.00$274.75$117.00
0235Tubular marker, 36" yellow (0704-1-4)EACH24$141.60$350.00$274.75$117.00
0240Raised pavement marker, type B (0706-1-3)EACH2,878$4.72$4.00$4.88$3.60
0245Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF103$5.90$4.00$6.10$3.15
0250Painted pavement markings, surface (0710-90)LS1$76,700$50,000$71,330$150,000
0255Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.17$7,080.00$6,000.00$8,137.00$6,120.00
0260Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF3,965$2.36$2.50$4.58$2.03
0265Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF283$3.54$5.00$6.87$3.00
0270Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF852$4.72$5.00$9.16$4.01
0275Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.06$2,950.00$5,000.00$3,249.00$3,991.00
0280Thermoplastic, standard, message or symbol (0711-11160)EACH37$212.40$200.00$110.00$180.00
0285Thermoplastic, standard, arrow (0711-11170)EACH90$94.40$150.00$75.70$135.00
0290Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF2,055$3.54$4.00$6.36$3.00
0295Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.22$2,950.00$4,000.00$3,280.00$3,991.00
0300Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF2,462$23.60$20.00$24.80$16.20
0305Thermoplastic, preformed, white, message (0711-14160)EACH106$472.00$500.00$519.00$495.00
0310Thermoplastic, preformed, color route shield (0711-14660)EACH13$3,540.00$3,000.00$2,673.00$2,880.00
0315Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM5.91$5,900.00$5,000.00$6,433.00$4,320.00
0320Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM4.12$2,950.00$3,000.00$1,610.00$2,295.00
0325Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.04$2,950.00$5,000.00$2,763.00$5,220.00
0330Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM5.40$5,900.00$5,000.00$6,044.00$4,320.00
0335Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM2.77$2,950.00$3,000.00$1,510.00$2,295.00
0340Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.08$17,700$60,000$64,710$59,000
0345Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.08$17,700$30,000$16,180$30,000
0350Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.17$17,700$50,000$64,330$43,750
0355Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.08$17,700$30,000$16,180$30,000
0360Conduit, furnish & install, directional bore (0630-2-12)LF1,515$59.00$50.00$85.20$50.00
0365Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH29$2,950.00$2,500.00$2,374.00$2,500.00
0370Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF5,327$7.08$4.00$4.94$6.00
0375Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF882$9.44$5.00$9.90$8.00
0380Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF1,395$2.36$1.00$1.78$2.00
0385Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH14$1,947.00$2,800.00$2,030.00$1,650.00
0390Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 10' arm length (0715-61121)EACH3$15,949$9,300.00$19,730$13,516
0395Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 12' arm length (0715-61242)EACH1$16,455$8,100.00$15,650$13,945
0400Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 10' arm length (0715-61321)EACH4$17,199$9,000.00$16,830$14,575
0405Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342)EACH1$18,384$9,000.00$16,960$15,580
0410Light pole complete, F&I, utility conflict pole special foundation, 35' mounting height, 16' arm length (0715-66266)EACH1$17,995$16,000$21,770$15,250
0415Pole cable distribution system, furnish and install alternate system, conventional (0715-500-11)EACH25$2,832.00$3,000.00$3,725.00$2,400.00
0420Conduit, furnish & install, directional bore (0630-2-12)LF1,349$59.00$70.00$98.80$50.00
0425Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI11$15,930$13,000$14,130$13,500
0430Signal cable, remove- intersection (0632-7-6)PI11$2,950.00$2,300.00$2,657.00$2,500.00
0435Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH100$2,950.00$2,500.00$2,374.00$2,500.00
0440Electrical service wire, & install (0639-2-1)LF228$11.80$11.00$9.50$10.00
0445Electrical service wire, (0639-2-6)LF228$2.36$2.00$2.66$2.00
0450Aluminum signals pole, (0646-1-11)EACH20$2,950.00$4,000.00$5,940.00$2,500.00
0455Aluminum signals pole, remove (0646-1-60)EACH12$590.00$300.00$2,480.00$500.00
0460Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS2$2,655.00$1,800.00$2,265.00$2,250.00
0465Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS2$3,363.00$2,300.00$2,863.00$2,280.00
0470Vehicular traffic signal, remove- poles to remain (0650-1-60)AS3$1,180.00$310.00$531.25$1,000.00
0475Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS15$2,537.00$1,200.00$1,223.00$2,150.00
0480Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS6$2,950.00$1,900.00$2,231.00$2,500.00
0485Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS11$590.00$200.00$354.25$500.00
0490Vehicle detection system- adjust/modify cabinet (0660-4-51)EACH10$2,242.00$2,200.00$1,236.00$1,900.00
0495Vehicle detection system- adjust/modify above ground equipment (0660-4-52)EACH10$2,832.00$3,100.00$1,590.00$2,400.00
0500Pedestrian detector, furnish & install, standard (0665-1-11)EACH44$885.00$540.00$536.50$750.00
0505Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH19$236.00$100.00$177.00$200.00
0510Sign panel, remove, UP to 12 SF (0700-3601)EACH7$177.00$150.00$354.25$150.00
0515Enhanced highway sign AC powered, F&I ground mount, blank out sign <12 SF (0700-141160)EACH1$10,856$13,000$15,350$9,200.00
0520Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360)EACH1$10,856$11,000$15,350$9,200.00
FDOT contract T6603: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of April 30, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy