| 0005 | Mobilization (0101-1) | LS | 1 | $1,000,000 | $820,000 | $875,000 | $900,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $540,000 | $1,595,000 | $1,000,000 | $900,000 |
| 0015 | Traffic control officer (0102-14) | HR | 1,272 | $1.18 | $70.00 | $116.00 | $110.00 |
| 0020 | Work zone sign (0102-60) | ED | 10,860 | $0.53 | $0.25 | $0.34 | $0.28 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 40,800 | $0.30 | $0.25 | $0.17 | $0.14 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 12,684 | $0.14 | $0.25 | $0.18 | $0.15 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 420 | $11.80 | $8.00 | $9.77 | $8.00 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 1,256 | $23.60 | $20.00 | $19.55 | $16.00 |
| 0045 | Temporary signalization and maintenance, intersection (0102-104) | ED | 3,600 | $10.62 | $22.20 | $17.70 | $9.00 |
| 0050 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 3,600 | $10.62 | $22.20 | $17.70 | $9.00 |
| 0055 | Type III barricade (0102-115) | ED | 4,156 | $0.65 | $0.25 | $0.43 | $0.35 |
| 0060 | Inlet protection system (0104-18) | EACH | 153 | $206.50 | $300.00 | $300.00 | $120.00 |
| 0065 | Litter removal (0107-1) | ACRE | 74.95 | $1.18 | $1.00 | $40.65 | $50.00 |
| 0070 | Mowing (0107-2) | ACRE | 3.61 | $1.18 | $1.00 | $58.10 | $500.00 |
| 0075 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1.18 | $30,000 | $14,530 | $5,000.00 |
| 0080 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $59,000 | $350,000 | $962,150 | $556,000 |
| 0085 | Removal of existing concrete (0110-4-10) | SY | 955 | $100.30 | $40.00 | $84.30 | $250.00 |
| 0090 | Tree protection barrier (0110-21) | LF | 250 | $11.80 | $21.00 | $12.20 | $8.00 |
| 0095 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $4,130.00 | $9,000.00 | $3,413.00 | $130,000 |
| 0100 | Optional base, base group 11 (0285-711) | SY | 39 | $177.00 | $400.00 | $141.50 | $250.00 |
| 0105 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 84,069 | $5.00 | $9.00 | $6.45 | $15.00 |
| 0110 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 6 | $1,666.73 | $500.00 | $421.25 | $1,000.00 |
| 0115 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 9,251.50 | $255.02 | $250.00 | $306.55 | $350.00 |
| 0120 | Miscellaneous asphalt (0339-1) | TN | 3.70 | $1,957.19 | $2,500.00 | $699.50 | $1,000.00 |
| 0125 | Manhole, adjust (0425-5) | EACH | 25 | $2,124.00 | $1,200.00 | $3,052.00 | $500.00 |
| 0130 | Bullet rail, single rail (0515-4-1) | LF | 9 | $472.00 | $350.00 | $274.75 | $225.00 |
| 0135 | Concrete curb & gutter, type E (0520-1-7) | LF | 51 | $118.00 | $90.00 | $92.30 | $45.10 |
| 0140 | Concrete curb & gutter, type F (0520-1-10) | LF | 818 | $118.00 | $90.00 | $89.20 | $39.65 |
| 0145 | Concrete curb, type D (0520-2-4) | LF | 40 | $118.00 | $90.00 | $69.80 | $35.34 |
| 0150 | Shoulder concrete barrier, curb and gutter barrier (0521-72-43) | LF | 23 | $885.00 | $850.00 | $550.00 | $419.40 |
| 0155 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 294 | $277.30 | $150.00 | $111.00 | $66.73 |
| 0160 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 500 | $300.90 | $210.00 | $119.25 | $78.52 |
| 0165 | Detectable warnings (0527-2) | SF | 411 | $50.15 | $60.00 | $54.40 | $50.47 |
| 0170 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 138 | $53.10 | $45.00 | $36.65 | $30.00 |
| 0175 | Pipe rail for guardrail (0536-6) | LF | 94 | $44.84 | $40.00 | $30.50 | $25.00 |
| 0180 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 3 | $413.00 | $850.00 | $671.50 | $550.00 |
| 0185 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-2 (0536-8111) | EACH | 1 | $4,720.00 | $4,500.00 | $3,663.00 | $3,000.00 |
| 0190 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $6,490.00 | $6,500.00 | $5,250.00 | $3,000.00 |
| 0195 | Performance turf, sod (0570-1-2) | SY | 54 | $23.60 | $50.00 | $68.10 | $25.00 |
| 0200 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $73,254 | $73,254 | $73,254 | $73,254 |
| 0205 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 16 | $472.00 | $950.00 | $763.00 | $1,000.00 |
| 0210 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $354.00 | $400.00 | $305.25 | $1,000.00 |
| 0215 | Single column ground sign assembly, remove (0700-1600) | EACH | 9 | $59.00 | $150.00 | $91.60 | $300.00 |
| 0220 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 2 | $236.00 | $800.00 | $549.50 | $2,000.00 |
| 0225 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 2 | $35.40 | $150.00 | $91.60 | $300.00 |
| 0230 | Tubular marker, 36" white post (0704-1-3) | EACH | 58 | $141.60 | $350.00 | $274.75 | $117.00 |
| 0235 | Tubular marker, 36" yellow (0704-1-4) | EACH | 24 | $141.60 | $350.00 | $274.75 | $117.00 |
| 0240 | Raised pavement marker, type B (0706-1-3) | EACH | 2,878 | $4.72 | $4.00 | $4.88 | $3.60 |
| 0245 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 103 | $5.90 | $4.00 | $6.10 | $3.15 |
| 0250 | Painted pavement markings, surface (0710-90) | LS | 1 | $76,700 | $50,000 | $71,330 | $150,000 |
| 0255 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.17 | $7,080.00 | $6,000.00 | $8,137.00 | $6,120.00 |
| 0260 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 3,965 | $2.36 | $2.50 | $4.58 | $2.03 |
| 0265 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 283 | $3.54 | $5.00 | $6.87 | $3.00 |
| 0270 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 852 | $4.72 | $5.00 | $9.16 | $4.01 |
| 0275 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.06 | $2,950.00 | $5,000.00 | $3,249.00 | $3,991.00 |
| 0280 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 37 | $212.40 | $200.00 | $110.00 | $180.00 |
| 0285 | Thermoplastic, standard, arrow (0711-11170) | EACH | 90 | $94.40 | $150.00 | $75.70 | $135.00 |
| 0290 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 2,055 | $3.54 | $4.00 | $6.36 | $3.00 |
| 0295 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.22 | $2,950.00 | $4,000.00 | $3,280.00 | $3,991.00 |
| 0300 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 2,462 | $23.60 | $20.00 | $24.80 | $16.20 |
| 0305 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 106 | $472.00 | $500.00 | $519.00 | $495.00 |
| 0310 | Thermoplastic, preformed, color route shield (0711-14660) | EACH | 13 | $3,540.00 | $3,000.00 | $2,673.00 | $2,880.00 |
| 0315 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 5.91 | $5,900.00 | $5,000.00 | $6,433.00 | $4,320.00 |
| 0320 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 4.12 | $2,950.00 | $3,000.00 | $1,610.00 | $2,295.00 |
| 0325 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.04 | $2,950.00 | $5,000.00 | $2,763.00 | $5,220.00 |
| 0330 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 5.40 | $5,900.00 | $5,000.00 | $6,044.00 | $4,320.00 |
| 0335 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 2.77 | $2,950.00 | $3,000.00 | $1,510.00 | $2,295.00 |
| 0340 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.08 | $17,700 | $60,000 | $64,710 | $59,000 |
| 0345 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.08 | $17,700 | $30,000 | $16,180 | $30,000 |
| 0350 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.17 | $17,700 | $50,000 | $64,330 | $43,750 |
| 0355 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.08 | $17,700 | $30,000 | $16,180 | $30,000 |
| 0360 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,515 | $59.00 | $50.00 | $85.20 | $50.00 |
| 0365 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 29 | $2,950.00 | $2,500.00 | $2,374.00 | $2,500.00 |
| 0370 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 5,327 | $7.08 | $4.00 | $4.94 | $6.00 |
| 0375 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 882 | $9.44 | $5.00 | $9.90 | $8.00 |
| 0380 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 1,395 | $2.36 | $1.00 | $1.78 | $2.00 |
| 0385 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 14 | $1,947.00 | $2,800.00 | $2,030.00 | $1,650.00 |
| 0390 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 10' arm length (0715-61121) | EACH | 3 | $15,949 | $9,300.00 | $19,730 | $13,516 |
| 0395 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 12' arm length (0715-61242) | EACH | 1 | $16,455 | $8,100.00 | $15,650 | $13,945 |
| 0400 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 10' arm length (0715-61321) | EACH | 4 | $17,199 | $9,000.00 | $16,830 | $14,575 |
| 0405 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342) | EACH | 1 | $18,384 | $9,000.00 | $16,960 | $15,580 |
| 0410 | Light pole complete, F&I, utility conflict pole special foundation, 35' mounting height, 16' arm length (0715-66266) | EACH | 1 | $17,995 | $16,000 | $21,770 | $15,250 |
| 0415 | Pole cable distribution system, furnish and install alternate system, conventional (0715-500-11) | EACH | 25 | $2,832.00 | $3,000.00 | $3,725.00 | $2,400.00 |
| 0420 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,349 | $59.00 | $70.00 | $98.80 | $50.00 |
| 0425 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 11 | $15,930 | $13,000 | $14,130 | $13,500 |
| 0430 | Signal cable, remove- intersection (0632-7-6) | PI | 11 | $2,950.00 | $2,300.00 | $2,657.00 | $2,500.00 |
| 0435 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 100 | $2,950.00 | $2,500.00 | $2,374.00 | $2,500.00 |
| 0440 | Electrical service wire, & install (0639-2-1) | LF | 228 | $11.80 | $11.00 | $9.50 | $10.00 |
| 0445 | Electrical service wire, (0639-2-6) | LF | 228 | $2.36 | $2.00 | $2.66 | $2.00 |
| 0450 | Aluminum signals pole, (0646-1-11) | EACH | 20 | $2,950.00 | $4,000.00 | $5,940.00 | $2,500.00 |
| 0455 | Aluminum signals pole, remove (0646-1-60) | EACH | 12 | $590.00 | $300.00 | $2,480.00 | $500.00 |
| 0460 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 2 | $2,655.00 | $1,800.00 | $2,265.00 | $2,250.00 |
| 0465 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 2 | $3,363.00 | $2,300.00 | $2,863.00 | $2,280.00 |
| 0470 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 3 | $1,180.00 | $310.00 | $531.25 | $1,000.00 |
| 0475 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 15 | $2,537.00 | $1,200.00 | $1,223.00 | $2,150.00 |
| 0480 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 6 | $2,950.00 | $1,900.00 | $2,231.00 | $2,500.00 |
| 0485 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 11 | $590.00 | $200.00 | $354.25 | $500.00 |
| 0490 | Vehicle detection system- adjust/modify cabinet (0660-4-51) | EACH | 10 | $2,242.00 | $2,200.00 | $1,236.00 | $1,900.00 |
| 0495 | Vehicle detection system- adjust/modify above ground equipment (0660-4-52) | EACH | 10 | $2,832.00 | $3,100.00 | $1,590.00 | $2,400.00 |
| 0500 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 44 | $885.00 | $540.00 | $536.50 | $750.00 |
| 0505 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 19 | $236.00 | $100.00 | $177.00 | $200.00 |
| 0510 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 7 | $177.00 | $150.00 | $354.25 | $150.00 |
| 0515 | Enhanced highway sign AC powered, F&I ground mount, blank out sign <12 SF (0700-141160) | EACH | 1 | $10,856 | $13,000 | $15,350 | $9,200.00 |
| 0520 | Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360) | EACH | 1 | $10,856 | $11,000 | $15,350 | $9,200.00 |