FDOT contract T4765 bid tabulation
SR 816 (OAKLAND PARK BLVD) FROM ROCK ISLAND RD TO E OF NW 31 AVE. Let by Florida DOT on October 28, 2026, Broward, District 4. 6 bids received; low bid $7,579,227 by General Asphalt Company, LLC.
- Owner
- Florida DOT
- Letting
- 28 OCT 2026
- Pay items
- 193
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | General Asphalt Company, LLC | $7,579,227 | Low |
| 2 | Ohla USA Inc | $7,801,449 | +3.0% |
| 3 | Weekley Asphalt Paving, Inc. | $8,158,412 | +8.0% |
| 4 | The Stout Group LLC | $8,432,226 | +11% |
| 5 | Asphalt Group, Inc. | $8,567,164 | +13% |
| 6 | Ranger Construction Industries, Inc. | $9,546,901 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. General Asphalt Company, LLC | 2. Ohla USA Inc | 3. Weekley Asphalt Paving, Inc. | 4. The Stout Group LLC | 5. Asphalt Group, Inc. | 6. Ranger Construction Industries, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges 860245 (0110-3) | SF | 1 | $26,400 | $50,000 | $52,225 | $26,400 | $2,333.13 | $159,091 |
| 0010 | Removal of existing structures/bridges 860246 (0110-3) | SF | 1 | $26,400 | $51,000 | $52,225 | $26,400 | $2,333.13 | $142,045 |
| 0015 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 480 | $77.00 | $83.74 | $89.00 | $200.00 | $58.33 | $73.85 |
| 0020 | Polymer nosing for bridge expansion joint (0458-2) | CF | 132 | $869.00 | $1,046.78 | $1,112.00 | $800.00 | $1,049.91 | $1,080.00 |
| 0025 | Galvanized steel sidewalk plate (0458-3-1) | LF | 60 | $352.00 | $450.12 | $478.00 | $150.00 | $373.30 | $454.55 |
| 0030 | Mobilization (0101-1) | LS | 1 | $5,000.00 | $153,000 | $21,450 | $420,000 | $75,000 | $825,709 |
| 0035 | Mobilization (0101-1) | LS | 1 | $369,000 | $627,000 | $192,900 | $420,000 | $680,000 | $118,656 |
| 0040 | Maintenance of traffic (0102-1) | DA | 1 | $5,000.00 | $5,000.00 | $68,663 | $115,000 | $58,328 | $350,000 |
| 0045 | Maintenance of traffic (0102-1) | DA | 1 | $382,000 | $173,500 | $389,085 | $115,000 | $349,970 | $121,894 |
| 0050 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $6,050.00 | $4,250.29 | $88,362 | $15,000 | $13,999 | $12,800 |
| 0055 | Traffic control officer (0102-14) | HR | 752 | $85.60 | $70.00 | $91.00 | $80.00 | $83.99 | $85.25 |
| 0060 | Work zone sign (0102-60) | ED | 36,662 | $0.20 | $0.22 | $0.19 | $0.19 | $0.22 | $0.20 |
| 0065 | Business sign (0102-61) | EACH | 4 | $48.15 | $51.16 | $37.00 | $45.00 | $43.16 | $51.15 |
| 0070 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 73,600 | $0.10 | $0.10 | $0.09 | $0.09 | $0.10 | $0.10 |
| 0075 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 12,075 | $0.05 | $0.06 | $0.05 | $0.05 | $0.06 | $0.05 |
| 0080 | Arrow board / advance warning arrow panel (0102-76) | ED | 886 | $5.35 | $5.68 | $5.00 | $5.00 | $5.83 | $5.70 |
| 0085 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 2,278 | $4.28 | $4.08 | $4.00 | $4.00 | $4.67 | $4.55 |
| 0090 | Portable changeable message sign, temporary (0102-99) | ED | 1,136 | $9.95 | $10.57 | $10.00 | $9.30 | $11.67 | $10.55 |
| 0095 | Temporary signalization and maintenance, intersection (0102-104) | ED | 3,960 | $2.14 | $2.04 | $2.00 | $5.00 | $17.50 | $5.35 |
| 0100 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 3,960 | $2.14 | $2.04 | $2.00 | $5.00 | $17.50 | $5.35 |
| 0105 | Existing ITS maintenance (0102-112) | DA | 360 | $160.50 | $0.01 | $100.00 | $90.00 | $174.98 | $225.00 |
| 0110 | Type III barricade (0102-115) | ED | 106 | $0.80 | $0.85 | $0.25 | $0.75 | $0.29 | $0.85 |
| 0115 | Inlet protection system (0104-18) | EACH | 79 | $155.15 | $170.00 | $22.50 | $100.00 | $128.32 | $187.50 |
| 0120 | Litter removal (0107-1) | ACRE | 244.27 | $11.00 | $80.00 | $25.00 | $0.01 | $0.01 | $46.25 |
| 0125 | Mowing (0107-2) | ACRE | 251.02 | $1.10 | $80.00 | $25.00 | $0.01 | $0.01 | $48.55 |
| 0130 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $8,800.00 | $14,580 | $35,000 | $13,500 | $11,082 | $54,231 |
| 0135 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $17,325 | $140,000 | $87,000 | $42,000 | $11,082 | $60,000 |
| 0140 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $8,800.00 | $14,250 | $8,143.00 | $1,000.00 | $11,082 | $55,000 |
| 0145 | Removal of existing concrete (0110-4-10) | SY | 3,034 | $31.46 | $22.20 | $39.00 | $25.00 | $28.58 | $23.85 |
| 0150 | Tree protection barrier (0110-21) | LF | 1,181 | $3.21 | $10.00 | $16.70 | $8.00 | $6.66 | $0.45 |
| 0155 | Tree root and branch pruning (0110-22) | EACH | 10 | $1,650.00 | $1,530.61 | $1,667.00 | $550.00 | $1,294.89 | $1,700.00 |
| 0160 | Tree removal (0110-23) | EACH | 4 | $3,300.00 | $3,061.23 | $1,900.00 | $650.00 | $1,405.71 | $1,700.00 |
| 0165 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $14,740 | $1.00 | $6,000.00 | $21,000 | $5,832.83 | $11,400 |
| 0170 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $26,158 | $1.00 | $14,000 | $80,000 | $3,383.04 | $11,400 |
| 0175 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $29,854 | $1.00 | $8,706.00 | $14,000 | $3,383.04 | $11,400 |
| 0180 | Type B stabilization (0160-4) | SY | 1,149 | $10.78 | $7.00 | $28.00 | $22.00 | $10.50 | $15.05 |
| 0185 | Optional base, base group 09 (0285-709) | SY | 773 | $54.70 | $140.00 | $57.61 | $28.00 | $67.72 | $81.80 |
| 0190 | Optional base, base group 11 (0285-711) | SY | 284 | $72.38 | $55.00 | $69.26 | $24.00 | $70.51 | $88.00 |
| 0195 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 118,889 | $4.07 | $3.80 | $4.00 | $3.75 | $4.74 | $4.35 |
| 0200 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 2,480 | $4.26 | $4.00 | $3.00 | $2.65 | $6.08 | $2.55 |
| 0205 | Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15) | SY | 770 | $11.66 | $9.00 | $5.00 | $4.15 | $5.25 | $7.50 |
| 0210 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 8,372.70 | $154.08 | $155.00 | $190.00 | $172.00 | $149.66 | $154.50 |
| 0215 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 8,457.70 | $169.57 | $160.00 | $210.00 | $209.00 | $156.31 | $190.35 |
| 0220 | Miscellaneous asphalt (0339-1) | TN | 6.40 | $1,877.59 | $548.20 | $300.00 | $300.00 | $291.64 | $586.05 |
| 0225 | Inlets, curb, type 9, <10' (0425-1201) | EACH | 1 | $14,190 | $11,224 | $15,000 | $10,375 | $9,157.54 | $12,500 |
| 0230 | Inlets, curb, type P-4, partial (0425-1345) | EACH | 2 | $5,500.00 | $10,816 | $9,500.00 | $6,620.97 | $8,165.96 | $6,020.00 |
| 0235 | Inlets, curb, type P-5, partial (0425-1355) | EACH | 2 | $6,050.00 | $9,438.78 | $9,500.00 | $6,067.24 | $9,682.50 | $5,260.00 |
| 0240 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 1 | $15,510 | $10,673 | $14,500 | $11,068 | $10,732 | $11,900 |
| 0245 | Manholes, P-7, <10' (0425-2-41) | EACH | 2 | $13,035 | $10,306 | $14,000 | $10,431 | $10,149 | $11,500 |
| 0250 | Manhole, adjust (0425-5) | EACH | 50 | $909.50 | $994.90 | $500.00 | $750.00 | $863.26 | $1,110.00 |
| 0255 | Valve boxes, adjust (0425-6) | EACH | 1 | $909.50 | $918.37 | $300.00 | $650.00 | $874.92 | $1,020.00 |
| 0260 | Pipe culvert, optional material, round, 15"SD (0430-174115) | LF | 8 | $398.75 | $128.57 | $470.00 | $1,000.00 | $163.32 | $143.20 |
| 0265 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 92 | $452.98 | $140.82 | $450.00 | $215.96 | $128.32 | $156.80 |
| 0270 | Concrete curb & gutter, type F (0520-1-10) | LF | 3,674 | $23.32 | $45.45 | $37.07 | $30.00 | $38.50 | $48.85 |
| 0275 | Concrete curb, type D (0520-2-4) | LF | 360 | $20.57 | $33.82 | $35.00 | $25.00 | $46.51 | $36.35 |
| 0280 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 190 | $31.90 | $78.22 | $84.65 | $75.00 | $80.46 | $84.10 |
| 0285 | Concrete traffic separator, special- variable width (0520-70) | SY | 25 | $66.55 | $141.64 | $96.80 | $85.00 | $192.48 | $152.25 |
| 0290 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 734 | $49.01 | $63.42 | $62.10 | $65.00 | $72.33 | $68.20 |
| 0295 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,614 | $59.20 | $97.25 | $74.98 | $75.00 | $90.99 | $104.55 |
| 0300 | Bus shelter pad- concrete (0522-4) | SY | 17 | $129.80 | $211.40 | $499.35 | $300.00 | $279.98 | $227.25 |
| 0305 | Detectable warnings (0527-2) | SF | 1,059 | $33.00 | $41.22 | $40.00 | $35.00 | $39.77 | $44.30 |
| 0310 | Guardrail -roadway, general (0536-1-1) | LF | 78 | $36.02 | $31.87 | $38.00 | $48.00 | $35.00 | $38.25 |
| 0315 | Guardrail removal (0536-73) | LF | 72 | $5.84 | $2.43 | $7.00 | $1.72 | $4.67 | $6.20 |
| 0320 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $3,819.29 | $4,457.76 | $4,000.00 | $3,160.75 | $3,149.73 | $4,060.00 |
| 0325 | Performance turf, sod (0570-1-2) | SY | 952 | $6.42 | $6.12 | $8.00 | $10.00 | $4.67 | $14.30 |
| 0330 | Irrigation system- modify existing system (0590-70-5) | LS | 1 | $23,968 | $3,061.22 | $28,300 | $34,920 | $29,164 | $40,800 |
| 0335 | Irrigation system- modify existing system (0590-70-5) | LS | 1 | $3,210.00 | $22,857 | $4,000.00 | $3,500.00 | $2,916.42 | $4,690.00 |
| 0340 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 50 | $53.50 | $51.02 | $50.00 | $35.00 | $46.66 | $40.25 |
| 0345 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 6 | $1,070.00 | $1,020.41 | $1,000.00 | $1,350.00 | $1,749.85 | $1,560.00 |
| 0350 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0355 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 18 | $2,996.00 | $2,857.14 | $2,600.00 | $1,800.00 | $3,266.39 | $2,100.00 |
| 0360 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 18 | $3,210.00 | $3,061.22 | $2,800.00 | $1,800.00 | $2,099.82 | $2,090.00 |
| 0365 | Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162) | EACH | 1 | $4,494.00 | $4,285.71 | $4,000.00 | $7,600.00 | $9,332.53 | $8,800.00 |
| 0370 | Raised pavement marker, type B (0706-1-3) | EACH | 100 | $4.28 | $4.08 | $4.00 | $5.00 | $4.67 | $4.55 |
| 0375 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 7.28 | $1,498.00 | $1,427.79 | $1,400.00 | $1,690.00 | $1,983.16 | $1,930.00 |
| 0380 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.40 | $1,605.00 | $1,522.99 | $1,500.00 | $2,100.00 | $2,644.61 | $2,560.00 |
| 0385 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 6,345 | $1.07 | $1.02 | $1.00 | $0.80 | $1.17 | $1.15 |
| 0390 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,489 | $1.61 | $1.53 | $1.50 | $1.50 | $1.52 | $1.50 |
| 0395 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 7.04 | $749.00 | $714.08 | $700.00 | $650.00 | $524.95 | $511.20 |
| 0400 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 0.02 | $1,391.00 | $1,263.33 | $1,300.00 | $1,000.00 | $1,049.91 | $974.30 |
| 0405 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.69 | $7,749.00 | $707.00 | $700.00 | $650.00 | $758.27 | $731.10 |
| 0410 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 12 | $74.90 | $71.43 | $70.00 | $50.00 | $40.83 | $39.75 |
| 0415 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 163 | $37.45 | $35.71 | $35.00 | $35.00 | $40.83 | $39.75 |
| 0420 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 4.55 | $1,498.00 | $1,426.06 | $1,400.00 | $1,690.00 | $1,983.16 | $1,930.00 |
| 0425 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 425 | $1.34 | $1.28 | $1.25 | $1.50 | $1.40 | $1.35 |
| 0430 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.11 | $749.00 | $673.87 | $700.00 | $650.00 | $758.27 | $696.90 |
| 0435 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0440 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $3,671.58 | $3,671.58 | $3,671.58 | $3,671.58 | $3,671.58 | $3,671.58 |
| 0445 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $76,496 | $76,496 | $76,496 | $76,496 | $76,496 | $76,496 |
| 0450 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $6,647.67 | $6,647.67 | $6,647.67 | $6,647.67 | $6,647.67 | $6,647.67 |
| 0455 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 2 | $10,165 | $7,653.06 | $1,400.00 | $9,400.00 | $3,966.32 | $10,900 |
| 0460 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 59 | $492.20 | $469.39 | $460.00 | $460.00 | $670.78 | $522.75 |
| 0465 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 20 | $2,140.00 | $2,040.82 | $2,000.00 | $2,000.00 | $2,041.49 | $2,270.00 |
| 0470 | Single column ground sign assembly, install (0700-1400) | EACH | 2 | $454.75 | $433.68 | $425.00 | $425.00 | $524.95 | $482.95 |
| 0475 | Single column ground sign assembly, remove (0700-1600) | EACH | 66 | $10.70 | $10.20 | $10.00 | $10.00 | $58.33 | $11.35 |
| 0480 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 2 | $7,490.00 | $7,142.86 | $7,000.00 | $7,000.00 | $7,932.65 | $7,950.00 |
| 0485 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 1 | $2,889.00 | $2,755.10 | $2,700.00 | $2,700.00 | $4,316.29 | $3,070.00 |
| 0490 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 1 | $2,140.00 | $2,040.82 | $2,000.00 | $2,000.00 | $1,364.88 | $2,270.00 |
| 0495 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 1 | $107.00 | $102.04 | $100.00 | $100.00 | $81.66 | $113.65 |
| 0500 | Sign panel, relocate, 31-50 SF (0700-3504) | EACH | 1 | $428.00 | $408.16 | $400.00 | $400.00 | $291.64 | $454.55 |
| 0505 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 38 | $107.00 | $102.04 | $100.00 | $100.00 | $130.66 | $113.65 |
| 0510 | Tubular marker, 36" yellow (0704-1-4) | EACH | 32 | $187.25 | $178.57 | $175.00 | $175.00 | $139.99 | $136.35 |
| 0515 | Object marker, type 1 (0705-10-1) | EACH | 3 | $321.00 | $306.12 | $300.00 | $300.00 | $355.80 | $340.90 |
| 0520 | Raised pavement marker, type B (0706-1-3) | EACH | 2,356 | $4.28 | $4.08 | $4.00 | $4.00 | $4.67 | $4.55 |
| 0525 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,675.00 | $2,551.02 | $2,500.00 | $20,000 | $5,832.83 | $5,680.00 |
| 0530 | Painted pavement markings, surface (0710-90) | LS | 1 | $51,895 | $49,490 | $48,500 | $20,250 | $50,502 | $49,200 |
| 0535 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 6,345 | $4.28 | $4.08 | $4.00 | $3.00 | $3.50 | $3.40 |
| 0540 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,489 | $6.42 | $6.12 | $6.00 | $5.00 | $7.00 | $6.80 |
| 0545 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.65 | $3,210.00 | $3,065.95 | $3,000.00 | $1,350.00 | $2,449.79 | $2,350.00 |
| 0550 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 12 | $214.00 | $204.08 | $200.00 | $120.00 | $82.83 | $80.70 |
| 0555 | Thermoplastic, standard, arrow (0711-11170) | EACH | 155 | $90.95 | $86.73 | $85.00 | $85.00 | $60.66 | $59.10 |
| 0560 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 399 | $5.35 | $5.10 | $5.00 | $3.00 | $5.25 | $5.10 |
| 0565 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.11 | $3,210.00 | $2,887.92 | $3,000.00 | $1,350.00 | $2,449.79 | $2,250.00 |
| 0570 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 3,902 | $14.98 | $14.29 | $14.00 | $15.00 | $18.36 | $17.90 |
| 0575 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 42 | $160.50 | $153.06 | $150.00 | $150.00 | $313.81 | $305.70 |
| 0580 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 7.22 | $5,350.00 | $5,099.22 | $5,000.00 | $5,500.00 | $5,435.03 | $5,290.00 |
| 0585 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.32 | $5,885.00 | $5,471.07 | $5,500.00 | $6,350.00 | $7,246.71 | $6,880.00 |
| 0590 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 7.18 | $2,675.00 | $2,548.18 | $2,500.00 | $1,550.00 | $1,359.05 | $1,320.00 |
| 0595 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.02 | $5,350.00 | $4,859.05 | $5,000.00 | $2,200.00 | $2,718.10 | $2,520.00 |
| 0600 | Thermoplastic, standard other surfaces, white, 6", 6-10 dotted managed lane marking (0711-16171) | GM | 0.92 | $3,210.00 | $3,057.90 | $3,000.00 | $1,550.00 | $2,449.79 | $2,380.00 |
| 0605 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 4.38 | $5,350.00 | $5,098.55 | $5,000.00 | $5,500.00 | $4,820.25 | $4,690.00 |
| 0610 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.13 | $34,240 | $31,347 | $32,000 | $32,000 | $45,685 | $42,700 |
| 0615 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.25 | $10,700 | $10,204 | $10,000 | $12,000 | $11,421 | $11,100 |
| 0620 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.13 | $34,240 | $31,347 | $32,000 | $32,000 | $45,673 | $42,700 |
| 0625 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.25 | $10,700 | $10,204 | $10,000 | $12,000 | $11,421 | $11,100 |
| 0630 | Conduit, furnish & install, open trench (0630-2-11) | LF | 56 | $26.75 | $25.51 | $25.00 | $32.50 | $29.16 | $15.30 |
| 0635 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 3,969 | $32.10 | $30.61 | $26.00 | $32.50 | $32.66 | $37.40 |
| 0640 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 35 | $1,284.00 | $1,224.49 | $1,000.00 | $1,350.00 | $1,749.85 | $1,560.00 |
| 0645 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $5,350.00 | $5,102.04 | $4,500.00 | $5,100.00 | $8,165.96 | $5,880.00 |
| 0650 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $3,424.00 | $3,265.31 | $3,200.00 | $2,800.00 | $2,916.42 | $3,250.00 |
| 0655 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $3,210.00 | $3,061.22 | $2,800.00 | $2,300.00 | $2,333.13 | $2,650.00 |
| 0660 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 13,356 | $4.28 | $4.08 | $4.00 | $2.85 | $3.50 | $3.30 |
| 0665 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 155 | $6.42 | $6.12 | $6.00 | $5.00 | $11.67 | $4.95 |
| 0670 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 828 | $1.07 | $1.02 | $1.00 | $0.60 | $1.17 | $0.45 |
| 0675 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $14,445 | $13,776 | $13,500 | $18,000 | $19,248 | $20,800 |
| 0680 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 9 | $1,605.00 | $1,530.61 | $1,500.00 | $1,350.00 | $1,283.22 | $1,560.00 |
| 0685 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 15' arm length (0715-61452) | EACH | 2 | $9,630.00 | $9,183.68 | $9,000.00 | $10,750 | $10,791 | $12,400 |
| 0690 | Light pole complete, F&I, standard pole standard foundation, 50' mounting height, 15' arm length (0715-61552) | EACH | 19 | $11,235 | $10,714 | $10,000 | $13,400 | $12,541 | $15,500 |
| 0695 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 22 | $695.50 | $663.27 | $650.00 | $800.00 | $874.92 | $916.80 |
| 0700 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 4,344 | $29.96 | $28.57 | $28.00 | $33.25 | $35.00 | $38.50 |
| 0705 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 12 | $9,630.00 | $9,183.67 | $7,000.00 | $8,800.00 | $11,666 | $10,100 |
| 0710 | Signal cable, remove- intersection (0632-7-6) | PI | 12 | $535.00 | $510.20 | $500.00 | $1,125.00 | $583.28 | $1,290.00 |
| 0715 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 155 | $4.28 | $4.08 | $4.00 | $5.00 | $8.17 | $5.45 |
| 0720 | Fiber optic connection, install, splice (0633-2-31) | EACH | 4 | $69.55 | $66.33 | $65.00 | $70.00 | $93.33 | $80.10 |
| 0725 | Fiber optic connection hardware, F&I, splice enclosure (0633-3-11) | EACH | 1 | $1,605.00 | $1,530.61 | $1,500.00 | $1,600.00 | $2,117.32 | $1,890.00 |
| 0730 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 1 | $74.90 | $71.43 | $70.00 | $70.00 | $93.33 | $80.10 |
| 0735 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 4 | $107.00 | $102.04 | $100.00 | $110.00 | $139.99 | $123.80 |
| 0740 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 1 | $1,872.50 | $1,785.71 | $1,750.00 | $2,100.00 | $2,683.10 | $2,400.00 |
| 0745 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 1 | $128.40 | $122.45 | $120.00 | $130.00 | $174.98 | $145.65 |
| 0750 | Fiber optic cable locator (0633-6) | DA | 360 | $90.95 | $0.01 | $85.00 | $30.00 | $116.66 | $182.15 |
| 0755 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 188 | $1,177.00 | $1,122.45 | $900.00 | $1,350.00 | $1,749.85 | $1,560.00 |
| 0760 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 10 | $2,354.00 | $2,244.90 | $2,200.00 | $2,150.00 | $2,916.42 | $2,480.00 |
| 0765 | Pull & splice box, install (0635-2-30) | EACH | 11 | $1,070.00 | $1,020.41 | $1,000.00 | $1,100.00 | $1,399.88 | $1,250.00 |
| 0770 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 11 | $4,494.00 | $4,285.71 | $4,200.00 | $5,250.00 | $8,165.96 | $6,100.00 |
| 0775 | Electrical power service, remove underground (0639-1620) | AS | 11 | $321.00 | $306.12 | $300.00 | $560.00 | $874.92 | $642.85 |
| 0780 | Electrical service wire, & install (0639-2-1) | LF | 707 | $10.70 | $10.20 | $10.00 | $9.50 | $9.33 | $10.95 |
| 0785 | Electrical service wire, (0639-2-6) | LF | 1,450 | $1.07 | $1.02 | $1.00 | $0.50 | $0.58 | $0.45 |
| 0790 | Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60) | EACH | 8 | $321.00 | $306.12 | $300.00 | $475.00 | $2,916.42 | $535.70 |
| 0795 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 11 | $2,354.00 | $2,244.90 | $2,200.00 | $2,300.00 | $2,333.13 | $2,650.00 |
| 0800 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 3 | $535.00 | $510.20 | $500.00 | $600.00 | $874.92 | $642.85 |
| 0805 | Aluminum signals pole, (0646-1-11) | EACH | 46 | $1,605.00 | $1,530.61 | $1,500.00 | $2,125.00 | $2,099.82 | $2,450.00 |
| 0810 | Aluminum signals pole, remove (0646-1-60) | EACH | 12 | $267.50 | $255.10 | $250.00 | $380.00 | $583.28 | $428.60 |
| 0815 | Vehicular traffic signal, furnish & install aluminum, 1 section, 1 way (0650-1-11) | AS | 1 | $1,284.00 | $1,224.49 | $1,200.00 | $1,000.00 | $874.92 | $1,130.00 |
| 0820 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 35 | $1,284.00 | $1,224.49 | $1,000.00 | $1,575.00 | $2,099.82 | $1,820.00 |
| 0825 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 2 | $1,819.00 | $1,734.70 | $1,700.00 | $1,900.00 | $2,333.13 | $2,140.00 |
| 0830 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 2 | $1,926.00 | $1,836.74 | $1,800.00 | $2,500.00 | $2,916.42 | $2,880.00 |
| 0835 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 19 | $214.00 | $204.08 | $200.00 | $280.00 | $291.64 | $321.45 |
| 0840 | Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70) | AS | 28 | $642.00 | $612.25 | $600.00 | $975.00 | $874.92 | $1,140.00 |
| 0845 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- black with reflect border (0650-2102) | EACH | 49 | $535.00 | $510.20 | $500.00 | $660.00 | $758.27 | $763.70 |
| 0850 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 44 | $1,070.00 | $1,020.41 | $900.00 | $940.00 | $1,749.85 | $1,080.00 |
| 0855 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 3 | $1,605.00 | $1,530.61 | $1,500.00 | $1,900.00 | $2,916.42 | $2,100.00 |
| 0860 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 31 | $160.50 | $153.06 | $150.00 | $95.00 | $291.64 | $107.15 |
| 0865 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 4 | $1,070.00 | $1,020.41 | $1,000.00 | $4,000.00 | $2,333.13 | $4,650.00 |
| 0870 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 4 | $7,490.00 | $7,142.86 | $7,000.00 | $11,500 | $13,416 | $13,200 |
| 0875 | Vehicle detection system- relocate above ground equipment (0660-4-42) | EACH | 16 | $1,070.00 | $1,020.41 | $1,000.00 | $2,350.00 | $2,916.42 | $2,700.00 |
| 0880 | Vehicle detection system- remove (0660-4-60) | EACH | 4 | $535.00 | $510.21 | $500.00 | $600.00 | $583.28 | $642.85 |
| 0885 | Signal priority and preemption system, furnish and install, detector (0663-1122) | EACH | 1 | $4,280.00 | $4,081.63 | $4,000.00 | $7,000.00 | $12,249 | $7,950.00 |
| 0890 | Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123) | EACH | 1 | $6,955.00 | $6,632.65 | $6,500.00 | $8,500.00 | $13,999 | $9,860.00 |
| 0895 | Signal priority & preemption system, remove (0663-1600) | EACH | 1 | $428.00 | $408.16 | $400.00 | $465.00 | $583.28 | $535.70 |
| 0900 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 56 | $642.00 | $612.24 | $600.00 | $390.00 | $408.30 | $448.10 |
| 0905 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 36 | $107.00 | $102.04 | $100.00 | $70.00 | $58.33 | $80.35 |
| 0910 | Traffic controller assembly, F&I, NEMA W/electronic lock, 1 preemption (0670-5171) | AS | 1 | $48,150 | $45,918 | $41,562 | $43,000 | $58,328 | $50,000 |
| 0915 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $535.00 | $510.20 | $500.00 | $1,200.00 | $874.92 | $1,290.00 |
| 0920 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 10 | $1,926.00 | $1,836.74 | $1,800.00 | $2,500.00 | $6,999.40 | $2,960.00 |
| 0925 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $7,490.00 | $7,142.86 | $7,000.00 | $8,400.00 | $11,082 | $9,660.00 |
| 0930 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 4 | $642.00 | $612.25 | $600.00 | $970.00 | $1,749.85 | $1,110.00 |
| 0935 | Internally illuminated sign, relocate (0700-5-50) | EACH | 7 | $1,070.00 | $1,020.41 | $1,000.00 | $2,000.00 | $1,749.85 | $2,340.00 |
| 0940 | Relocate trees and palms, palms, 18.1" or greater DBH, 14.0' or greater of clear trunk (0581-1292) | EACH | 1 | $8,025.00 | $7,653.06 | $8,400.00 | $6,500.00 | $3,091.40 | $28,400 |
| 0945 | Manhole, adjust, utilities (0425-5-1) | EACH | 12 | $1,070.00 | $994.90 | $500.00 | $750.00 | $1,079.07 | $1,110.00 |
| 0950 | Valve boxes, adjust (0425-6) | EACH | 50 | $909.50 | $918.37 | $300.00 | $650.00 | $874.92 | $909.10 |
| 0955 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $3,260.00 | $3,260.00 | $3,260.00 | $3,260.00 | $3,260.00 | $3,260.00 |
| 0960 | Utility structure, above adjust & modify (1060-25) | EACH | 2 | $1,070.00 | $994.90 | $2,300.00 | $750.00 | $2,333.13 | $1,110.00 |
| 0965 | Fire hydrant, adjust & modify (1644-700) | EACH | 1 | $19,260 | $2,142.86 | $2,270.00 | $3,500.00 | $3,499.70 | $2,390.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.