FDOT contract T6593 bid tabulation
SR 5 (US 1 / OVERSEAS HWY) FROM W OF VENETIAN BLVD TO EXECUTIVE BAY. Let by Florida DOT on September 30, 2026, Monroe, District 6. 5 bids received; low bid $2,978,999 by Ohla USA Inc.
- Owner
- Florida DOT
- Letting
- 30 SEP 2026
- Pay items
- 77
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ohla USA Inc | $2,978,999 | Low |
| 2 | Asphalt Group, Inc. | $3,425,838 | +15% |
| 3 | General Asphalt Company, LLC | $3,545,236 | +19% |
| 4 | The Stout Group LLC | $3,768,908 | +27% |
| 5 | Ranger Construction Industries, Inc. | $4,953,312 | +66% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ohla USA Inc | 2. Asphalt Group, Inc. | 3. General Asphalt Company, LLC | 4. The Stout Group LLC | 5. Ranger Construction Industries, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $297,000 | $345,000 | $216,000 | $350,000 | $1,234,380 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $196,000 | $320,524 | $446,000 | $350,000 | $283,100 |
| 0015 | Traffic control officer (0102-14) | HR | 640 | $0.01 | $75.00 | $103.50 | $90.00 | $113.10 |
| 0020 | Work zone sign (0102-60) | ED | 2,780 | $0.25 | $0.20 | $0.23 | $0.29 | $0.35 |
| 0025 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 1,340 | $0.01 | $0.01 | $59.80 | $52.00 | $74.55 |
| 0030 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 150 | $0.01 | $0.01 | $28.75 | $25.00 | $35.85 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 43,370 | $0.13 | $0.01 | $0.12 | $0.15 | $0.17 |
| 0040 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 12,880 | $0.09 | $0.01 | $0.08 | $0.09 | $0.08 |
| 0045 | Arrow board / advance warning arrow panel (0102-76) | ED | 460 | $7.50 | $6.00 | $6.90 | $6.75 | $7.15 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 468 | $15.00 | $12.00 | $13.80 | $17.20 | $19.05 |
| 0055 | Type III barricade (0102-115) | ED | 550 | $0.31 | $0.25 | $0.29 | $0.80 | $0.90 |
| 0060 | Sediment barrier (0104-10-3) | LF | 3,562 | $4.50 | $5.84 | $0.01 | $6.00 | $3.82 |
| 0065 | Inlet protection system (0104-18) | EACH | 10 | $190.00 | $125.00 | $201.25 | $150.00 | $360.95 |
| 0070 | Litter removal (0107-1) | ACRE | 62.18 | $250.00 | $35.00 | $1.15 | $1.00 | $304.00 |
| 0075 | Mowing (0107-2) | ACRE | 62.18 | $255.00 | $45.00 | $1.15 | $1.00 | $298.00 |
| 0080 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $100,000 | $57,770 | $60,950 | $150,000 | $78,400 |
| 0085 | Tree protection barrier (0110-21) | LF | 368 | $15.88 | $8.00 | $17.25 | $10.00 | $32.30 |
| 0090 | Tree root and branch pruning (0110-22) | EACH | 1 | $7,500.00 | $1,500.00 | $2,300.00 | $3,500.00 | $8,930.00 |
| 0095 | Borrow excavation, truck measure (0120-2-2) | CY | 83.90 | $46.00 | $50.00 | $201.25 | $60.00 | $372.42 |
| 0100 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $120,000 | $43,680 | $224,500 | $125,000 | $91,740 |
| 0105 | Geosynthetic reinforced embankment (0145-3) | SY | 283 | $26.53 | $20.00 | $12.65 | $25.00 | $35.55 |
| 0110 | Type B stabilization (0160-4) | SY | 4,393 | $26.00 | $15.96 | $34.50 | $35.00 | $30.02 |
| 0115 | Optional base, base group 06 (0285-706) | SY | 1,413 | $70.00 | $79.36 | $63.06 | $70.00 | $69.80 |
| 0120 | Optional base, base group 10 (0285-710) | SY | 2,123 | $70.00 | $96.52 | $77.23 | $90.00 | $128.90 |
| 0125 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 52,933 | $4.00 | $4.98 | $4.06 | $8.75 | $6.65 |
| 0130 | Superpave asphaltic conc, traffic E (0334-1-15) | TN | 200.50 | $275.00 | $339.89 | $262.00 | $300.00 | $269.60 |
| 0135 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 51 | $270.00 | $367.44 | $369.00 | $300.00 | $307.05 |
| 0140 | Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88) | TN | 5,053.50 | $184.00 | $210.42 | $202.39 | $185.00 | $262.98 |
| 0145 | Miscellaneous asphalt (0339-1) | TN | 17.80 | $600.00 | $500.00 | $792.00 | $500.00 | $1,260.00 |
| 0150 | Manhole, adjust (0425-5) | EACH | 6 | $2,700.00 | $1,500.00 | $1,650.00 | $850.00 | $441.70 |
| 0155 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 280 | $190.07 | $151.13 | $247.50 | $150.00 | $171.00 |
| 0160 | Detectable warnings (0527-2) | SF | 132 | $43.00 | $40.00 | $55.00 | $45.00 | $39.10 |
| 0165 | Guardrail -roadway, general (0536-1-1) | LF | 346 | $49.28 | $49.28 | $60.18 | $50.15 | $59.70 |
| 0170 | Guardrail removal (0536-73) | LF | 384 | $2.81 | $2.81 | $2.30 | $2.00 | $2.40 |
| 0175 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 2 | $1,790.89 | $1,790.98 | $1,877.09 | $1,632.25 | $1,944.00 |
| 0180 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $4,221.42 | $4,211.42 | $3,338.14 | $2,902.73 | $3,460.00 |
| 0185 | Performance turf, sod (0570-1-2) | SY | 3,060 | $10.00 | $5.00 | $9.20 | $20.00 | $28.32 |
| 0190 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 1.16 | $2,495.70 | $999.00 | $2,875.00 | $999.00 | $2,972.00 |
| 0195 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 2.33 | $2,505.38 | $999.00 | $2,875.00 | $999.00 | $2,983.00 |
| 0200 | Mcsaw vehicle detection and indentification - furnish and install, weigh in motion unit (0770-2-12) | AS | 2 | $33,304 | $39,295 | $30,633 | $37,358 | $22,994 |
| 0205 | Mcsaw vehicle detection and indentification - furnish and install, inductive loop (0770-2-13) | EACH | 1 | $2,893.86 | $23,539 | $2,557.71 | $2,224.10 | $1,790.00 |
| 0210 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0215 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 3.77 | $7,037.47 | $4,000.00 | $8,236.30 | $9,825.41 | $7,193.00 |
| 0220 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 11 | $595.00 | $874.78 | $684.25 | $681.00 | $836.90 |
| 0225 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $1,800.00 | $3,721.55 | $2,070.00 | $1,590.00 | $2,490.00 |
| 0230 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $350.00 | $1,254.77 | $402.50 | $189.00 | $511.00 |
| 0235 | Single column ground sign assembly, remove (0700-1600) | EACH | 7 | $30.00 | $375.51 | $34.50 | $71.00 | $114.00 |
| 0240 | Tubular marker, 36" white post (0704-1-3) | EACH | 21 | $129.00 | $231.50 | $148.35 | $130.00 | $289.00 |
| 0245 | Tubular marker, 36" yellow (0704-1-4) | EACH | 19 | $129.00 | $242.19 | $148.35 | $130.00 | $229.75 |
| 0250 | Object marker, type 1 (0705-10-1) | EACH | 3 | $350.00 | $357.00 | $402.50 | $357.00 | $312.60 |
| 0255 | Raised pavement marker, type B (0706-1-3) | EACH | 1,054 | $4.00 | $5.00 | $4.60 | $5.00 | $4.76 |
| 0260 | Painted pavement markings, surface (0710-90) | LS | 1 | $36,061 | $22,691 | $41,470 | $22,692 | $42,930 |
| 0265 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.23 | $6,893.87 | $6,495.00 | $7,755.60 | $6,495.00 | $8,210.00 |
| 0270 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 626 | $3.31 | $2.10 | $3.81 | $2.10 | $3.95 |
| 0275 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 2,190 | $5.00 | $3.12 | $5.75 | $3.12 | $5.95 |
| 0280 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 182 | $6.62 | $4.25 | $7.61 | $4.25 | $7.90 |
| 0285 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.44 | $2,483.07 | $1,225.00 | $2,875.00 | $1,255.00 | $2,960.00 |
| 0290 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 14 | $110.00 | $175.00 | $126.50 | $175.00 | $130.95 |
| 0295 | Thermoplastic, standard, arrow (0711-11170) | EACH | 63 | $53.00 | $95.00 | $60.95 | $95.00 | $63.10 |
| 0300 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 1,008 | $5.00 | $3.12 | $5.75 | $3.12 | $5.95 |
| 0305 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.03 | $2,272.73 | $1,255.00 | $2,875.00 | $1,255.00 | $2,710.00 |
| 0310 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 492 | $18.82 | $18.00 | $21.64 | $18.00 | $22.40 |
| 0315 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 16 | $242.00 | $450.00 | $278.30 | $450.00 | $288.10 |
| 0320 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 16 | $102.00 | $450.00 | $117.30 | $450.00 | $121.45 |
| 0325 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 4.62 | $5,056.91 | $5,014.00 | $5,816.70 | $5,014.00 | $6,021.00 |
| 0330 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.33 | $1,257.38 | $1,395.00 | $1,454.75 | $1,395.00 | $1,500.00 |
| 0335 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 4.18 | $4,489.22 | $5,014.00 | $5,158.90 | $5,014.00 | $5,345.00 |
| 0340 | Green-colored pavement markings, bike lane (0714-10) | SF | 5,116 | $8.85 | $19.95 | $10.18 | $18.00 | $10.12 |
| 0345 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 524 | $25.63 | $97.97 | $89.27 | $77.63 | $30.52 |
| 0350 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 5 | $877.08 | $3,750.55 | $1,862.87 | $1,619.89 | $1,045.00 |
| 0355 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 1,962 | $2.81 | $9.18 | $4.31 | $3.75 | $3.35 |
| 0360 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 636 | $0.86 | $17.33 | $0.66 | $0.57 | $1.02 |
| 0365 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pole top (0715-11213) | EACH | 4 | $2,473.13 | $4,731.44 | $2,377.82 | $2,067.67 | $2,945.00 |
| 0370 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 0' arm length (0715-61300) | EACH | 4 | $12,325 | $14,243 | $13,316 | $11,579 | $14,674 |
| 0375 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 2 | $1,224.98 | $6,460.87 | $1,302.31 | $1,132.44 | $1,460.00 |
| 0380 | Pole cable distribution system, furnish and install alternate system, conventional (0715-500-11) | EACH | 8 | $2,763.89 | $4,042.22 | $3,127.45 | $2,719.52 | $3,291.00 |
| 0385 | Root barrier- 24" (0580-12-35) | LF | 50 | $150.00 | $150.00 | $28.75 | $75.00 | $178.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of September 30, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.