FDOT letting results, March 27, 2024
19 contracts let by Florida DOT on March 27, 2024, $180,738,458 in low bids, a median of 3 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 19
- Low bids, total
- $180,738,458
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T4676 | SR 93 (I-75/ ALLIGATOR ALLEY) FROM BROWARD/COLLIER CO... | District 4 | 4 | Ohla USA Inc | $27,933,984 | $32,259,494 | +15% | FDOT |
| T1857 | SR 35 (US 17) and SR 45 (TAMIAMI TR/US 41) FROM SR 45... | District 1 | 5 | Watson Civil Construction, Inc. | $24,353,930 | $24,633,571 | +1.0% | FDOT |
| T2977 | SR 24 (NE WALDO RD) FROM SR 222 TO SR 200 (US 301) | District 2 | 2 | Whitehurst, V. E. & Sons, Inc. | $20,982,500 | $21,798,389 | +4.0% | FDOT |
| T2974 | SR 200 (US 301) FROM ALACHUA CO LINE TO CR 100A | District 2 | 2 | Anderson Columbia Co., Inc. | $18,339,896 | $26,923,692 | +47% | FDOT |
| T2973 | SR 111 (N EDGEWOOD AVE) FROM SR 10 (US 90 / BEAVER ST) TO... | District 2 | 4 | Watson Civil Construction, Inc. | $11,487,858 | $11,699,058 | +2.0% | FDOT |
| T2972 | SR 211 FROM SR 128 (SAN JUAN AVE) TO I-95 | District 2 | 2 | Watson Civil Construction, Inc. | $11,158,023 | $11,870,826 | +6.0% | FDOT |
| T3808 | SR 83 (US 331) FROM S OF SR 8 (I-10) TO SR 10 (US 90) | District 3 | 2 | C.W. Roberts Contracting, Inc. | $10,390,474 | $12,073,849 | +16% | FDOT |
| T4661 | SR 820 (PINES BLVD) FROM SR 93 (I-75 N / ALLIGATOR ALLEY)... | District 4 | 4 | Weekley Asphalt Paving, Inc. | $9,458,464 | $9,781,260 | +3.0% | FDOT |
| T6584 | SR 5 (US 1 / BISCAYNE BLVD) AND SR 922 (NE 123 ST) FROM N... | District 6 | 4 | Ohla USA Inc | $8,558,846 | $9,359,491 | +9.0% | FDOT |
| T1878 | SR 25 (US 27) AT SR 78 | District 1 | 3 | C.W. Roberts Contracting, Inc. | $8,427,705 | $9,979,523 | +18% | FDOT |
| T2763 | SR 24 AT NE 96TH PLACE AND FROM BRONSON TO ALACHUA CO LINE | District 2 | 3 | Anderson Columbia Co., Inc. | $7,121,088 | $7,381,124 | +4.0% | FDOT |
| T4667 | SR 5 (US 1) FROM DAVIS ST TO S END OF BRIDGE NO 700224 | District 4 | 4 | Ohla USA Inc | $5,722,729 | $6,236,133 | +9.0% | FDOT |
| T4685 | NW 16TH ST, NW 19TH ST AND NW 26TH ST FROM 49TH AVE TO SR 7 | District 4 | 4 | Horizon Contractors, Inc. | $5,530,214 | $5,922,178 | +7.0% | FDOT |
| T3890 | SR 10A (US 90 / SCENIC HWY) FROM S OF HYDE PARK RD TO S OF.. | District 3 | 3 | Roads, Inc. of NWF | $4,804,455 | $5,486,258 | +14% | FDOT |
| T1889 | SR 17 FROM 5TH AVE TO CROOKED LAKE DR | District 1 | 6 | Timothy Rose Contracting, Inc. | $2,636,284 | $2,959,515 | +12% | FDOT |
| T7529 | SR 580 (E BUSCH BLVD) AT N 18TH ST AND E OF N 22ND ST | District 7 | 6 | Blacktip Services Incorporated | $1,336,107 | $1,694,142 | +27% | FDOT |
| T1854 | SR 45 (US 41 BUSINESS) FROM 6TH AVE 2 TO MANATEE AVE W | District 1 | 3 | Leon America Construction | $1,273,662 | $1,309,703 | +3.0% | FDOT |
| T9034 | SR 55 (SE HWY 19) AT OLD TOWN WEIGH STATION | StateWide | 1 | Anderson Columbia Co., Inc. | $799,814 | FDOT | ||
| T9033 | SR 15 (US 17) AT NB AND SB PALATKA WEIGH STATIONS | StateWide | 2 | Traffic Control Devices, Inc. | $422,422 | $423,468 | 0.0% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.