FDOT contract T6591 bid tabulation
SR 25 (US 27 OKEECHOBEE RD) AND SR 9 (NW 27 AVE) FROM... Let by Florida DOT on March 25, 2026, Miami-Dade, District 6. 7 bids received; low bid $6,317,176 by Weekley Asphalt Paving, Inc..
- Owner
- Florida DOT
- Letting
- 25 MAR 2026
- Pay items
- 201
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Weekley Asphalt Paving, Inc. | $6,317,176 | Low |
| 2 | General Asphalt Company, LLC | $6,364,891 | +1.0% |
| 3 | Bacallao Construction & Engineering Development, LLC D/B/A BC&E | $6,530,113 | +3.0% |
| 4 | Ohla USA Inc | $6,680,531 | +6.0% |
| 5 | The Stout Group LLC | $6,798,593 | +8.0% |
| 6 | Asphalt Group, Inc. | $7,863,501 | +24% |
| 7 | Roadway Construction, LLC | $9,007,077 | +43% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Weekley Asphalt Paving, Inc. | 2. General Asphalt Company, LLC | 3. Bacallao Construction & Engineering Development, LLC D/B/A BC&E | 4. Ohla USA Inc | 5. The Stout Group LLC | 6. Asphalt Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $95,000 | $140,000 | $600,000 | $467,000 | $220,000 | $550,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $46,425 | $10,000 | $50,000 | $133,000 | $220,000 | $100,000 |
| 0015 | Mobilization (0101-1) | LS | 1 | $95,000 | $10,000 | $10,000 | $66,000 | $220,000 | $100,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $238,200 | $600,000 | $130,000 | $470,000 | $70,000 | $550,000 |
| 0025 | Maintenance of traffic (0102-1) | DA | 1 | $119,100 | $50,000 | $41,292 | $100,000 | $70,000 | $100,000 |
| 0030 | Maintenance of traffic (0102-1) | DA | 1 | $238,200 | $50,000 | $1,300.00 | $75,000 | $70,000 | $100,000 |
| 0035 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $54,556 | $5,250.00 | $0.01 | $5,000.00 | $11,900 | $10,000 |
| 0040 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $32,000 | $3,150.00 | $0.01 | $2,000.00 | $7,200.00 | $10,000 |
| 0045 | Pedestrian escort/flagger (0102-5) | HR | 120 | $65.00 | $31.50 | $0.01 | $100.00 | $45.00 | $80.00 |
| 0050 | Traffic control officer (0102-14) | HR | 544 | $89.00 | $84.00 | $80.00 | $85.00 | $85.00 | $90.00 |
| 0055 | Work zone sign (0102-60) | ED | 30,718 | $0.20 | $0.21 | $0.20 | $0.20 | $0.21 | $0.20 |
| 0060 | Business sign (0102-61) | EACH | 4 | $31.00 | $32.55 | $31.00 | $31.00 | $45.00 | $31.00 |
| 0065 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 72,794 | $0.10 | $0.11 | $0.11 | $0.10 | $0.09 | $0.10 |
| 0070 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 40,032 | $0.03 | $0.03 | $0.04 | $0.03 | $0.08 | $0.03 |
| 0075 | Arrow board / advance warning arrow panel (0102-76) | ED | 1,254 | $5.00 | $5.25 | $5.00 | $5.00 | $5.00 | $5.00 |
| 0080 | Portable changeable message sign, temporary (0102-99) | ED | 1,236 | $10.00 | $10.50 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0085 | Temporary signalization and maintenance, intersection (0102-104) | ED | 2,870 | $4.00 | $6.22 | $7.50 | $6.16 | $6.16 | $5.92 |
| 0090 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 2,870 | $4.00 | $6.22 | $7.50 | $6.16 | $6.16 | $5.92 |
| 0095 | Type III barricade (0102-115) | ED | 4,136 | $0.23 | $0.24 | $0.23 | $0.23 | $0.30 | $0.23 |
| 0100 | Inlet protection system (0104-18) | EACH | 133 | $140.00 | $136.50 | $55.00 | $250.00 | $150.00 | $100.00 |
| 0105 | Litter removal (0107-1) | ACRE | 172.85 | $25.00 | $1.05 | $1.00 | $90.00 | $1.00 | $50.00 |
| 0110 | Mowing (0107-2) | ACRE | 52.78 | $30.00 | $1.05 | $1.00 | $211.00 | $1.00 | $50.00 |
| 0115 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $7,500.00 | $1.05 | $0.01 | $15,600 | $10,000 | $5,000.00 |
| 0120 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1,000.00 | $1.05 | $0.01 | $1,500.00 | $10,000 | $5,000.00 |
| 0125 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $4,500.00 | $1.05 | $0.01 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0130 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $500.00 | $1.05 | $0.01 | $2,500.00 | $5,000.00 | $5,000.00 |
| 0135 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $32,658 | $31,500 | $100,000 | $83,500 | $10,000 | $400,000 |
| 0140 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $10,000 | $5,250.00 | $13,750 | $35,200 | $10,000 | $100,000 |
| 0145 | Removal of existing concrete (0110-4-10) | SY | 2,689 | $55.00 | $37.49 | $35.00 | $40.00 | $25.00 | $25.00 |
| 0150 | Tree protection barrier (0110-21) | LF | 388 | $13.35 | $3.15 | $1.00 | $3.00 | $10.00 | $5.00 |
| 0155 | Borrow excavation, truck measure (0120-2-2) | CY | 483 | $45.00 | $130.41 | $10.00 | $73.00 | $30.00 | $50.00 |
| 0160 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $11,460 | $27,825 | $8,000.00 | $11,000 | $8,000.00 | $15,000 |
| 0165 | Type B stabilization (0160-4) | SY | 57 | $45.00 | $15.75 | $0.01 | $40.00 | $30.00 | $50.00 |
| 0170 | Optional base, base group 11 (0285-711) | SY | 95 | $55.00 | $120.75 | $100.00 | $100.00 | $150.00 | $150.00 |
| 0175 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 125,349 | $3.00 | $2.82 | $3.75 | $3.00 | $3.00 | $5.00 |
| 0180 | Superpave asphaltic conc, traffic E (0334-1-15) | TN | 23.60 | $500.00 | $436.72 | $180.00 | $115.00 | $500.00 | $200.00 |
| 0185 | Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88) | TN | 10,349.10 | $180.00 | $175.69 | $180.00 | $135.00 | $210.00 | $200.00 |
| 0190 | Miscellaneous asphalt (0339-1) | TN | 20.20 | $500.00 | $365.66 | $300.00 | $300.00 | $300.00 | $750.00 |
| 0195 | Inlets, ditch bottom, type F, modify (0425-1569) | EACH | 1 | $8,500.00 | $15,362 | $10,000 | $15,000 | $17,000 | $15,000 |
| 0200 | Manhole, adjust (0425-5) | EACH | 117 | $100.00 | $1,050.00 | $300.00 | $1,000.00 | $825.00 | $500.00 |
| 0205 | French drain, 24" (0443-70-4) | LF | 20 | $556.00 | $498.23 | $700.00 | $750.00 | $500.00 | $500.00 |
| 0210 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 66 | $145.00 | $115.50 | $115.00 | $100.69 | $100.69 | $200.00 |
| 0215 | Concrete curb & gutter, type F (0520-1-10) | LF | 2,586 | $52.57 | $32.48 | $40.00 | $55.00 | $30.00 | $44.50 |
| 0220 | Concrete curb, type D (0520-2-4) | LF | 309 | $55.79 | $26.22 | $35.00 | $45.00 | $25.00 | $44.00 |
| 0225 | Valley gutter- concrete (0520-3) | LF | 29 | $98.00 | $27.35 | $45.00 | $50.00 | $50.00 | $50.00 |
| 0230 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 10 | $312.22 | $51.90 | $175.00 | $54.41 | $200.00 | $84.00 |
| 0235 | Concrete traffic separator, special- variable width (0520-70) | SY | 10 | $200.00 | $90.39 | $165.00 | $82.98 | $200.00 | $84.00 |
| 0240 | Shoulder concrete barrier, curb and gutter barrier (0521-72-43) | LF | 141 | $330.00 | $337.16 | $250.00 | $400.00 | $950.00 | $284.00 |
| 0245 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 309 | $75.39 | $52.00 | $110.00 | $125.29 | $90.00 | $66.60 |
| 0250 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,860 | $74.10 | $69.07 | $110.00 | $121.32 | $115.00 | $84.65 |
| 0255 | Pavers, architectural, (0526-1-2) | SY | 242 | $181.60 | $99.75 | $125.00 | $188.98 | $175.00 | $200.00 |
| 0260 | Detectable warnings (0527-2) | SF | 714 | $43.00 | $41.23 | $40.00 | $35.71 | $30.00 | $35.00 |
| 0265 | Guardrail -roadway, general (0536-1-1) | LF | 570 | $34.00 | $31.50 | $20.00 | $19.95 | $19.95 | $19.95 |
| 0270 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 2 | $3,840.00 | $3,622.50 | $3,500.00 | $3,120.89 | $3,120.89 | $3,120.00 |
| 0275 | Guardrail removal (0536-73) | LF | 492 | $2.25 | $2.10 | $2.25 | $2.13 | $2.13 | $2.13 |
| 0280 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 3 | $2,100.00 | $1,942.50 | $1,400.00 | $1,273.06 | $1,273.06 | $1,273.00 |
| 0285 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $4,560.00 | $4,305.00 | $3,000.00 | $2,930.33 | $2,930.33 | $2,930.00 |
| 0290 | Guardrail end treatment- type CRT (0536-85-26) | EACH | 1 | $4,670.00 | $4,410.00 | $4,000.00 | $3,483.18 | $3,483.18 | $3,483.00 |
| 0295 | Crash cushion, TL-2, narrow (0544-2-1) | EACH | 1 | $25,000 | $22,575 | $20,000 | $24,226 | $19,280 | $19,279 |
| 0300 | Performance turf, sod (0570-1-2) | SY | 1,243 | $6.80 | $6.30 | $4.00 | $17.10 | $11.00 | $8.00 |
| 0305 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 61 | $50.00 | $48.68 | $35.00 | $48.24 | $48.24 | $46.36 |
| 0310 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 2 | $1,500.00 | $1,482.08 | $1,500.00 | $1,468.61 | $1,468.61 | $1,411.00 |
| 0315 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0320 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0325 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 6 | $3,800.00 | $1,975.60 | $3,100.00 | $1,957.66 | $1,957.66 | $1,881.00 |
| 0330 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 6 | $4,200.00 | $1,977.06 | $3,000.00 | $1,959.09 | $1,959.09 | $1,882.00 |
| 0335 | Raised pavement marker, type B (0706-1-3) | EACH | 348 | $4.00 | $3.68 | $5.00 | $4.06 | $4.00 | $4.00 |
| 0340 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.67 | $1,100.00 | $2,415.00 | $1,800.00 | $2,277.47 | $1,600.00 | $2,250.00 |
| 0345 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.01 | $1,500.00 | $3,444.00 | $2,300.00 | $2,343.08 | $1,800.00 | $3,000.00 |
| 0350 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,740 | $1.00 | $1.68 | $1.00 | $1.73 | $1.00 | $1.70 |
| 0355 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 37 | $1.50 | $2.10 | $1.50 | $1.83 | $2.00 | $1.80 |
| 0360 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,018 | $2.00 | $2.10 | $2.25 | $1.93 | $3.00 | $1.90 |
| 0365 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.26 | $750.00 | $1,050.00 | $625.00 | $520.51 | $1,000.00 | $525.00 |
| 0370 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.07 | $750.00 | $1,050.00 | $625.00 | $662.17 | $1,000.00 | $750.00 |
| 0375 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 5 | $100.00 | $52.50 | $70.00 | $44.67 | $85.00 | $44.00 |
| 0380 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 20 | $75.00 | $36.75 | $45.00 | $44.67 | $45.00 | $44.00 |
| 0385 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.42 | $1,100.00 | $2,625.00 | $1,850.00 | $2,240.55 | $1,600.00 | $2,250.00 |
| 0390 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 470 | $1.50 | $2.10 | $1.75 | $1.83 | $2.00 | $1.80 |
| 0395 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.05 | $750.00 | $1,050.00 | $650.00 | $718.30 | $1,000.00 | $750.00 |
| 0400 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $52,341 | $52,341 | $52,341 | $52,341 | $52,341 | $52,341 |
| 0405 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $3,274.00 | $3,274.00 | $3,274.00 | $3,274.00 | $3,274.00 | $3,274.00 |
| 0410 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $10,714 | $10,714 | $10,714 | $10,714 | $10,714 | $10,714 |
| 0415 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $5,214.00 | $5,214.00 | $5,214.00 | $5,214.00 | $5,214.00 | $5,214.00 |
| 0420 | Raised rumble strip set- permanent (0546-71-1) | EACH | 8 | $360.00 | $1,050.00 | $415.00 | $100.00 | $1,000.00 | $2,000.00 |
| 0425 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 20 | $35.00 | $71.02 | $40.00 | $70.38 | $70.38 | $67.64 |
| 0430 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $1,500.00 | $1,482.08 | $1,500.00 | $1,468.61 | $1,468.61 | $1,411.00 |
| 0435 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 102 | $695.00 | $627.90 | $550.00 | $487.31 | $480.00 | $598.00 |
| 0440 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 25 | $2,350.00 | $1,942.50 | $1,550.00 | $1,928.93 | $1,900.00 | $1,850.00 |
| 0445 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 9 | $2,550.00 | $2,782.50 | $2,250.00 | $2,335.03 | $2,300.00 | $2,650.00 |
| 0450 | Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211) | EACH | 15 | $1,595.00 | $2,782.50 | $2,100.00 | $2,538.07 | $2,500.00 | $2,650.00 |
| 0455 | Single column ground sign assembly, F&I barrier 12.0-20.0 SF (0700-1212) | EACH | 2 | $2,550.00 | $3,465.00 | $2,200.00 | $2,639.60 | $2,600.00 | $3,300.00 |
| 0460 | Single column ground sign assembly, remove (0700-1600) | EACH | 52 | $10.00 | $52.50 | $20.00 | $20.30 | $20.00 | $50.00 |
| 0465 | Single column ground sign assembly, F&I cantilever mount, less than 12 SF (0700-1911) | EACH | 5 | $1,595.00 | $3,465.00 | $550.00 | $913.71 | $900.00 | $3,300.00 |
| 0470 | Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912) | EACH | 4 | $2,595.00 | $4,515.00 | $1,750.00 | $2,538.07 | $2,500.00 | $4,300.00 |
| 0475 | Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112) | EACH | 1 | $5,200.00 | $6,825.00 | $3,500.00 | $7,106.60 | $7,000.00 | $6,500.00 |
| 0480 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 1 | $2,500.00 | $8,610.00 | $5,400.00 | $9,137.06 | $9,000.00 | $8,200.00 |
| 0485 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 1 | $500.00 | $1,417.50 | $550.00 | $1,522.84 | $1,500.00 | $1,350.00 |
| 0490 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 4 | $1,000.00 | $388.50 | $300.00 | $329.95 | $325.00 | $370.00 |
| 0495 | Sign panel, furnish & install ground mount, 21-30 SF (0700-3103) | EACH | 6 | $1,500.00 | $735.00 | $600.00 | $406.09 | $400.00 | $700.00 |
| 0500 | Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205) | EACH | 1 | $3,000.00 | $5,250.00 | $5,250.00 | $5,076.14 | $4,333.50 | $5,000.00 |
| 0505 | Sign panel, furnish & install single post bridge mount index 11870/700-012, UP to 12 SF (0700-3301) | EACH | 2 | $1,120.00 | $840.00 | $1,200.00 | $355.33 | $1,012.50 | $800.00 |
| 0510 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 53 | $375.00 | $189.00 | $450.00 | $76.14 | $400.50 | $180.00 |
| 0515 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 6 | $70.00 | $105.00 | $150.00 | $15.23 | $139.50 | $100.00 |
| 0520 | Sign panel, remove, 21-30 SF (0700-3603) | EACH | 6 | $120.00 | $315.00 | $250.00 | $50.76 | $220.00 | $300.00 |
| 0525 | Sign panel, remove, 51-100 SF (0700-3605) | EACH | 1 | $350.00 | $630.00 | $1,000.00 | $507.61 | $867.50 | $600.00 |
| 0530 | Retroreflective sign strip- furnish and install, 2' (0700-13-12) | EACH | 9 | $50.00 | $105.00 | $55.00 | $81.22 | $80.00 | $170.00 |
| 0535 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 2 | $200.00 | $157.50 | $80.00 | $101.53 | $100.00 | $250.00 |
| 0540 | Enhanced highway sign solar powered, F&I ground mount, W/eds, UP to 12 SF of static sign panels (0700-142131) | EACH | 4 | $10,000 | $18,767 | $19,000 | $20,305 | $18,597 | $15,000 |
| 0545 | Object marker, type 1 (0705-10-1) | EACH | 5 | $395.00 | $231.00 | $350.00 | $304.57 | $300.00 | $350.00 |
| 0550 | Object marker, type 2 (0705-10-2) | EACH | 20 | $455.00 | $231.00 | $350.00 | $101.52 | $100.00 | $220.00 |
| 0555 | Delineator, flexible tubular (0705-11-1) | EACH | 45 | $130.00 | $126.00 | $100.00 | $101.52 | $100.00 | $120.00 |
| 0560 | Raised pavement marker, type B (0706-1-3) | EACH | 3,915 | $4.00 | $3.68 | $5.25 | $4.06 | $4.00 | $4.00 |
| 0565 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.06 | $1,100.00 | $2,415.00 | $1,800.00 | $2,246.89 | $1,600.00 | $2,250.00 |
| 0570 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.12 | $750.00 | $1,050.00 | $1,900.00 | $509.83 | $1,000.00 | $525.00 |
| 0575 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.06 | $1,100.00 | $2,625.00 | $1,825.00 | $2,246.89 | $1,600.00 | $2,250.00 |
| 0580 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 350 | $3.35 | $5.25 | $2.25 | $4.06 | $10.00 | $4.00 |
| 0585 | Painted pavement markings, surface (0710-90) | LS | 1 | $83,792 | $55,125 | $75,000 | $86,868 | $65,000 | $54,367 |
| 0590 | Painted pavement markings, surface (0710-90) | LS | 1 | $9,088.32 | $5,250.00 | $10,000 | $4,549.24 | $5,000.00 | $4,481.00 |
| 0595 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 4,328 | $2.10 | $2.10 | $2.50 | $3.18 | $4.00 | $3.13 |
| 0600 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 933 | $3.33 | $4.20 | $4.00 | $4.77 | $5.00 | $4.70 |
| 0605 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,754 | $4.10 | $4.73 | $5.50 | $6.36 | $6.00 | $6.26 |
| 0610 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.41 | $2,100.00 | $2,625.00 | $1,850.00 | $2,519.64 | $3,500.00 | $2,500.00 |
| 0615 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 61 | $200.00 | $105.00 | $140.00 | $70.05 | $200.00 | $69.00 |
| 0620 | Thermoplastic, standard, arrow (0711-11170) | EACH | 191 | $100.00 | $63.00 | $90.00 | $74.11 | $90.00 | $73.00 |
| 0625 | Thermoplastic, standard, yield line (0711-11180) | LF | 14 | $8.50 | $8.40 | $20.00 | $10.15 | $20.00 | $10.00 |
| 0630 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 906 | $3.33 | $3.15 | $4.00 | $4.38 | $5.00 | $4.31 |
| 0635 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.14 | $2,100.00 | $2,625.00 | $6,900.00 | $2,520.07 | $3,500.00 | $2,500.00 |
| 0640 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,578 | $18.00 | $15.75 | $22.00 | $15.31 | $16.00 | $15.08 |
| 0645 | Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527) | LF | 37 | $22.50 | $26.25 | $18.50 | $20.42 | $35.00 | $20.11 |
| 0650 | Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560) | EACH | 2 | $1,500.00 | $1,050.00 | $1,650.00 | $953.30 | $1,000.00 | $939.00 |
| 0655 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 3 | $1,250.00 | $1,050.00 | $1,350.00 | $928.93 | $800.00 | $915.00 |
| 0660 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 10.05 | $4,550.00 | $5,460.00 | $6,900.00 | $4,737.74 | $5,000.00 | $4,669.00 |
| 0665 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.51 | $5,200.00 | $6,300.00 | $7,225.00 | $6,220.28 | $5,500.00 | $6,225.00 |
| 0670 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 8.37 | $1,750.00 | $1,386.00 | $1,850.00 | $1,184.80 | $2,500.00 | $1,168.00 |
| 0675 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 6.91 | $4,550.00 | $5,460.00 | $7,050.00 | $4,351.68 | $5,000.00 | $4,292.00 |
| 0680 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.28 | $33,000 | $38,850 | $36,250 | $35,681 | $32,000 | $36,187 |
| 0685 | Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement (0713-103102) | GM | 0.01 | $300,000 | $47,250 | $89,250 | $48,250 | $40,000 | $48,250 |
| 0690 | Permanent tape, white, solid W/contrast, 6" primary line width, for concrete surfaces (0713-103121) | GM | 0.03 | $57,000 | $21,000 | $36,000 | $17,227 | $45,000 | $18,100 |
| 0695 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.18 | $10,000 | $10,500 | $9,200.00 | $9,086.87 | $10,000 | $9,050.00 |
| 0700 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.21 | $34,000 | $37,800 | $38,900 | $36,051 | $32,000 | $36,187 |
| 0705 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.15 | $13,000 | $10,500 | $9,250.00 | $9,187.80 | $10,000 | $9,050.00 |
| 0710 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 247 | $32.00 | $37.11 | $35.00 | $36.77 | $36.77 | $35.34 |
| 0715 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 10 | $30.00 | $41.87 | $18.00 | $41.49 | $41.49 | $39.88 |
| 0720 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 3 | $1,500.00 | $1,482.08 | $1,400.00 | $1,468.61 | $1,468.61 | $1,411.00 |
| 0725 | Junction box, furnish & install, mounted (0635-3-12) | EACH | 2 | $1,000.00 | $1,057.12 | $1,200.00 | $1,047.52 | $1,047.52 | $1,006.00 |
| 0730 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 1,067 | $4.00 | $3.28 | $3.00 | $3.24 | $3.24 | $3.12 |
| 0735 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 322 | $6.00 | $5.54 | $5.00 | $5.50 | $5.50 | $5.28 |
| 0740 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 1,299 | $0.50 | $0.42 | $1.00 | $0.41 | $0.41 | $0.40 |
| 0745 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 3 | $1,800.00 | $1,584.05 | $2,250.00 | $1,569.66 | $1,569.66 | $1,508.00 |
| 0750 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 3 | $800.00 | $884.19 | $1,500.00 | $876.16 | $876.16 | $842.00 |
| 0755 | Pole cable distribution system, furnish and install alternate system, conventional (0715-500-11) | EACH | 1 | $2,400.00 | $2,814.76 | $2,500.00 | $2,789.19 | $2,789.19 | $2,680.00 |
| 0760 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 3,142 | $35.00 | $37.10 | $48.00 | $36.76 | $36.76 | $35.33 |
| 0765 | Conduit, furnish & install, mount (0630-2-15) | LF | 492 | $55.00 | $49.85 | $62.00 | $49.40 | $49.40 | $47.48 |
| 0770 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 7 | $12,000 | $8,395.93 | $11,000 | $8,319.67 | $8,319.67 | $7,997.00 |
| 0775 | Signal cable, remove- intersection (0632-7-6) | PI | 7 | $500.00 | $1,450.53 | $2,000.00 | $1,437.36 | $1,437.36 | $1,381.00 |
| 0780 | Signal cable, remove- outside intersection (0632-7-7) | LF | 535 | $1.00 | $1.04 | $3.00 | $1.03 | $1.03 | $1.00 |
| 0785 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 141 | $1,200.00 | $1,482.08 | $1,500.00 | $1,468.61 | $1,468.61 | $1,411.00 |
| 0790 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 7 | $3,500.00 | $2,415.06 | $3,500.00 | $2,393.13 | $2,393.13 | $2,300.00 |
| 0795 | Pull & splice box, install (0635-2-30) | EACH | 6 | $1,000.00 | $1,046.61 | $1,200.00 | $1,037.10 | $1,037.10 | $996.00 |
| 0800 | Junction box, furnish & install, mounted (0635-3-12) | EACH | 1 | $1,000.00 | $1,264.34 | $1,250.00 | $1,252.86 | $1,252.86 | $1,204.00 |
| 0805 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 6 | $6,200.00 | $5,525.38 | $8,000.00 | $5,475.20 | $5,475.20 | $5,262.00 |
| 0810 | Electrical power service, F&I, underground, meter not required (0639-1123) | AS | 2 | $6,500.00 | $5,525.38 | $4,000.00 | $5,475.20 | $5,475.20 | $5,262.00 |
| 0815 | Electrical power service, remove underground (0639-1620) | AS | 10 | $200.00 | $518.05 | $400.00 | $513.34 | $513.34 | $493.00 |
| 0820 | Electrical service wire, & install (0639-2-1) | LF | 1,388 | $10.00 | $8.46 | $11.00 | $8.38 | $8.38 | $8.00 |
| 0825 | Electrical service wire, (0639-2-6) | LF | 1,061 | $0.25 | $0.41 | $1.00 | $0.41 | $0.41 | $0.39 |
| 0830 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 6 | $3,500.00 | $2,912.60 | $3,500.00 | $2,886.14 | $2,886.14 | $2,773.00 |
| 0835 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $500.00 | $621.65 | $1,200.00 | $616.01 | $616.01 | $592.00 |
| 0840 | Aluminum signals pole, (0646-1-11) | EACH | 20 | $1,700.00 | $2,438.29 | $3,500.00 | $2,416.14 | $2,416.14 | $2,322.00 |
| 0845 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 2 | $2,000.00 | $3,178.58 | $3,000.00 | $3,149.71 | $3,149.71 | $3,027.00 |
| 0850 | Aluminum signals pole, remove (0646-1-60) | EACH | 13 | $300.00 | $414.44 | $300.00 | $410.67 | $410.67 | $394.00 |
| 0855 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 3 | $62,000 | $73,685 | $65,000 | $73,015 | $73,015 | $70,175 |
| 0860 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 1 | $69,000 | $77,875 | $70,000 | $77,168 | $77,168 | $74,166 |
| 0865 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 1 | $3,800.00 | $5,263.57 | $3,500.00 | $5,215.75 | $5,215.76 | $5,012.00 |
| 0870 | Steel mast arm assembly, remove, deep foundation- bolt on attachment (0649-26-5) | EACH | 2 | $7,000.00 | $10,286 | $5,500.00 | $10,193 | $10,193 | $9,796.00 |
| 0875 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 11 | $1,600.00 | $1,503.58 | $2,000.00 | $1,489.20 | $1,489.92 | $1,431.00 |
| 0880 | Vehicular traffic signal, furnish & install aluminum, 5 section straight, 1 way (0650-1-18) | AS | 2 | $1,800.00 | $2,175.62 | $2,500.00 | $2,155.85 | $2,155.85 | $2,072.00 |
| 0885 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 1 | $1,800.00 | $2,175.63 | $3,000.00 | $2,155.87 | $2,155.87 | $2,072.00 |
| 0890 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 1 | $500.00 | $207.22 | $225.00 | $205.34 | $205.34 | $197.00 |
| 0895 | Vehicular signal auxiliaries, repair/replace/retrofit- 12" LED standard module (0650-2106) | EACH | 5 | $500.00 | $880.94 | $250.00 | $872.93 | $872.93 | $838.00 |
| 0900 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 5 | $800.00 | $880.94 | $650.00 | $872.93 | $872.93 | $838.00 |
| 0905 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 20 | $1,200.00 | $972.47 | $1,100.00 | $963.64 | $963.64 | $926.00 |
| 0910 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 4 | $200.00 | $103.61 | $200.00 | $102.67 | $102.67 | $98.00 |
| 0915 | Loop detector inductive, remove- cabinet to remain (0660-1600) | EACH | 15 | $100.00 | $103.61 | $150.00 | $102.67 | $102.67 | $98.00 |
| 0920 | Loop assembly, F&I, type F (0660-2106) | AS | 2 | $2,500.00 | $1,833.35 | $3,000.00 | $1,816.70 | $1,816.70 | $1,746.00 |
| 0925 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 29 | $4,000.00 | $4,845.15 | $5,300.00 | $4,801.14 | $4,801.14 | $4,614.00 |
| 0930 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 29 | $5,500.00 | $8,783.32 | $7,300.00 | $8,703.54 | $8,703.54 | $8,365.00 |
| 0935 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 20 | $700.00 | $424.96 | $550.00 | $421.09 | $421.09 | $404.00 |
| 0940 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 4 | $3,000.00 | $2,692.66 | $2,250.00 | $2,668.21 | $2,668.21 | $2,564.00 |
| 0945 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 1 | $200.00 | $621.65 | $70.00 | $616.01 | $616.01 | $592.00 |
| 0950 | Traffic controller assembly, F&I, caltrans W/standard lock (0670-5180) | AS | 1 | $45,000 | $43,708 | $45,000 | $43,311 | $43,311 | $41,626 |
| 0955 | Traffic controller assembly, F&I, caltrans W/standard lock, preemption (0670-5181) | AS | 1 | $47,000 | $43,708 | $48,000 | $43,311 | $43,311 | $41,626 |
| 0960 | Traffic controller assembly, remove controller with (0670-5600) | AS | 2 | $1,000.00 | $1,657.75 | $1,600.00 | $1,642.69 | $1,642.67 | $1,578.00 |
| 0965 | Cellular modem, furnish and install (0684-8-1) | EACH | 2 | $9,000.00 | $2,542.96 | $4,000.00 | $2,519.86 | $2,519.86 | $3,421.00 |
| 0970 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 9 | $675.00 | $886.19 | $1,000.00 | $878.14 | $878.14 | $843.00 |
| 0975 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 6 | $300.00 | $207.22 | $150.00 | $205.34 | $205.34 | $197.00 |
| 0980 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 5 | $4,000.00 | $4,102.86 | $3,500.00 | $4,065.60 | $4,065.60 | $3,907.00 |
| 0985 | Internally illuminated sign, remove (0700-5-60) | EACH | 3 | $500.00 | $518.05 | $700.00 | $513.34 | $513.34 | $493.00 |
| 0990 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 144 | $4.00 | $3.43 | $3.50 | $3.40 | $3.40 | $3.27 |
| 0995 | Landscape complete- small plants (0580-1-1) | LS | 1 | $2,250.00 | $2,100.00 | $2,333.80 | $3,800.00 | $10,000 | $3,800.00 |
| 1000 | Relocate trees and palms, palms, <10.0" DBH, 14.0' or of clear trunk (0581-1272) | EACH | 8 | $4,225.00 | $3,990.00 | $1,000.00 | $4,000.00 | $1,500.00 | $4,000.00 |
| 1005 | Relocate trees and palms, palms, 10.0"-18.0" DBH, 14.0' or greater of clear trunk (0581-1282) | EACH | 1 | $6,700.00 | $6,300.00 | $4,000.00 | $7,000.00 | $3,500.00 | $7,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.