Bacallao Construction & Engineering Development, LLC D/B/A BC&E: FDOT bid record
Bacallao Construction & Engineering Development, LLC D/B/A BC&E submitted 10 bids on Florida DOT contracts in the data, from 08 DEC 2021 to 30 SEP 2026, and was the low bidder on 5 of them (50%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $16,846,242
- Latest bid
- 30 SEP 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 2 | 1 | 50% |
| 2022 | 1 | 1 | 100% |
| 2025 | 3 | 1 | 33% |
| 2026 | 4 | 2 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 6 | 9 | 4 | 44% |
| District 4 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Inlet protection system | 0104-18 | EACH | 10 | 9 (90%) | $50.00 | $150.00 |
| Performance turf, sod | 0570-1-2 | SY | 9 | 5 (56%) | $5.00 | $5.00 |
| Sign panel, remove, UP to 12 SF | 0700-3601 | EACH | 11 | 4 (36%) | $150.00 | $65.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 10 | 4 (40%) | $5.12 | $5.90 |
| Type III barricade | 0102-115 | ED | 10 | 4 (40%) | $0.25 | $0.34 |
| Work zone sign | 0102-60 | ED | 10 | 3 (30%) | $0.21 | $0.25 |
| Portable changeable message sign, temporary | 0102-99 | ED | 10 | 3 (30%) | $10.00 | $12.00 |
| Traffic control officer | 0102-14 | HR | 10 | 3 (30%) | $77.50 | $80.00 |
| Temporary signalization and maintenance, intersection | 0102-104 | ED | 10 | 3 (30%) | $8.12 | $15.00 |
| Temporary traffic detection and maintenance, intersection | 0102-107-1 | ED | 10 | 3 (30%) | $8.12 | $11.10 |
| Single column ground sign assembly, F&I ground mount, 20.0 SF | 0700-1112 | EACH | 7 | 3 (43%) | $1,650.00 | $2,070.00 |
| Guardrail removal | 0536-73 | LF | 6 | 3 (50%) | $2.12 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| General Asphalt Company, LLC | 9 | 3 of 9 |
| Ohla USA Inc | 8 | 1 of 8 |
| Weekley Asphalt Paving, Inc. | 7 | 4 of 7 |
| The Stout Group LLC | 7 | 0 of 7 |
| Florida Engineering & Development Corp | 6 | 1 of 6 |
| Horizon Contractors, Inc. | 5 | 1 of 5 |
| Ranger Construction Industries, Inc. | 4 | 0 of 4 |
| Asphalt Group, Inc. | 4 | 0 of 4 |
| Aum Construction Inc. | 4 | 0 of 4 |
| Roadway Construction, LLC | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 SEP 2026 | T6613 | District 6 | SR 860 (MIAMI GARDENS DR) AT NW 37TH AVE AND FROM NE 6TH AVE TO W | 4 of 9 | $1,882,013 | +11% |
| 29 JUL 2026 | T6595 | District 6 | SR 985 (SW 107 AVE) FROM SR 94 (SW 88 ST) TO N OF SW 56 ST | 1 of 12 | $4,378,413 | Low, 1.0% under the second |
| 25 MAR 2026 | T6591 | District 6 | SR 25 (US 27 OKEECHOBEE RD) AND SR 9 (NW 27 AVE) FROM... | 3 of 7 | $6,530,113 | +3.0% |
| 25 FEB 2026 | T6619 | District 6 | SR 969 (NW 72 AVE) AND SR 826 AT SR 948 (NW 36 ST) AT SR... | 1 of 6 | $1,640,113 | Low, 4.0% under the second |
| 03 DEC 2025 | T6615 | District 6 | SR 5 (US 1 / BISCAYNE BLVD) FROM S OF NE 38TH ST TO NE 61... | 3 of 8 | $6,574,213 | +5.0% |
| 24 SEP 2025 | T6592 | District 6 | SR 886 (PORT BLVD) FROM BISCAYNE BLVD TO PORT OF MIAMI | 6 of 7 | $4,305,855 | +19% |
| 27 AUG 2025 | T4715 | District 4 | SR 817 (UNIVERSITY DR) FROM NOVA DR TO SR 84 | 1 of 9 | $6,850,813 | Low, 9.0% under the second |
| 26 JAN 2022 | T6519 | District 6 | SR 932/NW 103 ST/W 49TH ST | 1 of 5 | $3,487,287 | Low, 0.0% under the second |
| 08 DEC 2021 | T6518 | District 6 | SR 817 (NW 27 AVE) | 3 of 8 | $3,177,670 | +9.0% |
| 08 DEC 2021 | T6558 | District 6 | SR 959 (NW 57 AVE) | 1 of 4 | $489,616 | Low, 3.0% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.