FDOT contract T6615 bid tabulation
SR 5 (US 1 / BISCAYNE BLVD) FROM S OF NE 38TH ST TO NE 61... Let by Florida DOT on December 3, 2025, Miami-Dade, District 6. 8 bids received; low bid $6,267,634 by General Asphalt Company, LLC.
- Owner
- Florida DOT
- Letting
- 03 DEC 2025
- Pay items
- 145
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | General Asphalt Company, LLC | $6,267,634 | Low |
| 2 | Weekley Asphalt Paving, Inc. | $6,286,721 | 0.0% |
| 3 | Bacallao Construction & Engineering Development, LLC D/B/A BC&E | $6,574,213 | +5.0% |
| 4 | Florida Engineering & Development Corp | $7,055,440 | +13% |
| 5 | Ohla USA Inc | $7,304,730 | +17% |
| 6 | The Stout Group LLC | $7,358,335 | +17% |
| 7 | Aum Construction Inc. | $7,397,446 | +18% |
| 8 | Asphalt Group, Inc. | $7,863,373 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. General Asphalt Company, LLC | 2. Weekley Asphalt Paving, Inc. | 3. Bacallao Construction & Engineering Development, LLC D/B/A BC&E | 4. Florida Engineering & Development Corp | 5. Ohla USA Inc | 6. The Stout Group LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $100,000 | $105,530 | $350,000 | $350,000 | $365,000 | $350,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $100,000 | $114,400 | $300,000 | $350,000 | $365,000 | $350,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $275,000 | $144,000 | $110,537 | $200,000 | $300,000 | $350,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $275,000 | $156,000 | $100,000 | $194,000 | $305,902 | $350,000 |
| 0025 | Traffic control officer (0102-14) | HR | 732 | $84.00 | $89.00 | $75.00 | $81.20 | $0.01 | $95.00 |
| 0030 | Work zone sign (0102-60) | ED | 25,260 | $0.18 | $0.20 | $0.18 | $0.18 | $0.18 | $0.18 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 75,650 | $0.09 | $0.08 | $0.10 | $0.10 | $0.10 | $0.10 |
| 0040 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 125,760 | $0.04 | $0.04 | $0.04 | $0.04 | $0.03 | $0.04 |
| 0045 | Arrow board / advance warning arrow panel (0102-76) | ED | 570 | $4.73 | $4.25 | $5.00 | $5.08 | $4.88 | $5.00 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 3,632 | $8.93 | $9.00 | $8.50 | $9.08 | $9.21 | $8.95 |
| 0055 | Temporary signalization and maintenance, intersection (0102-104) | ED | 2,660 | $5.99 | $5.00 | $5.00 | $5.08 | $5.08 | $5.00 |
| 0060 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 2,660 | $5.99 | $5.00 | $5.00 | $5.08 | $5.08 | $5.00 |
| 0065 | Type III barricade (0102-115) | ED | 1,280 | $0.24 | $0.25 | $0.23 | $0.32 | $0.25 | $0.32 |
| 0070 | Inlet protection system (0104-18) | EACH | 238 | $126.00 | $16.00 | $50.00 | $130.38 | $268.10 | $150.00 |
| 0075 | Litter removal (0107-1) | ACRE | 375.97 | $1.05 | $15.00 | $0.01 | $19.30 | $119.92 | $1.00 |
| 0080 | Mowing (0107-2) | ACRE | 295.79 | $1.05 | $15.00 | $0.01 | $29.33 | $100.00 | $1.00 |
| 0085 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1.05 | $5,000.00 | $1.00 | $4,009.25 | $69,373 | $30,000 |
| 0090 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1.05 | $5,000.00 | $1.00 | $4,009.25 | $1.04 | $30,000 |
| 0095 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $1.05 | $1,400.00 | $1.00 | $5,227.25 | $1.00 | $15,000 |
| 0100 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $1.05 | $1,400.00 | $1.00 | $5,227.25 | $1.00 | $15,000 |
| 0105 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $6,195.00 | $114,150 | $70,000 | $4,526.90 | $50,000 | $75,000 |
| 0110 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $24,255 | $114,149 | $15,000 | $11,317 | $50,000 | $75,000 |
| 0115 | Removal of existing concrete (0110-4-10) | SY | 5,960 | $34.96 | $37.33 | $30.00 | $29.38 | $40.00 | $25.00 |
| 0120 | Tree protection barrier (0110-21) | LF | 2,540 | $10.50 | $14.00 | $0.01 | $9.66 | $9.78 | $15.00 |
| 0125 | Tree root and branch pruning (0110-22) | EACH | 18 | $1,260.00 | $1,334.00 | $1,200.00 | $3,552.50 | $3,000.00 | $1,100.00 |
| 0130 | Borrow excavation, truck measure (0120-2-2) | CY | 89.70 | $111.09 | $150.00 | $50.00 | $139.17 | $1.00 | $100.00 |
| 0135 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $21,000 | $11,834 | $750.00 | $4,319.43 | $100,000 | $10,000 |
| 0140 | Type B stabilization (0160-4) | SY | 26 | $57.89 | $55.00 | $0.01 | $40.80 | $81.40 | $100.00 |
| 0145 | Optional base, base group 09 (0285-709) | SY | 26 | $139.09 | $90.00 | $55.00 | $47.62 | $255.80 | $300.00 |
| 0150 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 97,419 | $2.89 | $3.00 | $4.25 | $3.35 | $4.00 | $3.25 |
| 0155 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 624.80 | $187.62 | $215.00 | $200.00 | $209.44 | $146.75 | $215.00 |
| 0160 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 8,038.50 | $181.76 | $193.75 | $200.00 | $210.00 | $146.75 | $225.00 |
| 0165 | Miscellaneous asphalt (0339-1) | TN | 6.30 | $1,049.16 | $375.00 | $350.00 | $244.57 | $1,590.25 | $250.00 |
| 0170 | Cleaning & sealing joints- concrete pavement (0350-5) | LF | 529 | $13.11 | $9.00 | $40.00 | $15.22 | $20.00 | $50.00 |
| 0175 | Concrete pavement slab replacement (0353-70) | CY | 39 | $997.50 | $2,600.00 | $650.00 | $558.25 | $800.00 | $1,500.00 |
| 0180 | Manhole, adjust (0425-5) | EACH | 49 | $945.00 | $1,200.00 | $750.00 | $967.50 | $1,203.70 | $950.00 |
| 0185 | Bullet rail, double rail (0515-4-2) | LF | 20 | $262.50 | $250.00 | $125.00 | $253.75 | $122.00 | $85.00 |
| 0190 | Concrete curb & gutter, type F (0520-1-10) | LF | 4,216 | $25.20 | $57.90 | $50.00 | $45.42 | $56.15 | $40.00 |
| 0195 | Concrete curb, type D (0520-2-4) | LF | 34 | $22.05 | $79.00 | $50.00 | $50.05 | $180.15 | $35.00 |
| 0200 | Valley gutter- concrete (0520-3) | LF | 294 | $33.08 | $65.00 | $50.00 | $52.41 | $136.29 | $42.00 |
| 0205 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 193 | $50.40 | $93.82 | $190.00 | $142.69 | $191.60 | $95.00 |
| 0210 | Traffic separator concrete- type IV, 6' wide (0520-5-42) | LF | 19 | $50.40 | $146.50 | $320.00 | $177.98 | $531.32 | $120.00 |
| 0215 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 1,510 | $51.40 | $89.31 | $85.00 | $69.62 | $95.77 | $60.00 |
| 0220 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 3,187 | $62.16 | $93.00 | $125.00 | $88.75 | $108.42 | $80.00 |
| 0225 | Patterned pavement (0523-3) | SY | 1,091 | $498.75 | $45.00 | $48.00 | $482.12 | $482.23 | $180.00 |
| 0230 | Detectable warnings (0527-2) | SF | 1,242 | $32.92 | $44.00 | $35.00 | $34.75 | $46.94 | $45.00 |
| 0235 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 162 | $23.10 | $22.00 | $25.00 | $22.33 | $23.00 | $20.00 |
| 0240 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 2 | $4,410.00 | $4,200.00 | $4,100.00 | $4,263.00 | $3,628.00 | $4,300.00 |
| 0245 | Guardrail removal (0536-73) | LF | 181 | $4.20 | $400.00 | $1.00 | $4.06 | $3.00 | $3.00 |
| 0250 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $3,570.00 | $3,400.00 | $4,100.00 | $3,451.00 | $3,579.00 | $3,000.00 |
| 0255 | Performance turf, sod (0570-1-2) | SY | 404 | $5.78 | $18.00 | $5.00 | $9.02 | $14.40 | $25.00 |
| 0260 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 9 | $15.75 | $100.00 | $25.00 | $10.11 | $14.40 | $25.00 |
| 0265 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 |
| 0270 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0275 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $33,359 | $33,359 | $33,359 | $33,359 | $33,359 | $33,359 |
| 0280 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $41,774 | $41,774 | $41,774 | $41,774 | $41,774 | $41,774 |
| 0285 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 82 | $577.50 | $550.00 | $550.00 | $558.25 | $609.14 | $599.00 |
| 0290 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 8 | $2,047.50 | $1,950.00 | $1,700.00 | $1,979.25 | $2,182.74 | $1,850.00 |
| 0295 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 11 | $2,677.50 | $2,550.00 | $3,000.00 | $2,588.25 | $2,690.36 | $2,650.00 |
| 0300 | Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114) | EACH | 13 | $2,089.50 | $1,990.00 | $4,000.00 | $2,019.85 | $2,817.26 | $3,850.00 |
| 0305 | Single column ground sign assembly, relocate (0700-1500) | EACH | 4 | $446.25 | $425.00 | $400.00 | $431.38 | $862.95 | $450.00 |
| 0310 | Single column ground sign assembly, remove (0700-1600) | EACH | 66 | $10.50 | $10.00 | $10.00 | $10.15 | $45.69 | $50.00 |
| 0315 | Sign panel, furnish & install ground mount, 101-200 SF (0700-3106) | EACH | 1 | $6,142.50 | $5,850.00 | $5,500.00 | $5,937.75 | $5,203.05 | $8,500.00 |
| 0320 | Sign panel, install, 21-30 SF (0700-3403) | EACH | 1 | $315.00 | $300.00 | $1,325.00 | $304.50 | $1,675.13 | $1,500.00 |
| 0325 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 68 | $393.75 | $375.00 | $150.00 | $380.63 | $142.13 | $150.00 |
| 0330 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 1 | $73.50 | $70.00 | $12.00 | $71.05 | $45.69 | $50.00 |
| 0335 | Sign panel, remove, 21-30 SF (0700-3603) | EACH | 1 | $126.00 | $120.00 | $12.00 | $152.25 | $45.69 | $50.00 |
| 0340 | Sign panel, remove, 101-200 SF (0700-3606) | EACH | 1 | $567.00 | $540.00 | $12.00 | $548.10 | $177.67 | $3,000.00 |
| 0345 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 41 | $105.00 | $100.00 | $12.00 | $101.50 | $126.90 | $150.00 |
| 0350 | Object marker, type 1 (0705-10-1) | EACH | 13 | $367.50 | $350.00 | $450.00 | $355.25 | $329.95 | $400.00 |
| 0355 | Delineator, flexible tubular (0705-11-1) | EACH | 23 | $84.00 | $90.00 | $150.00 | $91.35 | $128.15 | $100.00 |
| 0360 | Raised pavement marker, type B (0706-1-3) | EACH | 4,038 | $3.68 | $5.00 | $4.50 | $5.08 | $4.27 | $4.00 |
| 0365 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 236 | $5.25 | $2.00 | $3.50 | $2.03 | $5.34 | $2.00 |
| 0370 | Painted pavement markings, surface (0710-90) | LS | 1 | $42,000 | $29,600 | $35,000 | $32,480 | $22,004 | $37,127 |
| 0375 | Painted pavement markings, surface (0710-90) | LS | 1 | $42,000 | $32,100 | $35,000 | $30,084 | $22,720 | $24,751 |
| 0380 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 6,108 | $2.10 | $2.00 | $2.25 | $2.03 | $3.56 | $3.00 |
| 0385 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 542 | $2.63 | $3.00 | $3.50 | $3.05 | $5.34 | $4.00 |
| 0390 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,280 | $3.15 | $4.00 | $4.50 | $4.06 | $7.11 | $5.00 |
| 0395 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.17 | $210.00 | $1,320.00 | $1,725.00 | $1,339.82 | $2,388.77 | $1,950.00 |
| 0400 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 36 | $105.00 | $120.00 | $175.00 | $121.80 | $120.67 | $100.00 |
| 0405 | Thermoplastic, standard, arrow (0711-11170) | EACH | 195 | $63.00 | $80.00 | $110.00 | $81.20 | $66.21 | $90.00 |
| 0410 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 1,498 | $3.15 | $3.00 | $3.50 | $3.05 | $4.91 | $4.00 |
| 0415 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.23 | $2,100.00 | $1,320.00 | $1,700.00 | $1,339.78 | $2,318.51 | $1,950.00 |
| 0420 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 2,605 | $15.75 | $18.00 | $20.00 | $18.27 | $18.04 | $18.00 |
| 0425 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 7.11 | $5,250.00 | $5,900.00 | $5,250.00 | $5,988.50 | $5,154.73 | $5,350.00 |
| 0430 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.29 | $5,775.00 | $6,600.00 | $8,750.00 | $6,698.98 | $6,758.81 | $7,800.00 |
| 0435 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 4.97 | $1,890.00 | $1,320.00 | $1,650.00 | $1,339.80 | $1,287.70 | $1,950.00 |
| 0440 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.15 | $2,625.00 | $3,168.00 | $3,250.00 | $3,215.50 | $2,424.23 | $3,500.00 |
| 0445 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 6.13 | $5,250.00 | $5,900.00 | $5,250.00 | $5,988.50 | $4,736.89 | $5,350.00 |
| 0450 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.07 | $29,400 | $52,800 | $60,000 | $53,592 | $48,245 | $39,000 |
| 0455 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.07 | $12,600 | $6,600.00 | $30,000 | $6,698.94 | $12,244 | $18,000 |
| 0460 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.13 | $29,400 | $52,800 | $32,250 | $53,592 | $50,115 | $39,000 |
| 0465 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.07 | $12,600 | $6,800.00 | $30,000 | $6,901.97 | $11,930 | $18,000 |
| 0470 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,090 | $31.08 | $35.00 | $30.00 | $35.53 | $25.38 | $36.00 |
| 0475 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 48 | $1,475.78 | $1,700.00 | $1,400.00 | $1,725.50 | $1,319.80 | $1,750.00 |
| 0480 | Pull & splice box, install (0635-2-30) | EACH | 1 | $1,075.83 | $1,204.13 | $1,100.00 | $1,222.19 | $1,032.99 | $1,290.14 |
| 0485 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $7,305.90 | $5,262.27 | $6,000.00 | $5,341.21 | $5,869.55 | $5,638.15 |
| 0490 | Electrical power service, remove underground (0639-1620) | AS | 1 | $707.18 | $1,184.11 | $1,100.00 | $1,201.87 | $1,072.08 | $1,268.69 |
| 0495 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $3,198.09 | $3,050.39 | $3,500.00 | $3,096.15 | $3,082.24 | $3,268.27 |
| 0500 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $707.18 | $592.05 | $800.00 | $600.93 | $770.56 | $634.34 |
| 0505 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 10,714 | $3.36 | $3.04 | $3.25 | $3.09 | $2.94 | $3.26 |
| 0510 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 174 | $4.73 | $8.59 | $5.00 | $8.72 | $4.57 | $9.20 |
| 0515 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 8,292 | $1.26 | $0.39 | $0.50 | $0.40 | $0.41 | $0.42 |
| 0520 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 2 | $19,788 | $14,250 | $18,000 | $14,464 | $16,843 | $14,250 |
| 0525 | Load center, remove, voltage (0715-7-41) | EACH | 2 | $942.90 | $789.41 | $650.00 | $801.25 | $603.05 | $845.79 |
| 0530 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pole top (0715-11213) | EACH | 4 | $1,622.99 | $1,815.50 | $2,200.00 | $1,842.73 | $2,137.56 | $1,945.18 |
| 0535 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pendant/teardrop (0715-11216) | EACH | 15 | $2,862.41 | $3,142.64 | $3,500.00 | $3,189.78 | $3,275.63 | $3,367.11 |
| 0540 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 8' arm length (0715-61311) | EACH | 1 | $8,205.65 | $10,500 | $9,000.00 | $10,658 | $8,121.83 | $11,514 |
| 0545 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 2 | $707.18 | $789.41 | $700.00 | $801.25 | $642.13 | $845.79 |
| 0550 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 26 | $880.11 | $1,293.28 | $1,500.00 | $1,312.68 | $1,375.63 | $1,385.66 |
| 0555 | Light pole complete- special design, F&I, single arm shoulder mount, galvanized steel, 40' (0715-511240) | EACH | 2 | $38,392 | $41,526 | $40,000 | $42,149 | $39,329 | $44,492 |
| 0560 | Light pole complete-special design, F&I, pole top mount, aluminum, 15' (0715-516115) | EACH | 2 | $21,230 | $16,725 | $17,500 | $16,976 | $16,244 | $17,920 |
| 0565 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 3,675 | $33.81 | $36.00 | $32.00 | $36.54 | $30.46 | $36.00 |
| 0570 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 8 | $12,585 | $7,500.00 | $12,000 | $7,612.50 | $10,457 | $8,567.28 |
| 0575 | Signal cable, remove- intersection (0632-7-6) | PI | 7 | $942.90 | $1,381.46 | $2,000.00 | $1,402.18 | $1,754.31 | $1,480.14 |
| 0580 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 194 | $1,475.78 | $1,700.00 | $1,400.00 | $1,725.50 | $1,319.80 | $1,750.00 |
| 0585 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 8 | $2,382.13 | $2,334.63 | $3,250.00 | $2,369.65 | $3,046.19 | $2,501.38 |
| 0590 | Pull & splice box, install (0635-2-30) | EACH | 8 | $1,075.83 | $1,204.13 | $1,100.00 | $1,222.19 | $1,033.00 | $1,290.14 |
| 0595 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 8 | $8,566.84 | $4,800.00 | $7,500.00 | $4,872.00 | $6,385.79 | $5,623.34 |
| 0600 | Electrical power service, F&I, underground, meter not required (0639-1123) | AS | 2 | $8,080.49 | $5,248.45 | $4,500.00 | $5,327.18 | $4,286.80 | $5,623.34 |
| 0605 | Electrical power service, remove underground (0639-1620) | AS | 7 | $707.18 | $592.05 | $400.00 | $600.93 | $378.68 | $634.34 |
| 0610 | Electrical service wire, & install (0639-2-1) | LF | 2,690 | $11.87 | $9.80 | $11.00 | $9.95 | $10.15 | $10.50 |
| 0615 | Electrical service wire, (0639-2-6) | LF | 1,872 | $0.63 | $0.39 | $1.00 | $0.40 | $1.02 | $0.42 |
| 0620 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 8 | $2,990.30 | $3,050.39 | $3,250.00 | $3,096.15 | $3,045.69 | $3,268.27 |
| 0625 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 4 | $942.90 | $493.38 | $1,100.00 | $500.78 | $982.74 | $528.62 |
| 0630 | Aluminum signals pole, (0646-1-11) | EACH | 36 | $2,554.02 | $2,000.00 | $3,400.00 | $2,030.00 | $3,041.62 | $2,000.00 |
| 0635 | Aluminum signals pole, remove (0646-1-60) | EACH | 10 | $707.18 | $394.70 | $300.00 | $400.62 | $271.07 | $422.90 |
| 0640 | Steel mast arm assembly, and install, single arm 78' (0649-21-21) | EACH | 1 | $92,484 | $75,000 | $100,000 | $76,125 | $84,436 | $75,000 |
| 0645 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 5 | $1,490.58 | $1,524.70 | $2,000.00 | $1,547.57 | $1,887.31 | $1,633.61 |
| 0650 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 1 | $235.73 | $98.68 | $225.00 | $100.16 | $201.02 | $105.73 |
| 0655 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 50 | $479.54 | $700.00 | $650.00 | $710.50 | $566.50 | $700.00 |
| 0660 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 32 | $762.30 | $919.98 | $1,000.00 | $933.78 | $959.90 | $985.70 |
| 0665 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 4 | $1,631.60 | $1,749.41 | $1,750.00 | $1,775.65 | $1,573.10 | $1,874.37 |
| 0670 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 10 | $117.92 | $98.68 | $200.00 | $100.16 | $181.73 | $105.72 |
| 0675 | Midblock crosswalk: rectangular rapid flashing beacon, remove complete sign assembly (0654-2-60) | AS | 4 | $942.90 | $789.41 | $850.00 | $801.25 | $670.05 | $845.79 |
| 0680 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 20 | $359.42 | $339.58 | $650.00 | $344.67 | $549.24 | $363.83 |
| 0685 | Loop assembly, F&I, type F (0660-2106) | AS | 20 | $1,930.95 | $1,500.00 | $2,250.00 | $1,522.50 | $2,030.46 | $1,500.00 |
| 0690 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 44 | $383.99 | $404.72 | $650.00 | $410.79 | $541.62 | $433.62 |
| 0695 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 8 | $117.92 | $98.68 | $80.00 | $100.16 | $67.01 | $105.72 |
| 0700 | Traffic controller assembly, F&I, caltrans W/standard lock (0670-5180) | AS | 1 | $47,157 | $43,068 | $50,000 | $43,714 | $45,016 | $46,144 |
| 0705 | Cellular modem, furnish and install (0684-8-1) | EACH | 1 | $2,006.87 | $2,327.20 | $4,500.00 | $2,362.11 | $3,947.21 | $2,493.42 |
| 0710 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 2 | $883.79 | $1,085.26 | $1,000.00 | $1,101.54 | $916.25 | $1,162.78 |
| 0715 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 3 | $235.73 | $98.68 | $150.00 | $71.05 | $141.62 | $105.73 |
| 0720 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 235 | $3.36 | $3.27 | $3.00 | $3.32 | $2.94 | $3.50 |
| 0725 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 249 | $1.26 | $0.40 | $1.00 | $0.41 | $1.02 | $0.42 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of December 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.