FDOT contract T6613 bid tabulation
SR 860 (MIAMI GARDENS DR) AT NW 37TH AVE AND FROM NE 6TH AVE TO W. Let by Florida DOT on September 30, 2026, Miami-Dade, District 6. 9 bids received; low bid $1,690,338 by Weekley Asphalt Paving, Inc..
- Owner
- Florida DOT
- Letting
- 30 SEP 2026
- Pay items
- 119
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Weekley Asphalt Paving, Inc. | $1,690,338 | Low |
| 2 | Florida Signal & Lighting Contractors, Inc. | $1,828,110 | +8.0% |
| 3 | Horizon Contractors, Inc. | $1,849,265 | +9.0% |
| 4 | Bacallao Construction & Engineering Development, LLC D/B/A BC&E | $1,882,013 | +11% |
| 5 | Aum Construction Inc. | $1,895,895 | +12% |
| 6 | Florida Engineering & Development Corp | $1,970,553 | +17% |
| 7 | The Stout Group LLC | $2,053,425 | +21% |
| 8 | Ohla USA Inc | $2,158,467 | +28% |
| 9 | General Asphalt Company, LLC | $2,630,269 | +56% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Weekley Asphalt Paving, Inc. | 2. Florida Signal & Lighting Contractors, Inc. | 3. Horizon Contractors, Inc. | 4. Bacallao Construction & Engineering Development, LLC D/B/A BC&E | 5. Aum Construction Inc. | 6. Florida Engineering & Development Corp |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $55,000 | $100,000 | $100,000 | $200,000 | $100,000 | $196,907 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $173,239 | $100,000 | $100,000 | $40,000 | $100,000 | $121,665 |
| 0015 | Traffic control officer (0102-14) | HR | 138 | $90.00 | $85.00 | $80.00 | $80.00 | $70.00 | $88.08 |
| 0020 | Work zone sign (0102-60) | ED | 7,840 | $0.19 | $0.50 | $0.20 | $0.19 | $0.25 | $0.33 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 26,510 | $0.11 | $0.30 | $0.10 | $0.09 | $0.15 | $0.16 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 5,040 | $0.08 | $0.45 | $0.06 | $0.05 | $0.15 | $1.10 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 540 | $5.10 | $12.00 | $5.50 | $5.00 | $7.00 | $6.04 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 836 | $9.20 | $16.00 | $11.00 | $10.00 | $12.00 | $12.07 |
| 0045 | Temporary signalization and maintenance, intersection (0102-104) | ED | 660 | $6.00 | $15.00 | $5.00 | $5.00 | $10.00 | $5.17 |
| 0050 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 660 | $6.00 | $15.00 | $5.00 | $5.00 | $10.00 | $5.17 |
| 0055 | Type III barricade (0102-115) | ED | 1,690 | $0.32 | $1.00 | $0.30 | $0.25 | $0.50 | $0.55 |
| 0060 | Sediment barrier (0104-10-3) | LF | 1,868 | $2.50 | $3.00 | $0.01 | $0.01 | $2.80 | $4.18 |
| 0065 | Inlet protection system (0104-18) | EACH | 27 | $150.00 | $450.00 | $80.00 | $50.00 | $150.00 | $124.06 |
| 0070 | Litter removal (0107-1) | ACRE | 22.21 | $50.00 | $250.00 | $0.01 | $0.01 | $50.00 | $1.00 |
| 0075 | Mowing (0107-2) | ACRE | 17.86 | $50.00 | $100.00 | $0.01 | $0.01 | $50.00 | $250.00 |
| 0080 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $6,560.00 | $5,000.00 | $100.00 | $1.00 | $22,000 | $4,554.89 |
| 0085 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $6,480.00 | $25,000 | $100,000 | $39,988 | $14,538 | $17,808 |
| 0090 | Removal of existing concrete (0110-4-10) | SY | 543 | $38.00 | $51.00 | $27.00 | $40.00 | $30.00 | $56.14 |
| 0095 | Tree protection barrier (0110-21) | LF | 1,960 | $9.50 | $5.00 | $0.01 | $0.01 | $10.00 | $11.96 |
| 0100 | Type B stabilization (0160-4) | SY | 17 | $80.00 | $58.00 | $20.00 | $0.01 | $20.00 | $48.75 |
| 0105 | Optional base, base group 09 (0285-709) | SY | 17 | $80.00 | $116.00 | $80.00 | $125.00 | $60.00 | $120.09 |
| 0110 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 25,645 | $3.00 | $4.30 | $4.50 | $4.00 | $5.00 | $5.06 |
| 0115 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 96.10 | $250.00 | $268.00 | $225.00 | $210.00 | $225.00 | $272.20 |
| 0120 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 1,763.90 | $200.00 | $221.00 | $220.00 | $210.00 | $225.00 | $227.20 |
| 0125 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 1 | $9,672.00 | $11,300 | $8,000.00 | $10,250 | $12,500 | $10,116 |
| 0130 | Inlets, curb, type P-5, partial (0425-1355) | EACH | 1 | $7,634.00 | $8,900.00 | $5,000.00 | $4,900.00 | $12,000 | $5,205.86 |
| 0135 | Manhole, adjust (0425-5) | EACH | 7 | $950.00 | $1,155.00 | $900.00 | $800.00 | $1,500.00 | $1,223.69 |
| 0140 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 132 | $263.24 | $157.00 | $180.00 | $150.00 | $285.00 | $222.91 |
| 0145 | PVC pipe for back of sidewalk, (0430-963-1) | LF | 28 | $250.00 | $186.00 | $40.00 | $150.00 | $110.00 | $240.87 |
| 0150 | Concrete curb & gutter, type F (0520-1-10) | LF | 1,828 | $47.40 | $44.00 | $35.00 | $55.00 | $45.00 | $34.21 |
| 0155 | Concrete curb, type D (0520-2-4) | LF | 4 | $100.00 | $173.00 | $55.00 | $80.00 | $50.00 | $802.80 |
| 0160 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 41 | $100.35 | $114.00 | $75.00 | $90.00 | $85.00 | $64.27 |
| 0165 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 232 | $98.52 | $109.00 | $90.00 | $110.00 | $115.00 | $89.95 |
| 0170 | Pavers, architectural, remove existing and reinstall (0526-1101) | SY | 4 | $220.00 | $577.00 | $100.00 | $150.00 | $280.00 | $197.27 |
| 0175 | Detectable warnings (0527-2) | SF | 72 | $41.00 | $41.00 | $30.00 | $35.00 | $45.00 | $45.75 |
| 0180 | Performance turf, sod (0570-1-2) | SY | 518 | $7.20 | $5.00 | $5.00 | $4.50 | $15.00 | $6.04 |
| 0185 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 742 | $10.00 | $5.00 | $5.00 | $12.00 | $20.00 | $8.23 |
| 0190 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $1,333.08 | $1,333.08 | $1,333.08 | $1,333.08 | $1,333.08 | $1,333.08 |
| 0195 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0200 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 260 | $30.00 | $40.00 | $30.00 | $40.00 | $28.00 | $34.42 |
| 0205 | Signal cable- repair/replace/other, furnish & install (0632-7-2) | LF | 54 | $5.00 | $10.00 | $12.00 | $15.00 | $20.00 | $9.01 |
| 0210 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $1,000.00 | $1,650.00 | $1,400.00 | $1,500.00 | $1,350.00 | $1,407.87 |
| 0215 | Pull & splice box, install (0635-2-30) | EACH | 2 | $1,000.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,150.00 | $1,154.13 |
| 0220 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $3,200.00 | $5,900.00 | $6,200.00 | $6,000.00 | $7,000.00 | $5,860.46 |
| 0225 | Electrical service wire, & install (0639-2-1) | LF | 255 | $10.00 | $10.00 | $9.00 | $9.00 | $10.00 | $9.24 |
| 0230 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $2,800.00 | $2,900.00 | $3,200.00 | $2,500.00 | $2,500.00 | $2,495.27 |
| 0235 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 22 | $695.00 | $700.00 | $580.00 | $825.00 | $650.00 | $762.81 |
| 0240 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $2,350.00 | $2,350.00 | $1,700.00 | $2,200.00 | $2,500.00 | $2,579.28 |
| 0245 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 1 | $2,550.00 | $2,560.00 | $2,400.00 | $2,675.00 | $3,000.00 | $2,798.79 |
| 0250 | Single column ground sign assembly, F&I barrier less than 12 SF (0700-1311) | EACH | 1 | $1,995.00 | $2,000.00 | $2,300.00 | $2,600.00 | $2,500.00 | $2,189.64 |
| 0255 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $425.00 | $425.00 | $185.00 | $650.00 | $600.00 | $466.47 |
| 0260 | Single column ground sign assembly, remove (0700-1600) | EACH | 9 | $10.00 | $10.00 | $145.00 | $13.00 | $100.00 | $10.98 |
| 0265 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 4 | $200.00 | $200.00 | $125.00 | $155.00 | $150.00 | $219.51 |
| 0270 | Enhanced highway sign AC powered, F&I ground mount, W/eds, UP to 12 SF of static sign panels (0700-141131) | EACH | 2 | $9,000.00 | $13,000 | $17,000 | $14,500 | $15,000 | $14,769 |
| 0275 | Tubular marker, 36" yellow (0704-1-4) | EACH | 24 | $95.00 | $95.00 | $145.00 | $250.00 | $225.00 | $104.27 |
| 0280 | Object marker, type 3 (0705-10-3) | EACH | 1 | $395.00 | $395.00 | $345.00 | $650.00 | $500.00 | $433.54 |
| 0285 | Delineator, flexible tubular (0705-11-1) | EACH | 1 | $90.00 | $90.00 | $145.00 | $125.00 | $200.00 | $98.78 |
| 0290 | Raised pavement marker, type B (0706-1-3) | EACH | 515 | $5.00 | $5.00 | $6.00 | $6.50 | $8.00 | $5.49 |
| 0295 | Painted pavement markings, surface (0710-90) | LS | 1 | $12,820 | $13,000 | $20,000 | $16,500 | $16,000 | $14,071 |
| 0300 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,091 | $2.40 | $2.40 | $3.00 | $3.25 | $4.00 | $2.63 |
| 0305 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 353 | $3.60 | $3.60 | $4.00 | $4.75 | $6.00 | $3.95 |
| 0310 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 192 | $4.80 | $4.80 | $5.00 | $6.00 | $8.00 | $5.27 |
| 0315 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.13 | $1,320.00 | $1,320.00 | $1,500.00 | $1,350.00 | $5,000.00 | $188.28 |
| 0320 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 15 | $120.00 | $120.00 | $190.00 | $125.00 | $200.00 | $131.71 |
| 0325 | Thermoplastic, standard, arrow (0711-11170) | EACH | 25 | $80.00 | $80.00 | $105.00 | $100.00 | $150.00 | $87.81 |
| 0330 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 6 | $3.60 | $3.60 | $4.00 | $4.00 | $6.00 | $3.95 |
| 0335 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.12 | $5,290.00 | $5,290.00 | $1,500.00 | $1,500.00 | $5,000.00 | $5,553.74 |
| 0340 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 766 | $17.00 | $17.00 | $19.00 | $20.00 | $20.00 | $18.66 |
| 0345 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.23 | $5,290.00 | $5,290.00 | $5,500.00 | $5,400.00 | $6,500.00 | $5,806.12 |
| 0350 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.56 | $5,650.00 | $5,650.00 | $7,200.00 | $5,750.00 | $8,500.00 | $6,201.23 |
| 0355 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 1.11 | $1,320.00 | $1,320.00 | $1,500.00 | $1,400.00 | $2,000.00 | $1,448.78 |
| 0360 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.07 | $4,600.00 | $4,600.00 | $3,000.00 | $5,000.00 | $3,500.00 | $5,048.84 |
| 0365 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.98 | $5,290.00 | $5,290.00 | $6,000.00 | $5,500.00 | $5,700.00 | $5,806.12 |
| 0370 | Thermoplastic, standard-other surfaces, yellow, solid, 8" (0711-16202) | GM | 0.09 | $5,650.00 | $5,650.00 | $7,000.00 | $6,500.00 | $7,500.00 | $6,201.18 |
| 0375 | Channelizing curb, centerline (0921-703100) | LF | 24 | $610.00 | $350.00 | $300.00 | $0.01 | $320.00 | $87.81 |
| 0380 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 415 | $30.00 | $30.00 | $30.00 | $35.00 | $28.00 | $34.38 |
| 0385 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 10 | $1,000.00 | $1,650.00 | $1,400.00 | $1,450.00 | $1,350.00 | $1,407.87 |
| 0390 | Pull & splice box, install (0635-2-30) | EACH | 1 | $1,000.00 | $1,200.00 | $1,200.00 | $725.00 | $1,150.00 | $1,154.14 |
| 0395 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $6,200.00 | $5,900.00 | $7,500.00 | $6,500.00 | $7,000.00 | $5,457.00 |
| 0400 | Electrical power service, remove underground (0639-1620) | AS | 1 | $500.00 | $850.00 | $1,600.00 | $1,650.00 | $750.00 | $620.94 |
| 0405 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,800.00 | $2,900.00 | $3,300.00 | $3,000.00 | $2,500.00 | $2,495.27 |
| 0410 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 2,150 | $5.00 | $3.00 | $4.00 | $3.50 | $3.00 | $3.18 |
| 0415 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 550 | $6.00 | $5.00 | $5.00 | $5.00 | $5.00 | $4.62 |
| 0420 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 300 | $1.00 | $0.50 | $2.00 | $1.00 | $1.00 | $0.42 |
| 0425 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $14,000 | $22,500 | $18,000 | $18,000 | $18,000 | $16,215 |
| 0430 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 12' arm length (0715-61242) | EACH | 1 | $12,000 | $15,000 | $10,000 | $10,500 | $9,000.00 | $10,743 |
| 0435 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 1 | $1,000.00 | $850.00 | $700.00 | $900.00 | $1,000.00 | $827.92 |
| 0440 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 4 | $1,200.00 | $700.00 | $1,500.00 | $1,250.00 | $750.00 | $1,201.14 |
| 0445 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,171 | $35.00 | $38.00 | $33.00 | $35.00 | $28.00 | $35.91 |
| 0450 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 2 | $12,000 | $12,000 | $10,000 | $10,000 | $10,000 | $9,214.12 |
| 0455 | Signal cable, remove- intersection (0632-7-6) | PI | 2 | $500.00 | $850.00 | $2,000.00 | $1,750.00 | $500.00 | $1,655.83 |
| 0460 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 45 | $1,000.00 | $1,650.00 | $1,400.00 | $1,400.00 | $1,350.00 | $1,407.87 |
| 0465 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 2 | $2,800.00 | $2,600.00 | $3,500.00 | $3,000.00 | $2,500.00 | $2,564.50 |
| 0470 | Pull & splice box, install (0635-2-30) | EACH | 1 | $1,000.00 | $1,200.00 | $1,200.00 | $725.00 | $1,150.00 | $1,117.90 |
| 0475 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $4,000.00 | $5,900.00 | $7,100.00 | $6,500.00 | $7,000.00 | $5,518.99 |
| 0480 | Electrical power service, remove overhead (0639-1610) | AS | 1 | $500.00 | $500.00 | $1,600.00 | $1,250.00 | $750.00 | $827.92 |
| 0485 | Electrical service wire, & install (0639-2-1) | LF | 218 | $10.00 | $10.00 | $11.00 | $10.00 | $10.00 | $10.28 |
| 0490 | Electrical service wire, (0639-2-6) | LF | 96 | $1.00 | $1.00 | $2.00 | $1.00 | $1.00 | $0.52 |
| 0495 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,800.00 | $2,900.00 | $3,500.00 | $2,500.00 | $2,500.00 | $2,495.27 |
| 0500 | Aluminum signals pole, remove (0646-1-60) | EACH | 1 | $250.00 | $200.00 | $300.00 | $300.00 | $250.00 | $620.94 |
| 0505 | Steel mast arm, extend arm on existing pole assembly (0649-4-7) | EACH | 1 | $10,000 | $10,000 | $7,000.00 | $5,000.00 | $3,000.00 | $3,486.30 |
| 0510 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 1 | $85,000 | $67,000 | $95,000 | $100,000 | $100,000 | $92,741 |
| 0515 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 1 | $90,000 | $75,000 | $105,000 | $125,000 | $110,000 | $102,691 |
| 0520 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 2 | $4,000.00 | $3,500.00 | $5,000.00 | $5,500.00 | $2,500.00 | $5,329.96 |
| 0525 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 17 | $1,500.00 | $1,450.00 | $1,600.00 | $2,000.00 | $1,650.00 | $1,561.24 |
| 0530 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 2 | $1,700.00 | $1,600.00 | $2,400.00 | $2,000.00 | $2,000.00 | $2,013.59 |
| 0535 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 13 | $200.00 | $80.00 | $220.00 | $225.00 | $150.00 | $206.98 |
| 0540 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 1 | $1,200.00 | $2,000.00 | $1,200.00 | $1,100.00 | $1,800.00 | $985.16 |
| 0545 | Loop assembly, F&I, type F (0660-2106) | AS | 1 | $3,500.00 | $3,000.00 | $2,800.00 | $1,950.00 | $1,450.00 | $2,038.20 |
| 0550 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 4 | $2,000.00 | $6,500.00 | $3,900.00 | $5,000.00 | $4,000.00 | $4,986.64 |
| 0555 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 2 | $8,000.00 | $4,000.00 | $12,000 | $12,500 | $12,000 | $12,041 |
| 0560 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 1 | $600.00 | $500.00 | $650.00 | $550.00 | $500.00 | $424.46 |
| 0565 | Traffic controller assembly, F&I, caltrans W/standard lock (0670-5180) | AS | 1 | $40,000 | $52,000 | $48,000 | $55,000 | $49,000 | $45,194 |
| 0570 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $800.00 | $600.00 | $1,700.00 | $1,250.00 | $750.00 | $1,241.87 |
| 0575 | Cellular modem, furnish and install (0684-8-1) | EACH | 1 | $2,500.00 | $3,000.00 | $5,000.00 | $3,000.00 | $2,000.00 | $2,624.74 |
| 0580 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 2 | $200.00 | $1,200.00 | $900.00 | $1,000.00 | $1,000.00 | $219.52 |
| 0585 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 1 | $70.00 | $85.00 | $200.00 | $160.00 | $100.00 | $76.83 |
| 0590 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 3 | $3,000.00 | $3,100.00 | $3,700.00 | $4,000.00 | $2,750.00 | $3,996.63 |
| 0595 | Internally illuminated sign, remove (0700-5-60) | EACH | 1 | $500.00 | $600.00 | $700.00 | $700.00 | $250.00 | $620.94 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of September 30, 2026. Compiled by Mirage Metrics.