FDOT contract T6619 bid tabulation

SR 969 (NW 72 AVE) AND SR 826 AT SR 948 (NW 36 ST) AT SR... Let by Florida DOT on February 25, 2026, Miami-Dade, District 6. 6 bids received; low bid $1,640,113 by Bacallao Construction & Engineering Development, LLC D/B/A BC&E.

Owner
Florida DOT
Letting
25 FEB 2026
Pay items
124
Data through
28 OCT 2026

Bidders

FDOT contract T6619: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Bacallao Construction & Engineering Development, LLC D/B/A BC&E2. Florida Engineering & Development Corp3. The Stout Group LLC4. General Asphalt Company, LLC5. Weekley Asphalt Paving, Inc.6. Jva Engineering Contractor, Inc
0005Mobilization (0101-1)LS1$170,000$145,000$89,000$120,000$84,010$115,400
0010Mobilization (0101-1)LS1$5,000.00$145,000$89,000$80,000$57,450$114,800
0015Maintenance of traffic (0102-1)DA1$50,000$82,500$105,000$220,000$139,450$103,800
0020Maintenance of traffic (0102-1)DA1$25,030$82,500$105,000$177,000$60,000$68,300
0025Commercial material for temporary driveway maintenance (0102-3)CY17.80$0.01$119.87$45.00$105.00$59.00$66.10
0030Pedestrian or bicycle special detour (0102-4-1)SY1$1.00$1,034.39$10,000$2,625.00$12,445$18,900
0035Pedestrian escort/flagger (0102-5)HR480$1.00$58.06$1.00$33.60$50.00$48.00
0040Traffic control officer (0102-14)HR480$75.00$81.45$1.00$42.00$90.00$89.00
0045Work zone sign (0102-60)ED2,075$0.23$0.20$0.18$0.21$0.30$0.25
0050Barrier mounted work zone sign- index 700-012 (0102-62-12)ED572$1.50$1.78$1.75$1.84$0.50$38.00
0055Temporary barrier, F&I, free standing (0102-71-16)LF580$0.01$25.71$35.00$1.00$40.00$23.70
0060Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED10,465$0.11$0.11$0.10$0.12$0.10$0.13
0065Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD26,502$0.06$0.04$0.06$0.05$0.05$0.06
0070Arrow board / advance warning arrow panel (0102-76)ED310$6.00$5.08$5.00$5.25$5.00$5.90
0075Temporary crash cushion, redirective option (0102-89-1)LO1$1.00$908.42$1,950.00$939.75$3,600.00$1,140.67
0080Portable changeable message sign, temporary (0102-99)ED338$10.00$9.24$8.90$9.56$10.00$12.65
0085Temporary signalization and maintenance, intersection (0102-104)ED180$5.00$7.34$10.00$5.25$10.00$11.80
0090Temporary traffic detection and maintenance, intersection (0102-107-1)ED180$5.00$7.34$10.00$5.25$10.00$11.80
0095Type III barricade (0102-115)ED482$0.28$0.28$0.25$0.29$0.35$0.29
0100Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22)GM0.40$6,000.00$6,699.00$7,500.00$6,300.00$7,335.00$9,590.00
0105Inlet protection system (0104-18)EACH10$70.00$93.64$150.00$126.00$170.00$220.00
0110Litter removal (0107-1)ACRE18.66$0.01$0.05$0.01$1.05$200.00$280.00
0115Mowing (0107-2)ACRE14.10$0.01$0.08$0.01$1.05$200.00$260.00
0120Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$1.00$3,958.50$15,000$1.05$5,500.00$5,000.00
0125Monitor existing structures- vibration monitoring (0108-2)LS1$1.00$2,436.00$10,000$1.05$2,700.00$3,000.00
0130Clearing & grubbing (0110-1-1)ACRE1$30,000$4,526.90$30,000$18,060$26,000$29,600
0135Clearing & grubbing (0110-1-1)ACRE1$25,000$9,053.80$30,000$33,075$38,500$29,600
0140Removal of existing concrete (0110-4-10)SY807$35.00$34.17$25.00$66.94$49.00$30.80
0145Tree protection barrier (0110-21)LF231$0.01$7.21$10.00$5.25$19.00$5.80
0150Regular excavation (0120-1)CY346.60$82.00$48.19$60.00$81.59$58.00$43.10
0155Embankment (0120-6)CY178$55.00$77.05$90.00$149.00$45.00$51.00
0160Type B stabilization (0160-4)SY443$0.01$15.16$18.00$12.71$30.00$51.00
0165Optional base, base group 10 (0285-710)SY442$73.00$46.08$80.00$84.11$92.85$52.00
0170Composite base, special design, 6.5" of B-12 & 6" granular (0285-774)SY1$1,000.00$266.32$150.00$840.00$1,800.00$5,900.00
0175Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY6,053$6.25$3.14$15.00$3.57$5.00$7.15
0180Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY2,235$6.25$5.10$22.50$3.86$8.00$6.40
0185Superpave asphaltic conc, traffic C (0334-1-13)TN61.20$245.00$249.64$250.00$229.96$300.00$387.00
0190Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN499.80$245.00$196.23$185.00$229.30$250.00$235.00
0195Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88)TN230.60$270.00$221.99$185.00$201.95$250.00$254.00
0200Miscellaneous asphalt (0339-1)TN63.40$300.00$243.99$250.00$273.80$350.00$373.00
0205Manholes, J-7, <10' (0425-2-71)EACH2$9,500.00$9,913.89$13,000$13,488$20,000$8,400.00
0210Special drainage, utility avoidance structure (0425-100-41)EACH4$15,800$20,553$18,000$15,400$29,000$13,300
0215Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218)LF143$250.00$254.50$180.00$264.50$400.00$256.00
0220Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF316$165.00$127.94$180.00$209.48$500.00$216.00
0225Concrete curb & gutter, type F (0520-1-10)LF693$50.00$41.55$35.00$39.90$59.90$51.70
0230Concrete sidewalk and driveways, 4" thick (0522-1)SY210$85.00$56.64$80.00$58.80$93.30$90.40
0235Concrete sidewalk and driveways, 6" thick (0522-2)SY280$110.00$72.86$110.00$79.80$112.98$115.00
0240Concrete ditch pavement, non reinforced, 6" (0524-1-4)SY343$150.00$105.39$120.00$74.55$106.20$111.70
0245Guardrail -roadway, general (0536-1-1)LF844$30.00$25.88$24.00$26.78$24.00$30.20
0250Special guardrail post- deep post for slope break timber or steel (0536-7-1)EACH88$60.00$131.95$104.25$136.50$47.00$154.00
0255Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123)EACH2$2,200.00$2,436.00$3,050.00$2,520.00$1,751.00$2,800.00
0260Guardrail removal (0536-73)LF30$2.50$3.05$4.00$3.15$2.20$3.55
0265Guardrail end treatment- trailing anchorage (0536-85-20)EACH1$1,650.00$1,827.00$1,880.00$1,890.00$1,316.00$2,130.00
0270Performance turf (0570-1-1)SY117$4.25$6.56$10.00$15.75$20.00$19.80
0275Performance turf, sod (0570-1-2)SY370$4.25$7.83$10.00$15.75$18.00$15.25
0280Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00
0285High friction surface course (0908-333100)SY2,792$35.00$25.38$33.25$36.94$34.56$37.90
0290Initial contingency amount, DO not bid (0999-25)LS1$30,950$30,950$30,950$30,950$30,950$30,950
0295Initial contingency amount, DO not bid (0999-25)LS1$19,050$19,050$19,050$19,050$19,050$19,050
0300Raised rumble strip set- permanent (0546-71-1)EACH1$450.00$365.40$1,200.00$2,940.00$475.00$426.00
0305Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH4$625.00$705.43$500.00$525.00$590.00$823.00
0310Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH4$1,650.00$2,024.93$1,600.00$1,680.00$1,800.00$2,363.08
0315Single column ground sign assembly, remove (0700-1600)EACH11$12.00$10.15$150.00$157.50$50.00$11.80
0320Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113)EACH1$4,750.00$6,084.92$6,000.00$6,300.00$7,300.00$7,100.00
0325Multi-column ground sign assembly, remove (0700-2600)EACH1$625.00$507.50$750.00$787.50$1,200.00$592.00
0330Sign panel, relocate, UP to 12 SF (0700-3501)EACH1$175.00$603.92$100.00$105.00$190.00$705.00
0335Retroreflective sign strip- furnish and install, 2' (0700-13-12)EACH2$50.00$121.80$90.00$94.50$110.00$71.00
0340Enhanced hwy sign assembly, solar powered, F&I ground mount, W/highlighted sign <12 UP to 12 SF of static panels (0700-142141)EACH5$12,500$12,207$12,367$10,379$12,000$17,767
0345Delineator, flexible tubular (0705-11-1)EACH10$100.00$91.35$130.00$84.00$130.00$106.60
0350Raised pavement marker, type B (0706-1-3)EACH158$5.00$4.06$7.00$5.25$5.00$4.70
0355Painted pavement markings, surface (0710-90)LS1$5,000.00$2,059.06$5,000.00$6,300.00$3,550.00$2,370.00
0360Painted pavement markings, surface (0710-90)LS1$625.00$2,059.06$4,000.00$5,250.00$2,085.00$2,440.00
0365Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.04$7,000.00$6,292.95$7,500.00$5,775.00$12,019$7,343.90
0370Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF973$2.50$2.23$5.00$2.10$3.38$2.60
0375Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF190$4.00$3.45$7.00$3.15$6.76$4.00
0380Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.24$2,250.00$1,979.26$4,500.00$2,625.00$3,397.00$2,309.00
0385Thermoplastic, standard, message or symbol (0711-11160)EACH8$150.00$121.80$300.00$126.00$90.00$124.00
0390Thermoplastic, standard, arrow (0711-11170)EACH4$100.00$81.20$90.00$105.00$61.00$95.00
0395Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF888$24.00$19.29$20.00$18.90$17.16$22.50
0400Thermoplastic, preformed, white, message (0711-14160)EACH2$325.00$263.90$850.00$210.00$221.00$308.00
0405Thermoplastic, preformed, white, arrow (0711-14170)EACH2$190.00$152.25$600.00$105.00$93.00$180.00
0410Thermoplastic, preformed, color route shield (0711-14660)EACH2$3,750.00$3,065.30$2,500.00$3,150.00$2,061.00$3,580.00
0415Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.39$7,400.00$5,988.49$8,500.00$5,250.00$9,015.00$7,000.00
0420Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.20$2,500.00$1,979.24$4,500.00$2,625.00$2,254.00$2,300.00
0425Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.27$7,500.00$5,988.50$8,500.00$5,250.00$8,285.00$6,988.55
0430Conduit, furnish & install, directional bore (0630-2-12)LF1,362$35.00$33.42$10.00$29.40$30.00$32.00
0435Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH8$1,400.00$1,499.31$1,540.00$1,453.20$1,300.00$2,070.00
0440Pull & splice box, install (0635-2-30)EACH1$1,100.00$1,205.62$1,017.50$1,050.00$1,000.00$1,420.00
0445Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$6,000.00$5,589.64$7,573.00$5,670.00$5,500.00$7,000.00
0450Electrical power service, remove underground (0639-1620)AS1$1,650.00$524.07$1,056.00$1,575.00$500.00$1,000.00
0455Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$4,000.00$3,240.15$3,292.50$3,255.00$3,200.00$2,490.00
0460Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH1$1,250.00$628.88$759.00$1,050.00$200.00$1,000.00
0465Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF4,642$5.00$3.47$3.00$4.83$4.00$3.55
0470Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF40$10.00$5.90$4.50$8.40$8.00$23.70
0475Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF4,113$1.75$0.42$0.50$1.58$1.00$0.59
0480Load center, F&I, secondary voltage (0715-7-11)EACH1$20,000$15,585$16,590$19,688$14,000$29,600
0485Load center, remove, voltage (0715-7-41)EACH1$3,000.00$838.51$594.00$2,625.00$1,000.00$1,000.00
0490Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH2$2,000.00$1,730.21$2,992.00$1,706.25$1,300.00$3,550.00
0495Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 12' arm length (0715-61442)EACH1$11,000$12,223$9,148.00$11,078$12,000$11,845
0500Light pole complete, remove pole and foundation (0715-69000)EACH1$1,750.00$838.51$635.50$1,575.00$1,000.00$1,240.00
0505Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH3$1,400.00$1,305.64$1,433.50$1,155.00$900.00$770.00
0510Conduit, furnish & install, directional bore (0630-2-12)LF494$35.00$33.42$30.00$29.40$35.00$46.20
0515Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH7$1,500.00$1,499.31$1,540.00$1,453.20$1,200.00$2,070.00
0520Pull & splice box, install (0635-2-30)EACH1$1,300.00$1,132.20$1,017.50$1,050.00$1,000.00$1,420.00
0525Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$7,500.00$4,488.31$6,290.00$5,670.00$5,500.00$7,000.00
0530Electrical power service, remove underground (0639-1620)AS1$1,950.00$838.51$373.00$1,575.00$500.00$1,000.00
0535Electrical service wire, & install (0639-2-1)LF494$8.00$10.41$10.00$7.51$12.00$11.85
0540Electrical service wire, (0639-2-6)LF494$2.00$0.42$1.00$1.58$1.00$1.19
0545Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$3,250.00$3,240.15$3,292.50$3,134.25$3,200.00$2,480.00
0550Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH1$1,750.00$628.88$968.00$1,575.00$306.00$1,240.00
0555Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS2$2,500.00$1,799.59$1,859.00$2,100.00$1,500.00$2,370.00
0560Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH2$900.00$786.36$558.00$761.25$1,000.00$1,180.00
0565Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH4$900.00$1,043.34$902.50$735.00$500.00$1,420.00
0570Itsfm subsurface documentation- project length (0611-1-1)MI0.13$30,000$5,489.45$3,677.00$31,500$6,000.00$7,100.00
0575Itsfm location documentation- ITS site (0611-2-2)EACH1$3,250.00$3,561.28$3,088.50$3,255.00$3,000.00$4,210.00
0580Conduit, furnish & install, directional bore (0630-2-12)LF888$35.00$33.42$30.00$29.40$30.00$53.30
0585Fiber optic cable locator (0633-6)DA100$175.00$205.85$338.00$157.50$165.00$355.00
0590Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH6$1,500.00$1,499.31$1,540.00$1,454.25$1,500.00$2,250.00
0595Pull & splice box, install (0635-2-30)EACH1$1,200.00$1,132.20$1,017.50$1,050.00$1,000.00$1,420.00
0600Electrical service wire, & install (0639-2-1)LF888$8.00$15.26$10.00$7.51$12.00$16.60
0605Electrical service wire, (0639-2-6)LF896$2.00$0.42$1.00$1.58$1.00$1.18
0610Electrical service disconnect, F&I, pole mount (0639-3-11)EACH1$3,500.00$4,488.31$4,753.00$2,992.50$6,500.00$2,960.00
0615Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$3,750.00$3,240.15$3,292.50$3,134.25$3,200.00$2,480.00
0620ITS cabinet- adjust/modify (0676-2500)EACH1$5,000.00$1,624.88$2,906.00$4,830.00$4,000.00$7,700.00
FDOT contract T6619: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of February 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy