FDOT contract T6619 bid tabulation
SR 969 (NW 72 AVE) AND SR 826 AT SR 948 (NW 36 ST) AT SR... Let by Florida DOT on February 25, 2026, Miami-Dade, District 6. 6 bids received; low bid $1,640,113 by Bacallao Construction & Engineering Development, LLC D/B/A BC&E.
- Owner
- Florida DOT
- Letting
- 25 FEB 2026
- Pay items
- 124
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bacallao Construction & Engineering Development, LLC D/B/A BC&E | $1,640,113 | Low |
| 2 | Florida Engineering & Development Corp | $1,699,417 | +4.0% |
| 3 | The Stout Group LLC | $1,789,318 | +9.0% |
| 4 | General Asphalt Company, LLC | $1,950,487 | +19% |
| 5 | Weekley Asphalt Paving, Inc. | $2,001,900 | +22% |
| 6 | Jva Engineering Contractor, Inc | $2,020,820 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bacallao Construction & Engineering Development, LLC D/B/A BC&E | 2. Florida Engineering & Development Corp | 3. The Stout Group LLC | 4. General Asphalt Company, LLC | 5. Weekley Asphalt Paving, Inc. | 6. Jva Engineering Contractor, Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $170,000 | $145,000 | $89,000 | $120,000 | $84,010 | $115,400 |
| 0010 | Mobilization (0101-1) | LS | 1 | $5,000.00 | $145,000 | $89,000 | $80,000 | $57,450 | $114,800 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $50,000 | $82,500 | $105,000 | $220,000 | $139,450 | $103,800 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $25,030 | $82,500 | $105,000 | $177,000 | $60,000 | $68,300 |
| 0025 | Commercial material for temporary driveway maintenance (0102-3) | CY | 17.80 | $0.01 | $119.87 | $45.00 | $105.00 | $59.00 | $66.10 |
| 0030 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $1.00 | $1,034.39 | $10,000 | $2,625.00 | $12,445 | $18,900 |
| 0035 | Pedestrian escort/flagger (0102-5) | HR | 480 | $1.00 | $58.06 | $1.00 | $33.60 | $50.00 | $48.00 |
| 0040 | Traffic control officer (0102-14) | HR | 480 | $75.00 | $81.45 | $1.00 | $42.00 | $90.00 | $89.00 |
| 0045 | Work zone sign (0102-60) | ED | 2,075 | $0.23 | $0.20 | $0.18 | $0.21 | $0.30 | $0.25 |
| 0050 | Barrier mounted work zone sign- index 700-012 (0102-62-12) | ED | 572 | $1.50 | $1.78 | $1.75 | $1.84 | $0.50 | $38.00 |
| 0055 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 580 | $0.01 | $25.71 | $35.00 | $1.00 | $40.00 | $23.70 |
| 0060 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 10,465 | $0.11 | $0.11 | $0.10 | $0.12 | $0.10 | $0.13 |
| 0065 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 26,502 | $0.06 | $0.04 | $0.06 | $0.05 | $0.05 | $0.06 |
| 0070 | Arrow board / advance warning arrow panel (0102-76) | ED | 310 | $6.00 | $5.08 | $5.00 | $5.25 | $5.00 | $5.90 |
| 0075 | Temporary crash cushion, redirective option (0102-89-1) | LO | 1 | $1.00 | $908.42 | $1,950.00 | $939.75 | $3,600.00 | $1,140.67 |
| 0080 | Portable changeable message sign, temporary (0102-99) | ED | 338 | $10.00 | $9.24 | $8.90 | $9.56 | $10.00 | $12.65 |
| 0085 | Temporary signalization and maintenance, intersection (0102-104) | ED | 180 | $5.00 | $7.34 | $10.00 | $5.25 | $10.00 | $11.80 |
| 0090 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 180 | $5.00 | $7.34 | $10.00 | $5.25 | $10.00 | $11.80 |
| 0095 | Type III barricade (0102-115) | ED | 482 | $0.28 | $0.28 | $0.25 | $0.29 | $0.35 | $0.29 |
| 0100 | Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22) | GM | 0.40 | $6,000.00 | $6,699.00 | $7,500.00 | $6,300.00 | $7,335.00 | $9,590.00 |
| 0105 | Inlet protection system (0104-18) | EACH | 10 | $70.00 | $93.64 | $150.00 | $126.00 | $170.00 | $220.00 |
| 0110 | Litter removal (0107-1) | ACRE | 18.66 | $0.01 | $0.05 | $0.01 | $1.05 | $200.00 | $280.00 |
| 0115 | Mowing (0107-2) | ACRE | 14.10 | $0.01 | $0.08 | $0.01 | $1.05 | $200.00 | $260.00 |
| 0120 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1.00 | $3,958.50 | $15,000 | $1.05 | $5,500.00 | $5,000.00 |
| 0125 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $1.00 | $2,436.00 | $10,000 | $1.05 | $2,700.00 | $3,000.00 |
| 0130 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $30,000 | $4,526.90 | $30,000 | $18,060 | $26,000 | $29,600 |
| 0135 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $25,000 | $9,053.80 | $30,000 | $33,075 | $38,500 | $29,600 |
| 0140 | Removal of existing concrete (0110-4-10) | SY | 807 | $35.00 | $34.17 | $25.00 | $66.94 | $49.00 | $30.80 |
| 0145 | Tree protection barrier (0110-21) | LF | 231 | $0.01 | $7.21 | $10.00 | $5.25 | $19.00 | $5.80 |
| 0150 | Regular excavation (0120-1) | CY | 346.60 | $82.00 | $48.19 | $60.00 | $81.59 | $58.00 | $43.10 |
| 0155 | Embankment (0120-6) | CY | 178 | $55.00 | $77.05 | $90.00 | $149.00 | $45.00 | $51.00 |
| 0160 | Type B stabilization (0160-4) | SY | 443 | $0.01 | $15.16 | $18.00 | $12.71 | $30.00 | $51.00 |
| 0165 | Optional base, base group 10 (0285-710) | SY | 442 | $73.00 | $46.08 | $80.00 | $84.11 | $92.85 | $52.00 |
| 0170 | Composite base, special design, 6.5" of B-12 & 6" granular (0285-774) | SY | 1 | $1,000.00 | $266.32 | $150.00 | $840.00 | $1,800.00 | $5,900.00 |
| 0175 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 6,053 | $6.25 | $3.14 | $15.00 | $3.57 | $5.00 | $7.15 |
| 0180 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 2,235 | $6.25 | $5.10 | $22.50 | $3.86 | $8.00 | $6.40 |
| 0185 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 61.20 | $245.00 | $249.64 | $250.00 | $229.96 | $300.00 | $387.00 |
| 0190 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 499.80 | $245.00 | $196.23 | $185.00 | $229.30 | $250.00 | $235.00 |
| 0195 | Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88) | TN | 230.60 | $270.00 | $221.99 | $185.00 | $201.95 | $250.00 | $254.00 |
| 0200 | Miscellaneous asphalt (0339-1) | TN | 63.40 | $300.00 | $243.99 | $250.00 | $273.80 | $350.00 | $373.00 |
| 0205 | Manholes, J-7, <10' (0425-2-71) | EACH | 2 | $9,500.00 | $9,913.89 | $13,000 | $13,488 | $20,000 | $8,400.00 |
| 0210 | Special drainage, utility avoidance structure (0425-100-41) | EACH | 4 | $15,800 | $20,553 | $18,000 | $15,400 | $29,000 | $13,300 |
| 0215 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 143 | $250.00 | $254.50 | $180.00 | $264.50 | $400.00 | $256.00 |
| 0220 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 316 | $165.00 | $127.94 | $180.00 | $209.48 | $500.00 | $216.00 |
| 0225 | Concrete curb & gutter, type F (0520-1-10) | LF | 693 | $50.00 | $41.55 | $35.00 | $39.90 | $59.90 | $51.70 |
| 0230 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 210 | $85.00 | $56.64 | $80.00 | $58.80 | $93.30 | $90.40 |
| 0235 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 280 | $110.00 | $72.86 | $110.00 | $79.80 | $112.98 | $115.00 |
| 0240 | Concrete ditch pavement, non reinforced, 6" (0524-1-4) | SY | 343 | $150.00 | $105.39 | $120.00 | $74.55 | $106.20 | $111.70 |
| 0245 | Guardrail -roadway, general (0536-1-1) | LF | 844 | $30.00 | $25.88 | $24.00 | $26.78 | $24.00 | $30.20 |
| 0250 | Special guardrail post- deep post for slope break timber or steel (0536-7-1) | EACH | 88 | $60.00 | $131.95 | $104.25 | $136.50 | $47.00 | $154.00 |
| 0255 | Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123) | EACH | 2 | $2,200.00 | $2,436.00 | $3,050.00 | $2,520.00 | $1,751.00 | $2,800.00 |
| 0260 | Guardrail removal (0536-73) | LF | 30 | $2.50 | $3.05 | $4.00 | $3.15 | $2.20 | $3.55 |
| 0265 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 1 | $1,650.00 | $1,827.00 | $1,880.00 | $1,890.00 | $1,316.00 | $2,130.00 |
| 0270 | Performance turf (0570-1-1) | SY | 117 | $4.25 | $6.56 | $10.00 | $15.75 | $20.00 | $19.80 |
| 0275 | Performance turf, sod (0570-1-2) | SY | 370 | $4.25 | $7.83 | $10.00 | $15.75 | $18.00 | $15.25 |
| 0280 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0285 | High friction surface course (0908-333100) | SY | 2,792 | $35.00 | $25.38 | $33.25 | $36.94 | $34.56 | $37.90 |
| 0290 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $30,950 | $30,950 | $30,950 | $30,950 | $30,950 | $30,950 |
| 0295 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $19,050 | $19,050 | $19,050 | $19,050 | $19,050 | $19,050 |
| 0300 | Raised rumble strip set- permanent (0546-71-1) | EACH | 1 | $450.00 | $365.40 | $1,200.00 | $2,940.00 | $475.00 | $426.00 |
| 0305 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 4 | $625.00 | $705.43 | $500.00 | $525.00 | $590.00 | $823.00 |
| 0310 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 4 | $1,650.00 | $2,024.93 | $1,600.00 | $1,680.00 | $1,800.00 | $2,363.08 |
| 0315 | Single column ground sign assembly, remove (0700-1600) | EACH | 11 | $12.00 | $10.15 | $150.00 | $157.50 | $50.00 | $11.80 |
| 0320 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 1 | $4,750.00 | $6,084.92 | $6,000.00 | $6,300.00 | $7,300.00 | $7,100.00 |
| 0325 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 1 | $625.00 | $507.50 | $750.00 | $787.50 | $1,200.00 | $592.00 |
| 0330 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 1 | $175.00 | $603.92 | $100.00 | $105.00 | $190.00 | $705.00 |
| 0335 | Retroreflective sign strip- furnish and install, 2' (0700-13-12) | EACH | 2 | $50.00 | $121.80 | $90.00 | $94.50 | $110.00 | $71.00 |
| 0340 | Enhanced hwy sign assembly, solar powered, F&I ground mount, W/highlighted sign <12 UP to 12 SF of static panels (0700-142141) | EACH | 5 | $12,500 | $12,207 | $12,367 | $10,379 | $12,000 | $17,767 |
| 0345 | Delineator, flexible tubular (0705-11-1) | EACH | 10 | $100.00 | $91.35 | $130.00 | $84.00 | $130.00 | $106.60 |
| 0350 | Raised pavement marker, type B (0706-1-3) | EACH | 158 | $5.00 | $4.06 | $7.00 | $5.25 | $5.00 | $4.70 |
| 0355 | Painted pavement markings, surface (0710-90) | LS | 1 | $5,000.00 | $2,059.06 | $5,000.00 | $6,300.00 | $3,550.00 | $2,370.00 |
| 0360 | Painted pavement markings, surface (0710-90) | LS | 1 | $625.00 | $2,059.06 | $4,000.00 | $5,250.00 | $2,085.00 | $2,440.00 |
| 0365 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.04 | $7,000.00 | $6,292.95 | $7,500.00 | $5,775.00 | $12,019 | $7,343.90 |
| 0370 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 973 | $2.50 | $2.23 | $5.00 | $2.10 | $3.38 | $2.60 |
| 0375 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 190 | $4.00 | $3.45 | $7.00 | $3.15 | $6.76 | $4.00 |
| 0380 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.24 | $2,250.00 | $1,979.26 | $4,500.00 | $2,625.00 | $3,397.00 | $2,309.00 |
| 0385 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 8 | $150.00 | $121.80 | $300.00 | $126.00 | $90.00 | $124.00 |
| 0390 | Thermoplastic, standard, arrow (0711-11170) | EACH | 4 | $100.00 | $81.20 | $90.00 | $105.00 | $61.00 | $95.00 |
| 0395 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 888 | $24.00 | $19.29 | $20.00 | $18.90 | $17.16 | $22.50 |
| 0400 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 2 | $325.00 | $263.90 | $850.00 | $210.00 | $221.00 | $308.00 |
| 0405 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 2 | $190.00 | $152.25 | $600.00 | $105.00 | $93.00 | $180.00 |
| 0410 | Thermoplastic, preformed, color route shield (0711-14660) | EACH | 2 | $3,750.00 | $3,065.30 | $2,500.00 | $3,150.00 | $2,061.00 | $3,580.00 |
| 0415 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.39 | $7,400.00 | $5,988.49 | $8,500.00 | $5,250.00 | $9,015.00 | $7,000.00 |
| 0420 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.20 | $2,500.00 | $1,979.24 | $4,500.00 | $2,625.00 | $2,254.00 | $2,300.00 |
| 0425 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.27 | $7,500.00 | $5,988.50 | $8,500.00 | $5,250.00 | $8,285.00 | $6,988.55 |
| 0430 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,362 | $35.00 | $33.42 | $10.00 | $29.40 | $30.00 | $32.00 |
| 0435 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $1,400.00 | $1,499.31 | $1,540.00 | $1,453.20 | $1,300.00 | $2,070.00 |
| 0440 | Pull & splice box, install (0635-2-30) | EACH | 1 | $1,100.00 | $1,205.62 | $1,017.50 | $1,050.00 | $1,000.00 | $1,420.00 |
| 0445 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $6,000.00 | $5,589.64 | $7,573.00 | $5,670.00 | $5,500.00 | $7,000.00 |
| 0450 | Electrical power service, remove underground (0639-1620) | AS | 1 | $1,650.00 | $524.07 | $1,056.00 | $1,575.00 | $500.00 | $1,000.00 |
| 0455 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $4,000.00 | $3,240.15 | $3,292.50 | $3,255.00 | $3,200.00 | $2,490.00 |
| 0460 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $1,250.00 | $628.88 | $759.00 | $1,050.00 | $200.00 | $1,000.00 |
| 0465 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 4,642 | $5.00 | $3.47 | $3.00 | $4.83 | $4.00 | $3.55 |
| 0470 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 40 | $10.00 | $5.90 | $4.50 | $8.40 | $8.00 | $23.70 |
| 0475 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 4,113 | $1.75 | $0.42 | $0.50 | $1.58 | $1.00 | $0.59 |
| 0480 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $20,000 | $15,585 | $16,590 | $19,688 | $14,000 | $29,600 |
| 0485 | Load center, remove, voltage (0715-7-41) | EACH | 1 | $3,000.00 | $838.51 | $594.00 | $2,625.00 | $1,000.00 | $1,000.00 |
| 0490 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 2 | $2,000.00 | $1,730.21 | $2,992.00 | $1,706.25 | $1,300.00 | $3,550.00 |
| 0495 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 12' arm length (0715-61442) | EACH | 1 | $11,000 | $12,223 | $9,148.00 | $11,078 | $12,000 | $11,845 |
| 0500 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 1 | $1,750.00 | $838.51 | $635.50 | $1,575.00 | $1,000.00 | $1,240.00 |
| 0505 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 3 | $1,400.00 | $1,305.64 | $1,433.50 | $1,155.00 | $900.00 | $770.00 |
| 0510 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 494 | $35.00 | $33.42 | $30.00 | $29.40 | $35.00 | $46.20 |
| 0515 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 7 | $1,500.00 | $1,499.31 | $1,540.00 | $1,453.20 | $1,200.00 | $2,070.00 |
| 0520 | Pull & splice box, install (0635-2-30) | EACH | 1 | $1,300.00 | $1,132.20 | $1,017.50 | $1,050.00 | $1,000.00 | $1,420.00 |
| 0525 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $7,500.00 | $4,488.31 | $6,290.00 | $5,670.00 | $5,500.00 | $7,000.00 |
| 0530 | Electrical power service, remove underground (0639-1620) | AS | 1 | $1,950.00 | $838.51 | $373.00 | $1,575.00 | $500.00 | $1,000.00 |
| 0535 | Electrical service wire, & install (0639-2-1) | LF | 494 | $8.00 | $10.41 | $10.00 | $7.51 | $12.00 | $11.85 |
| 0540 | Electrical service wire, (0639-2-6) | LF | 494 | $2.00 | $0.42 | $1.00 | $1.58 | $1.00 | $1.19 |
| 0545 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $3,250.00 | $3,240.15 | $3,292.50 | $3,134.25 | $3,200.00 | $2,480.00 |
| 0550 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $1,750.00 | $628.88 | $968.00 | $1,575.00 | $306.00 | $1,240.00 |
| 0555 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 2 | $2,500.00 | $1,799.59 | $1,859.00 | $2,100.00 | $1,500.00 | $2,370.00 |
| 0560 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 2 | $900.00 | $786.36 | $558.00 | $761.25 | $1,000.00 | $1,180.00 |
| 0565 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 4 | $900.00 | $1,043.34 | $902.50 | $735.00 | $500.00 | $1,420.00 |
| 0570 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.13 | $30,000 | $5,489.45 | $3,677.00 | $31,500 | $6,000.00 | $7,100.00 |
| 0575 | Itsfm location documentation- ITS site (0611-2-2) | EACH | 1 | $3,250.00 | $3,561.28 | $3,088.50 | $3,255.00 | $3,000.00 | $4,210.00 |
| 0580 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 888 | $35.00 | $33.42 | $30.00 | $29.40 | $30.00 | $53.30 |
| 0585 | Fiber optic cable locator (0633-6) | DA | 100 | $175.00 | $205.85 | $338.00 | $157.50 | $165.00 | $355.00 |
| 0590 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 6 | $1,500.00 | $1,499.31 | $1,540.00 | $1,454.25 | $1,500.00 | $2,250.00 |
| 0595 | Pull & splice box, install (0635-2-30) | EACH | 1 | $1,200.00 | $1,132.20 | $1,017.50 | $1,050.00 | $1,000.00 | $1,420.00 |
| 0600 | Electrical service wire, & install (0639-2-1) | LF | 888 | $8.00 | $15.26 | $10.00 | $7.51 | $12.00 | $16.60 |
| 0605 | Electrical service wire, (0639-2-6) | LF | 896 | $2.00 | $0.42 | $1.00 | $1.58 | $1.00 | $1.18 |
| 0610 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $3,500.00 | $4,488.31 | $4,753.00 | $2,992.50 | $6,500.00 | $2,960.00 |
| 0615 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $3,750.00 | $3,240.15 | $3,292.50 | $3,134.25 | $3,200.00 | $2,480.00 |
| 0620 | ITS cabinet- adjust/modify (0676-2500) | EACH | 1 | $5,000.00 | $1,624.88 | $2,906.00 | $4,830.00 | $4,000.00 | $7,700.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of February 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.