FDOT contract T4740 bid tabulation
SR 5 (US 1) FROM CAMINO REAL TO NE 8TH ST (MIZNER BLVD). Let by Florida DOT on March 25, 2026, Palm Beach, District 4. 9 bids received; low bid $6,362,382 by General Asphalt Company, LLC.
- Owner
- Florida DOT
- Letting
- 25 MAR 2026
- Pay items
- 152
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | General Asphalt Company, LLC | $6,362,382 | Low |
| 2 | Weekley Asphalt Paving, Inc. | $6,393,237 | 0.0% |
| 3 | Florida Engineering & Development Corp | $6,616,521 | +4.0% |
| 4 | The Stout Group LLC | $6,749,702 | +6.0% |
| 5 | Ohla USA Inc | $6,979,980 | +10% |
| 6 | Roadway Construction, LLC | $7,069,937 | +11% |
| 7 | Asphalt Group, Inc. | $7,072,601 | +11% |
| 8 | Ranger Construction Industries, Inc. | $7,244,769 | +14% |
| 9 | Posillico Civil, Inc. | $8,152,153 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. General Asphalt Company, LLC | 2. Weekley Asphalt Paving, Inc. | 3. Florida Engineering & Development Corp | 4. The Stout Group LLC | 5. Ohla USA Inc | 6. Roadway Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $200,000 | $221,590 | $615,333 | $650,000 | $696,000 | $706,900 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $645,000 | $622,448 | $475,333 | $275,000 | $550,000 | $424,578 |
| 0015 | Traffic control officer (0102-14) | HR | 460 | $88.00 | $89.00 | $75.00 | $95.00 | $85.00 | $75.00 |
| 0020 | Work zone sign (0102-60) | ED | 14,622 | $0.20 | $0.18 | $0.18 | $0.18 | $0.20 | $0.18 |
| 0025 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 803 | $45.36 | $43.00 | $53.37 | $42.00 | $0.01 | $0.01 |
| 0030 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 863 | $20.52 | $30.00 | $29.28 | $28.27 | $0.01 | $0.01 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 32,026 | $0.10 | $0.09 | $0.09 | $0.09 | $0.10 | $0.09 |
| 0040 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 13,584 | $0.04 | $0.04 | $0.04 | $0.04 | $0.05 | $0.04 |
| 0045 | Arrow board / advance warning arrow panel (0102-76) | ED | 906 | $4.86 | $4.50 | $4.57 | $4.50 | $5.10 | $4.50 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 712 | $9.13 | $8.45 | $8.58 | $8.45 | $9.55 | $8.45 |
| 0055 | Temporary signalization and maintenance, intersection (0102-104) | ED | 1,710 | $6.39 | $5.00 | $6.01 | $8.60 | $6.40 | $6.27 |
| 0060 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 1,710 | $6.39 | $5.00 | $6.01 | $8.60 | $6.40 | $6.27 |
| 0065 | Type III barricade (0102-115) | ED | 802 | $0.26 | $0.24 | $0.24 | $0.24 | $0.25 | $0.24 |
| 0070 | Inlet protection system (0104-18) | EACH | 53 | $162.00 | $180.00 | $108.57 | $150.00 | $308.50 | $396.85 |
| 0075 | Litter removal (0107-1) | ACRE | 65.23 | $1.08 | $25.00 | $11.12 | $1.00 | $200.00 | $0.02 |
| 0080 | Mowing (0107-2) | ACRE | 34.42 | $1.08 | $25.00 | $25.21 | $1.00 | $700.00 | $976.25 |
| 0085 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1.08 | $7,800.00 | $22,736 | $22,400 | $34,500 | $1,600.00 |
| 0090 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $89,640 | $107,105 | $75,242 | $275,000 | $555,256 | $101,852 |
| 0095 | Selective clearing and areas with trees to remain (0110-2-2) | ACRE | 0.37 | $68,040 | $82,583 | $118,706 | $80,000 | $50,000 | $36,216 |
| 0100 | Removal of existing concrete (0110-4-10) | SY | 5,441 | $34.86 | $40.00 | $32.52 | $15.00 | $56.00 | $31.50 |
| 0105 | Tree protection barrier (0110-21) | LF | 3,755 | $10.80 | $11.50 | $12.72 | $9.00 | $2.00 | $4.85 |
| 0110 | Tree root and branch pruning (0110-22) | EACH | 16 | $1,620.00 | $1,700.00 | $3,045.00 | $650.00 | $500.00 | $360.00 |
| 0115 | Tree removal (0110-23) | EACH | 3 | $2,700.00 | $2,780.00 | $926.22 | $2,500.00 | $700.00 | $525.00 |
| 0120 | Regular excavation (0120-1) | CY | 3,204 | $62.10 | $49.00 | $73.52 | $30.00 | $1.00 | $53.83 |
| 0125 | Embankment (0120-6) | CY | 829 | $35.64 | $27.97 | $85.71 | $60.00 | $10.00 | $46.12 |
| 0130 | Type B stabilization (0160-4) | SY | 6,395 | $11.02 | $23.59 | $10.62 | $27.00 | $0.01 | $27.77 |
| 0135 | Optional base, base group 01 (0285-701) | SY | 1,110 | $20.09 | $38.22 | $57.05 | $32.00 | $7.00 | $27.15 |
| 0140 | Optional base, base group 09 (0285-709) | SY | 3,116 | $45.79 | $40.00 | $57.58 | $39.00 | $55.00 | $72.70 |
| 0145 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 50,536 | $3.48 | $3.00 | $3.56 | $3.75 | $2.50 | $3.50 |
| 0150 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 524.40 | $232.82 | $180.00 | $340.48 | $250.00 | $200.00 | $366.46 |
| 0155 | Asphalt concrete friction course,traffic C, FC-12.5, high polymer (0337-7-93) | TN | 4,525.50 | $212.21 | $182.50 | $192.85 | $255.00 | $200.00 | $190.00 |
| 0160 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 5 | $15,282 | $11,600 | $9,613.02 | $14,000 | $8,500.00 | $18,158 |
| 0165 | Inlets, curb, type P-5, modify (0425-1359) | EACH | 1 | $18,248 | $12,300 | $12,414 | $15,000 | $9,250.00 | $12,650 |
| 0170 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 1 | $17,539 | $13,830 | $10,050 | $14,500 | $9,250.00 | $19,512 |
| 0175 | Inlets, curb, type J-5, <10' (0425-1451) | EACH | 1 | $23,090 | $15,700 | $12,694 | $15,000 | $11,200 | $22,231 |
| 0180 | Inlets, curb, type J-5, modify (0425-1459) | EACH | 3 | $28,901 | $15,000 | $19,590 | $19,000 | $8,340.00 | $21,707 |
| 0185 | Inlets, curb, type J-6, <10' (0425-1461) | EACH | 2 | $22,075 | $17,000 | $12,301 | $16,000 | $11,400 | $26,662 |
| 0190 | Manholes, P-7, <10' (0425-2-41) | EACH | 1 | $11,599 | $9,100.00 | $8,966.73 | $12,000 | $6,820.00 | $15,969 |
| 0195 | Manholes, P-7, partial (0425-2-43) | EACH | 1 | $5,400.00 | $5,900.00 | $3,607.81 | $10,000 | $6,320.00 | $7,979.46 |
| 0200 | Manholes, J-7, <10' (0425-2-71) | EACH | 1 | $15,736 | $16,000 | $11,317 | $15,000 | $9,730.00 | $17,772 |
| 0205 | Manhole, adjust (0425-5) | EACH | 31 | $1,080.00 | $1,000.00 | $1,031.10 | $900.00 | $1,050.00 | $2,032.71 |
| 0210 | Yard drain (0425-10) | EACH | 11 | $8,791.20 | $3,090.00 | $4,789.28 | $7,000.00 | $6,300.00 | $4,560.78 |
| 0215 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 512 | $233.84 | $233.50 | $183.63 | $190.00 | $235.00 | $288.22 |
| 0220 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 49 | $868.43 | $510.00 | $366.00 | $250.00 | $360.00 | $822.51 |
| 0225 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 18 | $1,468.69 | $635.00 | $480.71 | $500.00 | $450.00 | $1,473.28 |
| 0230 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 20 | $1,589.54 | $853.00 | $509.36 | $650.00 | $580.00 | $1,217.21 |
| 0235 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 11 | $183.60 | $340.40 | $66.72 | $250.00 | $170.00 | $125.00 |
| 0240 | Concrete curb & gutter, type F (0520-1-10) | LF | 7,944 | $26.58 | $48.24 | $46.81 | $29.00 | $40.30 | $73.92 |
| 0245 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 181 | $52.47 | $80.85 | $123.63 | $60.00 | $132.00 | $145.88 |
| 0250 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 58 | $52.43 | $65.00 | $83.04 | $60.00 | $197.50 | $161.52 |
| 0255 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 356 | $70.92 | $102.52 | $82.10 | $75.00 | $139.00 | $186.41 |
| 0260 | Pavers, architectural, (0526-1-2) | SY | 3,219 | $138.71 | $238.20 | $130.96 | $137.00 | $170.00 | $123.72 |
| 0265 | Detectable warnings (0527-2) | SF | 320 | $41.45 | $39.50 | $31.40 | $40.00 | $49.65 | $62.72 |
| 0270 | Performance turf, sod (0570-1-2) | SY | 2,623 | $14.31 | $7.25 | $8.37 | $8.25 | $27.10 | $11.69 |
| 0275 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 143 | $38.09 | $35.00 | $35.80 | $30.00 | $38.10 | $37.34 |
| 0280 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $1,524.42 | $2,000.00 | $1,432.67 | $1,540.00 | $1,530.00 | $1,494.53 |
| 0285 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 4 | $1,972.33 | $3,800.00 | $1,853.62 | $2,893.50 | $1,970.00 | $1,933.65 |
| 0290 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 4 | $1,988.74 | $4,000.00 | $1,869.05 | $2,947.50 | $1,990.00 | $1,949.75 |
| 0295 | Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162) | EACH | 1 | $6,912.82 | $6,000.00 | $6,496.77 | $7,634.00 | $6,920.00 | $6,777.28 |
| 0300 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 2.06 | $2,700.00 | $2,375.00 | $2,410.63 | $1,600.00 | $2,370.00 | $1,595.33 |
| 0305 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.28 | $2,700.00 | $2,375.00 | $2,410.64 | $1,600.00 | $2,380.00 | $1,600.00 |
| 0310 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0315 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $70,995 | $70,995 | $70,995 | $70,995 | $70,995 | $70,995 |
| 0320 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $51,072 | $51,072 | $51,072 | $51,072 | $51,072 | $51,072 |
| 0325 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 43 | $513.00 | $700.00 | $578.91 | $551.02 | $627.50 | $475.00 |
| 0330 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 4 | $2,376.00 | $2,350.00 | $1,915.41 | $1,823.13 | $1,990.00 | $2,200.00 |
| 0335 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 2 | $3,240.00 | $2,550.00 | $3,563.79 | $3,392.10 | $2,810.00 | $3,000.00 |
| 0340 | Single column ground sign assembly, remove (0700-1600) | EACH | 28 | $16.20 | $20.00 | $55.40 | $25.00 | $81.65 | $15.00 |
| 0345 | Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912) | EACH | 3 | $3,456.00 | $2,250.00 | $3,549.20 | $3,378.22 | $4,400.00 | $3,200.00 |
| 0350 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 6 | $1,620.00 | $500.00 | $913.50 | $900.00 | $1,430.00 | $1,500.00 |
| 0355 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 25 | $108.00 | $195.00 | $96.43 | $95.00 | $153.00 | $100.00 |
| 0360 | Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360) | EACH | 2 | $5,832.56 | $10,000 | $5,481.53 | $9,530.00 | $5,830.00 | $5,718.19 |
| 0365 | Object marker, type 1 (0705-10-1) | EACH | 1 | $324.00 | $395.00 | $69.92 | $66.55 | $350.00 | $300.00 |
| 0370 | Delineator, flexible tubular (0705-11-1) | EACH | 18 | $108.00 | $105.00 | $106.58 | $100.00 | $105.00 | $100.00 |
| 0375 | Raised pavement marker, type B (0706-1-3) | EACH | 941 | $3.78 | $4.00 | $4.06 | $5.00 | $4.00 | $5.00 |
| 0380 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 212 | $3.24 | $4.00 | $4.06 | $10.00 | $4.00 | $10.00 |
| 0385 | Painted pavement markings, surface (0710-90) | LS | 1 | $23,760 | $19,072 | $19,358 | $35,000 | $19,100 | $35,000 |
| 0390 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 5,101 | $2.16 | $2.88 | $2.92 | $4.00 | $2.90 | $4.00 |
| 0395 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 222 | $4.32 | $4.32 | $4.38 | $5.00 | $4.30 | $5.00 |
| 0400 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 875 | $4.32 | $5.76 | $5.85 | $6.00 | $5.75 | $6.00 |
| 0405 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 3.59 | $1,458.00 | $2,250.00 | $2,283.75 | $3,000.00 | $2,250.00 | $2,995.82 |
| 0410 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 10 | $108.00 | $63.00 | $63.95 | $200.00 | $63.00 | $200.00 |
| 0415 | Thermoplastic, standard, arrow (0711-11170) | EACH | 89 | $75.60 | $48.00 | $48.72 | $90.00 | $48.00 | $90.00 |
| 0420 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 74 | $4.32 | $4.32 | $4.38 | $5.00 | $4.30 | $5.00 |
| 0425 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.17 | $2,160.00 | $2,250.00 | $2,283.76 | $3,000.00 | $2,180.00 | $2,909.09 |
| 0430 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 2,803 | $16.20 | $14.53 | $14.75 | $16.00 | $14.55 | $16.00 |
| 0435 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 42 | $378.00 | $350.00 | $355.25 | $500.00 | $350.00 | $500.00 |
| 0440 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 33 | $162.00 | $350.00 | $355.25 | $125.00 | $350.00 | $125.00 |
| 0445 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 3.45 | $5,616.00 | $4,770.00 | $4,841.55 | $5,500.00 | $4,760.00 | $5,490.42 |
| 0450 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.05 | $6,480.00 | $6,365.00 | $6,460.40 | $6,000.00 | $6,370.00 | $6,000.00 |
| 0455 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 1.93 | $1,425.60 | $1,193.00 | $1,210.90 | $2,500.00 | $1,190.00 | $2,493.51 |
| 0460 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.08 | $2,808.00 | $2,386.00 | $2,421.82 | $6,000.00 | $2,170.00 | $5,454.55 |
| 0465 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 2.43 | $5,702.40 | $4,385.00 | $4,450.78 | $5,500.00 | $4,380.00 | $5,497.74 |
| 0470 | Green-colored pavement markings, bike lane (0714-10) | SF | 10,177 | $9.18 | $7.70 | $7.82 | $11.00 | $7.70 | $11.00 |
| 0475 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 203 | $39.56 | $35.00 | $37.18 | $30.00 | $39.60 | $38.79 |
| 0480 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 42 | $1,673.72 | $1,300.00 | $1,572.99 | $1,736.50 | $1,670.00 | $1,640.90 |
| 0485 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 2,895 | $3.37 | $4.00 | $3.17 | $2.90 | $3.35 | $3.30 |
| 0490 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 6,117 | $0.42 | $0.25 | $0.40 | $0.50 | $0.45 | $0.42 |
| 0495 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pole top (0715-11213) | EACH | 6 | $2,585.76 | $2,200.00 | $2,430.13 | $2,105.50 | $2,590.00 | $2,535.05 |
| 0500 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 12 | $894.52 | $650.00 | $840.68 | $1,355.00 | $895.00 | $876.98 |
| 0505 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,741 | $39.91 | $38.00 | $38.58 | $43.00 | $41.05 | $40.25 |
| 0510 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 6 | $8,635.81 | $12,000 | $8,116.06 | $11,982 | $8,640.00 | $8,466.48 |
| 0515 | Signal cable, remove- intersection (0632-7-6) | PI | 5 | $1,491.98 | $500.00 | $1,402.18 | $1,728.00 | $1,490.00 | $1,462.72 |
| 0520 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 1,002 | $5.51 | $4.50 | $5.18 | $4.50 | $5.50 | $5.40 |
| 0525 | Fiber optic connection, install, splice (0633-2-31) | EACH | 8 | $62.79 | $55.00 | $59.01 | $52.50 | $62.80 | $61.56 |
| 0530 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 1 | $4,151.16 | $3,200.00 | $3,901.33 | $3,060.50 | $4,150.00 | $4,069.77 |
| 0535 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 1 | $69.77 | $75.00 | $65.57 | $59.00 | $69.80 | $68.40 |
| 0540 | Fiber optic cable locator (0633-6) | DA | 342 | $244.88 | $135.00 | $230.14 | $324.50 | $231.50 | $0.01 |
| 0545 | Multi-conductor cable, adjust/modify (0633-8-5) | LF | 40 | $17.06 | $5.00 | $16.04 | $1.40 | $17.05 | $16.73 |
| 0550 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 7 | $2,196.28 | $3,500.00 | $2,064.09 | $3,455.50 | $2,200.00 | $2,153.21 |
| 0555 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 115 | $1,627.23 | $1,100.00 | $1,572.99 | $1,736.50 | $1,670.00 | $1,640.90 |
| 0560 | Pull & splice box, install (0635-2-30) | EACH | 6 | $1,225.81 | $1,200.00 | $1,152.04 | $1,017.50 | $1,230.00 | $1,201.78 |
| 0565 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 6 | $4,508.50 | $6,000.00 | $4,237.16 | $6,290.00 | $4,510.00 | $4,420.10 |
| 0570 | Electrical service wire, & install (0639-2-1) | LF | 1,833 | $8.70 | $10.00 | $8.18 | $10.00 | $8.70 | $8.53 |
| 0575 | Electrical service wire, (0639-2-6) | LF | 560 | $0.42 | $1.00 | $0.40 | $1.00 | $0.45 | $0.42 |
| 0580 | Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60) | EACH | 4 | $532.85 | $250.00 | $500.78 | $742.50 | $533.00 | $522.40 |
| 0585 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 6 | $3,070.46 | $3,600.00 | $2,885.67 | $3,292.50 | $3,070.00 | $3,010.26 |
| 0590 | Aluminum signals pole, (0646-1-11) | EACH | 15 | $2,470.63 | $1,500.00 | $2,321.93 | $3,003.00 | $2,470.00 | $2,422.19 |
| 0595 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 10 | $2,054.08 | $1,850.00 | $1,930.46 | $2,568.00 | $2,050.00 | $2,013.80 |
| 0600 | Aluminum signals pole, remove (0646-1-60) | EACH | 16 | $426.28 | $300.00 | $400.62 | $267.00 | $426.50 | $417.92 |
| 0605 | Steel mast arm assembly, and install, double arm 70'-60' (0649-21-19) | EACH | 1 | $141,298 | $110,000 | $132,794 | $130,177 | $141,355 | $138,528 |
| 0610 | Steel mast arm assembly, and install, single arm 78' (0649-21-21) | EACH | 1 | $138,194 | $125,000 | $129,877 | $143,039 | $138,250 | $135,485 |
| 0615 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 1 | $5,413.95 | $4,500.00 | $5,088.11 | $3,030.00 | $5,420.00 | $5,307.80 |
| 0620 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 16 | $1,625.17 | $1,800.00 | $1,527.36 | $1,859.00 | $1,630.00 | $1,593.31 |
| 0625 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 1 | $213.14 | $250.00 | $200.31 | $198.00 | $213.00 | $208.96 |
| 0630 | Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70) | AS | 2 | $906.11 | $800.00 | $851.58 | $993.50 | $906.50 | $888.34 |
| 0635 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 10 | $1,075.74 | $1,100.00 | $1,011.00 | $992.50 | $1,080.00 | $1,054.65 |
| 0640 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 3 | $2,038.38 | $1,500.00 | $1,915.70 | $1,729.00 | $2,040.00 | $1,998.41 |
| 0645 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 2 | $12,753 | $8,000.00 | $11,985 | $11,626 | $12,800 | $12,503 |
| 0650 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 2 | $7,385.89 | $5,600.00 | $6,941.37 | $14,365 | $7,390.00 | $7,241.07 |
| 0655 | Vehicle detection system- adjust/modify above ground equipment (0660-4-52) | EACH | 11 | $2,558.20 | $1,800.00 | $2,404.23 | $2,490.50 | $2,560.00 | $2,508.04 |
| 0660 | Signal priority & preemption system, relocate (0663-1400) | EACH | 1 | $1,652.10 | $6,500.00 | $1,552.67 | $1,817.00 | $1,650.00 | $1,619.70 |
| 0665 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 30 | $437.10 | $625.00 | $410.79 | $649.50 | $437.50 | $428.52 |
| 0670 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 8 | $1,819.92 | $2,400.00 | $1,710.39 | $1,814.00 | $1,820.00 | $1,784.24 |
| 0675 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 10 | $106.57 | $240.00 | $100.16 | $66.00 | $106.50 | $104.48 |
| 0680 | Traffic controller assembly, F&I, NEMA W/electronic lock (0670-5170) | AS | 1 | $49,289 | $50,000 | $46,323 | $49,266 | $49,300 | $48,323 |
| 0685 | Traffic controller assembly, modify only - no components added (0670-5710) | AS | 1 | $1,225.81 | $4,000.00 | $1,152.04 | $5,720.00 | $1,230.00 | $1,201.78 |
| 0690 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 4 | $2,451.63 | $3,500.00 | $2,304.08 | $5,475.00 | $2,450.00 | $2,403.56 |
| 0695 | ITS CCTV camera, install (0682-1300) | EACH | 2 | $1,883.73 | $2,200.00 | $1,770.36 | $1,782.00 | $1,880.00 | $1,846.79 |
| 0700 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $3,166.74 | $9,000.00 | $2,976.15 | $4,633.00 | $3,170.00 | $3,104.65 |
| 0705 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 2 | $325.11 | $500.00 | $305.55 | $765.50 | $325.50 | $318.74 |
| 0710 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 1 | $213.14 | $288.75 | $200.31 | $139.50 | $213.00 | $208.96 |
| 0715 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 4 | $5,396.60 | $3,500.00 | $5,071.80 | $3,464.00 | $5,400.00 | $5,290.78 |
| 0720 | Internally illuminated sign, relocate (0700-5-50) | EACH | 1 | $2,471.04 | $950.00 | $2,322.32 | $1,625.50 | $2,470.00 | $2,422.59 |
| 0725 | Mulching, 3" deep layer (0580-12-82) | SY | 810 | $4.32 | $4.50 | $20.30 | $8.50 | $20.30 | $20.00 |
| 0730 | Relocate trees and palms, palms, 10.0"-18.0" DBH, 14.0' or greater of clear trunk (0581-1282) | EACH | 4 | $3,240.00 | $3,350.00 | $3,552.50 | $1,500.00 | $3,550.00 | $3,500.00 |
| 0735 | Relocate trees and palms, palms, 18.1" or greater DBH, 14.0' or greater of clear trunk (0581-1292) | EACH | 8 | $4,320.00 | $4,500.00 | $8,120.00 | $3,200.00 | $8,120.00 | $8,000.00 |
| 0740 | Relocate trees and palms, multi-trunk or clustering (0581-1500) | EACH | 1 | $2,916.00 | $3,000.00 | $2,030.00 | $1,100.00 | $2,030.00 | $2,000.00 |
| 0745 | Manhole, adjust, utilities (0425-5-1) | EACH | 9 | $1,080.00 | $1,200.00 | $1,336.75 | $950.00 | $860.00 | $550.00 |
| 0750 | Valve boxes, adjust (0425-6) | EACH | 68 | $972.00 | $550.00 | $848.72 | $750.00 | $875.00 | $450.00 |
| 0755 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $6,295.00 | $6,295.00 | $6,295.00 | $6,295.00 | $6,295.00 | $6,295.00 |
| 0760 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 1 | $2,196.28 | $5,000.00 | $2,064.09 | $3,455.50 | $2,200.00 | $2,153.21 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.