FDOT contract T4740 bid tabulation

SR 5 (US 1) FROM CAMINO REAL TO NE 8TH ST (MIZNER BLVD). Let by Florida DOT on March 25, 2026, Palm Beach, District 4. 9 bids received; low bid $6,362,382 by General Asphalt Company, LLC.

Owner
Florida DOT
Letting
25 MAR 2026
Pay items
152
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1General Asphalt Company, LLC$6,362,382Low
2Weekley Asphalt Paving, Inc.$6,393,2370.0%
3Florida Engineering & Development Corp$6,616,521+4.0%
4The Stout Group LLC$6,749,702+6.0%
5Ohla USA Inc$6,979,980+10%
6Roadway Construction, LLC$7,069,937+11%
7Asphalt Group, Inc.$7,072,601+11%
8Ranger Construction Industries, Inc.$7,244,769+14%
9Posillico Civil, Inc.$8,152,153+28%
FDOT contract T4740: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. General Asphalt Company, LLC2. Weekley Asphalt Paving, Inc.3. Florida Engineering & Development Corp4. The Stout Group LLC5. Ohla USA Inc6. Roadway Construction, LLC
0005Mobilization (0101-1)LS1$200,000$221,590$615,333$650,000$696,000$706,900
0010Maintenance of traffic (0102-1)DA1$645,000$622,448$475,333$275,000$550,000$424,578
0015Traffic control officer (0102-14)HR460$88.00$89.00$75.00$95.00$85.00$75.00
0020Work zone sign (0102-60)ED14,622$0.20$0.18$0.18$0.18$0.20$0.18
0025Temporary barrier, F&I, low profile, concrete (0102-71-13)LF803$45.36$43.00$53.37$42.00$0.01$0.01
0030Temporary barrier, relocate, low profile concrete (0102-71-23)LF863$20.52$30.00$29.28$28.27$0.01$0.01
0035Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED32,026$0.10$0.09$0.09$0.09$0.10$0.09
0040Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD13,584$0.04$0.04$0.04$0.04$0.05$0.04
0045Arrow board / advance warning arrow panel (0102-76)ED906$4.86$4.50$4.57$4.50$5.10$4.50
0050Portable changeable message sign, temporary (0102-99)ED712$9.13$8.45$8.58$8.45$9.55$8.45
0055Temporary signalization and maintenance, intersection (0102-104)ED1,710$6.39$5.00$6.01$8.60$6.40$6.27
0060Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,710$6.39$5.00$6.01$8.60$6.40$6.27
0065Type III barricade (0102-115)ED802$0.26$0.24$0.24$0.24$0.25$0.24
0070Inlet protection system (0104-18)EACH53$162.00$180.00$108.57$150.00$308.50$396.85
0075Litter removal (0107-1)ACRE65.23$1.08$25.00$11.12$1.00$200.00$0.02
0080Mowing (0107-2)ACRE34.42$1.08$25.00$25.21$1.00$700.00$976.25
0085Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$1.08$7,800.00$22,736$22,400$34,500$1,600.00
0090Clearing & grubbing (0110-1-1)ACRE1$89,640$107,105$75,242$275,000$555,256$101,852
0095Selective clearing and areas with trees to remain (0110-2-2)ACRE0.37$68,040$82,583$118,706$80,000$50,000$36,216
0100Removal of existing concrete (0110-4-10)SY5,441$34.86$40.00$32.52$15.00$56.00$31.50
0105Tree protection barrier (0110-21)LF3,755$10.80$11.50$12.72$9.00$2.00$4.85
0110Tree root and branch pruning (0110-22)EACH16$1,620.00$1,700.00$3,045.00$650.00$500.00$360.00
0115Tree removal (0110-23)EACH3$2,700.00$2,780.00$926.22$2,500.00$700.00$525.00
0120Regular excavation (0120-1)CY3,204$62.10$49.00$73.52$30.00$1.00$53.83
0125Embankment (0120-6)CY829$35.64$27.97$85.71$60.00$10.00$46.12
0130Type B stabilization (0160-4)SY6,395$11.02$23.59$10.62$27.00$0.01$27.77
0135Optional base, base group 01 (0285-701)SY1,110$20.09$38.22$57.05$32.00$7.00$27.15
0140Optional base, base group 09 (0285-709)SY3,116$45.79$40.00$57.58$39.00$55.00$72.70
0145Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY50,536$3.48$3.00$3.56$3.75$2.50$3.50
0150Superpave asphaltic conc, traffic C (0334-1-13)TN524.40$232.82$180.00$340.48$250.00$200.00$366.46
0155Asphalt concrete friction course,traffic C, FC-12.5, high polymer (0337-7-93)TN4,525.50$212.21$182.50$192.85$255.00$200.00$190.00
0160Inlets, curb, type P-5, <10' (0425-1351)EACH5$15,282$11,600$9,613.02$14,000$8,500.00$18,158
0165Inlets, curb, type P-5, modify (0425-1359)EACH1$18,248$12,300$12,414$15,000$9,250.00$12,650
0170Inlets, curb, type P-6, <10' (0425-1361)EACH1$17,539$13,830$10,050$14,500$9,250.00$19,512
0175Inlets, curb, type J-5, <10' (0425-1451)EACH1$23,090$15,700$12,694$15,000$11,200$22,231
0180Inlets, curb, type J-5, modify (0425-1459)EACH3$28,901$15,000$19,590$19,000$8,340.00$21,707
0185Inlets, curb, type J-6, <10' (0425-1461)EACH2$22,075$17,000$12,301$16,000$11,400$26,662
0190Manholes, P-7, <10' (0425-2-41)EACH1$11,599$9,100.00$8,966.73$12,000$6,820.00$15,969
0195Manholes, P-7, partial (0425-2-43)EACH1$5,400.00$5,900.00$3,607.81$10,000$6,320.00$7,979.46
0200Manholes, J-7, <10' (0425-2-71)EACH1$15,736$16,000$11,317$15,000$9,730.00$17,772
0205Manhole, adjust (0425-5)EACH31$1,080.00$1,000.00$1,031.10$900.00$1,050.00$2,032.71
0210Yard drain (0425-10)EACH11$8,791.20$3,090.00$4,789.28$7,000.00$6,300.00$4,560.78
0215Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF512$233.84$233.50$183.63$190.00$235.00$288.22
0220Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF49$868.43$510.00$366.00$250.00$360.00$822.51
0225Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF18$1,468.69$635.00$480.71$500.00$450.00$1,473.28
0230Pipe culvert, opt material, round, 36"S/CD (0430-175136)LF20$1,589.54$853.00$509.36$650.00$580.00$1,217.21
0235Pipe handrail - guiderail, aluminum (0515-1-2)LF11$183.60$340.40$66.72$250.00$170.00$125.00
0240Concrete curb & gutter, type F (0520-1-10)LF7,944$26.58$48.24$46.81$29.00$40.30$73.92
0245Traffic separator concrete- type IV, 4' wide (0520-5-41)LF181$52.47$80.85$123.63$60.00$132.00$145.88
0250Concrete sidewalk and driveways, 4" thick (0522-1)SY58$52.43$65.00$83.04$60.00$197.50$161.52
0255Concrete sidewalk and driveways, 6" thick (0522-2)SY356$70.92$102.52$82.10$75.00$139.00$186.41
0260Pavers, architectural, (0526-1-2)SY3,219$138.71$238.20$130.96$137.00$170.00$123.72
0265Detectable warnings (0527-2)SF320$41.45$39.50$31.40$40.00$49.65$62.72
0270Performance turf, sod (0570-1-2)SY2,623$14.31$7.25$8.37$8.25$27.10$11.69
0275Conduit, furnish & install, directional bore (0630-2-12)LF143$38.09$35.00$35.80$30.00$38.10$37.34
0280Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH4$1,524.42$2,000.00$1,432.67$1,540.00$1,530.00$1,494.53
0285Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH4$1,972.33$3,800.00$1,853.62$2,893.50$1,970.00$1,933.65
0290Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH4$1,988.74$4,000.00$1,869.05$2,947.50$1,990.00$1,949.75
0295Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162)EACH1$6,912.82$6,000.00$6,496.77$7,634.00$6,920.00$6,777.28
0300Painted pavement markings, standard, white, solid, 6" (0710-11101)GM2.06$2,700.00$2,375.00$2,410.63$1,600.00$2,370.00$1,595.33
0305Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.28$2,700.00$2,375.00$2,410.64$1,600.00$2,380.00$1,600.00
0310Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00
0315Initial contingency amount, DO not bid (0999-25)LS1$70,995$70,995$70,995$70,995$70,995$70,995
0320Local agency initial amount (DO not bid) (0999-26)LS1$51,072$51,072$51,072$51,072$51,072$51,072
0325Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH43$513.00$700.00$578.91$551.02$627.50$475.00
0330Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH4$2,376.00$2,350.00$1,915.41$1,823.13$1,990.00$2,200.00
0335Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH2$3,240.00$2,550.00$3,563.79$3,392.10$2,810.00$3,000.00
0340Single column ground sign assembly, remove (0700-1600)EACH28$16.20$20.00$55.40$25.00$81.65$15.00
0345Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912)EACH3$3,456.00$2,250.00$3,549.20$3,378.22$4,400.00$3,200.00
0350Multi-column ground sign assembly, remove (0700-2600)EACH6$1,620.00$500.00$913.50$900.00$1,430.00$1,500.00
0355Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH25$108.00$195.00$96.43$95.00$153.00$100.00
0360Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360)EACH2$5,832.56$10,000$5,481.53$9,530.00$5,830.00$5,718.19
0365Object marker, type 1 (0705-10-1)EACH1$324.00$395.00$69.92$66.55$350.00$300.00
0370Delineator, flexible tubular (0705-11-1)EACH18$108.00$105.00$106.58$100.00$105.00$100.00
0375Raised pavement marker, type B (0706-1-3)EACH941$3.78$4.00$4.06$5.00$4.00$5.00
0380Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF212$3.24$4.00$4.06$10.00$4.00$10.00
0385Painted pavement markings, surface (0710-90)LS1$23,760$19,072$19,358$35,000$19,100$35,000
0390Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF5,101$2.16$2.88$2.92$4.00$2.90$4.00
0395Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF222$4.32$4.32$4.38$5.00$4.30$5.00
0400Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF875$4.32$5.76$5.85$6.00$5.75$6.00
0405Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM3.59$1,458.00$2,250.00$2,283.75$3,000.00$2,250.00$2,995.82
0410Thermoplastic, standard, message or symbol (0711-11160)EACH10$108.00$63.00$63.95$200.00$63.00$200.00
0415Thermoplastic, standard, arrow (0711-11170)EACH89$75.60$48.00$48.72$90.00$48.00$90.00
0420Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF74$4.32$4.32$4.38$5.00$4.30$5.00
0425Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.17$2,160.00$2,250.00$2,283.76$3,000.00$2,180.00$2,909.09
0430Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF2,803$16.20$14.53$14.75$16.00$14.55$16.00
0435Thermoplastic, preformed, white, message (0711-14160)EACH42$378.00$350.00$355.25$500.00$350.00$500.00
0440Thermoplastic, preformed, white, arrow (0711-14170)EACH33$162.00$350.00$355.25$125.00$350.00$125.00
0445Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM3.45$5,616.00$4,770.00$4,841.55$5,500.00$4,760.00$5,490.42
0450Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.05$6,480.00$6,365.00$6,460.40$6,000.00$6,370.00$6,000.00
0455Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM1.93$1,425.60$1,193.00$1,210.90$2,500.00$1,190.00$2,493.51
0460Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.08$2,808.00$2,386.00$2,421.82$6,000.00$2,170.00$5,454.55
0465Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM2.43$5,702.40$4,385.00$4,450.78$5,500.00$4,380.00$5,497.74
0470Green-colored pavement markings, bike lane (0714-10)SF10,177$9.18$7.70$7.82$11.00$7.70$11.00
0475Conduit, furnish & install, directional bore (0630-2-12)LF203$39.56$35.00$37.18$30.00$39.60$38.79
0480Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH42$1,673.72$1,300.00$1,572.99$1,736.50$1,670.00$1,640.90
0485Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF2,895$3.37$4.00$3.17$2.90$3.35$3.30
0490Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF6,117$0.42$0.25$0.40$0.50$0.45$0.42
0495Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pole top (0715-11213)EACH6$2,585.76$2,200.00$2,430.13$2,105.50$2,590.00$2,535.05
0500Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH12$894.52$650.00$840.68$1,355.00$895.00$876.98
0505Conduit, furnish & install, directional bore (0630-2-12)LF2,741$39.91$38.00$38.58$43.00$41.05$40.25
0510Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI6$8,635.81$12,000$8,116.06$11,982$8,640.00$8,466.48
0515Signal cable, remove- intersection (0632-7-6)PI5$1,491.98$500.00$1,402.18$1,728.00$1,490.00$1,462.72
0520Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF1,002$5.51$4.50$5.18$4.50$5.50$5.40
0525Fiber optic connection, install, splice (0633-2-31)EACH8$62.79$55.00$59.01$52.50$62.80$61.56
0530Fiber optic connection hardware, F&I, splice (0633-3-11)EACH1$4,151.16$3,200.00$3,901.33$3,060.50$4,150.00$4,069.77
0535Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH1$69.77$75.00$65.57$59.00$69.80$68.40
0540Fiber optic cable locator (0633-6)DA342$244.88$135.00$230.14$324.50$231.50$0.01
0545Multi-conductor cable, adjust/modify (0633-8-5)LF40$17.06$5.00$16.04$1.40$17.05$16.73
0550Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH7$2,196.28$3,500.00$2,064.09$3,455.50$2,200.00$2,153.21
0555Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH115$1,627.23$1,100.00$1,572.99$1,736.50$1,670.00$1,640.90
0560Pull & splice box, install (0635-2-30)EACH6$1,225.81$1,200.00$1,152.04$1,017.50$1,230.00$1,201.78
0565Electrical power service, F&I, underground, meter by contractor (0639-1122)AS6$4,508.50$6,000.00$4,237.16$6,290.00$4,510.00$4,420.10
0570Electrical service wire, & install (0639-2-1)LF1,833$8.70$10.00$8.18$10.00$8.70$8.53
0575Electrical service wire, (0639-2-6)LF560$0.42$1.00$0.40$1.00$0.45$0.42
0580Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60)EACH4$532.85$250.00$500.78$742.50$533.00$522.40
0585Prestressed concrete pole, type P-II service pole (0641-2-12)EACH6$3,070.46$3,600.00$2,885.67$3,292.50$3,070.00$3,010.26
0590Aluminum signals pole, (0646-1-11)EACH15$2,470.63$1,500.00$2,321.93$3,003.00$2,470.00$2,422.19
0595Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH10$2,054.08$1,850.00$1,930.46$2,568.00$2,050.00$2,013.80
0600Aluminum signals pole, remove (0646-1-60)EACH16$426.28$300.00$400.62$267.00$426.50$417.92
0605Steel mast arm assembly, and install, double arm 70'-60' (0649-21-19)EACH1$141,298$110,000$132,794$130,177$141,355$138,528
0610Steel mast arm assembly, and install, single arm 78' (0649-21-21)EACH1$138,194$125,000$129,877$143,039$138,250$135,485
0615Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3)EACH1$5,413.95$4,500.00$5,088.11$3,030.00$5,420.00$5,307.80
0620Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS16$1,625.17$1,800.00$1,527.36$1,859.00$1,630.00$1,593.31
0625Vehicular traffic signal, remove- poles to remain (0650-1-60)AS1$213.14$250.00$200.31$198.00$213.00$208.96
0630Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70)AS2$906.11$800.00$851.58$993.50$906.50$888.34
0635Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS10$1,075.74$1,100.00$1,011.00$992.50$1,080.00$1,054.65
0640Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS3$2,038.38$1,500.00$1,915.70$1,729.00$2,040.00$1,998.41
0645Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH2$12,753$8,000.00$11,985$11,626$12,800$12,503
0650Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH2$7,385.89$5,600.00$6,941.37$14,365$7,390.00$7,241.07
0655Vehicle detection system- adjust/modify above ground equipment (0660-4-52)EACH11$2,558.20$1,800.00$2,404.23$2,490.50$2,560.00$2,508.04
0660Signal priority & preemption system, relocate (0663-1400)EACH1$1,652.10$6,500.00$1,552.67$1,817.00$1,650.00$1,619.70
0665Pedestrian detector, furnish & install, standard (0665-1-11)EACH30$437.10$625.00$410.79$649.50$437.50$428.52
0670Pedestrian detector, furnish & install, accessible (0665-1-12)EACH8$1,819.92$2,400.00$1,710.39$1,814.00$1,820.00$1,784.24
0675Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH10$106.57$240.00$100.16$66.00$106.50$104.48
0680Traffic controller assembly, F&I, NEMA W/electronic lock (0670-5170)AS1$49,289$50,000$46,323$49,266$49,300$48,323
0685Traffic controller assembly, modify only - no components added (0670-5710)AS1$1,225.81$4,000.00$1,152.04$5,720.00$1,230.00$1,201.78
0690Traffic signal controller cabinet, adjust/modify (0676-1500)EACH4$2,451.63$3,500.00$2,304.08$5,475.00$2,450.00$2,403.56
0695ITS CCTV camera, install (0682-1300)EACH2$1,883.73$2,200.00$1,770.36$1,782.00$1,880.00$1,846.79
0700Managed field ethernet switch, furnish & install (0684-1-1)EACH1$3,166.74$9,000.00$2,976.15$4,633.00$3,170.00$3,104.65
0705Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH2$325.11$500.00$305.55$765.50$325.50$318.74
0710Sign panel, remove, UP to 12 SF (0700-3601)EACH1$213.14$288.75$200.31$139.50$213.00$208.96
0715Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21)EACH4$5,396.60$3,500.00$5,071.80$3,464.00$5,400.00$5,290.78
0720Internally illuminated sign, relocate (0700-5-50)EACH1$2,471.04$950.00$2,322.32$1,625.50$2,470.00$2,422.59
0725Mulching, 3" deep layer (0580-12-82)SY810$4.32$4.50$20.30$8.50$20.30$20.00
0730Relocate trees and palms, palms, 10.0"-18.0" DBH, 14.0' or greater of clear trunk (0581-1282)EACH4$3,240.00$3,350.00$3,552.50$1,500.00$3,550.00$3,500.00
0735Relocate trees and palms, palms, 18.1" or greater DBH, 14.0' or greater of clear trunk (0581-1292)EACH8$4,320.00$4,500.00$8,120.00$3,200.00$8,120.00$8,000.00
0740Relocate trees and palms, multi-trunk or clustering (0581-1500)EACH1$2,916.00$3,000.00$2,030.00$1,100.00$2,030.00$2,000.00
0745Manhole, adjust, utilities (0425-5-1)EACH9$1,080.00$1,200.00$1,336.75$950.00$860.00$550.00
0750Valve boxes, adjust (0425-6)EACH68$972.00$550.00$848.72$750.00$875.00$450.00
0755Local agency initial amount (DO not bid) (0999-26)LS1$6,295.00$6,295.00$6,295.00$6,295.00$6,295.00$6,295.00
0760Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH1$2,196.28$5,000.00$2,064.09$3,455.50$2,200.00$2,153.21
FDOT contract T4740: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way