FDOT contract T4693 bid tabulation
SR 7 (US 441) FROM N OF GLADES RD TO N OF BRIDGE BROOK DR. Let by Florida DOT on February 26, 2025, Palm Beach, District 4. 6 bids received; low bid $9,521,050 by Weekley Asphalt Paving, Inc..
- Owner
- Florida DOT
- Letting
- 26 FEB 2025
- Pay items
- 140
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Weekley Asphalt Paving, Inc. | $9,521,050 | Low |
| 2 | General Asphalt Company, LLC | $10,065,703 | +6.0% |
| 3 | Ohla USA Inc | $10,131,010 | +6.0% |
| 4 | Ranger Construction Industries, Inc. | $10,756,829 | +13% |
| 5 | Halley Engineering Contractors, Inc. | $11,095,261 | +17% |
| 6 | Asphalt Group, Inc. | $12,778,094 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Weekley Asphalt Paving, Inc. | 2. General Asphalt Company, LLC | 3. Ohla USA Inc | 4. Ranger Construction Industries, Inc. | 5. Halley Engineering Contractors, Inc. | 6. Asphalt Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $323,475 | $270,000 | $1,000,000 | $1,000,000 | $1,100,000 | $1,200,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $546,338 | $1,000,000 | $420,000 | $750,000 | $925,000 | $1,200,000 |
| 0015 | Traffic control officer (0102-14) | HR | 364 | $89.00 | $82.50 | $75.00 | $106.25 | $85.00 | $100.00 |
| 0020 | Work zone sign (0102-60) | ED | 2,552 | $0.24 | $0.26 | $0.30 | $0.31 | $0.25 | $0.25 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 77,307 | $0.11 | $0.12 | $0.11 | $0.12 | $0.25 | $0.12 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 1,830 | $0.10 | $0.11 | $0.20 | $0.22 | $0.15 | $1.00 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 475 | $6.00 | $5.83 | $5.00 | $5.59 | $7.00 | $7.00 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 489 | $11.00 | $12.10 | $10.00 | $11.20 | $14.00 | $14.00 |
| 0045 | Temporary signalization and maintenance, intersection (0102-104) | ED | 2,346 | $15.54 | $11.55 | $26.25 | $20.10 | $18.00 | $15.54 |
| 0050 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 2,346 | $1.20 | $1.10 | $25.25 | $20.10 | $18.00 | $1.20 |
| 0055 | Type III barricade (0102-115) | ED | 1,006 | $0.35 | $0.34 | $0.35 | $0.39 | $0.30 | $0.30 |
| 0060 | Sediment barrier (0104-10-3) | LF | 4,376 | $1.60 | $0.01 | $2.30 | $1.72 | $3.00 | $2.00 |
| 0065 | Floating turbidity barrier (0104-11) | LF | 215 | $38.00 | $11.00 | $25.00 | $13.95 | $10.00 | $20.00 |
| 0070 | Inlet protection system (0104-18) | EACH | 35 | $150.00 | $154.00 | $250.00 | $151.00 | $125.00 | $120.00 |
| 0075 | Litter removal (0107-1) | ACRE | 740.15 | $10.00 | $0.01 | $39.00 | $33.55 | $35.00 | $15.00 |
| 0080 | Mowing (0107-2) | ACRE | 496.36 | $10.00 | $0.01 | $90.00 | $34.65 | $100.00 | $15.00 |
| 0085 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $7,230.00 | $1.10 | $8,000.00 | $6,595.00 | $5,000.00 | $5,000.00 |
| 0090 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $4,350.00 | $1.10 | $5,000.00 | $4,359.00 | $5,000.00 | $5,000.00 |
| 0095 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $137,720 | $52,932 | $900,000 | $282,500 | $70,000 | $793,000 |
| 0100 | Selective clearing and areas with trees to remain (0110-2-2) | ACRE | 0.01 | $445,600 | $1,100,000 | $1,000,000 | $39,120 | $20,000 | $750,000 |
| 0105 | Removal of existing concrete (0110-4-10) | SY | 1,281 | $40.00 | $35.20 | $23.00 | $41.55 | $25.00 | $35.00 |
| 0110 | Regular excavation (0120-1) | CY | 563.30 | $48.00 | $25.77 | $21.00 | $39.85 | $20.00 | $25.00 |
| 0115 | Embankment (0120-6) | CY | 1,976.60 | $32.50 | $52.58 | $23.00 | $43.85 | $40.00 | $35.00 |
| 0120 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 209,601 | $2.75 | $3.51 | $3.00 | $2.71 | $4.30 | $8.00 |
| 0125 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 23,056.10 | $180.00 | $183.65 | $160.00 | $180.00 | $202.00 | $170.00 |
| 0130 | Miscellaneous asphalt (0339-1) | TN | 76.20 | $250.00 | $316.60 | $450.00 | $221.75 | $250.00 | $300.00 |
| 0135 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 2.20 | $29.00 | $1,650.00 | $965.00 | $1,079.00 | $3,000.00 | $2,000.00 |
| 0140 | Inlets, DT bot, type C,jbot, <10' (0425-1523) | EACH | 1 | $10,600 | $8,580.00 | $12,100 | $8,383.00 | $7,500.00 | $20,000 |
| 0145 | Inlets, ditch bottom, type D, J bot, <10' (0425-1543) | EACH | 6 | $12,460 | $10,296 | $15,200 | $10,060 | $9,000.00 | $20,000 |
| 0150 | Inlets, closed flume (0425-1910) | EACH | 2 | $7,813.00 | $11,440 | $10,350 | $11,180 | $10,000 | $6,000.00 |
| 0155 | Manhole, adjust (0425-5) | EACH | 4 | $700.00 | $858.00 | $1,320.00 | $838.25 | $750.00 | $2,000.00 |
| 0160 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 212 | $304.25 | $354.64 | $215.00 | $346.50 | $310.00 | $500.00 |
| 0165 | Pipe culvert, optional material, round, 24"SD (0430-174124) | LF | 9 | $410.25 | $755.04 | $230.00 | $737.75 | $660.00 | $1,000.00 |
| 0170 | Mitered end section, optional round, 24" SD (0430-984129) | EACH | 1 | $7,105.00 | $6,864.00 | $5,060.00 | $6,707.00 | $6,000.00 | $5,000.00 |
| 0175 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 51 | $60.00 | $117.70 | $94.00 | $105.00 | $52.00 | $120.00 |
| 0180 | Concrete curb & gutter, type F (0520-1-10) | LF | 693 | $49.00 | $59.28 | $62.00 | $51.90 | $44.00 | $52.00 |
| 0185 | Concrete curb, type D (0520-2-4) | LF | 128 | $44.00 | $49.24 | $67.00 | $54.20 | $63.00 | $55.00 |
| 0190 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 2,908 | $49.50 | $64.08 | $56.00 | $65.20 | $76.00 | $100.00 |
| 0195 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,031 | $59.00 | $120.45 | $82.00 | $93.20 | $86.00 | $100.00 |
| 0200 | Detectable warnings (0527-2) | SF | 837 | $48.00 | $39.60 | $45.00 | $50.30 | $63.00 | $45.00 |
| 0205 | Guardrail -roadway, general (0536-1-1) | LF | 705 | $27.10 | $30.80 | $23.75 | $23.35 | $24.32 | $20.88 |
| 0210 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 6 | $192.00 | $209.00 | $113.00 | $111.50 | $172.13 | $99.84 |
| 0215 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 2 | $4,170.00 | $4,620.00 | $3,100.00 | $3,056.00 | $3,752.00 | $2,734.00 |
| 0220 | Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123) | EACH | 1 | $1,486.00 | $4,730.00 | $1,800.00 | $1,780.00 | $1,337.00 | $1,592.00 |
| 0225 | Guardrail removal (0536-73) | LF | 1,150 | $3.45 | $2.15 | $2.45 | $2.40 | $3.10 | $2.15 |
| 0230 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 4 | $3,528.00 | $3,795.00 | $3,365.00 | $3,309.00 | $3,175.00 | $2,960.00 |
| 0235 | Performance turf, sod (0570-1-2) | SY | 11,344 | $3.60 | $2.92 | $3.70 | $9.60 | $5.00 | $3.00 |
| 0240 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 10,366 | $7.10 | $6.22 | $3.20 | $9.60 | $7.00 | $5.00 |
| 0245 | Irrigation system- modify existing system (0590-70-5) | LS | 1 | $12,800 | $12,650 | $11,500 | $18,440 | $21,000 | $11,500 |
| 0250 | Conduit, furnish & install, open trench (0630-2-11) | LF | 229 | $32.69 | $45.10 | $27.00 | $25.15 | $22.50 | $32.69 |
| 0255 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 185 | $66.36 | $48.40 | $55.00 | $26.25 | $23.50 | $66.36 |
| 0260 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 9 | $1,772.89 | $1,468.50 | $950.00 | $2,080.00 | $1,111.00 | $1,772.00 |
| 0265 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 18 | $2,227.80 | $2,244.00 | $1,900.00 | $2,222.00 | $1,989.00 | $2,227.00 |
| 0270 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 18 | $2,382.68 | $1,578.50 | $1,200.00 | $2,557.00 | $2,288.00 | $2,382.00 |
| 0275 | Traffic monitoring site cabinet, furnish & install, type 4, base mount (0695-7141) | EACH | 2 | $8,293.76 | $13,200 | $6,885.00 | $12,840 | $11,489 | $8,293.00 |
| 0280 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 13.60 | $1,350.00 | $440.00 | $1,350.00 | $447.00 | $400.00 | $400.00 |
| 0285 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 3,500 | $1.00 | $0.28 | $1.00 | $0.28 | $0.25 | $0.25 |
| 0290 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,200 | $3.00 | $0.39 | $3.00 | $0.39 | $0.35 | $0.35 |
| 0295 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 25 | $35.00 | $11.00 | $35.00 | $11.20 | $10.00 | $10.00 |
| 0300 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 6.50 | $1,350.00 | $440.00 | $1,400.00 | $447.00 | $400.00 | $400.00 |
| 0305 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0310 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $107,501 | $107,501 | $107,501 | $107,501 | $107,501 | $107,501 |
| 0315 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 130 | $510.00 | $605.28 | $550.00 | $615.00 | $525.00 | $550.25 |
| 0320 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 40 | $1,900.00 | $1,853.76 | $1,685.00 | $1,884.00 | $1,385.00 | $1,685.00 |
| 0325 | Single column ground sign assembly, remove (0700-1600) | EACH | 119 | $35.00 | $55.00 | $50.00 | $55.90 | $30.00 | $50.00 |
| 0330 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 5 | $8,000.00 | $6,431.03 | $5,850.00 | $6,535.00 | $4,500.00 | $5,846.00 |
| 0335 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 3 | $9,000.00 | $7,176.87 | $6,525.00 | $7,293.00 | $5,850.00 | $6,524.00 |
| 0340 | Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115) | EACH | 2 | $9,500.00 | $9,951.45 | $9,050.00 | $10,110 | $6,950.00 | $9,046.00 |
| 0345 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 9 | $2,000.00 | $1,320.00 | $1,200.00 | $1,341.00 | $650.00 | $1,200.00 |
| 0350 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 50 | $125.00 | $154.00 | $140.00 | $156.50 | $100.00 | $140.00 |
| 0355 | Tubular marker, 36" yellow (0704-1-4) | EACH | 28 | $225.00 | $242.23 | $220.00 | $246.25 | $220.00 | $220.00 |
| 0360 | Object marker, type 1 (0705-10-1) | EACH | 15 | $325.00 | $220.00 | $200.00 | $223.50 | $225.00 | $200.00 |
| 0365 | Raised pavement marker, type B (0706-1-3) | EACH | 3,999 | $5.00 | $4.40 | $5.00 | $4.47 | $4.00 | $5.00 |
| 0370 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 109 | $10.00 | $4.40 | $10.00 | $4.47 | $4.00 | $10.00 |
| 0375 | Painted pavement markings, surface (0710-90) | LS | 1 | $60,000 | $113,758 | $60,000 | $115,600 | $103,416 | $103,416 |
| 0380 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 6,883 | $4.00 | $3.50 | $4.00 | $3.55 | $3.18 | $3.18 |
| 0385 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 696 | $5.00 | $5.25 | $5.00 | $5.33 | $4.77 | $4.77 |
| 0390 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 2,933 | $6.00 | $7.00 | $6.00 | $7.11 | $6.36 | $6.36 |
| 0395 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 3.46 | $3,000.00 | $2,200.00 | $3,000.00 | $2,236.00 | $2,000.00 | $2,000.00 |
| 0400 | Thermoplastic, standard, arrow (0711-11170) | EACH | 179 | $90.00 | $59.40 | $90.00 | $60.40 | $54.00 | $54.90 |
| 0405 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 800 | $7.00 | $4.90 | $7.00 | $4.97 | $4.45 | $4.45 |
| 0410 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.61 | $3,000.00 | $2,200.00 | $3,000.00 | $2,236.00 | $2,000.00 | $2,000.00 |
| 0415 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 3,819 | $16.00 | $17.47 | $16.00 | $17.75 | $15.88 | $15.88 |
| 0420 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 91 | $200.00 | $280.50 | $200.00 | $285.00 | $255.00 | $255.00 |
| 0425 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 159 | $225.00 | $119.90 | $225.00 | $121.75 | $109.00 | $109.00 |
| 0430 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 16.24 | $5,200.00 | $5,001.70 | $5,200.00 | $5,083.00 | $4,547.00 | $4,547.00 |
| 0435 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.34 | $6,000.00 | $6,669.30 | $5,850.00 | $6,777.00 | $6,063.00 | $6,063.00 |
| 0440 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 12.25 | $2,500.00 | $1,250.70 | $2,500.00 | $1,271.00 | $1,137.00 | $1,137.00 |
| 0445 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 7.03 | $5,200.00 | $4,688.20 | $5,200.00 | $4,764.00 | $4,262.00 | $4,262.00 |
| 0450 | Green-colored pavement markings, bike lane (0714-10) | SF | 19,301 | $8.00 | $9.35 | $8.00 | $9.50 | $6.00 | $8.50 |
| 0455 | Conduit, furnish & install, open trench (0630-2-11) | LF | 4,259 | $20.59 | $15.40 | $16.00 | $18.45 | $16.50 | $20.59 |
| 0460 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 173 | $44.63 | $37.40 | $38.00 | $39.10 | $35.00 | $44.63 |
| 0465 | Conduit, furnish & install, mount (0630-2-15) | LF | 240 | $55.55 | $51.70 | $55.00 | $83.60 | $74.80 | $55.55 |
| 0470 | Conduit, remove, bridge mount (0630-2-65) | LF | 180 | $11.95 | $18.70 | $16.00 | $29.85 | $26.70 | $11.95 |
| 0475 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 39 | $1,772.89 | $2,607.00 | $1,075.00 | $2,096.00 | $1,125.00 | $1,772.00 |
| 0480 | Pull & splice box, install (0635-2-30) | EACH | 1 | $1,422.97 | $2,200.00 | $555.00 | $2,459.00 | $1,450.00 | $1,422.00 |
| 0485 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $6,034.16 | $7,617.50 | $5,850.00 | $9,222.00 | $8,250.00 | $6,034.00 |
| 0490 | Electrical power service, remove underground (0639-1620) | AS | 1 | $956.40 | $962.50 | $1,100.00 | $715.50 | $641.00 | $956.00 |
| 0495 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 1,713 | $3.76 | $3.30 | $2.00 | $3.69 | $3.30 | $3.76 |
| 0500 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 15,307 | $5.47 | $3.58 | $6.00 | $5.25 | $4.70 | $5.47 |
| 0505 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 15,983 | $0.60 | $1.10 | $1.00 | $0.22 | $0.20 | $0.60 |
| 0510 | Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31) | EACH | 1 | $2,908.21 | $2,695.00 | $2,300.00 | $2,929.00 | $2,620.00 | $2,908.00 |
| 0515 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $21,501 | $25,025 | $15,500 | $20,850 | $18,650 | $21,500 |
| 0520 | Load center, remove, voltage (0715-7-41) | EACH | 1 | $956.40 | $960.30 | $825.00 | $950.00 | $850.00 | $956.00 |
| 0525 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 29 | $1,951.74 | $1,353.00 | $1,500.00 | $1,453.00 | $1,300.00 | $1,951.00 |
| 0530 | Light pole complete, F&I, standard pole standard foundation, 50' mounting height, 15' arm length (0715-61552) | EACH | 18 | $14,007 | $13,398 | $9,950.00 | $9,892.00 | $8,850.00 | $14,007 |
| 0535 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 19 | $1,195.49 | $1,540.00 | $2,100.00 | $726.50 | $650.00 | $1,195.00 |
| 0540 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 48 | $1,219.84 | $968.00 | $640.00 | $827.25 | $740.00 | $1,219.00 |
| 0545 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,321 | $22.71 | $18.70 | $27.00 | $35.20 | $31.50 | $22.71 |
| 0550 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,263 | $50.38 | $39.60 | $55.00 | $35.20 | $31.50 | $50.80 |
| 0555 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 5 | $9,268.90 | $6,424.00 | $3,690.00 | $13,970 | $12,500 | $9,268.00 |
| 0560 | Signal cable, remove- intersection (0632-7-6) | PI | 5 | $1,912.79 | $1,820.50 | $1,325.00 | $596.25 | $534.00 | $1,912.00 |
| 0565 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 113 | $1,878.52 | $2,200.00 | $1,225.00 | $2,347.00 | $1,350.00 | $1,878.00 |
| 0570 | Pull & splice box, F&I, 30" X 48" cover size (0635-2-15) | EACH | 5 | $4,329.29 | $4,361.50 | $4,680.00 | $4,024.00 | $2,850.00 | $4,329.00 |
| 0575 | Pull & splice box, install (0635-2-30) | EACH | 6 | $1,267.44 | $1,430.00 | $555.00 | $1,900.00 | $950.00 | $1,267.00 |
| 0580 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 6 | $4,789.97 | $4,889.50 | $5,800.00 | $6,434.00 | $5,757.00 | $4,789.00 |
| 0585 | Electrical power service, remove underground (0639-1620) | AS | 6 | $717.30 | $962.50 | $1,100.00 | $447.25 | $401.00 | $717.00 |
| 0590 | Electrical service wire, & install (0639-2-1) | LF | 585 | $11.28 | $9.90 | $4.00 | $11.85 | $10.60 | $11.28 |
| 0595 | Electrical service wire, (0639-2-6) | LF | 739 | $0.48 | $4.13 | $1.00 | $0.28 | $0.25 | $0.48 |
| 0600 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 6 | $3,701.31 | $2,986.50 | $1,450.00 | $2,388.00 | $2,137.00 | $3,701.00 |
| 0605 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 6 | $4,090.12 | $3,025.00 | $2,050.00 | $2,307.00 | $2,064.00 | $4,090.00 |
| 0610 | Aluminum signals pole, (0646-1-11) | EACH | 28 | $2,812.53 | $2,876.50 | $3,175.00 | $2,042.00 | $1,828.00 | $2,812.00 |
| 0615 | Aluminum signals pole, remove (0646-1-60) | EACH | 8 | $478.20 | $374.00 | $875.00 | $447.25 | $401.00 | $478.00 |
| 0620 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 94 | $1,106.10 | $742.50 | $750.00 | $592.50 | $530.00 | $1,106.00 |
| 0625 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 26 | $1,013.20 | $880.00 | $840.00 | $726.50 | $650.00 | $1,013.00 |
| 0630 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 3 | $1,805.96 | $2,090.00 | $1,700.00 | $1,509.00 | $1,350.00 | $1,805.00 |
| 0635 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 19 | $119.55 | $198.00 | $137.00 | $149.00 | $134.00 | $119.55 |
| 0640 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 8 | $525.26 | $489.50 | $370.00 | $357.75 | $320.00 | $525.00 |
| 0645 | Loop assembly, F&I, type F (0660-2106) | AS | 82 | $2,032.68 | $1,666.50 | $1,165.00 | $2,459.00 | $2,201.00 | $2,032.00 |
| 0650 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 31 | $433.50 | $379.50 | $485.00 | $391.25 | $350.00 | $433.00 |
| 0655 | Pedestrian detector, relocate (0665-1-40) | EACH | 3 | $517.08 | $242.00 | $275.00 | $189.00 | $170.00 | $517.00 |
| 0660 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 19 | $119.55 | $121.00 | $70.00 | $74.60 | $67.00 | $119.00 |
| 0665 | Traffic controller, modify (0671-2-40) | EACH | 5 | $3,257.99 | $2,365.00 | $830.00 | $6,371.00 | $5,700.00 | $3,257.00 |
| 0670 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 6 | $1,289.22 | $880.00 | $945.00 | $952.00 | $852.00 | $1,289.00 |
| 0675 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 6 | $119.22 | $126.50 | $66.00 | $149.00 | $134.00 | $119.00 |
| 0680 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 4 | $4,723.13 | $7,502.00 | $6,875.00 | $4,248.00 | $3,800.00 | $4,723.00 |
| 0685 | Internally illuminated sign, remove (0700-5-60) | EACH | 4 | $717.30 | $363.00 | $400.00 | $149.00 | $134.00 | $717.00 |
| 0690 | Manhole, adjust, utilities (0425-5-1) | EACH | 7 | $800.00 | $915.20 | $1,000.00 | $894.25 | $800.00 | $2,000.00 |
| 0695 | Valve boxes, adjust (0425-6) | EACH | 25 | $500.00 | $743.60 | $1,000.00 | $726.50 | $650.00 | $500.00 |
| 0700 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $1,238.75 | $1,238.75 | $1,238.75 | $1,238.75 | $1,238.75 | $1,238.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of February 26, 2025. Compiled by Mirage Metrics.