FDOT contract T4736 bid tabulation

SR 27 (US 27) AT I-75/US 27 INTERCHANGE. Let by Florida DOT on July 30, 2025, Palm Beach, District 4. 7 bids received; low bid $20,985,425 by Prince Contracting, LLC..

Owner
Florida DOT
Letting
30 JUL 2025
Pay items
137
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Prince Contracting, LLC.$20,985,425Low
2Lead Engineering Contractors, LLC$22,688,237+8.0%
3Ranger Construction Industries, Inc.$25,295,999+21%
4Cone & Graham, Inc.$25,835,661+23%
5Johnson Bros. Corporation, A Southland Company$28,254,476+35%
6Strongcore Group, LLC$28,497,737+36%
7Asphalt Group, Inc.$28,681,335+37%
FDOT contract T4736: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Prince Contracting, LLC.2. Lead Engineering Contractors, LLC3. Ranger Construction Industries, Inc.4. Cone & Graham, Inc.5. Johnson Bros. Corporation, A Southland Company6. Strongcore Group, LLC
0005Conc class II, bridge superstructure (0400-2-4)CY1,312.80$1,100.00$1,200.00$1,320.00$1,500.00$1,100.00$1,320.00
0010Concrete class II, approach slabs (0400-2-10)CY311.30$550.00$700.00$960.00$1,000.00$600.00$516.00
0015Concrete class IV, bridge substructure (0400-4-5)CY136.80$2,500.00$2,600.00$3,030.00$2,700.00$4,000.00$3,375.00
0020Concrete class IV, mass, substructure (0400-4-25)CY384.30$1,300.00$300.00$1,535.00$2,500.00$1,500.00$1,200.00
0025Bridge deck grooving (0400-7-1)SY2,597$8.00$5.00$6.50$4.00$4.00$5.50
0030Bridge deck planing (0400-9-1)SY2,597$8.00$8.00$6.50$5.00$8.00$5.50
0035Composite neoprene pads (0400-147)CF10.10$1,500.00$1,500.00$2,850.00$3,000.00$2,350.00$1,550.00
0040Plain neoprene bearing pads (0400-148)CF28.60$600.00$800.00$1,500.00$1,500.00$1,100.00$770.00
0045Reinforcing steel - bridge superstructure (0415-1-4)LB256,750$1.20$1.00$1.65$2.00$1.25$1.20
0050Reinforcing steel- bridge substructure (0415-1-5)LB59,937$1.60$1.40$2.05$2.00$1.30$1.50
0055Reinforcing steel- approach slabs (0415-1-9)LB64,033$1.20$1.02$1.70$2.00$1.25$1.20
0060Prest beams: florida-I beam 36" (0450-2-36)LF1,800$450.00$495.00$546.00$700.00$450.00$312.00
0065Preformed pile holes, 36" to 43" drill/punch size (0455-15-16)LF2,764$200.00$65.00$150.00$200.00$225.00$245.00
0070Pile inspection, driven pile (0455-20-1)EACH69$800.00$520.00$900.00$750.00$3,100.00$300.00
0075Prestressed concrete piling, SQ (0455-34-5)LF3,955$300.00$225.00$410.00$100.00$305.00$230.00
0080Pile redrive (0455-115)EACH16$3,700.00$6,500.00$2,000.00$200.00$3,300.00$1,970.00
0085Load test (dynamic), data collection and analysis (0455-137)EACH85$600.00$700.00$2,230.00$2,500.00$1,700.00$641.00
0090Load test (dynamic), test (0455-137-2)EACH8$2,200.00$700.00$1,105.00$5,000.00$2,000.00$1,020.00
0095Test piles-prestressed concrete,24" SQ (0455-143-5)LF650$450.00$260.00$600.00$800.00$400.00$547.00
0100Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11)LF504$45.00$25.00$37.50$125.00$9.00$85.00
0105Concrete traffic railing- 36" single-slope (0521-5-13)LF994$130.00$96.00$150.00$200.00$225.00$665.00
0110Riprap, sand-cement bags (0530-1100)CY76.20$850.00$1,500.00$1,080.00$1,100.00$1,400.00$2,190.00
0115Riprap- rubble, bank and shore (0530-3-3)TN8,704$100.00$100.00$67.00$1.00$150.00$90.00
0120Bedding stone (0530-74)TN5,654$90.00$90.00$54.00$1.00$165.00$51.00
0125Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16)LF2,485$55.00$51.76$39.70$70.36$85.00$64.00
0130Junction box, furnish & install, embedded (0635-3-13)EACH6$1,650.00$1,552.80$1,590.00$1,962.95$2,300.00$1,920.00
0135Mobilization (0101-1)LS1$2,100,000$2,000,000$2,394,500$2,583,000$2,615,000$2,800,000
0140Maintenance of traffic (0102-1)DA1$650,000$385,000$970,000$939,288$90,000$1,000,000
0145Special detour- temporary pavement (0102-2200)SY1$750,000$890,000$915,250$1,336,610$600,000$200,000
0150Special detour- temporary earthwork/base (0102-2300)CY1$450,000$800,000$1,456,300$1,307,348$953,000$200,000
0155Traffic control officer (0102-14)HR360$100.00$90.00$105.90$97.28$115.00$92.00
0160Work zone sign (0102-60)ED46,223$0.19$0.19$0.20$0.22$0.23$0.20
0165Temporary barrier, F&I, anchored (0102-71-15)LF240$0.01$47.00$45.30$54.59$85.00$41.00
0170Temporary barrier, F&I, free standing (0102-71-16)LF6,312$0.01$43.00$27.05$49.74$85.00$25.00
0175Temporary barrier, relocate, free standing (0102-71-26)LF16,296$0.01$17.00$10.45$19.41$16.00$10.00
0180Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED91,941$0.09$0.10$0.10$0.12$0.10$0.10
0185Arrow board / advance warning arrow panel (0102-76)ED1,007$5.10$5.20$5.90$6.07$6.00$6.40
0190Temporary crash cushion, redirective option (0102-89-1)LO6$1,800.00$960.00$4,470.00$2,069.87$1,100.00$3,990.00
0195Temporary glare screen, F&I, wall material-concrete (0102-94-1)LF2,300$25.51$25.00$29.40$33.97$31.00$30.50
0200Glare screen, temporary, relocate, wall material- concrete (0102-94-11)LF2,300$14.29$14.00$16.45$10.92$18.00$17.00
0205Portable changeable message sign, temporary (0102-99)ED1,624$9.18$11.20$10.60$13.10$14.00$11.50
0210Type III barricade (0102-115)ED1,596$0.23$0.50$0.25$0.55$0.45$0.30
0215Removable tape, white, solid 6" (0102-913-21)GM0.55$9,700.00$16,200$11,100$17,168$16,000$11,700
0220Removable tape, yellow, solid, (0102-913-31)GM0.09$9,500.00$20,500$10,700$17,168$17,000$11,100
0225Sediment barrier (0104-10-3)LF1,700$4.00$8.15$3.70$2.70$40.00$20.50
0230Floating turbidity barrier (0104-11)LF404$16.50$35.00$18.70$14.00$75.00$81.50
0235Inlet protection system (0104-18)EACH2$23.00$1,200.00$235.30$1,912.62$1,315.00$521.00
0240Litter removal (0107-1)ACRE365.32$30.00$30.00$50.00$141.61$25.00$113.00
0245Mowing (0107-2)ACRE237.04$135.00$150.00$275.00$274.63$35.00$439.00
0250Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$5,600.00$5,000.00$6,350.00$1.00$30,000$5,430.00
0255Monitor existing structures- vibration monitoring (0108-2)LS1$10,200$5,000.00$11,600$1.00$30,000$13,500
0260Clearing & grubbing (0110-1-1)ACRE1$421,614$450,000$825,000$1,228,356$217,000$5,280,000
0265Regular excavation (0120-1)CY6,156$3.50$19.00$5.30$6.89$15.00$12.50
0270Subsoil excavation (0120-4)CY1,400$15.00$100.00$31.75$49.00$40.00$30.00
0275Channel excavation (0120-5)CY36,899$30.00$27.00$11.80$29.00$30.00$30.00
0280Embankment (0120-6)CY23,001$10.00$26.00$2.65$6.70$15.00$15.50
0285Surcharge embankment (0120-74)CY718.70$25.00$190.00$14.40$76.46$100.00$10.00
0290Geosynthetic reinforced foundation over soft soil (0145-2)SY2,065$6.25$9.00$3.20$4.85$10.00$25.00
0295Type B stabilization (0160-4)SY19,126$2.00$18.00$8.65$8.83$25.00$0.01
0300Optional base, base group 01 (0285-701)SY7,295$9.50$14.00$7.55$10.37$22.00$18.00
0305Optional base, base group 09 (0285-709)SY11,371$15.00$26.00$21.90$16.33$45.00$28.00
0310Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY3,481$6.60$5.00$6.15$8.00$6.00$7.00
0315Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY21,230$4.00$5.00$3.50$6.00$8.55$6.00
0320Superpave asphaltic conc, traffic E (0334-1-15)TN721.60$210.00$180.00$195.00$225.00$215.00$195.00
0325Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55)TN4,382.90$180.00$165.00$165.50$200.00$240.00$175.00
0330Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN1,347.60$255.00$220.00$235.00$280.00$275.00$269.00
0335Miscellaneous asphalt (0339-1)TN147$290.00$220.00$287.20$250.00$430.00$221.00
0340Precast bulkhead panels (0400-72)SF6,671$85.00$140.00$151.10$117.00$110.00$133.00
0345Inlets, DT bot, type D, <10' (0425-1541)EACH1$9,000.00$8,000.00$10,000$9,728.25$15,000$10,100
0350Inlets, DT bot, type F, <10' (0425-1561)EACH4$6,000.00$8,000.00$7,290.00$7,095.90$15,000$9,550.00
0355Inlets, gutter, type S, <10' (0425-1701)EACH23$6,000.00$8,000.00$8,350.00$8,125.95$19,000$9,290.00
0360Inlets, adjacent barrier, <=10' (0425-1921)EACH1$10,000$9,500.00$10,400$10,072$24,000$10,600
0365Inlets, adjust (0425-4)EACH1$5,000.00$2,000.00$4,120.00$4,005.75$4,500.00$3,740.00
0370Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF1,168$150.00$120.00$194.10$188.84$225.00$188.00
0375Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF146$180.00$130.00$241.20$234.62$300.00$308.00
0380Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF348$250.00$240.00$270.60$263.24$345.00$307.00
0385Pipe culvert,optional material,other-elip/arch, (0430-175218)LF31$205.00$260.00$223.50$217.46$335.00$335.00
0390Mitered end section, optional round, 18" CD (0430-982125)EACH9$3,500.00$3,500.00$4,000.00$3,891.30$4,000.00$6,490.00
0395Mitered end section, optional round, 24" CD (0430-982129)EACH4$4,000.00$3,600.00$4,240.00$4,120.20$4,200.00$8,030.00
0400Mitered end section , optional round, 30" SD (0430-984133)EACH2$12,000$16,000$21,200$20,601$8,500.00$9,900.00
0405Underdrain, type III (0440-1-30)LF130$150.00$155.00$141.20$137.34$120.00$111.00
0410Underdrain outlet pipe, 6" (0440-73-2)LF8$110.00$450.00$129.40$125.90$270.00$175.00
0415Preformed pile holes, 24" to 29" drill/punch size (0455-15-14)LF1,995$225.00$180.00$149.00$129.56$375.00$293.00
0420Pile inspection, driven pile (0455-20-1)EACH105$600.00$315.00$900.00$254.18$1,800.00$245.00
0425Prestressed concrete piling, SQ (0455-34-3)LF3,442$190.00$260.00$293.00$173.42$255.00$185.00
0430Sheet piling steel, temporary- critical (0455-133-2)SF9,500$45.00$96.00$115.00$101.00$160.00$95.00
0440Shoulder gutter- concrete (0520-6)LF3,379$40.00$74.00$58.00$63.23$60.00$61.50
0445Concrete barrier, with slab, 36" single slope (0521-8-7)LF600$525.00$550.00$716.00$789.00$900.00$677.00
0450Riprap- rubble, bank and shore (0530-3-3)TN1,777$125.00$112.00$67.00$1.00$175.00$90.00
0455Bedding stone (0530-74)TN663$140.00$160.00$54.00$1.00$230.00$51.00
0460Guardrail -roadway, general (0536-1-1)LF4,049$30.00$24.00$27.80$28.72$40.00$29.50
0465Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112)EACH4$3,025.00$2,800.00$3,170.00$3,588.09$4,760.00$3,340.00
0470Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113)EACH4$1,500.00$1,200.00$1,460.00$1,063.81$2,300.00$1,540.00
0475Guardrail removal (0536-73)LF1,711$4.00$2.30$2.65$0.63$5.00$2.80
0480Guardrail end treatment- trailing anchorage (0536-85-20)EACH7$1,300.00$1,300.00$1,500.00$1,703.66$2,350.00$1,580.00
0485Guardrail end treatment- parallel approach terminal (0536-85-24)EACH3$3,100.00$3,000.00$3,520.00$3,687.06$5,300.00$3,720.00
0490Fencing, type A, 5.1-6.0, standard (0550-10120)LF2,212$15.25$15.00$17.60$30.66$23.00$18.50
0495Fence gate, type A, single, opening (0550-60112)EACH2$2,000.00$1,784.00$2,060.00$3,090.15$2,500.00$2,170.00
0500Performance turf, sod (0570-1-2)SY16,886$7.75$3.00$5.90$4.15$6.00$5.40
0505Raised pavement marker, type B (0706-1-3)EACH16,454$4.00$4.33$4.35$4.29$5.00$4.50
0510Painted pavement markings, standard, white, solid, 6" (0710-11101)GM5.36$1,650.00$1,400.00$1,850.00$1,791.14$2,000.00$1,930.00
0515Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF98$2.25$2.00$2.35$2.29$2.45$2.50
0520Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.21$700.00$901.00$757.50$795.43$850.00$788.00
0525Painted pavement markings, standard, white, message or symbol (0710-11160)EACH72$36.00$108.00$41.20$74.39$80.00$43.00
0530Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM2.62$1,700.00$1,388.00$1,850.00$1,814.03$1,900.00$1,930.00
0535Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00
0540Disputes review board, meeting- DO not bid (0999-20-1)DA26$3,900.00$3,900.00$3,900.00$3,900.00$3,900.00$3,900.00
0545Disputes review board, hearing- DO not bid (0999-20-2)EACH2$4,500.00$4,500.00$4,500.00$4,500.00$4,500.00$4,500.00
0550Local agency initial amount (DO not bid) (0999-26)LS1$1,231,392$1,231,392$1,231,392$1,231,392$1,231,392$1,231,392
0555Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM1.28$13,000$1,800.00$6,950.00$1,974.26$15,000$15,700
0560Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH26$575.00$554.00$642.00$549.36$600.00$667.00
0565Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH7$1,850.00$1,750.00$2,030.00$2,689.58$3,000.00$2,110.00
0570Single column ground sign assembly, remove (0700-1600)EACH38$50.00$41.00$47.05$85.84$92.00$49.00
0575Retroreflective sign strip- furnish and install, 2' (0700-13-12)EACH8$100.00$134.00$111.80$143.06$185.00$116.00
0580Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH19$150.00$160.00$164.70$112.16$125.00$171.00
0585Object marker, type 1 (0705-10-1)EACH3$425.00$430.00$458.00$251.79$270.00$476.00
0590Raised pavement marker, type B (0706-1-3)EACH823$4.00$4.00$4.35$4.29$5.00$4.50
0595Painted pavement markings, surface (0710-90)LS1$22,500$38,500$25,000$16,023$17,000$26,000
0600Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF26$7.00$3.00$7.20$5.72$6.00$7.50
0605Thermoplastic, standard, message or symbol (0711-11160)EACH4$150.00$215.00$163.50$211.73$225.00$170.00
0610Thermoplastic, standard, arrow (0711-11170)EACH44$80.00$267.00$88.20$91.56$100.00$92.00
0615Thermoplastic, standard, yield line (0711-11180)LF248$7.00$5.80$7.55$17.05$19.00$7.90
0620Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.18$2,400.00$4,500.00$2,740.00$3,261.83$3,500.00$2,850.00
0625Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM1.75$7,100.00$5,600.00$8,090.00$6,981.45$7,500.00$8,410.00
0630Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM1.87$1,800.00$3,600.00$2,020.00$2,289.00$2,500.00$2,110.00
0635Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-15133)GM0.08$3,200.00$7,400.00$3,590.00$7,610.93$7,200.00$4,260.00
0640Thermoplastic, standard-open graded asphalt surfaces, 6", 6-10 dotted managed lane marking (0711-15171)GM0.16$2,700.00$3,500.00$2,970.00$4,051.53$4,300.00$3,110.00
0645Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM1.19$6,500.00$5,600.00$7,390.00$6,981.45$7,500.00$7,690.00
0650Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.14$38,000$5,800.00$43,500$44,063$46,000$45,200
0655Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.14$10,000$19,500$10,600$13,734$15,000$11,100
0660Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.09$37,000$29,000$41,900$44,063$46,000$43,600
0665Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.13$10,000$20,000$10,300$10,827$12,000$10,800
0670Conduit, furnish & install, mount (0630-2-15)LF500$87.00$82.82$63.50$113.44$135.00$102.00
0675Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16)LF500$54.25$51.76$39.70$67.81$80.00$64.00
0680Junction box, furnish & install, embedded (0635-3-13)EACH2$1,650.00$1,552.80$1,590.00$1,962.95$2,300.00$2,530.00
0685Local agency initial amount (DO not bid) (0999-26)LS1$1,623.98$1,623.98$1,623.98$1,623.98$1,623.98$1,623.98
0690Local agency initial amount (DO not bid) (0999-26)LS1$774.51$774.51$774.51$774.51$774.51$774.51
FDOT contract T4736: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of July 30, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy