Johnson Bros. Corporation, A Southland Company: FDOT bid record
Johnson Bros. Corporation, A Southland Company submitted 17 bids on Florida DOT contracts in the data, from 13 JUN 2018 to 30 JUL 2025, and was the low bidder on 3 of them (18%). When it was not low, its total sat a median +24% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $383,130,535
- Latest bid
- 30 JUL 2025
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 5 | 0 | 0% |
| 2019 | 1 | 0 | 0% |
| 2020 | 4 | 0 | 0% |
| 2021 | 4 | 2 | 50% |
| 2022 | 2 | 1 | 50% |
| 2025 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 8 | 2 | 25% |
| District 5 | 3 | 0 | 0% |
| District 2 | 2 | 0 | 0% |
| District 3 | 2 | 0 | 0% |
| District 6 | 1 | 0 | 0% |
| District 7 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Disputes review board, meeting- DO not bid | 0999-20-1 | DA | 13 | 13 (100%) | $3,900.00 | $3,900.00 |
| Disputes review board, hearing- DO not bid | 0999-20-2 | EACH | 13 | 13 (100%) | $4,500.00 | $4,500.00 |
| Performance turf, sod | 0570-1-2 | SY | 17 | 6 (35%) | $3.00 | $5.00 |
| Bedding stone | 0530-74 | TN | 13 | 6 (46%) | $115.00 | $155.00 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 28 | 5 (18%) | $807.50 | $1,150.00 |
| Work zone sign | 0102-60 | ED | 17 | 5 (29%) | $0.25 | $0.25 |
| Single post sign, remove | 0700-1-60 | AS | 16 | 5 (31%) | $32.25 | $31.94 |
| Thermoplastic, standard, solid, 24" for stop line and crosswalk | 0711-11125 | LF | 15 | 5 (33%) | $4.20 | $6.09 |
| Manholes, P-8, <10' | 0425-2-61 | EACH | 9 | 5 (56%) | $5,000.00 | $6,325.37 |
| Electrical power service, F&I, underground, meter furnished by power company | 0639-1121 | AS | 9 | 5 (56%) | $1,918.80 | $3,425.48 |
| Manholes, J-8, >10' | 0425-2-92 | EACH | 8 | 5 (63%) | $7,500.00 | $13,300 |
| Pipe culvert, opt material, round, 48"S/CD | 0430-175148 | LF | 7 | 5 (71%) | $250.06 | $360.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Superior Construction Company Southeast, LLC | 11 | 6 of 11 |
| Prince Contracting, LLC. | 9 | 3 of 9 |
| Vecellio & Grogan, Inc. | 6 | 5 of 6 |
| Ranger Construction Industries, Inc. | 6 | 4 of 6 |
| Halley Engineering Contractors, Inc. | 5 | 4 of 5 |
| General Asphalt Company, LLC | 5 | 3 of 5 |
| Ohl USA Inc | 4 | 3 of 4 |
| Hardrives of Delray, Inc. | 4 | 2 of 4 |
| Asphalt Group, Inc. | 4 | 2 of 4 |
| Anderson Columbia Co., Inc. | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 JUL 2025 | T4736 | District 4 | SR 27 (US 27) AT I-75/US 27 INTERCHANGE | 5 of 7 | $28,254,476 | +35% |
| 15 JUN 2022 | T7476 | District 7 | SR 55 (US 19) | 1 of 3 | $242,553,920 | Low, 9.0% under the second |
| 12 JAN 2022 | T4583 | District 4 | SR A1A (NORTH CAUSEWAY) | 3 of 7 | $121,895,976 | +9.0% |
| 27 OCT 2021 | T4581 | District 4 | SR 25 (US 27) | 1 of 6 | $18,365,525 | Low, 9.0% under the second |
| 25 AUG 2021 | T5735 | District 5 | NASA CAUSEWAY | 4 of 9 | $153,373,994 | +23% |
| 09 JUN 2021 | T4564 | District 4 | SR 5 (US 1) AND SR 811 (ALT A1A) | 1 of 8 | $122,211,090 | Low, 2.0% under the second |
| 27 JAN 2021 | T4559 | District 4 | CORAL RIDGE DR | 12 of 13 | $10,672,830 | +41% |
| 29 APR 2020 | T4546 | District 4 | SR 9 (I-95) | 2 of 6 | $12,599,429 | +6.0% |
| 25 MAR 2020 | T5706 | District 5 | SR 44 | 3 of 6 | $48,571,285 | +8.0% |
| 26 FEB 2020 | T4542 | District 4 | SR 25 (US 27) | 6 of 7 | $27,182,452 | +25% |
| 26 FEB 2020 | T4545 | District 4 | SR 804 (BOYNTON BEACH BLVD) | 11 of 11 | $3,567,111 | +70% |
| 27 FEB 2019 | T3604 | District 3 | SR 4 | 6 of 7 | $13,049,045 | +28% |
| 05 DEC 2018 | T2724 | District 2 | SR 23 (FIRST COAST EXPRESSWAY) | 8 of 8 | $230,093,090 | +28% |
| 31 OCT 2018 | T2717 | District 2 | SR 23 (FIRST COAST EXPRESSWAY) | 4 of 6 | $250,299,295 | +9.0% |
| 26 SEP 2018 | T3702 | District 3 | SR 388 | 5 of 5 | $62,971,364 | +26% |
| 26 SEP 2018 | T5641 | District 5 | SR A1A | 2 of 8 | $23,429,052 | +4.0% |
| 13 JUN 2018 | T6433 | District 6 | SR 968 (SW 1ST ST) | 2 of 6 | $65,707,067 | -2.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.