FDOT contract T5872 bid tabulation

SR 438 (SILVER STAR RD) FROM COAST LINE DR TO DARDANELLE DR. Let by Florida DOT on August 27, 2025, Orange, District 5. 4 bids received; low bid $2,644,570 by Blacktip Services Incorporated.

Owner
Florida DOT
Letting
27 AUG 2025
Pay items
119
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Blacktip Services Incorporated$2,644,570Low
2Signal Technology and Installation Corp.$2,699,032+2.0%
3Chinchor Electric Inc.$3,153,305+19%
4Ranger Construction Industries, Inc.$3,778,528+43%
FDOT contract T5872: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Blacktip Services Incorporated2. Signal Technology and Installation Corp.3. Chinchor Electric Inc.4. Ranger Construction Industries, Inc.
0005Mobilization (0101-1)LS1$348,750$315,020$311,686$374,800
0010Maintenance of traffic (0102-1)DA1$25,000$96,635$336,375$540,200
0015Pedestrian or bicycle special detour (0102-4-1)SY1$12,500$1,709.36$22,093$14,750
0020Traffic control officer (0102-14)HR332$80.00$102.57$126.50$99.40
0025Work zone sign (0102-60)ED14,752$0.25$0.29$0.24$0.25
0030Temporary barrier, F&I, low profile, concrete (0102-71-13)LF100$60.00$71.11$59.80$64.60
0035Temporary barrier, relocate, low profile concrete (0102-71-23)LF200$40.00$47.87$40.25$43.50
0040Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED13,366$0.12$0.11$0.09$0.10
0045Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD25,651$0.10$0.07$0.06$0.05
0050Arrow board / advance warning arrow panel (0102-76)ED376$5.20$6.16$5.18$5.60
0055Portable changeable message sign, temporary (0102-99)ED704$11.00$12.31$10.35$11.20
0060Temporary signalization and maintenance, intersection (0102-104)ED250$28.00$27.56$17.25$22.35
0065Temporary traffic detection and maintenance, intersection (0102-107-1)ED250$30.00$27.56$17.25$22.35
0070Type III barricade (0102-115)ED809$0.29$0.35$0.29$0.30
0075Sediment barrier (0104-10-3)LF1,064$6.00$2.95$5.75$4.15
0080Inlet protection system (0104-18)EACH7$50.00$149.61$172.50$147.40
0085Litter removal (0107-1)ACRE2.45$100.00$62.44$517.50$400.00
0090Mowing (0107-2)ACRE1.26$100.00$84.39$575.00$534.00
0095Clearing & grubbing (0110-1-1)ACRE1$110,000$5,510.96$46,000$65,000
0100Removal of existing concrete (0110-4-10)SY476$80.00$44.09$109.25$80.50
0105Regular excavation (0120-1)CY66.90$80.00$28.84$103.50$81.90
0110Embankment (0120-6)CY99.90$50.00$32.29$103.50$73.00
0115Optional base, base group 09 (0285-709)SY61$100.00$76.95$404.80$354.50
0120Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY4,142$13.00$13.01$19.55$12.55
0125Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN12.20$900.00$1,014.68$2,047.00$1,850.00
0130Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN256.60$280.00$421.19$563.50$508.00
0135Inlets, curb, type P-5, partial (0425-1355)EACH1$8,000.00$3,418.71$4,853.00$4,250.00
0140Inlets, curb, type P-6, <10' (0425-1361)EACH2$11,000$5,469.93$12,075$10,600
0145Inlets, curb, type J-6, <10' (0425-1461)EACH1$11,000$5,469.93$19,435$17,000
0150Inlets, DT bot, type C,<10' (0425-1521)EACH1$11,000$4,922.94$10,776$9,430.00
0155Manholes, P-7, <10' (0425-2-41)EACH1$11,000$4,102.45$29,785$26,000
0160Valve boxes, adjust (0425-6)EACH9$500.00$576.74$1,725.00$1,440.00
0165Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF4$700.00$478.62$517.50$439.50
0170Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF85$700.00$478.62$362.25$308.00
0175Concrete curb & gutter, type E (0520-1-7)LF31$45.00$41.03$172.50$145.20
0180Concrete curb & gutter, type F (0520-1-10)LF740$45.00$27.35$120.75$103.30
0185Concrete curb, type D (0520-2-4)LF21$45.00$27.35$316.25$276.40
0190Concrete traffic separator, special- variable width (0520-70)SY30$125.00$68.38$203.67$178.20
0195Concrete sidewalk and driveways, 4" thick (0522-1)SY74$85.00$57.44$101.66$88.90
0200Concrete sidewalk and driveways, 6" thick (0522-2)SY245$105.00$72.48$136.62$119.60
0205Detectable warnings (0527-2)SF208$30.00$30.09$49.62$43.40
0210Performance turf, sod (0570-1-2)SY686$10.00$13.00$14.32$12.55
0215Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF58$12.00$5.47$23.00$3.75
0220Painted pavement markings, standard, white, message or symbol (0710-11160)EACH1$230.00$136.76$115.00$435.00
0225Painted pavement markings, standard, white, arrows (0710-11170)EACH1$115.00$82.06$115.00$310.50
0230Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.09$2,300.00$3,418.84$11,500$21,400
0235Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000
0240Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH2$1,150.00$954.73$906.93$1,180.00
0245Single column ground sign assembly, relocate (0700-1500)EACH3$230.00$559.65$345.00$447.50
0250Single column ground sign assembly, remove (0700-1600)EACH2$115.00$275.55$115.00$149.10
0255Tubular marker, 36" white post (0704-1-3)EACH2$290.00$376.06$322.29$418.00
0260Tubular marker, 36" yellow (0704-1-4)EACH6$290.00$376.06$322.29$418.00
0265Raised pavement marker, type B (0706-1-3)EACH152$7.00$10.94$11.50$5.60
0270Painted pavement markings, standard, white, island nose (0710-11190)SF11$12.00$27.36$5.75$12.45
0275Painted pavement markings, standard, yellow, island nose (0710-11290)SF10$12.00$27.35$5.75$12.45
0280Painted pavement markings, surface (0710-90)LS1$7,060.00$20,512$7,475.00$9,320.00
0285Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.03$11,500$12,992$11,500$18,500
0290Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF1,262$7.00$6.84$5.75$7.45
0295Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF23$10.00$9.58$7.48$9.95
0300Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF279$14.00$12.31$9.20$12.45
0305Thermoplastic, standard, message or symbol (0711-11160)EACH2$288.00$410.25$172.50$559.00
0310Thermoplastic, standard, arrow (0711-11170)EACH6$92.00$136.75$138.00$186.40
0315Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF134$9.00$9.58$7.48$9.95
0320Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,014$23.00$27.35$18.40$19.90
0325Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.31$8,625.00$11,624$10,925$9,720.00
0330Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.01$2,875.00$6,155.00$2,300.00$3,520.00
0335Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.21$8,625.00$11,624$10,925$9,460.00
0340Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF141$37.00$34.19$5.75$12.45
0345Itsfm subsurface documentation- project length (0611-1-1)MI0.72$3,575.00$3,555.47$2,990.00$3,850.00
0350Itsfm location documentation- intersection (0611-2-1)EACH1$3,018.00$3,001.63$2,524.25$3,270.00
0355Conduit, furnish & install, open trench (0630-2-11)LF471$41.00$28.48$28.63$37.15
0360Conduit, furnish & install, directional bore (0630-2-12)LF840$35.50$63.34$42.42$55.00
0365Conduit, furnish & install, aboveground (0630-2-14)LF30$41.00$35.73$44.93$58.30
0370Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI2$18,367$12,827$12,754$16,500
0375Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF161$6.00$5.13$4.31$5.60
0380Fiber optic connection, install, splice (0633-2-31)EACH24$67.00$61.54$51.75$67.10
0385Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH1$75.00$68.38$57.50$74.60
0390Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13)EACH12$67.00$61.54$51.75$67.10
0395Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH1$1,775.00$1,634.15$1,374.25$1,780.00
0400Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH1$141.00$129.92$109.25$141.70
0405Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51)EACH1$1,151.00$1,059.81$891.25$1,160.00
0410Fiber optic connection hardware, adjust/modify splice tray (0633-3-52)EACH1$23.00$20.53$17.25$22.35
0415Fiber optic cable locator (0633-6)DA250$273.00$307.69$258.75$335.50
0420Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH62$1,696.00$1,889.87$1,673.72$2,170.00
0425Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH2$2,857.00$2,961.63$2,679.64$3,470.00
0430Electrical power service, F&I, underground, meter by contractor (0639-1122)AS2$3,212.00$7,529.02$4,843.80$6,280.00
0435Electrical power service, remove overhead (0639-1610)AS1$2,387.00$551.10$460.00$596.50
0440Electrical service wire, & install (0639-2-1)LF196$33.00$7.56$6.18$8.00
0445Electrical service disconnect, F&I, pole mount (0639-3-11)EACH2$3,418.00$1,924.05$2,840.50$3,680.00
0450Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$3,564.00$2,494.32$2,339.79$3,030.00
0455Prestressed concrete pole, shallow pole removal- pole 30' and greater (0641-2-70)EACH4$3,183.00$4,133.22$15,525$20,100
0460Aluminum signals pole, (0646-1-11)EACH10$848.00$3,723.10$2,895.87$3,750.00
0465Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH2$825.00$3,205.13$2,390.34$3,100.00
0470Aluminum pole- index 695-001, remove (0646-2600)EACH1$3,183.00$551.10$690.00$894.50
0475Steel mast arm assembly, and install, single arm 30' (0649-21-1)EACH3$63,363$59,772$57,635$74,700
0480Steel mast arm assembly, and install, single arm 50' (0649-21-6)EACH1$71,164$74,681$71,799$86,600
0485Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH2$81,919$91,319$81,594$103,000
0490Steel mast arm assembly, and install, single arm 78' (0649-21-21)EACH2$88,218$103,852$91,397$115,000
0495Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS20$1,840.00$1,796.93$1,833.90$2,380.00
0500Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS4$2,534.00$2,253.37$2,363.61$3,060.00
0505Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS6$892.00$1,107.08$786.75$1,020.00
0510Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS4$1,535.00$2,189.40$1,707.62$2,210.00
0515Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH4$24,194$27,343$22,994$29,800
0520Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH8$13,910$15,719$13,219$17,100
0525Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111)EACH2$7,641.00$10,464$7,862.27$10,200
0530Signal priority and preemption system, F&I, optical, detector (0663-1112)EACH2$7,651.00$4,863.10$4,794.74$6,220.00
0535Signal priority and preemption system, furnish and install, detector (0663-1122)EACH2$8,068.00$7,891.01$8,815.85$11,400
0540Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123)EACH2$11,222$10,464$7,862.27$10,200
0545Pedestrian detector, furnish & install, standard (0665-1-11)EACH1$512.00$981.75$535.73$694.50
0550Pedestrian detector, furnish & install, accessible (0665-1-12)EACH14$1,487.00$1,709.55$1,724.85$2,240.00
0555Traffic controller assembly, F&I, NEMA W/electronic lock, 1 preemption (0670-5171)AS2$49,148$51,139$44,849$58,200
0560Traffic controller assembly, remove controller with (0670-5600)AS1$6,365.00$2,204.39$1,178.75$1,530.00
0565ITS CCTV camera, non- pressurized, IP, high definition (0682-1173)EACH2$5,579.00$8,957.01$7,532.50$9,770.00
0570Managed field ethernet switch, furnish & install (0684-1-1)EACH2$3,831.00$5,435.75$4,571.25$5,930.00
0575Cellular modem, furnish and install (0684-8-1)EACH2$2,209.00$12,123$10,195$13,200
0580Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH2$15,746$12,327$14,513$18,800
0585Remote power management rpmu, furnish and install (0685-2-1)EACH2$1,285.00$943.68$853.30$1,110.00
0590Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH10$5,550.00$4,643.62$6,811.45$8,830.00
0595Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360)EACH8$4,921.00$7,509.74$6,271.08$8,130.00
FDOT contract T5872: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of August 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy