Reeves Construction Company: FDOT bid record

Reeves Construction Company submitted 11 bids on Florida DOT contracts in the data, from 25 MAY 2022 to 28 OCT 2026, and was the low bidder on 2 of them (18%). When it was not low, its total sat a median +18% above the low bid.

Owner
Florida DOT
Low bid volume
$9,267,662
Latest bid
28 OCT 2026
Data through
28 OCT 2026
11Bids
2Low bids
18Win rate, percent
+18%Median gap to the low bid when not low, 9 bids

By year

YearBidsLow bidsWin rate
20222150%
20232150%
2024200%
2025100%
2026400%
Reeves Construction Company, FDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Litter removal0107-1ACRE114 (36%)$158.00$52.98
Performance turf, sod0570-1-2SY104 (40%)$6.88$5.00
Channelizing device- pedestrian LCD (longitudinal channelizing device)0102-74-8FD94 (44%)$0.06$0.07
Inlet protection system0104-18EACH84 (50%)$170.00$150.00
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED113 (27%)$0.11$0.13
Mowing0107-2ACRE113 (27%)$425.00$80.65
Sediment barrier0104-10-3LF83 (38%)$4.07$2.60
Traffic control officer0102-14HR83 (38%)$91.45$80.00
Object marker, type 10705-10-1EACH73 (43%)$250.00$225.00
Regular excavation0120-1CY63 (50%)$36.50$25.47
Raised pavement marker, type B0706-1-3EACH212 (10%)$5.25$5.00
Work zone sign0102-60ED112 (18%)$0.26$0.25
Reeves Construction Company, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Reeves Construction Company, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T2A83District 2SR 13 (HENDRICKS AVE) FROM SAN MARCO BLVD TO PRUDENTIAL DR5 of 6$2,456,940+20%
10 JUN 2026T2A47District 2SR 10 (US 90 / BEAVER ST) AT CR 119 (OTTIS RD)4 of 5$895,913+21%
28 JAN 2026T2A49District 2SR 228 (NORMANDY BLVD) FROM S OF MEMORIAL PARK RD TO SR...4 of 5$2,945,910+18%
28 JAN 2026T2A54District 2SR 5 (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF...3 of 5$6,473,542+31%
27 AUG 2025T2A35District 2SR 16 FROM SR 13 TO CR 16A7 of 8$2,087,799+46%
13 NOV 2024T2A04District 2SR 134 (103RD ST) FROM SAMARITAN WAY TO SHINDLER DR3 of 5$9,014,441+2.0%
30 OCT 2024T2A13District 2SR 228 (NORMANDY BLVD) FROM E OF LANE AVE TO CASSAT AVE3 of 4$3,903,590+13%
15 NOV 2023T2985District 2SR 134 (103RD ST / TIMUQUANA RD) FROM SHINDLER DR TO FIRE...1 of 4$7,308,506Low, 13% under the second
14 JUN 2023T2958District 2SR 15 (US 17)3 of 3$4,382,993+15%
16 NOV 2022T2881District 2SR 228 (NORMANDY BLVD)1 of 2$1,959,156Low, 23% under the second
25 MAY 2022T2843District 2SR 3122 of 4$12,600,000+4.0%
Reeves Construction Company: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy