Reeves Construction Company: FDOT bid record
Reeves Construction Company submitted 11 bids on Florida DOT contracts in the data, from 25 MAY 2022 to 28 OCT 2026, and was the low bidder on 2 of them (18%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $9,267,662
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 2 | 1 | 50% |
| 2023 | 2 | 1 | 50% |
| 2024 | 2 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
| 2026 | 4 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Litter removal | 0107-1 | ACRE | 11 | 4 (36%) | $158.00 | $52.98 |
| Performance turf, sod | 0570-1-2 | SY | 10 | 4 (40%) | $6.88 | $5.00 |
| Channelizing device- pedestrian LCD (longitudinal channelizing device) | 0102-74-8 | FD | 9 | 4 (44%) | $0.06 | $0.07 |
| Inlet protection system | 0104-18 | EACH | 8 | 4 (50%) | $170.00 | $150.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 11 | 3 (27%) | $0.11 | $0.13 |
| Mowing | 0107-2 | ACRE | 11 | 3 (27%) | $425.00 | $80.65 |
| Sediment barrier | 0104-10-3 | LF | 8 | 3 (38%) | $4.07 | $2.60 |
| Traffic control officer | 0102-14 | HR | 8 | 3 (38%) | $91.45 | $80.00 |
| Object marker, type 1 | 0705-10-1 | EACH | 7 | 3 (43%) | $250.00 | $225.00 |
| Regular excavation | 0120-1 | CY | 6 | 3 (50%) | $36.50 | $25.47 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 21 | 2 (10%) | $5.25 | $5.00 |
| Work zone sign | 0102-60 | ED | 11 | 2 (18%) | $0.26 | $0.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Preferred Materials Inc. | 9 | 5 of 9 |
| Hubbard Construction Company | 8 | 5 of 8 |
| Duval Asphalt Products, Inc. | 6 | 4 of 6 |
| Watson Civil Construction, Inc. | 5 | 2 of 5 |
| P & S Paving, Inc. | 2 | 2 of 2 |
| Coxwell, J.B. Contracting, Inc. | 2 | 1 of 2 |
| DB Civil Construction, LLC | 2 | 2 of 2 |
| Janus Construction Corp. | 2 | 1 of 2 |
| Superior Construction Company Southeast, LLC | 1 | 1 of 1 |
| Halifax Paving, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T2A83 | District 2 | SR 13 (HENDRICKS AVE) FROM SAN MARCO BLVD TO PRUDENTIAL DR | 5 of 6 | $2,456,940 | +20% |
| 10 JUN 2026 | T2A47 | District 2 | SR 10 (US 90 / BEAVER ST) AT CR 119 (OTTIS RD) | 4 of 5 | $895,913 | +21% |
| 28 JAN 2026 | T2A49 | District 2 | SR 228 (NORMANDY BLVD) FROM S OF MEMORIAL PARK RD TO SR... | 4 of 5 | $2,945,910 | +18% |
| 28 JAN 2026 | T2A54 | District 2 | SR 5 (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF... | 3 of 5 | $6,473,542 | +31% |
| 27 AUG 2025 | T2A35 | District 2 | SR 16 FROM SR 13 TO CR 16A | 7 of 8 | $2,087,799 | +46% |
| 13 NOV 2024 | T2A04 | District 2 | SR 134 (103RD ST) FROM SAMARITAN WAY TO SHINDLER DR | 3 of 5 | $9,014,441 | +2.0% |
| 30 OCT 2024 | T2A13 | District 2 | SR 228 (NORMANDY BLVD) FROM E OF LANE AVE TO CASSAT AVE | 3 of 4 | $3,903,590 | +13% |
| 15 NOV 2023 | T2985 | District 2 | SR 134 (103RD ST / TIMUQUANA RD) FROM SHINDLER DR TO FIRE... | 1 of 4 | $7,308,506 | Low, 13% under the second |
| 14 JUN 2023 | T2958 | District 2 | SR 15 (US 17) | 3 of 3 | $4,382,993 | +15% |
| 16 NOV 2022 | T2881 | District 2 | SR 228 (NORMANDY BLVD) | 1 of 2 | $1,959,156 | Low, 23% under the second |
| 25 MAY 2022 | T2843 | District 2 | SR 312 | 2 of 4 | $12,600,000 | +4.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.