Janus Construction Corp.: FDOT bid record
Janus Construction Corp. submitted 14 bids on Florida DOT contracts in the data, from 26 JUL 2023 to 28 OCT 2026, and was the low bidder on 2 of them (14%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $2,407,632
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 3 | 1 | 33% |
| 2024 | 1 | 0 | 0% |
| 2025 | 7 | 1 | 14% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 10 | 2 | 20% |
| District 3 | 2 | 0 | 0% |
| District 1 | 1 | 0 | 0% |
| District 5 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Portable changeable message sign, temporary | 0102-99 | ED | 14 | 7 (50%) | $12.05 | $12.00 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 20 | 5 (25%) | $6.77 | $5.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 14 | 5 (36%) | $0.14 | $0.13 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 8 | 5 (63%) | $5.00 | $5.90 |
| Work zone sign | 0102-60 | ED | 14 | 4 (29%) | $0.30 | $0.25 |
| Litter removal | 0107-1 | ACRE | 12 | 4 (33%) | $540.12 | $52.98 |
| Painted pavement markings, standard, yellow, solid, 6" | 0710-11201 | GM | 9 | 4 (44%) | $1,650.00 | $1,350.00 |
| Painted pavement markings, standard, white, solid, 6" | 0710-11101 | GM | 8 | 4 (50%) | $1,760.00 | $1,350.00 |
| Asphalt concrete friction course,traffic C, FC-12.5, PG | 0337-7-83 | TN | 8 | 4 (50%) | $261.12 | $185.00 |
| Temporary traffic detection and maintenance, intersection | 0102-107-1 | ED | 7 | 4 (57%) | $16.50 | $11.10 |
| Superpave asphaltic concrete, traffic C, PG76-22 | 0334-1-53 | TN | 6 | 4 (67%) | $294.26 | $169.18 |
| Removal of existing concrete | 0110-4-10 | SY | 11 | 3 (27%) | $52.02 | $33.96 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Preferred Materials Inc. | 6 | 3 of 6 |
| Maer Homes, LLC | 4 | 4 of 4 |
| American Design Engineering Construction Inc. | 4 | 2 of 4 |
| Hubbard Construction Company | 3 | 1 of 3 |
| Duval Asphalt Products, Inc. | 3 | 1 of 3 |
| American Lighting and Signalization, LLC. | 2 | 1 of 2 |
| Blacktip Services Incorporated | 2 | 2 of 2 |
| National Traffic Solution, Inc | 2 | 2 of 2 |
| DB Civil Construction, LLC | 2 | 2 of 2 |
| Reeves Construction Company | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T2A83 | District 2 | SR 13 (HENDRICKS AVE) FROM SAN MARCO BLVD TO PRUDENTIAL DR | 6 of 6 | $2,781,748 | +35% |
| 28 OCT 2026 | T3A06 | District 3 | SR 95 (US 29 / N CENTURY BLVD) FROM POND ST TO ALABAMA STATE LINE | 2 of 2 | $319,810 | +2.0% |
| 10 JUN 2026 | T2A47 | District 2 | SR 10 (US 90 / BEAVER ST) AT CR 119 (OTTIS RD) | 3 of 5 | $880,533 | +19% |
| 29 OCT 2025 | T3983 | District 3 | SR 20 FROM E OF CR 275 TO E OF MATTHEW WOOD RD | 2 of 3 | $274,394 | +25% |
| 24 SEP 2025 | T2A46 | District 2 | SR 212 (BEACH BLVD) AND SR 10 (ATLANTIC BLVD) AT FOSTER DR.. | 3 of 5 | $1,098,429 | +11% |
| 30 JUL 2025 | T1927 | District 1 | WEST MAIN ST FROM HANCHEY RD TO W OF FLORIDA AVE | 6 of 6 | $568,227 | +37% |
| 30 JUL 2025 | T2A31 | District 2 | SR 10 (ATLANTIC BLVD) FROM E OF LAURINA ST TO SILVERSMITH... | 1 of 5 | $541,819 | Low, 12% under the second |
| 30 JUL 2025 | T5859 | District 5 | SR 500 (US 441 / ORANGE BLOSSOM TR) AT CLARCONA-OCOEE RD | 5 of 5 | $3,459,169 | +27% |
| 11 JUN 2025 | T2A25 | District 2 | SR A1A FROM GATE 5 NAVAL STATION MAYPORT TO S OF US COAST... | 5 of 5 | $2,223,222 | +50% |
| 28 MAY 2025 | T2991 | District 2 | SR A1A (US 90A / 3RD ST) AT 3RD AVE S AND AT 7TH AVE N | 3 of 3 | $2,162,824 | +14% |
| 24 APR 2024 | T2988 | District 2 | SR 10 (US 90/ATLANTIC BLVD) AND SR 104 (DUNN AVE)... | 2 of 3 | $1,635,948 | +5.0% |
| 15 NOV 2023 | T2949 | District 2 | SR 13 (HENDRICKS AVE) AT SAN MARCO BLVD | 1 of 2 | $1,865,813 | Low, 2.0% under the second |
| 27 SEP 2023 | T2944 | District 2 | SR 115 (SOUTHSIDE BLVD) AT SR10 (US90) (ATLANTIC BLVD) | 2 of 3 | $1,895,397 | +6.0% |
| 26 JUL 2023 | T2935 | District 2 | SR45 (US 41) AND SR 20, FROM END OF SIDEWALK TO NW 9TH RD... | 3 of 5 | $730,661 | +6.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.