FDOT contract T5859 bid tabulation
SR 500 (US 441 / ORANGE BLOSSOM TR) AT CLARCONA-OCOEE RD. Let by Florida DOT on July 30, 2025, Orange, District 5. 5 bids received; low bid $2,732,458 by American Design Engineering Construction Inc..
- Owner
- Florida DOT
- Letting
- 30 JUL 2025
- Pay items
- 133
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | American Design Engineering Construction Inc. | $2,732,458 | Low |
| 2 | National Traffic Solution, Inc | $2,899,803 | +6.0% |
| 3 | Valencia Construction Group | $3,341,040 | +22% |
| 4 | Blacktip Services Incorporated | $3,405,791 | +25% |
| 5 | Janus Construction Corp. | $3,459,169 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. American Design Engineering Construction Inc. | 2. National Traffic Solution, Inc | 3. Valencia Construction Group | 4. Blacktip Services Incorporated | 5. Janus Construction Corp. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $250,000 | $265,000 | $555,000 | $313,000 | $338,636 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $45,000 | $265,000 | $234,000 | $45,000 | $381,067 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $15,000 | $19,500 | $9,000.00 | $137,000 | $86,363 |
| 0020 | Traffic control officer (0102-14) | HR | 16 | $95.00 | $65.00 | $101.00 | $80.00 | $88.13 |
| 0025 | Work zone sign (0102-60) | ED | 3,295 | $1.00 | $0.43 | $0.24 | $0.30 | $1.00 |
| 0030 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 384 | $50.00 | $98.00 | $53.63 | $50.00 | $53.00 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 23,975 | $2.00 | $0.24 | $0.10 | $0.15 | $0.20 |
| 0040 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 27,678 | $2.00 | $0.24 | $0.05 | $0.10 | $0.50 |
| 0045 | Arrow board / advance warning arrow panel (0102-76) | ED | 561 | $30.00 | $24.50 | $5.07 | $5.00 | $5.00 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 271 | $30.00 | $24.50 | $10.73 | $12.00 | $10.58 |
| 0055 | Temporary signalization and maintenance, intersection (0102-104) | ED | 190 | $100.00 | $30.00 | $160.90 | $32.00 | $16.50 |
| 0060 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 190 | $100.00 | $30.00 | $228.84 | $25.00 | $16.50 |
| 0065 | Type III barricade (0102-115) | ED | 90 | $1.00 | $0.50 | $0.30 | $0.30 | $1.18 |
| 0070 | Sediment barrier (0104-10-3) | LF | 237 | $15.00 | $4.50 | $6.91 | $10.00 | $4.70 |
| 0075 | Inlet protection system (0104-18) | EACH | 6 | $150.00 | $195.00 | $297.97 | $65.00 | $177.00 |
| 0080 | Litter removal (0107-1) | ACRE | 4.81 | $200.00 | $95.00 | $655.53 | $65.00 | $871.00 |
| 0085 | Mowing (0107-2) | ACRE | 2.33 | $200.00 | $95.00 | $893.91 | $65.00 | $1,809.00 |
| 0090 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $25,000 | $25,000 | $40,302 | $494,000 | $251,925 |
| 0095 | Removal of existing concrete (0110-4-10) | SY | 690 | $15.00 | $50.00 | $16.60 | $60.00 | $41.13 |
| 0100 | Regular excavation (0120-1) | CY | 277.50 | $45.00 | $50.00 | $23.60 | $60.00 | $88.13 |
| 0105 | Embankment (0120-6) | CY | 54.60 | $45.00 | $50.00 | $36.70 | $60.00 | $117.50 |
| 0110 | Type B stabilization (0160-4) | SY | 694 | $35.00 | $50.00 | $16.56 | $60.00 | $118.68 |
| 0115 | Optional base, base group 07 (0285-707) | SY | 558 | $35.00 | $58.85 | $27.00 | $80.00 | $130.43 |
| 0120 | Optional base, base group 13 (0285-713) | SY | 230 | $150.00 | $58.85 | $184.74 | $90.00 | $106.70 |
| 0125 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 5,562 | $12.00 | $5.88 | $15.32 | $16.00 | $6.05 |
| 0130 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 1,943 | $12.00 | $5.29 | $17.52 | $9.00 | $7.15 |
| 0135 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 516.70 | $250.00 | $299.99 | $362.85 | $275.00 | $237.60 |
| 0140 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 670.20 | $250.00 | $299.99 | $559.00 | $279.00 | $223.30 |
| 0145 | Concrete pavement for roundabout apron, 12" depth (0350-30-13) | SY | 23 | $350.00 | $217.65 | $145.00 | $225.00 | $352.50 |
| 0150 | Inlets, curb, type P-1, <10' (0425-1311) | EACH | 1 | $25,000 | $16,500 | $15,470 | $45,000 | $34,075 |
| 0155 | Inlets, curb type P-1, partial (0425-1315) | EACH | 1 | $25,000 | $4,500.00 | $3,562.00 | $12,000 | $14,100 |
| 0160 | Inlets, curb type J-1, <10' (0425-1411) | EACH | 1 | $25,000 | $15,500 | $15,470 | $45,000 | $37,600 |
| 0165 | Inlets, curb, type J-2, <10' (0425-1421) | EACH | 1 | $25,000 | $15,500 | $17,384 | $45,000 | $39,950 |
| 0170 | Manholes, P-8, partial (0425-2-63) | EACH | 1 | $25,000 | $5,500.00 | $5,156.00 | $12,000 | $8,812.50 |
| 0175 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 16 | $350.00 | $300.00 | $180.00 | $1,000.00 | $705.00 |
| 0180 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 32 | $350.00 | $300.00 | $141.00 | $1,000.00 | $822.50 |
| 0185 | Concrete curb & gutter, type E (0520-1-7) | LF | 268 | $40.00 | $59.95 | $42.53 | $65.00 | $99.88 |
| 0190 | Concrete curb & gutter, type F (0520-1-10) | LF | 562 | $40.00 | $64.95 | $42.53 | $65.00 | $94.00 |
| 0195 | Concrete curb, type B (0520-2-2) | LF | 106 | $40.00 | $94.95 | $36.61 | $65.00 | $99.88 |
| 0200 | Concrete curb, type RA (0520-2-8) | LF | 99 | $40.00 | $64.95 | $61.51 | $65.00 | $146.88 |
| 0205 | Valley gutter- concrete (0520-3) | LF | 87 | $40.00 | $64.95 | $45.93 | $65.00 | $158.63 |
| 0210 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 7 | $250.00 | $200.00 | $315.49 | $165.00 | $205.63 |
| 0215 | Concrete traffic separator, special- variable width (0520-70) | SY | 100 | $250.00 | $200.00 | $93.69 | $165.00 | $205.63 |
| 0220 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 186 | $75.00 | $94.50 | $54.42 | $165.00 | $82.25 |
| 0225 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 348 | $85.00 | $104.50 | $81.78 | $165.00 | $125.73 |
| 0230 | Detectable warnings (0527-2) | SF | 172 | $30.00 | $42.50 | $50.30 | $30.00 | $29.38 |
| 0235 | Performance turf, sod (0570-1-2) | SY | 422 | $8.00 | $12.50 | $7.00 | $10.00 | $17.63 |
| 0240 | Raised pavement marker, type B (0706-1-3) | EACH | 206 | $5.00 | $4.00 | $8.26 | $7.00 | $8.23 |
| 0245 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.65 | $25,000 | $5,800.00 | $5,782.00 | $1,725.00 | $5,714.03 |
| 0250 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,790 | $1.50 | $2.25 | $5.90 | $2.30 | $5.85 |
| 0255 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,000 | $3.00 | $4.50 | $13.00 | $3.50 | $12.88 |
| 0260 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.06 | $1,150.00 | $1,320.00 | $944.00 | $863.00 | $935.30 |
| 0265 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.26 | $2,500.00 | $5,800.00 | $5,800.00 | $1,725.00 | $5,714.03 |
| 0270 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0275 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 11 | $750.00 | $400.00 | $773.00 | $805.00 | $675.63 |
| 0280 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 2 | $1,560.00 | $1,250.00 | $2,714.00 | $2,875.00 | $2,702.50 |
| 0285 | Single column ground sign assembly, remove (0700-1600) | EACH | 7 | $200.00 | $50.00 | $248.00 | $57.00 | $101.05 |
| 0290 | Single column ground sign assembly, F&I cantilever mount, 20.1-30.0 SF (0700-1913) | EACH | 3 | $6,500.00 | $3,750.00 | $4,773.00 | $4,140.00 | $4,700.00 |
| 0295 | Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115) | EACH | 1 | $15,000 | $7,285.00 | $7,115.00 | $12,650 | $12,925 |
| 0300 | Object marker, type 1 (0705-10-1) | EACH | 2 | $450.00 | $350.00 | $674.00 | $230.00 | $276.13 |
| 0305 | Raised pavement marker, type B (0706-1-3) | EACH | 206 | $5.00 | $4.00 | $8.26 | $7.00 | $8.23 |
| 0310 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 13 | $5.00 | $2.95 | $5.90 | $6.00 | $5.88 |
| 0315 | Painted pavement markings, surface (0710-90) | LS | 1 | $18,000 | $6,500.00 | $13,216 | $11,500 | $16,450 |
| 0320 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.06 | $6,500.00 | $6,500.00 | $10,207 | $10,350 | $10,164 |
| 0325 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,158 | $3.00 | $2.95 | $13.00 | $7.00 | $12.76 |
| 0330 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 221 | $5.00 | $4.50 | $15.35 | $14.00 | $15.23 |
| 0335 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.10 | $5,000.00 | $1,320.00 | $6,844.00 | $6,900.00 | $6,815.00 |
| 0340 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 2 | $250.00 | $250.00 | $348.00 | $288.00 | $346.63 |
| 0345 | Thermoplastic, standard, arrow (0711-11170) | EACH | 18 | $300.00 | $75.00 | $230.00 | $115.00 | $229.13 |
| 0350 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.04 | $5,000.00 | $1,320.00 | $6,844.00 | $6,900.00 | $6,815.00 |
| 0355 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 763 | $20.00 | $24.00 | $21.25 | $23.00 | $20.68 |
| 0360 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 1 | $650.00 | $350.00 | $460.00 | $345.00 | $458.25 |
| 0365 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 1 | $650.00 | $250.00 | $332.00 | $230.00 | $331.35 |
| 0370 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.56 | $6,500.00 | $5,800.00 | $8,142.00 | $2,875.00 | $8,087.53 |
| 0375 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.06 | $6,500.00 | $1,320.00 | $3,304.00 | $2,875.00 | $3,290.00 |
| 0380 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.26 | $6,500.00 | $5,800.00 | $8,142.00 | $8,625.00 | $8,087.53 |
| 0385 | Drilled shaft casing, 54" diameter (0455-107-8) | LF | 36 | $2,100.00 | $3,500.00 | $244.00 | $4,801.00 | $1,265.00 |
| 0390 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.08 | $45,000 | $19,500 | $5,636.00 | $4,262.00 | $4,400.00 |
| 0395 | Itsfm location documentation- intersection (0611-2-1) | EACH | 2 | $3,500.00 | $12,500 | $3,540.00 | $3,231.00 | $3,025.00 |
| 0400 | Conduit, furnish & install, open trench (0630-2-11) | LF | 334 | $26.00 | $50.00 | $17.70 | $41.00 | $35.20 |
| 0405 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 4,892 | $44.00 | $35.00 | $67.56 | $35.00 | $31.35 |
| 0410 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 47 | $60.00 | $95.00 | $28.14 | $41.00 | $44.00 |
| 0415 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $18,000 | $19,500 | $17,936 | $16,453 | $19,250 |
| 0420 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $2,650.00 | $9,500.00 | $6,985.00 | $3,183.00 | $2,090.00 |
| 0425 | Fiber optic cable, F&I, overhead, 2-12 fibers (0633-1111) | LF | 240 | $10.00 | $6.00 | $8.70 | $8.00 | $4.95 |
| 0430 | Fiber optic cable, F&I, overhead,13-48 fibers (0633-1112) | LF | 420 | $10.00 | $8.00 | $8.70 | $6.00 | $5.50 |
| 0435 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 290 | $8.00 | $6.00 | $5.80 | $5.00 | $7.15 |
| 0440 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 794 | $10.00 | $8.00 | $6.05 | $6.00 | $7.43 |
| 0445 | Fiber optic cable, F&I, underground,49-96 fibers (0633-1123) | LF | 5,190 | $10.00 | $5.00 | $6.55 | $7.00 | $7.70 |
| 0450 | Fiber optic cable, relocate, underground (0633-1420) | LF | 249 | $10.00 | $4.00 | $4.76 | $4.00 | $5.50 |
| 0455 | Fiber optic cable, remove, overhead (0633-1610) | LF | 479 | $10.00 | $2.00 | $2.00 | $2.00 | $1.65 |
| 0460 | Fiber optic connection, install, splice (0633-2-31) | EACH | 84 | $95.00 | $95.00 | $66.50 | $62.00 | $60.50 |
| 0465 | Fiber optic connection, install, termination (0633-2-32) | EACH | 84 | $105.00 | $95.00 | $125.00 | $117.00 | $115.50 |
| 0470 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 2 | $2,500.00 | $1,950.00 | $2,160.00 | $1,959.00 | $1,925.00 |
| 0475 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 7 | $200.00 | $125.00 | $148.00 | $117.00 | $115.50 |
| 0480 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 5 | $2,100.00 | $2,950.00 | $1,536.00 | $1,410.00 | $1,375.00 |
| 0485 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 5 | $180.00 | $295.00 | $170.00 | $138.00 | $137.50 |
| 0490 | Fiber optic cable locator (0633-6) | DA | 190 | $265.00 | $295.00 | $338.00 | $310.00 | $302.50 |
| 0495 | Span wire assembly, F&I, two point, diagonal (0634-4152) | PI | 2 | $8,500.00 | $9,500.00 | $2,428.00 | $5,827.00 | $7,975.00 |
| 0500 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 28 | $2,650.00 | $2,150.00 | $2,200.00 | $1,555.00 | $1,925.00 |
| 0505 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 13 | $2,650.00 | $3,450.00 | $3,045.00 | $3,079.00 | $4,015.00 |
| 0510 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 1 | $8,000.00 | $6,950.00 | $4,800.00 | $4,672.00 | $7,150.00 |
| 0515 | Pull & splice box, install (0635-2-30) | EACH | 1 | $2,500.00 | $2,450.00 | $1,830.00 | $1,483.00 | $1,320.00 |
| 0520 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $7,000.00 | $7,500.00 | $5,000.00 | $6,630.00 | $5,445.00 |
| 0525 | Electrical service wire, & install (0639-2-1) | LF | 235 | $13.00 | $25.00 | $14.75 | $33.00 | $9.90 |
| 0530 | Electrical service wire, (0639-2-6) | LF | 20 | $2.00 | $10.00 | $3.42 | $8.00 | $3.30 |
| 0535 | Electrical power service- contribution in aid of construction (ciac), duke (DO not bid) (0639-8100) | LS | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 0540 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,550.00 | $4,500.00 | $1,850.00 | $3,654.00 | $3,190.00 |
| 0545 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 2 | $23,000 | $9,500.00 | $3,930.00 | $10,637 | $11,550 |
| 0550 | Aluminum signals pole, (0646-1-11) | EACH | 8 | $3,200.00 | $2,950.00 | $2,845.00 | $3,658.00 | $3,905.00 |
| 0555 | Aluminum signals pole, remove (0646-1-60) | EACH | 6 | $800.00 | $1,250.00 | $717.00 | $1,591.00 | $522.50 |
| 0560 | Steel strain pole, F&I, type PS- (0649-1-14) | EACH | 4 | $49,000 | $65,000 | $65,490 | $22,904 | $66,550 |
| 0565 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 12 | $2,005.00 | $2,250.00 | $2,160.00 | $2,156.00 | $2,805.00 |
| 0570 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 2 | $3,300.00 | $3,250.00 | $3,010.00 | $2,973.00 | $4,125.00 |
| 0575 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 8 | $1,250.00 | $1,000.00 | $888.00 | $1,006.00 | $1,155.00 |
| 0580 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 1 | $30,000 | $24,950 | $21,650 | $20,478 | $26,400 |
| 0585 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 4 | $9,850.00 | $10,000 | $10,000 | $40,424 | $11,550 |
| 0590 | Traffic data detection system- video, furnish and install, cabinet equipment (0660-9-11) | EACH | 1 | $40,000 | $37,500 | $28,025 | $30,000 | $33,000 |
| 0595 | Traffic data detection system- video, furnish and install, ground equipment (0660-9-12) | EACH | 2 | $13,500 | $19,500 | $8,060.00 | $9,900.00 | $9,900.00 |
| 0600 | Signal priority and preemption system, furnish and install, detector (0663-1122) | EACH | 1 | $9,500.00 | $3,750.00 | $9,500.00 | $11,915 | $7,920.00 |
| 0605 | Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123) | EACH | 1 | $9,500.00 | $9,500.00 | $9,300.00 | $9,631.00 | $9,790.00 |
| 0610 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 8 | $780.00 | $495.00 | $370.00 | $509.00 | $594.00 |
| 0615 | Traffic controller assembly, F&I, NEMA W/electronic lock, 2 preemption (0670-5172) | AS | 1 | $53,000 | $75,000 | $47,800 | $45,295 | $56,100 |
| 0620 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $1,500.00 | $1,450.00 | $2,785.00 | $6,365.00 | $1,925.00 |
| 0625 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 1 | $7,600.00 | $19,500 | $6,608.00 | $9,316.00 | $9,185.00 |
| 0630 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 2 | $2,850.00 | $5,950.00 | $3,422.00 | $4,435.00 | $4,785.00 |
| 0635 | Managed field ethernet switch, relocate (0684-1-4) | EACH | 1 | $800.00 | $500.00 | $513.00 | $447.00 | $440.00 |
| 0640 | Wireless communication system device, remove (0684-6-6) | EACH | 1 | $400.00 | $1,950.00 | $540.00 | $344.00 | $253.00 |
| 0645 | Uninterruptible power supply, furnish and install, line interactive (0685-1-11) | EACH | 1 | $9,800.00 | $5,450.00 | $10,030 | $10,244 | $15,400 |
| 0650 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 1 | $1,500.00 | $1,250.00 | $2,250.00 | $1,209.00 | $1,760.00 |
| 0655 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 2 | $1,500.00 | $400.00 | $1,300.00 | $1,054.00 | $1,177.00 |
| 0660 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 4 | $9,850.00 | $7,500.00 | $10,000 | $6,375.00 | $9,295.00 |
| 0665 | Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360) | EACH | 2 | $9,000.00 | $8,500.00 | $11,800 | $4,577.00 | $7,645.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of July 30, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.