National Traffic Solution, Inc: FDOT bid record
National Traffic Solution, Inc submitted 11 bids on Florida DOT contracts in the data, from 30 MAR 2022 to 24 SEP 2025, and was the low bidder on 3 of them (27%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $3,895,969
- Latest bid
- 24 SEP 2025
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 2 | 2 | 100% |
| 2023 | 1 | 0 | 0% |
| 2024 | 3 | 1 | 33% |
| 2025 | 5 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 1 | 5 | 2 | 40% |
| District 4 | 4 | 0 | 0% |
| District 6 | 1 | 1 | 100% |
| District 5 | 1 | 0 | 0% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| American Design Engineering Construction Inc. | 7 | 2 of 7 |
| Rogar Management & Consulting of Florida LLC | 4 | 0 of 4 |
| Signal Technology and Installation Corp. | 4 | 2 of 4 |
| Leon America Construction | 3 | 2 of 3 |
| Aj General Construction Services, Inc. | 3 | 1 of 3 |
| Aum Construction Inc. | 3 | 3 of 3 |
| Wrangler Construction Inc. | 2 | 0 of 2 |
| Alexander Design + Build, LLC | 2 | 2 of 2 |
| Blacktip Services Incorporated | 2 | 1 of 2 |
| Janus Construction Corp. | 2 | 0 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 SEP 2025 | T4721 | District 4 | SR 811 (DIXIE HWY) FROM N OF SR 816 (OAKLAND PARK BLVD) TO.. | 3 of 4 | $938,860 | +14% |
| 24 SEP 2025 | T4752 | District 4 | SR 858 HALLANDALE BEACH BLVD FROM E OF SR 7 (US 441) TO SW.. | 2 of 5 | $294,981 | +5.0% |
| 30 JUL 2025 | T1927 | District 1 | WEST MAIN ST FROM HANCHEY RD TO W OF FLORIDA AVE | 4 of 6 | $496,932 | +20% |
| 30 JUL 2025 | T5859 | District 5 | SR 500 (US 441 / ORANGE BLOSSOM TR) AT CLARCONA-OCOEE RD | 2 of 5 | $2,899,803 | +6.0% |
| 29 JAN 2025 | T4713 | District 4 | SR A1A (N OCEAN BLVD/N FT LAUDERALE BEACH BLVD) AT NE 27TH.. | 4 of 4 | $3,219,342 | +55% |
| 04 DEC 2024 | T6590 | District 6 | SR 932 (NE 103 ST) FROM E OF NE 2 AVE TO W OF NE 6TH AVE | 1 of 3 | $1,086,169 | Low, 34% under the second |
| 31 JUL 2024 | T4668 | District 4 | FLORANADA RD (NE 45 ST) FROM SR 811 (DIXIE HWY) TO SR 54... | 2 of 3 | $1,992,057 | +2.0% |
| 28 FEB 2024 | T1868 | District 1 | SR 64 FROM E OF MANATEE RIVER TO BILL PARRISH RD | 4 of 5 | $1,399,059 | +35% |
| 06 DEC 2023 | T1884 | District 1 | SR 17, AT HILLCREST AVE | 3 of 4 | $1,545,111 | +30% |
| 27 JUL 2022 | T1845 | District 1 | SR 80 | 1 of 5 | $1,416,092 | Low, 27% under the second |
| 30 MAR 2022 | T1831 | District 1 | SR 78 | 1 of 5 | $1,393,708 | Low, 23% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.