Rogar Management & Consulting of Florida LLC: FDOT bid record

Rogar Management & Consulting of Florida LLC submitted 25 bids on Florida DOT contracts in the data, from 12 JUN 2019 to 28 OCT 2026, and was the low bidder on 2 of them (8%). When it was not low, its total sat a median +45% above the low bid.

Owner
Florida DOT
Low bid volume
$1,544,313
Latest bid
28 OCT 2026
Data through
28 OCT 2026
25Bids
2Low bids
8Win rate, percent
+45%Median gap to the low bid when not low, 22 bids

By year

YearBidsLow bidsWin rate
2019100%
2021300%
20223133%
20234125%
2024300%
2025500%
2026600%
Rogar Management & Consulting of Florida LLC, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 37229%
District 1700%
District 2400%
District 5300%
District 7300%
District 6100%
Rogar Management & Consulting of Florida LLC, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Thermoplastic, standard, solid, 24" for stop line and crosswalk0711-11125LF158 (53%)$10.00$6.09
Sediment barrier0104-10-3LF197 (37%)$3.00$2.60
Inlet protection system0104-18EACH177 (41%)$100.00$150.00
Mowing0107-2ACRE137 (54%)$100.00$80.65
Thermoplastic, standard, solid, 12" for crosswalk and roundabout0711-11123LF146 (43%)$6.00$3.25
Litter removal0107-1ACRE136 (46%)$100.00$52.98
Removal of existing concrete0110-4-10SY195 (26%)$46.00$33.96
Detectable warnings0527-2SF175 (29%)$35.00$35.00
Single column ground sign assembly, F&I ground mount, than 12 SF0700-1111EACH105 (50%)$627.50$585.00
Single column ground sign assembly, remove0700-1600EACH105 (50%)$65.00$53.75
Performance turf, sod0570-1-2SY194 (21%)$8.66$5.00
Thermoplastic, preformed, white, solid, 24" for crosswalk0711-14125LF134 (31%)$25.00$17.00
Rogar Management & Consulting of Florida LLC, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Rogar Management & Consulting of Florida LLC, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T2A88District 2SW 4TH AVE, SW 11TH ST AND S LAKE AVE FROM SR 121 TO SR 1216 of 6$1,474,794+135%
30 SEP 2026T1943District 1SR 776 AT OCEANSPRAY BLVD5 of 5$1,382,038+42%
30 SEP 2026T7622District 7SR 699 (GULF BLVD) FROM SR 682 (PINELLAS BAYWAY) TO SR 688 (WALSINGHAM3 of 9$774,879+31%
26 AUG 2026T1948District 1AT CENTRAL ELEMENTARY6 of 10$1,091,903+49%
29 JUL 2026T2A72District 2SR 200 (US 441 / N MLK MEMORIAL HWY) FROM NW 125TH STREET TO W OF7 of 9$321,469+116%
25 FEB 2026T5868District 5SR A1A FROM HIDDEN COVE DR TO SEA DUNES DR11 of 11$509,206+241%
26 MAR 2025T7570District 7SR 45 (US 41) AND SR 54 FROM GATOR LN TO SABAL PALM CT AND..5 of 5$788,319+22%
26 MAR 2025T7573District 7SR 595 (ALT US 19) AND SR 686 (ROOSEVELT BLVD) AT VARIOUS...5 of 5$522,839+43%
26 FEB 2025T5846District 5SR 434 (N ALAFAYA TR) FROM CENTAURUS DR TO SEMINOLE CO LINE3 of 4$1,555,391+13%
26 FEB 2025T5857District 5SR 600 (US 92) AND SR 44 FROM ON RAMP TO I-4 AND AT W OF G..4 of 5$271,904+132%
29 JAN 2025T1905District 1HINSON AVE, 20TH ST, CAROL AVE AND HORNET DR, FROM 17TH...4 of 6$708,662+23%
04 DEC 2024T6590District 6SR 932 (NE 103 ST) FROM E OF NE 2 AVE TO W OF NE 6TH AVE3 of 3$1,692,740+56%
22 MAY 2024T3921District 3SR 8 (I-10) FROM E OF ESCAMBIA BAY BRIDGE TO W OF SR 281 (AV4 of 4$1,189,509+81%
28 FEB 2024T1868District 1SR 64 FROM E OF MANATEE RIVER TO BILL PARRISH RD5 of 5$1,612,676+56%
06 DEC 2023T1884District 1SR 17, AT HILLCREST AVE4 of 4$1,911,186+60%
06 DEC 2023T3897District 3SR 10/SR 12 (US 90) (JEFFERSON ST) FROM CHALK ST TO RALPH...6 of 6$3,405,351+152%
26 JUL 2023T2935District 2SR45 (US 41) AND SR 20, FROM END OF SIDEWALK TO NW 9TH RD...4 of 5$739,160+7.0%
24 MAY 2023T3773District 3CLARA AVE1 of 2$556,581Low, 24% under the second
27 JUL 2022T1845District 1SR 803 of 5$2,072,303+46%
27 JUL 2022T3750District 3SR 30 (US 98B)1 of 2$987,732Low, 68% under the second
23 FEB 2022T1828District 1SR 453 of 3$705,614+26%
25 AUG 2021T2851District 2SR 25 (US 41)7 of 7$531,058+128%
31 MAR 2021T3682District 3SR 812 of 4$377,941+9.0%
17 FEB 2021T3770District 3GADSDEN CO SAFE ROUTES TO SCHOOL2 of 2$311,969+39%
12 JUN 2019T3726District 3SR 30 (FRONT BEACH RD)4 of 4$1,138,889+41%
Rogar Management & Consulting of Florida LLC: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy