Rogar Management & Consulting of Florida LLC: FDOT bid record
Rogar Management & Consulting of Florida LLC submitted 25 bids on Florida DOT contracts in the data, from 12 JUN 2019 to 28 OCT 2026, and was the low bidder on 2 of them (8%). When it was not low, its total sat a median +45% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $1,544,313
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 1 | 0 | 0% |
| 2021 | 3 | 0 | 0% |
| 2022 | 3 | 1 | 33% |
| 2023 | 4 | 1 | 25% |
| 2024 | 3 | 0 | 0% |
| 2025 | 5 | 0 | 0% |
| 2026 | 6 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 7 | 2 | 29% |
| District 1 | 7 | 0 | 0% |
| District 2 | 4 | 0 | 0% |
| District 5 | 3 | 0 | 0% |
| District 7 | 3 | 0 | 0% |
| District 6 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Thermoplastic, standard, solid, 24" for stop line and crosswalk | 0711-11125 | LF | 15 | 8 (53%) | $10.00 | $6.09 |
| Sediment barrier | 0104-10-3 | LF | 19 | 7 (37%) | $3.00 | $2.60 |
| Inlet protection system | 0104-18 | EACH | 17 | 7 (41%) | $100.00 | $150.00 |
| Mowing | 0107-2 | ACRE | 13 | 7 (54%) | $100.00 | $80.65 |
| Thermoplastic, standard, solid, 12" for crosswalk and roundabout | 0711-11123 | LF | 14 | 6 (43%) | $6.00 | $3.25 |
| Litter removal | 0107-1 | ACRE | 13 | 6 (46%) | $100.00 | $52.98 |
| Removal of existing concrete | 0110-4-10 | SY | 19 | 5 (26%) | $46.00 | $33.96 |
| Detectable warnings | 0527-2 | SF | 17 | 5 (29%) | $35.00 | $35.00 |
| Single column ground sign assembly, F&I ground mount, than 12 SF | 0700-1111 | EACH | 10 | 5 (50%) | $627.50 | $585.00 |
| Single column ground sign assembly, remove | 0700-1600 | EACH | 10 | 5 (50%) | $65.00 | $53.75 |
| Performance turf, sod | 0570-1-2 | SY | 19 | 4 (21%) | $8.66 | $5.00 |
| Thermoplastic, preformed, white, solid, 24" for crosswalk | 0711-14125 | LF | 13 | 4 (31%) | $25.00 | $17.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| American Design Engineering Construction Inc. | 9 | 6 of 9 |
| Blacktip Services Incorporated | 8 | 7 of 8 |
| Yoroca Engineering Contractors, LLC | 8 | 8 of 8 |
| Aj General Construction Services, Inc. | 7 | 4 of 7 |
| CDM Contracting, Inc. | 5 | 5 of 5 |
| Leon America Construction | 5 | 5 of 5 |
| Alexander Design + Build, LLC | 5 | 5 of 5 |
| Wrangler Construction Inc. | 4 | 1 of 4 |
| National Traffic Solution, Inc | 4 | 4 of 4 |
| Concept Construction and Demoli | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T2A88 | District 2 | SW 4TH AVE, SW 11TH ST AND S LAKE AVE FROM SR 121 TO SR 121 | 6 of 6 | $1,474,794 | +135% |
| 30 SEP 2026 | T1943 | District 1 | SR 776 AT OCEANSPRAY BLVD | 5 of 5 | $1,382,038 | +42% |
| 30 SEP 2026 | T7622 | District 7 | SR 699 (GULF BLVD) FROM SR 682 (PINELLAS BAYWAY) TO SR 688 (WALSINGHAM | 3 of 9 | $774,879 | +31% |
| 26 AUG 2026 | T1948 | District 1 | AT CENTRAL ELEMENTARY | 6 of 10 | $1,091,903 | +49% |
| 29 JUL 2026 | T2A72 | District 2 | SR 200 (US 441 / N MLK MEMORIAL HWY) FROM NW 125TH STREET TO W OF | 7 of 9 | $321,469 | +116% |
| 25 FEB 2026 | T5868 | District 5 | SR A1A FROM HIDDEN COVE DR TO SEA DUNES DR | 11 of 11 | $509,206 | +241% |
| 26 MAR 2025 | T7570 | District 7 | SR 45 (US 41) AND SR 54 FROM GATOR LN TO SABAL PALM CT AND.. | 5 of 5 | $788,319 | +22% |
| 26 MAR 2025 | T7573 | District 7 | SR 595 (ALT US 19) AND SR 686 (ROOSEVELT BLVD) AT VARIOUS... | 5 of 5 | $522,839 | +43% |
| 26 FEB 2025 | T5846 | District 5 | SR 434 (N ALAFAYA TR) FROM CENTAURUS DR TO SEMINOLE CO LINE | 3 of 4 | $1,555,391 | +13% |
| 26 FEB 2025 | T5857 | District 5 | SR 600 (US 92) AND SR 44 FROM ON RAMP TO I-4 AND AT W OF G.. | 4 of 5 | $271,904 | +132% |
| 29 JAN 2025 | T1905 | District 1 | HINSON AVE, 20TH ST, CAROL AVE AND HORNET DR, FROM 17TH... | 4 of 6 | $708,662 | +23% |
| 04 DEC 2024 | T6590 | District 6 | SR 932 (NE 103 ST) FROM E OF NE 2 AVE TO W OF NE 6TH AVE | 3 of 3 | $1,692,740 | +56% |
| 22 MAY 2024 | T3921 | District 3 | SR 8 (I-10) FROM E OF ESCAMBIA BAY BRIDGE TO W OF SR 281 (AV | 4 of 4 | $1,189,509 | +81% |
| 28 FEB 2024 | T1868 | District 1 | SR 64 FROM E OF MANATEE RIVER TO BILL PARRISH RD | 5 of 5 | $1,612,676 | +56% |
| 06 DEC 2023 | T1884 | District 1 | SR 17, AT HILLCREST AVE | 4 of 4 | $1,911,186 | +60% |
| 06 DEC 2023 | T3897 | District 3 | SR 10/SR 12 (US 90) (JEFFERSON ST) FROM CHALK ST TO RALPH... | 6 of 6 | $3,405,351 | +152% |
| 26 JUL 2023 | T2935 | District 2 | SR45 (US 41) AND SR 20, FROM END OF SIDEWALK TO NW 9TH RD... | 4 of 5 | $739,160 | +7.0% |
| 24 MAY 2023 | T3773 | District 3 | CLARA AVE | 1 of 2 | $556,581 | Low, 24% under the second |
| 27 JUL 2022 | T1845 | District 1 | SR 80 | 3 of 5 | $2,072,303 | +46% |
| 27 JUL 2022 | T3750 | District 3 | SR 30 (US 98B) | 1 of 2 | $987,732 | Low, 68% under the second |
| 23 FEB 2022 | T1828 | District 1 | SR 45 | 3 of 3 | $705,614 | +26% |
| 25 AUG 2021 | T2851 | District 2 | SR 25 (US 41) | 7 of 7 | $531,058 | +128% |
| 31 MAR 2021 | T3682 | District 3 | SR 81 | 2 of 4 | $377,941 | +9.0% |
| 17 FEB 2021 | T3770 | District 3 | GADSDEN CO SAFE ROUTES TO SCHOOL | 2 of 2 | $311,969 | +39% |
| 12 JUN 2019 | T3726 | District 3 | SR 30 (FRONT BEACH RD) | 4 of 4 | $1,138,889 | +41% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.