SW 4TH AVE, SW 11TH ST AND S LAKE AVE FROM SR 121 TO SR 121. Let by Florida DOT on October 28, 2026, Union, District 2. 6 bids received; low bid $627,923 by DB Civil Construction, LLC.
- Owner
- Florida DOT
- Letting
- 28 OCT 2026
- Pay items
- 44
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | DB Civil Construction, LLC | $627,923 | Low |
| 2 | Yoroca Engineering Contractors, LLC | $646,576 | +3.0% |
| 3 | CDM Contracting, Inc. | $662,418 | +5.0% |
| 4 | Curt'S Construction, Inc | $678,476 | +8.0% |
| 5 | Maer Homes, LLC | $859,115 | +37% |
| 6 | Rogar Management & Consulting of Florida LLC | $1,474,794 | +135% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. DB Civil Construction, LLC | 2. Yoroca Engineering Contractors, LLC | 3. CDM Contracting, Inc. | 4. Curt'S Construction, Inc | 5. Maer Homes, LLC | 6. Rogar Management & Consulting of Florida LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $58,000 | $100,000 | $70,956 | $32,300 | $82,585 | $100,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $15,000 | $15,000 | $15,640 | $75,000 | $43,912 | $50,000 |
| 0015 | Work zone sign (0102-60) | ED | 7,200 | $0.50 | $0.22 | $0.25 | $0.45 | $0.50 | $1.00 |
| 0020 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 34,350 | $0.20 | $0.11 | $0.11 | $0.31 | $0.25 | $1.00 |
| 0025 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 15,300 | $0.12 | $0.08 | $0.08 | $0.11 | $1.00 | $1.00 |
| 0030 | Portable changeable message sign, temporary (0102-99) | ED | 300 | $18.00 | $6.00 | $17.60 | $20.00 | $16.00 | $30.00 |
| 0035 | Sediment barrier (0104-10-3) | LF | 4,558 | $1.50 | $1.93 | $1.33 | $7.00 | $5.00 | $2.00 |
| 0040 | Inlet protection system (0104-18) | EACH | 16 | $150.00 | $200.00 | $137.50 | $300.00 | $427.50 | $100.00 |
| 0045 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $37,500 | $15,000 | $10,621 | $30,000 | $42,110 | $35,000 |
| 0050 | Removal of existing concrete (0110-4-10) | SY | 1,095 | $23.00 | $9.00 | $35.80 | $9.00 | $20.00 | $55.00 |
| 0055 | Mailbox, F&I single (0110-7-1) | EACH | 2 | $200.00 | $300.00 | $273.75 | $150.00 | $425.00 | $200.00 |
| 0060 | Tree removal (0110-23) | EACH | 1 | $8,491.30 | $2,000.00 | $550.00 | $1,500.00 | $4,500.00 | $1,000.00 |
| 0065 | Regular excavation (0120-1) | CY | 650.10 | $37.00 | $30.00 | $50.92 | $25.00 | $21.00 | $51.00 |
| 0070 | Embankment (0120-6) | CY | 224.20 | $40.00 | $30.00 | $57.54 | $15.00 | $30.00 | $61.00 |
| 0075 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 8.90 | $1,100.00 | $800.00 | $2,950.79 | $2,000.00 | $1,800.00 | $4,800.00 |
| 0080 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 2 | $6,000.00 | $6,900.00 | $6,906.50 | $3,200.00 | $7,500.00 | $25,000 |
| 0085 | Manhole, adjust, utilities (0425-5-1) | EACH | 1 | $800.00 | $750.00 | $1,220.00 | $600.00 | $2,200.00 | $10,000 |
| 0090 | Yard drain (0425-10) | EACH | 1 | $2,500.00 | $8,000.00 | $2,904.50 | $1,500.00 | $1,800.00 | $5,000.00 |
| 0095 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 198 | $120.00 | $180.00 | $154.67 | $82.00 | $175.00 | $260.00 |
| 0100 | Pipe culvert,optional material,round, 12"S/CD (0430-175112) | LF | 14 | $180.00 | $180.00 | $110.36 | $78.00 | $250.00 | $500.00 |
| 0105 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 4 | $240.00 | $180.00 | $203.75 | $74.00 | $400.00 | $500.00 |
| 0110 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 4 | $260.00 | $18.00 | $228.13 | $82.00 | $400.00 | $500.00 |
| 0115 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 14 | $260.00 | $180.00 | $167.14 | $99.60 | $400.00 | $500.00 |
| 0120 | Straight concrete endwalls, single, 0 degrees, round (0430-515100) | EACH | 1 | $3,500.00 | $6,000.00 | $2,885.00 | $2,956.00 | $4,000.00 | $10,000 |
| 0125 | Straight concrete endwalls, single, 0 degrees, round (0430-518100) | EACH | 1 | $4,000.00 | $6,000.00 | $3,665.00 | $3,011.20 | $4,000.00 | $15,000 |
| 0130 | Straight concrete endwalls, single, 0 degrees, elliptical (0430-518102) | EACH | 1 | $4,000.00 | $6,000.00 | $3,665.00 | $3,032.00 | $4,500.00 | $15,000 |
| 0135 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 1 | $2,800.00 | $1,500.00 | $1,747.50 | $1,750.00 | $4,300.00 | $15,000 |
| 0140 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 314 | $74.00 | $110.00 | $64.98 | $65.80 | $70.00 | $70.00 |
| 0145 | Concrete curb & gutter, type F (0520-1-10) | LF | 266 | $35.00 | $45.00 | $66.92 | $31.10 | $45.00 | $75.00 |
| 0150 | Concrete curb, type D (0520-2-4) | LF | 233 | $32.00 | $35.00 | $60.93 | $30.35 | $45.00 | $78.00 |
| 0155 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 3,904 | $60.00 | $65.00 | $58.10 | $68.81 | $82.00 | $165.00 |
| 0160 | Concrete ditch pavt, non reinforced, 3" (0524-1-1) | SY | 53 | $70.00 | $65.00 | $280.00 | $58.86 | $140.00 | $200.00 |
| 0165 | Detectable warnings (0527-2) | SF | 871 | $32.00 | $11.50 | $31.57 | $40.00 | $29.00 | $35.00 |
| 0170 | Performance turf, sod (0570-1-2) | SY | 3,750 | $5.00 | $4.00 | $3.23 | $5.00 | $6.50 | $18.00 |
| 0175 | Architectural- special, remove 73'X8' covering with 12 poles (0751-11601) | LS | 1 | $6,500.00 | $4,000.00 | $5,000.00 | $7,500.00 | $2,920.00 | $15,000 |
| 0180 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $123.00 | $123.00 | $123.00 | $123.00 | $123.00 | $123.00 |
| 0185 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 1 | $900.00 | $750.00 | $1,100.00 | $175.00 | $610.00 | $1,500.00 |
| 0190 | Single column ground sign assembly, relocate (0700-1500) | EACH | 3 | $200.00 | $150.00 | $266.20 | $125.00 | $654.00 | $500.00 |
| 0195 | Single column ground sign assembly, remove (0700-1600) | EACH | 2 | $100.00 | $50.00 | $203.50 | $75.00 | $85.00 | $500.00 |
| 0200 | Painted pavement markings, surface (0710-90) | LS | 1 | $3,000.00 | $3,000.00 | $2,739.00 | $4,200.00 | $29,000 | $15,000 |
| 0205 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,542 | $4.50 | $7.00 | $4.56 | $5.50 | $6.20 | $6.00 |
| 0210 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 38 | $9.00 | $9.00 | $9.12 | $12.55 | $15.00 | $10.00 |
| 0215 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 304 | $16.00 | $25.00 | $36.30 | $20.25 | $25.00 | $35.00 |
| 0220 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 806 | $5.00 | $3.50 | $4.84 | $7.75 | $10.00 | $6.61 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.