Yoroca Engineering Contractors, LLC: FDOT bid record
Yoroca Engineering Contractors, LLC submitted 15 bids on Florida DOT contracts in the data, from 26 MAR 2025 to 28 OCT 2026, and was the low bidder on 3 of them (20%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $1,863,540
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 4 | 1 | 25% |
| 2026 | 11 | 2 | 18% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 7 | 6 | 0 | 0% |
| District 1 | 3 | 1 | 33% |
| District 3 | 2 | 1 | 50% |
| District 2 | 2 | 0 | 0% |
| District 5 | 1 | 0 | 0% |
| StateWide | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Work zone sign | 0102-60 | ED | 13 | 13 (100%) | $0.22 | $0.25 |
| Detectable warnings | 0527-2 | SF | 11 | 9 (82%) | $20.00 | $35.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 14 | 8 (57%) | $0.11 | $0.13 |
| Thermoplastic, standard, solid, 24" for stop line and crosswalk | 0711-11125 | LF | 9 | 8 (89%) | $6.20 | $6.09 |
| Type III barricade | 0102-115 | ED | 7 | 6 (86%) | $0.30 | $0.34 |
| Portable changeable message sign, temporary | 0102-99 | ED | 13 | 5 (38%) | $15.00 | $12.00 |
| Performance turf, sod | 0570-1-2 | SY | 11 | 4 (36%) | $5.00 | $5.00 |
| Regular excavation | 0120-1 | CY | 13 | 3 (23%) | $50.00 | $25.47 |
| Removal of existing concrete | 0110-4-10 | SY | 11 | 3 (27%) | $20.00 | $33.96 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 9 | 3 (33%) | $5.00 | $5.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 9 | 3 (33%) | $10.00 | $5.90 |
| Thermoplastic, standard, solid, 12" for crosswalk and roundabout | 0711-11123 | LF | 9 | 3 (33%) | $5.00 | $3.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Blacktip Services Incorporated | 10 | 4 of 10 |
| American Design Engineering Construction Inc. | 9 | 1 of 9 |
| Rogar Management & Consulting of Florida LLC | 8 | 0 of 8 |
| Estep Construction, Inc. | 6 | 1 of 6 |
| Alexander Design + Build, LLC | 5 | 2 of 5 |
| Leon America Construction | 5 | 4 of 5 |
| Garcia Civil Contractors | 4 | 2 of 4 |
| Maer Homes, LLC | 4 | 0 of 4 |
| Lakeview Contracting, Inc. | 3 | 2 of 3 |
| Wrangler Construction Inc. | 3 | 0 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T2A88 | District 2 | SW 4TH AVE, SW 11TH ST AND S LAKE AVE FROM SR 121 TO SR 121 | 2 of 6 | $646,576 | +3.0% |
| 30 SEP 2026 | T1943 | District 1 | SR 776 AT OCEANSPRAY BLVD | 1 of 5 | $973,567 | Low, 8.0% under the second |
| 30 SEP 2026 | T7622 | District 7 | SR 699 (GULF BLVD) FROM SR 682 (PINELLAS BAYWAY) TO SR 688 (WALSINGHAM | 2 of 9 | $593,478 | 0.0% |
| 26 AUG 2026 | T1948 | District 1 | AT CENTRAL ELEMENTARY | 2 of 10 | $844,714 | +15% |
| 26 AUG 2026 | T7604 | District 7 | MIDDLE SCHOOL SIDEWALKS AT VARIOUS LOCATIONS AS SHOWN IN THE PLANS | 8 of 9 | $2,266,798 | +46% |
| 26 AUG 2026 | T7605 | District 7 | SR 45 (US 41 / S FLORIDA AVE) FROM CR 480 TO E TOWER TR | 4 of 12 | $1,097,789 | +23% |
| 26 AUG 2026 | T7613 | District 7 | SR 55 (US 19 / COMMERCIAL WAY) FROM APPLEGATE DR TO E TRENTON AVE | 2 of 10 | $1,279,095 | +26% |
| 29 JUL 2026 | T2A72 | District 2 | SR 200 (US 441 / N MLK MEMORIAL HWY) FROM NW 125TH STREET TO W OF | 2 of 9 | $163,532 | +10% |
| 20 MAY 2026 | T9049 | StateWide | SR 93 (I-75) AT NB AND SB WILDWOOD WEIGH STATIONS | 1 of 2 | $670,439 | Low, 82% under the second |
| 25 MAR 2026 | T1928 | District 1 | SR 544 FROM LAKE BLUE DR TO 26TH ST NW | 4 of 10 | $1,385,948 | +16% |
| 25 FEB 2026 | T5868 | District 5 | SR A1A FROM HIDDEN COVE DR TO SEA DUNES DR | 2 of 11 | $149,964 | 0.0% |
| 29 OCT 2025 | T3983 | District 3 | SR 20 FROM E OF CR 275 TO E OF MATTHEW WOOD RD | 1 of 3 | $219,533 | Low, 25% under the second |
| 30 JUL 2025 | T3A07 | District 3 | SR 300 OVER ST GEORGE SOUND (BRIDGE NO 490100) | 4 of 4 | $263,695 | +174% |
| 26 MAR 2025 | T7570 | District 7 | SR 45 (US 41) AND SR 54 FROM GATOR LN TO SABAL PALM CT AND.. | 3 of 5 | $731,313 | +14% |
| 26 MAR 2025 | T7573 | District 7 | SR 595 (ALT US 19) AND SR 686 (ROOSEVELT BLVD) AT VARIOUS... | 4 of 5 | $428,747 | +17% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.