FDOT contract T7605 bid tabulation

SR 45 (US 41 / S FLORIDA AVE) FROM CR 480 TO E TOWER TR. Let by Florida DOT on August 26, 2026, Citrus, District 7. 12 bids received; low bid $894,226 by Leon America Construction.

Owner
Florida DOT
Letting
26 AUG 2026
Pay items
49
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Leon America Construction$894,226Low
2Concept Construction and Demoli$1,078,070+21%
3Hartman Civil Construction Company, Inc.$1,093,738+22%
4Yoroca Engineering Contractors, LLC$1,097,789+23%
5Garcia Civil Contractors$1,158,674+30%
6American Design Engineering Construction Inc.$1,305,527+46%
7Environmental Land Development$1,338,208+50%
8Maer Homes, LLC$1,357,857+52%
9Estep Construction, Inc.$1,399,539+57%
10Blacktip Services Incorporated$1,512,151+69%
11Vector Paving LLC$1,555,959+74%
12Sparks Concrete, LLC$1,568,435+75%
FDOT contract T7605: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Leon America Construction2. Concept Construction and Demoli3. Hartman Civil Construction Company, Inc.4. Yoroca Engineering Contractors, LLC5. Garcia Civil Contractors6. American Design Engineering Construction Inc.
0005Mobilization (0101-1)LS1$120,000$118,110$95,000$100,000$138,486$200,000
0010Maintenance of traffic (0102-1)DA1$60,000$50,000$55,000$20,000$29,080$20,000
0015Work zone sign (0102-60)ED6,812$0.20$0.27$0.50$0.19$0.36$4.00
0020Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED43,230$0.10$0.11$0.20$0.11$0.19$4.00
0025Portable changeable message sign, temporary (0102-99)ED538$10.00$10.75$15.00$9.90$23.22$4.00
0030Temporary raised rumble per day, includes all sets and relocations (0102-909)DA524$15.00$24.50$20.00$1.00$77.40$200.00
0035Artificial coverings /rolled erosion control products (0104-1)SY114$7.00$10.00$20.00$6.00$6.38$35.00
0040Sediment barrier (0104-10-3)LF1,624$2.50$1.00$3.00$5.00$2.11$10.00
0045Soil tracking prevention device (0104-15)EACH1$4,000.00$1,500.00$4,500.00$4,000.00$276.06$3,500.00
0050Inlet protection system (0104-18)EACH1$176.00$100.00$500.00$2,250.00$82.82$60.00
0055Chemical treatment- powdered, for erosion control (0104-19)SY114$46.00$25.00$10.00$50.00$22.49$65.00
0060Litter removal (0107-1)ACRE65.67$24.00$50.00$100.00$1.00$107.53$100.00
0065Mowing (0107-2)ACRE44.12$30.00$50.00$100.00$1.00$187.13$50.00
0070Clearing & grubbing (0110-1-1)ACRE1$80,000$200,000$78,700$40,000$95,665$35,000
0075Removal of existing concrete (0110-4-10)SY1$35.00$1,500.00$500.00$100.00$637.10$100.00
0080Mailbox, F&I single (0110-7-1)EACH8$40.00$500.00$250.00$250.00$269.70$200.00
0085Tree root and branch pruning (0110-22)EACH1$650.00$250.00$2,500.00$1,000.00$637.10$150.00
0090Regular excavation (0120-1)CY863.60$6.00$51.00$25.00$40.00$49.88$20.00
0095Embankment (0120-6)CY1,617.20$9.00$50.00$30.00$40.00$56.42$20.00
0100Optional base, base group 06 (0285-706)SY318$18.00$72.25$40.00$200.00$79.17$115.00
0105Turnout construction- asphalt/driveway base- asphalt material (0286-2)TN269.60$270.00$269.60$340.00$200.00$340.61$300.00
0110Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY457$10.00$31.15$40.00$15.00$19.06$35.00
0115Superpave asphaltic conc, traffic B (0334-1-12)TN165$150.00$293.50$400.00$220.00$333.57$320.00
0120Inlets, DT bot, type C,<10' (0425-1521)EACH1$6,700.00$5,000.00$9,500.00$10,000$6,288.88$25,000
0125Pipe culvert, optional material, round, 15"SD (0430-174115)LF76$140.00$84.85$110.00$215.00$106.31$65.00
0130Pipe culvert, optional material, round, 18"SD (0430-174118)LF313$150.00$87.85$130.00$215.00$116.97$75.00
0135Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218)LF238$180.00$132.85$160.00$215.00$122.97$85.00
0140Mitered end section, optional round, 15" SD (0430-984123)EACH4$2,500.00$1,300.00$3,000.00$2,000.00$3,239.53$1,500.00
0145Mitered end section, optional round, 18" SD (0430-984125)EACH4$2,500.00$1,400.00$3,200.00$2,000.00$2,512.34$1,500.00
0150Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625)EACH12$2,500.00$1,500.00$3,300.00$1,500.00$2,535.90$1,500.00
0155Concrete curb, type A (0520-2-1)LF27$25.00$75.00$50.00$50.00$81.66$35.00
0160Concrete curb, type B (0520-2-2)LF30$45.00$75.00$50.00$50.00$81.92$35.00
0165Concrete sidewalk and driveways, 4" thick (0522-1)SY2,541$60.00$45.00$72.00$100.00$50.66$65.00
0170Concrete sidewalk and driveways, 6" thick (0522-2)SY601$65.00$63.00$87.00$100.00$91.26$75.00
0175Concrete ditch pavt, non reinforced, 3" (0524-1-1)SY22$70.00$100.00$150.00$100.00$139.39$85.00
0180Detectable warnings (0527-2)SF289$30.00$22.00$35.00$20.00$20.00$20.00
0185Performance turf, sod (0570-1-2)SY11,421$3.00$4.00$5.00$5.00$6.42$6.00
0190Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000$50,000
0195Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH11$500.00$588.00$600.00$700.00$805.00$850.00
0200Single column ground sign assembly, relocate (0700-1500)EACH5$350.00$480.00$400.00$450.00$517.50$250.00
0205Single column ground sign assembly, remove (0700-1600)EACH11$50.00$50.00$100.00$100.00$57.50$50.00
0210Sign panel, relocate, UP to 12 SF (0700-3501)EACH3$170.00$150.00$200.00$700.00$115.00$250.00
0215Object marker, type 4 (0705-10-4)EACH6$310.00$210.00$400.00$350.00$345.00$100.00
0220Raised pavement marker, type B (0706-1-3)EACH16$4.80$5.00$12.00$5.00$16.75$3.00
0225Painted pavement markings, surface (0710-90)LS1$8,000.00$1,850.00$2,000.00$5,000.00$5,750.00$3,500.00
0230Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF631$3.80$5.10$6.00$3.00$8.05$6.00
0235Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF108$7.00$9.00$11.00$5.00$13.80$8.00
0240Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF302$8.50$17.00$20.00$25.00$28.75$8.00
0245Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.09$5,000.00$6,980.00$10,000$9,000.00$11,500$6,500.00
FDOT contract T7605: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy