American Design Engineering Construction Inc.: FDOT bid record

American Design Engineering Construction Inc. submitted 27 bids on Florida DOT contracts in the data, from 25 AUG 2021 to 28 OCT 2026, and was the low bidder on 4 of them (15%). When it was not low, its total sat a median +42% above the low bid.

Owner
Florida DOT
Low bid volume
$6,009,739
Latest bid
28 OCT 2026
Data through
28 OCT 2026
27Bids
4Low bids
15Win rate, percent
+42%Median gap to the low bid when not low, 22 bids

By year

YearBidsLow bidsWin rate
20212150%
2022300%
202311100%
202511218%
20261000%
American Design Engineering Construction Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 19222%
District 56233%
District 7600%
District 2300%
District 4200%
District 3100%
American Design Engineering Construction Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Raised pavement marker, type B0706-1-3EACH2215 (68%)$4.00$5.00
Removal of existing concrete0110-4-10SY2114 (67%)$15.00$33.96
Thermoplastic, preformed, white, solid, 24" for crosswalk0711-14125LF1710 (59%)$12.00$17.00
Concrete curb & gutter, type F0520-1-10LF159 (60%)$35.00$42.32
Concrete sidewalk and driveways, 6" thick0522-2SY208 (40%)$75.00$86.00
Thermoplastic, standard-other surfaces, yellow, solid, 6"0711-16201GM167 (44%)$6,500.00$5,200.00
Thermoplastic, standard-other surfaces, white, solid, 6"0711-16101GM137 (54%)$6,500.00$5,220.00
Pipe culvert,optional material,round, 18"S/CD0430-175118LF97 (78%)$120.00$154.00
Embankment0120-6CY196 (32%)$30.00$30.04
Thermoplastic, standard, solid, 24" for stop line and crosswalk0711-11125LF205 (25%)$8.00$6.09
Pipe culvert, optional material, other shape - ellip/arch, 18"SD0430-174218LF55 (100%)$85.00$154.87
Performance turf, sod0570-1-2SY214 (19%)$7.20$5.00
American Design Engineering Construction Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

American Design Engineering Construction Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T5894District 5SR 438 FROM LAKE STANLEY RD TO HIAWASSEE RD4 of 5$3,099,941+24%
30 SEP 2026T1943District 1SR 776 AT OCEANSPRAY BLVD3 of 5$1,256,120+29%
30 SEP 2026T7622District 7SR 699 (GULF BLVD) FROM SR 682 (PINELLAS BAYWAY) TO SR 688 (WALSINGHAM8 of 9$976,871+65%
26 AUG 2026T1948District 1AT CENTRAL ELEMENTARY4 of 10$1,066,346+46%
26 AUG 2026T7604District 7MIDDLE SCHOOL SIDEWALKS AT VARIOUS LOCATIONS AS SHOWN IN THE PLANS2 of 9$1,697,037+9.0%
26 AUG 2026T7605District 7SR 45 (US 41 / S FLORIDA AVE) FROM CR 480 TO E TOWER TR6 of 12$1,305,527+46%
26 AUG 2026T7613District 7SR 55 (US 19 / COMMERCIAL WAY) FROM APPLEGATE DR TO E TRENTON AVE10 of 10$1,680,898+66%
26 AUG 2026T7624District 7SR 93 (I-275), SR 690 AND SR 686 FROM SR 686 TO OLD TAMPA BAY, FROM SR 694 TO7 of 7$1,388,160+238%
25 MAR 2026T1928District 1SR 544 FROM LAKE BLUE DR TO 26TH ST NW5 of 10$1,404,542+17%
25 FEB 2026T5868District 5SR A1A FROM HIDDEN COVE DR TO SEA DUNES DR7 of 11$248,149+66%
29 OCT 2025T3983District 3SR 20 FROM E OF CR 275 TO E OF MATTHEW WOOD RD3 of 3$621,043+183%
24 SEP 2025T2A45District 2SR 10 (US 90) AT SW HEATHRIDGE DR4 of 4$1,314,096+60%
24 SEP 2025T2A46District 2SR 212 (BEACH BLVD) AND SR 10 (ATLANTIC BLVD) AT FOSTER DR..4 of 5$1,335,221+35%
24 SEP 2025T4721District 4SR 811 (DIXIE HWY) FROM N OF SR 816 (OAKLAND PARK BLVD) TO..4 of 4$1,146,299+39%
24 SEP 2025T4752District 4SR 858 HALLANDALE BEACH BLVD FROM E OF SR 7 (US 441) TO SW..4 of 5$436,255+56%
24 SEP 2025T7566District 7SR 595 (ALT US 19 / BAYSHORE DR) FROM WILSON ST TO CURLEW ST5 of 6$1,445,604+13%
27 AUG 2025T5864District 5SR 600 (US 92) AT LOCKHART ST2 of 2$1,204,305+13%
30 JUL 2025T1927District 1WEST MAIN ST FROM HANCHEY RD TO W OF FLORIDA AVE5 of 6$507,140+22%
30 JUL 2025T5859District 5SR 500 (US 441 / ORANGE BLOSSOM TR) AT CLARCONA-OCOEE RD1 of 5$2,732,458Low, 6.0% under the second
26 FEB 2025T5846District 5SR 434 (N ALAFAYA TR) FROM CENTAURUS DR TO SEMINOLE CO LINE1 of 4$1,377,191Low, 7.0% under the second
29 JAN 2025T1905District 1HINSON AVE, 20TH ST, CAROL AVE AND HORNET DR, FROM 17TH...6 of 6$759,663+32%
06 DEC 2023T1884District 1SR 17, AT HILLCREST AVE1 of 4$1,190,968Low, 9.0% under the second
26 OCT 2022T5765District 5SR 404 of 5$1,642,751+54%
27 JUL 2022T1845District 1SR 804 of 5$2,242,522+58%
30 MAR 2022T1831District 1SR 783 of 5$2,016,618+45%
American Design Engineering Construction Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy