American Design Engineering Construction Inc.: FDOT bid record
American Design Engineering Construction Inc. submitted 27 bids on Florida DOT contracts in the data, from 25 AUG 2021 to 28 OCT 2026, and was the low bidder on 4 of them (15%). When it was not low, its total sat a median +42% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $6,009,739
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 2 | 1 | 50% |
| 2022 | 3 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
| 2025 | 11 | 2 | 18% |
| 2026 | 10 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 1 | 9 | 2 | 22% |
| District 5 | 6 | 2 | 33% |
| District 7 | 6 | 0 | 0% |
| District 2 | 3 | 0 | 0% |
| District 4 | 2 | 0 | 0% |
| District 3 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Raised pavement marker, type B | 0706-1-3 | EACH | 22 | 15 (68%) | $4.00 | $5.00 |
| Removal of existing concrete | 0110-4-10 | SY | 21 | 14 (67%) | $15.00 | $33.96 |
| Thermoplastic, preformed, white, solid, 24" for crosswalk | 0711-14125 | LF | 17 | 10 (59%) | $12.00 | $17.00 |
| Concrete curb & gutter, type F | 0520-1-10 | LF | 15 | 9 (60%) | $35.00 | $42.32 |
| Concrete sidewalk and driveways, 6" thick | 0522-2 | SY | 20 | 8 (40%) | $75.00 | $86.00 |
| Thermoplastic, standard-other surfaces, yellow, solid, 6" | 0711-16201 | GM | 16 | 7 (44%) | $6,500.00 | $5,200.00 |
| Thermoplastic, standard-other surfaces, white, solid, 6" | 0711-16101 | GM | 13 | 7 (54%) | $6,500.00 | $5,220.00 |
| Pipe culvert,optional material,round, 18"S/CD | 0430-175118 | LF | 9 | 7 (78%) | $120.00 | $154.00 |
| Embankment | 0120-6 | CY | 19 | 6 (32%) | $30.00 | $30.04 |
| Thermoplastic, standard, solid, 24" for stop line and crosswalk | 0711-11125 | LF | 20 | 5 (25%) | $8.00 | $6.09 |
| Pipe culvert, optional material, other shape - ellip/arch, 18"SD | 0430-174218 | LF | 5 | 5 (100%) | $85.00 | $154.87 |
| Performance turf, sod | 0570-1-2 | SY | 21 | 4 (19%) | $7.20 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Blacktip Services Incorporated | 14 | 8 of 14 |
| Rogar Management & Consulting of Florida LLC | 9 | 3 of 9 |
| Yoroca Engineering Contractors, LLC | 9 | 8 of 9 |
| Aj General Construction Services, Inc. | 7 | 0 of 7 |
| National Traffic Solution, Inc | 7 | 5 of 7 |
| Garcia Civil Contractors | 6 | 4 of 6 |
| Estep Construction, Inc. | 6 | 3 of 6 |
| Leon America Construction | 5 | 5 of 5 |
| Wrangler Construction Inc. | 5 | 2 of 5 |
| Signal Technology and Installation Corp. | 5 | 4 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T5894 | District 5 | SR 438 FROM LAKE STANLEY RD TO HIAWASSEE RD | 4 of 5 | $3,099,941 | +24% |
| 30 SEP 2026 | T1943 | District 1 | SR 776 AT OCEANSPRAY BLVD | 3 of 5 | $1,256,120 | +29% |
| 30 SEP 2026 | T7622 | District 7 | SR 699 (GULF BLVD) FROM SR 682 (PINELLAS BAYWAY) TO SR 688 (WALSINGHAM | 8 of 9 | $976,871 | +65% |
| 26 AUG 2026 | T1948 | District 1 | AT CENTRAL ELEMENTARY | 4 of 10 | $1,066,346 | +46% |
| 26 AUG 2026 | T7604 | District 7 | MIDDLE SCHOOL SIDEWALKS AT VARIOUS LOCATIONS AS SHOWN IN THE PLANS | 2 of 9 | $1,697,037 | +9.0% |
| 26 AUG 2026 | T7605 | District 7 | SR 45 (US 41 / S FLORIDA AVE) FROM CR 480 TO E TOWER TR | 6 of 12 | $1,305,527 | +46% |
| 26 AUG 2026 | T7613 | District 7 | SR 55 (US 19 / COMMERCIAL WAY) FROM APPLEGATE DR TO E TRENTON AVE | 10 of 10 | $1,680,898 | +66% |
| 26 AUG 2026 | T7624 | District 7 | SR 93 (I-275), SR 690 AND SR 686 FROM SR 686 TO OLD TAMPA BAY, FROM SR 694 TO | 7 of 7 | $1,388,160 | +238% |
| 25 MAR 2026 | T1928 | District 1 | SR 544 FROM LAKE BLUE DR TO 26TH ST NW | 5 of 10 | $1,404,542 | +17% |
| 25 FEB 2026 | T5868 | District 5 | SR A1A FROM HIDDEN COVE DR TO SEA DUNES DR | 7 of 11 | $248,149 | +66% |
| 29 OCT 2025 | T3983 | District 3 | SR 20 FROM E OF CR 275 TO E OF MATTHEW WOOD RD | 3 of 3 | $621,043 | +183% |
| 24 SEP 2025 | T2A45 | District 2 | SR 10 (US 90) AT SW HEATHRIDGE DR | 4 of 4 | $1,314,096 | +60% |
| 24 SEP 2025 | T2A46 | District 2 | SR 212 (BEACH BLVD) AND SR 10 (ATLANTIC BLVD) AT FOSTER DR.. | 4 of 5 | $1,335,221 | +35% |
| 24 SEP 2025 | T4721 | District 4 | SR 811 (DIXIE HWY) FROM N OF SR 816 (OAKLAND PARK BLVD) TO.. | 4 of 4 | $1,146,299 | +39% |
| 24 SEP 2025 | T4752 | District 4 | SR 858 HALLANDALE BEACH BLVD FROM E OF SR 7 (US 441) TO SW.. | 4 of 5 | $436,255 | +56% |
| 24 SEP 2025 | T7566 | District 7 | SR 595 (ALT US 19 / BAYSHORE DR) FROM WILSON ST TO CURLEW ST | 5 of 6 | $1,445,604 | +13% |
| 27 AUG 2025 | T5864 | District 5 | SR 600 (US 92) AT LOCKHART ST | 2 of 2 | $1,204,305 | +13% |
| 30 JUL 2025 | T1927 | District 1 | WEST MAIN ST FROM HANCHEY RD TO W OF FLORIDA AVE | 5 of 6 | $507,140 | +22% |
| 30 JUL 2025 | T5859 | District 5 | SR 500 (US 441 / ORANGE BLOSSOM TR) AT CLARCONA-OCOEE RD | 1 of 5 | $2,732,458 | Low, 6.0% under the second |
| 26 FEB 2025 | T5846 | District 5 | SR 434 (N ALAFAYA TR) FROM CENTAURUS DR TO SEMINOLE CO LINE | 1 of 4 | $1,377,191 | Low, 7.0% under the second |
| 29 JAN 2025 | T1905 | District 1 | HINSON AVE, 20TH ST, CAROL AVE AND HORNET DR, FROM 17TH... | 6 of 6 | $759,663 | +32% |
| 06 DEC 2023 | T1884 | District 1 | SR 17, AT HILLCREST AVE | 1 of 4 | $1,190,968 | Low, 9.0% under the second |
| 26 OCT 2022 | T5765 | District 5 | SR 40 | 4 of 5 | $1,642,751 | +54% |
| 27 JUL 2022 | T1845 | District 1 | SR 80 | 4 of 5 | $2,242,522 | +58% |
| 30 MAR 2022 | T1831 | District 1 | SR 78 | 3 of 5 | $2,016,618 | +45% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.