FDOT contract T2A45 bid tabulation
SR 10 (US 90) AT SW HEATHRIDGE DR. Let by Florida DOT on September 24, 2025, Columbia, District 2. 4 bids received; low bid $822,535 by Whitehurst, V. E. & Sons, Inc..
- Owner
- Florida DOT
- Letting
- 24 SEP 2025
- Pay items
- 45
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Whitehurst, V. E. & Sons, Inc. | $822,535 | Low |
| 2 | Southern Development & Construction, Inc. | $840,000 | +2.0% |
| 3 | Anderson Columbia Co., Inc. | $927,126 | +13% |
| 4 | American Design Engineering Construction Inc. | $1,314,096 | +60% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Whitehurst, V. E. & Sons, Inc. | 2. Southern Development & Construction, Inc. | 3. Anderson Columbia Co., Inc. | 4. American Design Engineering Construction Inc. |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $150,649 | $80,000 | $171,113 | $265,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $106,250 | $80,000 | $103,984 | $175,000 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $59,125 | $9,000.00 | $19,115 | $80,000 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $7,500.00 | $15,000 | $16,118 | $50,000 |
| 0025 | Work zone sign (0102-60) | ED | 1,400 | $0.54 | $0.50 | $0.71 | $3.00 |
| 0030 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 938 | $44.61 | $30.00 | $59.32 | $85.00 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 3,170 | $0.11 | $0.15 | $0.14 | $3.00 |
| 0040 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 118 | $6.99 | $7.00 | $9.29 | $8.00 |
| 0045 | Temporary crash cushion, redirective option (0102-89-1) | LO | 2 | $1,613.00 | $1,500.00 | $3,573.19 | $4,500.00 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 208 | $18.28 | $12.00 | $17.15 | $35.00 |
| 0055 | Sediment barrier (0104-10-3) | LF | 907 | $2.00 | $4.00 | $4.54 | $5.00 |
| 0060 | Litter removal (0107-1) | ACRE | 10.78 | $430.00 | $50.00 | $1,071.96 | $200.00 |
| 0065 | Mowing (0107-2) | ACRE | 10.70 | $430.00 | $50.00 | $1,429.28 | $200.00 |
| 0070 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $28,953 | $193,216 | $32,976 | $25,000 |
| 0075 | Regular excavation (0120-1) | CY | 502 | $15.00 | $16.00 | $72.59 | $45.00 |
| 0080 | Subsoil excavation (0120-4) | CY | 227.10 | $17.50 | $30.00 | $54.91 | $55.00 |
| 0085 | Embankment (0120-6) | CY | 637.60 | $25.00 | $20.00 | $52.41 | $45.00 |
| 0090 | Type B stabilization (0160-4) | SY | 1,992 | $15.00 | $14.00 | $4.86 | $20.00 |
| 0095 | Optional base, base group 01 (0285-701) | SY | 493 | $19.70 | $22.00 | $23.81 | $20.00 |
| 0100 | Optional base, base group 06 (0285-706) | SY | 1,007 | $24.50 | $30.00 | $38.33 | $20.00 |
| 0105 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 5,018 | $3.10 | $5.00 | $3.93 | $10.00 |
| 0110 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 187.10 | $164.20 | $200.00 | $218.86 | $350.00 |
| 0115 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 534.80 | $166.52 | $225.00 | $199.76 | $350.00 |
| 0120 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 94 | $395.62 | $100.00 | $157.13 | $250.00 |
| 0125 | Pipe filling and plugging- place out of service (0430-830) | CY | 6.20 | $529.20 | $1,500.00 | $285.85 | $350.00 |
| 0130 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 2 | $2,912.20 | $2,500.00 | $2,463.71 | $6,500.00 |
| 0135 | Performance turf, sod (0570-1-2) | SY | 3,719 | $2.85 | $6.00 | $5.72 | $7.20 |
| 0140 | Raised pavement marker, type B (0706-1-3) | EACH | 1,260 | $6.99 | $5.00 | $7.86 | $4.00 |
| 0145 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 1.08 | $3,225.00 | $5,000.00 | $3,215.87 | $1,500.00 |
| 0150 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 3 | $80.63 | $200.00 | $107.20 | $150.00 |
| 0155 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 1.34 | $3,225.00 | $5,000.00 | $3,215.87 | $1,500.00 |
| 0160 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 140 | $5.38 | $10.00 | $5.36 | $2.00 |
| 0165 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $44,409 | $44,409 | $44,409 | $44,409 |
| 0170 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 0.77 | $20,700 | $6,000.00 | $24,765 | $15,500 |
| 0175 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 3 | $808.40 | $500.00 | $821.84 | $750.00 |
| 0180 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $348.30 | $100.00 | $142.93 | $450.00 |
| 0185 | Single column ground sign assembly, remove (0700-1600) | EACH | 2 | $53.75 | $60.00 | $121.49 | $50.00 |
| 0190 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 4 | $118.25 | $300.00 | $393.05 | $450.00 |
| 0195 | Object marker, type 1 (0705-10-1) | EACH | 3 | $407.45 | $300.00 | $428.78 | $350.00 |
| 0200 | Raised pavement marker, type B (0706-1-3) | EACH | 124 | $16.15 | $8.00 | $10.72 | $4.00 |
| 0205 | Painted pavement markings, surface (0710-90) | LS | 1 | $21,500 | $10,000 | $17,866 | $15,000 |
| 0210 | Thermoplastic, standard, arrow (0711-11170) | EACH | 3 | $215.00 | $200.00 | $285.85 | $200.00 |
| 0215 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 140 | $26.90 | $10.00 | $35.73 | $10.00 |
| 0220 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.57 | $10,213 | $8,000.00 | $13,578 | $6,500.00 |
| 0225 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.78 | $10,213 | $8,000.00 | $13,578 | $6,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of September 24, 2025. Compiled by Mirage Metrics.