FDOT contract T1905 bid tabulation
HINSON AVE, 20TH ST, CAROL AVE AND HORNET DR, FROM 17TH... Let by Florida DOT on January 29, 2025, Polk, District 1. 6 bids received; low bid $574,929 by Garcia Civil Contractors.
- Owner
- Florida DOT
- Letting
- 29 JAN 2025
- Pay items
- 47
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Garcia Civil Contractors | $574,929 | Low |
| 2 | Ranger Construction Industries, Inc. | $628,657 | +9.0% |
| 3 | Blacktip Services Incorporated | $659,260 | +15% |
| 4 | Rogar Management & Consulting of Florida LLC | $708,662 | +23% |
| 5 | C M Engineering Services Florida | $726,165 | +26% |
| 6 | American Design Engineering Construction Inc. | $759,663 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Garcia Civil Contractors | 2. Ranger Construction Industries, Inc. | 3. Blacktip Services Incorporated | 4. Rogar Management & Consulting of Florida LLC | 5. C M Engineering Services Florida | 6. American Design Engineering Construction Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $86,600 | $62,865 | $137,350 | $50,000 | $72,617 | $175,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $47,335 | $58,085 | $26,000 | $100,000 | $60,000 | $100,000 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $20,456 | $15,000 | $3,600.00 | $1,000.00 | $5,179.90 | $10,000 |
| 0020 | Work zone sign (0102-60) | ED | 7,800 | $0.30 | $0.40 | $0.30 | $1.00 | $0.56 | $4.00 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 7,200 | $0.14 | $0.15 | $0.15 | $1.00 | $0.25 | $4.00 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 7,472 | $0.07 | $0.05 | $0.35 | $3.00 | $0.30 | $4.00 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 200 | $5.75 | $9.30 | $6.00 | $30.00 | $12.80 | $40.00 |
| 0040 | Type III barricade (0102-115) | ED | 300 | $0.32 | $0.60 | $0.35 | $1.00 | $0.87 | $4.00 |
| 0045 | Removable tape, white, 12" crosswalk (0102-913-24) | LF | 176 | $6.90 | $11.65 | $8.00 | $6.00 | $25.00 | $10.00 |
| 0050 | Sediment barrier (0104-10-3) | LF | 1,452 | $1.61 | $8.00 | $5.00 | $3.00 | $2.00 | $8.00 |
| 0055 | Inlet protection system (0104-18) | EACH | 7 | $229.04 | $232.60 | $50.00 | $100.00 | $475.00 | $75.00 |
| 0060 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $68,473 | $30,000 | $91,000 | $10,000 | $72,873 | $9,500.00 |
| 0065 | Removal of existing concrete (0110-4-10) | SY | 311 | $76.93 | $38.90 | $85.00 | $40.00 | $45.00 | $25.00 |
| 0070 | Mailbox, F&I single (0110-7-1) | EACH | 6 | $838.83 | $800.00 | $200.00 | $500.00 | $750.00 | $350.00 |
| 0075 | Tree root and branch pruning (0110-22) | EACH | 6 | $423.81 | $1,080.00 | $700.00 | $1,000.00 | $3,000.00 | $650.00 |
| 0080 | Regular excavation (0120-1) | CY | 305 | $84.81 | $75.00 | $55.00 | $10.00 | $45.00 | $25.00 |
| 0085 | Embankment (0120-6) | CY | 378.40 | $70.61 | $30.00 | $42.00 | $10.00 | $65.00 | $25.00 |
| 0090 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 417 | $38.48 | $27.00 | $20.00 | $30.00 | $44.00 | $35.00 |
| 0095 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 34.40 | $825.00 | $550.00 | $800.00 | $400.00 | $955.00 | $600.00 |
| 0100 | Inlets, DT bot, type D, modify (0425-1549) | EACH | 1 | $5,703.35 | $14,000 | $7,500.00 | $6,000.00 | $5,630.00 | $12,000 |
| 0105 | Manhole, adjust (0425-5) | EACH | 1 | $1,209.25 | $1,500.00 | $1,000.00 | $3,000.00 | $775.00 | $8,500.00 |
| 0110 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 12 | $179.55 | $600.00 | $700.00 | $500.00 | $405.00 | $141.00 |
| 0115 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 8 | $462.74 | $900.00 | $700.00 | $500.00 | $350.00 | $500.00 |
| 0120 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 1 | $2,367.40 | $4,500.00 | $1,800.00 | $4,000.00 | $2,750.00 | $4,500.00 |
| 0125 | Mitered end section, optional round, 30" CD (0430-982133) | EACH | 1 | $2,367.40 | $7,300.00 | $1,800.00 | $6,000.00 | $3,750.00 | $4,500.00 |
| 0130 | Concrete curb & gutter, type F (0520-1-10) | LF | 25 | $56.55 | $175.00 | $95.00 | $100.00 | $75.00 | $40.00 |
| 0135 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 1,582 | $45.33 | $100.00 | $82.00 | $125.00 | $95.00 | $70.00 |
| 0140 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 555 | $85.85 | $100.00 | $92.00 | $125.00 | $112.00 | $95.00 |
| 0145 | Concrete ditch pavement, 4", reinforced (0524-1-29) | SY | 36 | $128.36 | $150.00 | $85.00 | $300.00 | $125.00 | $115.00 |
| 0150 | Detectable warnings (0527-2) | SF | 142 | $28.19 | $50.00 | $35.00 | $100.00 | $75.00 | $35.00 |
| 0155 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 14.60 | $126.65 | $177.00 | $300.00 | $500.00 | $555.00 | $275.00 |
| 0160 | Bedding stone (0530-74) | TN | 10.40 | $292.11 | $367.50 | $300.00 | $400.00 | $285.00 | $192.00 |
| 0165 | Fencing, type A, 0.0-5.0', standard (0550-10110) | LF | 654 | $18.40 | $15.15 | $20.00 | $35.00 | $43.00 | $30.00 |
| 0170 | Fence gate, type A, double, 12.1- 18.0' opening (0550-60123) | EACH | 1 | $1,725.00 | $1,590.00 | $1,950.00 | $6,500.00 | $2,550.00 | $1,500.00 |
| 0175 | Performance turf, sod (0570-1-2) | SY | 2,350 | $4.70 | $12.00 | $5.00 | $12.00 | $8.50 | $6.00 |
| 0180 | Plastic erosion mat, turf reinforced mat, type 1 (0571-1-11) | SY | 497 | $15.88 | $13.35 | $14.00 | $25.00 | $15.00 | $3.50 |
| 0185 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 20 | $603.75 | $581.50 | $600.00 | $800.00 | $983.00 | $510.00 |
| 0190 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 2 | $2,242.50 | $1,400.00 | $1,250.00 | $1,700.00 | $3,555.00 | $1,800.00 |
| 0195 | Single column ground sign assembly, relocate (0700-1500) | EACH | 4 | $287.50 | $349.00 | $185.00 | $400.00 | $215.00 | $750.00 |
| 0200 | Single column ground sign assembly, remove (0700-1600) | EACH | 15 | $57.50 | $23.25 | $40.00 | $200.00 | $265.00 | $300.00 |
| 0205 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 2 | $86.25 | $145.40 | $65.00 | $400.00 | $238.00 | $750.00 |
| 0210 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 1 | $40.25 | $58.20 | $65.00 | $100.00 | $150.00 | $300.00 |
| 0215 | Painted pavement markings, surface (0710-90) | LS | 1 | $3,737.50 | $2,330.00 | $2,560.00 | $4,000.00 | $6,350.00 | $3,000.00 |
| 0220 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 379 | $5.75 | $7.00 | $8.00 | $10.00 | $4.75 | $7.00 |
| 0225 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 64 | $8.05 | $13.95 | $12.00 | $10.00 | $8.17 | $12.00 |
| 0230 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 192 | $18.40 | $29.05 | $19.00 | $25.00 | $39.00 | $25.00 |
| 0235 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.00 | $23,000 | $11,600 | $9,500.00 | $30,000 | $9,732.00 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.