FDOT contract T5868 bid tabulation
SR A1A FROM HIDDEN COVE DR TO SEA DUNES DR. Let by Florida DOT on February 25, 2026, Brevard, District 5. 11 bids received; low bid $149,377 by Concept Construction and Demoli.
- Owner
- Florida DOT
- Letting
- 25 FEB 2026
- Pay items
- 32
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Concept Construction and Demoli | $149,377 | Low |
| 2 | Yoroca Engineering Contractors, LLC | $149,964 | 0.0% |
| 3 | WT Comp Inc. | $194,842 | +30% |
| 4 | Lakeview Contracting, Inc. | $210,944 | +41% |
| 5 | Blacktip Services Incorporated | $229,722 | +54% |
| 6 | Estep Construction, Inc. | $238,056 | +59% |
| 7 | American Design Engineering Construction Inc. | $248,149 | +66% |
| 8 | Garcia Civil Contractors | $254,893 | +71% |
| 9 | Higher Ground Land Services, LL | $263,024 | +76% |
| 10 | Aj General Construction Services, Inc. | $317,680 | +113% |
| 11 | Rogar Management & Consulting of Florida LLC | $509,206 | +241% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Concept Construction and Demoli | 2. Yoroca Engineering Contractors, LLC | 3. WT Comp Inc. | 4. Lakeview Contracting, Inc. | 5. Blacktip Services Incorporated | 6. Estep Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $6,500.00 | $20,000 | $20,162 | $15,000 | $27,000 | $32,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $4,000.00 | $5,000.00 | $9,707.50 | $35,000 | $5,000.00 | $16,000 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $1,500.00 | $3,000.00 | $1,210.00 | $19,000 | $1,000.00 | $5,500.00 |
| 0020 | Work zone sign (0102-60) | ED | 3,068 | $0.30 | $0.10 | $0.36 | $0.35 | $0.35 | $3.00 |
| 0025 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 216 | $40.00 | $27.50 | $121.00 | $85.00 | $82.00 | $100.00 |
| 0030 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 8,208 | $0.14 | $0.10 | $0.31 | $0.15 | $0.15 | $0.50 |
| 0035 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 48,440 | $0.05 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 252 | $20.00 | $15.00 | $24.20 | $15.00 | $12.00 | $55.00 |
| 0045 | Sediment barrier (0104-10-3) | LF | 332 | $0.90 | $10.00 | $2.51 | $5.00 | $5.00 | $5.00 |
| 0050 | Litter removal (0107-1) | ACRE | 1.12 | $150.00 | $10.00 | $108.76 | $250.00 | $100.00 | $2,500.00 |
| 0055 | Mowing (0107-2) | ACRE | 0.57 | $150.00 | $10.00 | $163.14 | $500.00 | $100.00 | $3,500.00 |
| 0060 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $9,000.00 | $3,000.00 | $4,627.81 | $3,500.00 | $36,835 | $10,000 |
| 0065 | Regular excavation (0120-1) | CY | 14.80 | $35.00 | $50.00 | $58.34 | $110.00 | $80.00 | $75.00 |
| 0070 | Embankment (0120-6) | CY | 12.60 | $50.00 | $50.00 | $86.11 | $100.00 | $50.00 | $100.00 |
| 0075 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 2 | $12,500 | $10,000 | $6,447.50 | $9,800.00 | $9,000.00 | $12,500 |
| 0080 | French drain, 18" (0443-70-3) | LF | 100 | $270.00 | $249.00 | $293.42 | $200.00 | $435.00 | $285.00 |
| 0085 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 175 | $75.00 | $120.00 | $97.88 | $85.00 | $80.00 | $110.00 |
| 0090 | Detectable warnings (0527-2) | SF | 130 | $15.00 | $19.00 | $32.37 | $50.00 | $35.00 | $55.00 |
| 0095 | Performance turf, sod (0570-1-2) | SY | 143 | $7.00 | $5.00 | $10.00 | $20.00 | $12.00 | $8.00 |
| 0100 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 0105 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 8 | $700.00 | $700.00 | $756.25 | $600.00 | $770.00 | $400.00 |
| 0110 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 4 | $2,350.00 | $1,400.00 | $5,445.00 | $2,200.00 | $2,700.00 | $500.00 |
| 0115 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $50.00 | $150.00 | $363.00 | $2,050.00 | $330.00 | $300.00 |
| 0120 | Raised pavement marker, type B (0706-1-3) | EACH | 4 | $15.00 | $10.00 | $12.10 | $10.00 | $11.00 | $35.00 |
| 0125 | Painted pavement markings, surface (0710-90) | LS | 1 | $5,000.00 | $2,300.00 | $3,025.00 | $6,500.00 | $5,500.00 | $4,500.00 |
| 0130 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 310 | $4.00 | $3.00 | $6.05 | $6.50 | $11.00 | $12.00 |
| 0135 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 71 | $8.00 | $5.00 | $12.10 | $8.50 | $13.00 | $15.00 |
| 0140 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 12 | $250.00 | $160.00 | $242.00 | $225.00 | $275.00 | $225.00 |
| 0145 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 132 | $18.00 | $25.00 | $30.25 | $21.50 | $22.00 | $18.00 |
| 0150 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.03 | $20,000 | $8,000.00 | $6,050.00 | $25,000 | $8,800.00 | $3,500.00 |
| 0155 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.03 | $20,000 | $8,000.00 | $6,050.00 | $28,000 | $8,800.00 | $3,500.00 |
| 0160 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 67 | $65.00 | $19.00 | $24.20 | $10.00 | $77.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of February 25, 2026. Compiled by Mirage Metrics.