Aj General Construction Services, Inc.: FDOT bid record

Aj General Construction Services, Inc. submitted 24 bids on Florida DOT contracts in the data, from 25 AUG 2021 to 25 MAR 2026, and was the low bidder on 5 of them (21%). When it was not low, its total sat a median +32% above the low bid.

Owner
Florida DOT
Low bid volume
$2,741,422
Latest bid
25 MAR 2026
Data through
28 OCT 2026
24Bids
5Low bids
21Win rate, percent
+32%Median gap to the low bid when not low, 19 bids

By year

YearBidsLow bidsWin rate
2021300%
202213431%
2023400%
2024100%
20263133%
Aj General Construction Services, Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 1700%
District 37114%
District 26350%
District 5300%
District 711100%
Aj General Construction Services, Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Work zone sign0102-60ED218 (38%)$0.35$0.25
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED218 (38%)$0.20$0.13
Inlet protection system0104-18EACH137 (54%)$200.00$150.00
Portable changeable message sign, temporary0102-99ED206 (30%)$16.50$12.00
Artificial coverings /rolled erosion control products0104-1SY76 (86%)$2.75$6.00
Type III barricade0102-115ED145 (36%)$0.56$0.34
Detectable warnings0527-2SF135 (38%)$29.70$35.00
Concrete curb & gutter, type F0520-1-10LF105 (50%)$44.00$42.32
Arrow board / advance warning arrow panel0102-76ED85 (63%)$8.93$5.90
Removal of existing concrete0110-4-10SY174 (24%)$37.03$33.96
Regular excavation0120-1CY164 (25%)$58.44$25.47
Raised pavement marker, type B0706-1-3EACH124 (33%)$5.81$5.00
Aj General Construction Services, Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Aj General Construction Services, Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
25 MAR 2026T1928District 1SR 544 FROM LAKE BLUE DR TO 26TH ST NW6 of 10$1,407,980+18%
25 FEB 2026T5868District 5SR A1A FROM HIDDEN COVE DR TO SEA DUNES DR10 of 11$317,680+113%
28 JAN 2026T7580District 7SR 574 (W REYNOLDS ST) FROM E OF SR 39 TO W OF US 921 of 4$809,030Low, 46% under the second
27 MAR 2024T1854District 1SR 45 (US 41 BUSINESS) FROM 6TH AVE 2 TO MANATEE AVE W2 of 3$1,309,703+3.0%
06 DEC 2023T1884District 1SR 17, AT HILLCREST AVE2 of 4$1,292,522+9.0%
24 MAY 2023T3773District 3CLARA AVE2 of 2$688,117+24%
22 FEB 2023T3687District 3CR 274 (BARACK OBAMA BLVD)8 of 8$1,424,703+60%
22 FEB 2023T3784District 3HORSE BARN RD2 of 2$1,154,776+39%
16 NOV 2022T2882District 2SR 122 (GOLFAIR BLVD)2 of 2$1,337,089+4.0%
26 OCT 2022T5765District 5SR 405 of 5$1,693,121+58%
31 AUG 2022T2887District 2SR 5 (US 17)1 of 1$782,704Low
31 AUG 2022T2923District 2SR 13 (SAN JOSE BLVD)1 of 4$212,969Low, 8.0% under the second
31 AUG 2022T3833District 3SR 971 of 3$192,351Low, 44% under the second
27 JUL 2022T1845District 1SR 805 of 5$2,813,212+99%
27 JUL 2022T3750District 3SR 30 (US 98B)2 of 2$1,657,405+68%
15 JUN 2022T2877District 2SR 212 (US 90) (BEACH BLVD)1 of 3$744,369Low, 20% under the second
08 JUN 2022T2867District 2SR 2074 of 6$573,822+32%
25 MAY 2022T3801District 3SR 43 of 3$853,257+142%
30 MAR 2022T1831District 1SR 784 of 5$2,044,392+47%
30 MAR 2022T5726District 5SR A1A2 of 6$1,080,570+2.0%
23 FEB 2022T1828District 1SR 452 of 3$671,689+20%
08 DEC 2021T3598District 3CR 296 (SAUFLEY FIELD RD) AND SR 296 (MICHIGAN AVE)3 of 4$1,689,082+17%
25 AUG 2021T1771District 1EDGEWOOD DR N4 of 6$1,104,743+26%
25 AUG 2021T2851District 2SR 25 (US 41)6 of 7$406,410+74%
Aj General Construction Services, Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy