Wrangler Construction Inc.: FDOT bid record
Wrangler Construction Inc. submitted 20 bids on Florida DOT contracts in the data, from 27 FEB 2019 to 26 AUG 2026, and was the low bidder on 1 of them (5%). When it was not low, its total sat a median +50% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $140,340
- Latest bid
- 26 AUG 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 3 | 0 | 0% |
| 2020 | 7 | 1 | 14% |
| 2021 | 3 | 0 | 0% |
| 2022 | 3 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 1 | 5 | 1 | 20% |
| District 2 | 4 | 0 | 0% |
| District 3 | 3 | 0 | 0% |
| District 4 | 3 | 0 | 0% |
| District 7 | 2 | 0 | 0% |
| District 5 | 2 | 0 | 0% |
| District 6 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Removal of existing concrete | 0110-4-10 | SY | 16 | 6 (38%) | $23.59 | $33.96 |
| Channelizing device- pedestrian LCD (longitudinal channelizing device) | 0102-74-8 | FD | 13 | 4 (31%) | $0.13 | $0.07 |
| Inlet protection system | 0104-18 | EACH | 11 | 4 (36%) | $126.19 | $150.00 |
| Sediment barrier | 0104-10-3 | LF | 14 | 3 (21%) | $2.42 | $2.60 |
| Thermoplastic, standard, solid, 12" for crosswalk and roundabout | 0711-11123 | LF | 13 | 3 (23%) | $5.00 | $3.25 |
| Work zone sign | 0102-60 | ED | 17 | 2 (12%) | $0.43 | $0.25 |
| Performance turf, sod | 0570-1-2 | SY | 16 | 2 (13%) | $6.30 | $5.00 |
| Thermoplastic, standard, solid, 24" for stop line and crosswalk | 0711-11125 | LF | 14 | 2 (14%) | $12.62 | $6.09 |
| Concrete curb & gutter, type F | 0520-1-10 | LF | 9 | 2 (22%) | $37.86 | $42.32 |
| Single post sign, relocate | 0700-1-50 | AS | 9 | 2 (22%) | $250.00 | $250.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 17 | 1 (6%) | $0.24 | $0.13 |
| Detectable warnings | 0527-2 | SF | 16 | 1 (6%) | $27.91 | $35.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| CDM Contracting, Inc. | 5 | 5 of 5 |
| Leon America Construction | 5 | 4 of 5 |
| American Design Engineering Construction Inc. | 5 | 3 of 5 |
| Rogar Management & Consulting of Florida LLC | 4 | 3 of 4 |
| DB Civil Construction, LLC | 4 | 1 of 4 |
| Burnett Civil Contracting of FL | 3 | 3 of 3 |
| West To West Construction, LLC | 3 | 3 of 3 |
| Heavy Civil Inc | 3 | 3 of 3 |
| Las Contracting Corp | 3 | 3 of 3 |
| Aj General Construction Services, Inc. | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | T1948 | District 1 | AT CENTRAL ELEMENTARY | 7 of 10 | $1,130,014 | +54% |
| 26 AUG 2026 | T7613 | District 7 | SR 55 (US 19 / COMMERCIAL WAY) FROM APPLEGATE DR TO E TRENTON AVE | 7 of 10 | $1,516,737 | +50% |
| 29 JUL 2026 | T2A72 | District 2 | SR 200 (US 441 / N MLK MEMORIAL HWY) FROM NW 125TH STREET TO W OF | 9 of 9 | $423,239 | +185% |
| 24 SEP 2025 | T4752 | District 4 | SR 858 HALLANDALE BEACH BLVD FROM E OF SR 7 (US 441) TO SW.. | 5 of 5 | $566,072 | +102% |
| 26 OCT 2022 | T5765 | District 5 | SR 40 | 2 of 5 | $1,213,480 | +14% |
| 30 MAR 2022 | T1831 | District 1 | SR 78 | 5 of 5 | $2,225,803 | +60% |
| 30 MAR 2022 | T5726 | District 5 | SR A1A | 3 of 6 | $1,095,308 | +4.0% |
| 28 APR 2021 | T6524 | District 6 | SR 969/MILAM DAIRY RD/NW 72 AVE | 4 of 6 | $885,650 | +17% |
| 31 MAR 2021 | T3682 | District 3 | SR 81 | 3 of 4 | $392,687 | +13% |
| 27 JAN 2021 | T1791 | District 1 | SR 17 | 3 of 6 | $776,669 | +27% |
| 26 AUG 2020 | T3700 | District 3 | SR 30 (US 98B) | 4 of 5 | $1,166,487 | +72% |
| 26 AUG 2020 | T4528 | District 4 | SR 5 (US 1) | 4 of 4 | $725,167 | +32% |
| 29 JUL 2020 | T2776 | District 2 | SR 20 | 4 of 4 | $309,956 | +56% |
| 29 JUL 2020 | T2780 | District 2 | SR 121 | 7 of 9 | $409,308 | +72% |
| 29 JUL 2020 | T4553 | District 4 | NE 5TH AVE | 6 of 6 | $586,481 | +35% |
| 10 JUN 2020 | T1776 | District 1 | CONNECTICUT ST | 1 of 2 | $140,340 | Low, 6.0% under the second |
| 29 APR 2020 | T7452 | District 7 | PLEASANT GROVE ELEMENTARY SIDEWALK | 5 of 7 | $656,763 | +23% |
| 28 AUG 2019 | T2745 | District 2 | SR 26 | 5 of 6 | $272,728 | +82% |
| 12 JUN 2019 | T3726 | District 3 | SR 30 (FRONT BEACH RD) | 3 of 4 | $904,905 | +12% |
| 27 FEB 2019 | T1743 | District 1 | NORTH HICKORY ST | 3 of 3 | $248,190 | +79% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.