FDOT contract T7613 bid tabulation
SR 55 (US 19 / COMMERCIAL WAY) FROM APPLEGATE DR TO E TRENTON AVE. Let by Florida DOT on August 26, 2026, Hernando, District 7. 10 bids received; low bid $1,011,974 by Leon America Construction.
- Owner
- Florida DOT
- Letting
- 26 AUG 2026
- Pay items
- 65
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Leon America Construction | $1,011,974 | Low |
| 2 | Yoroca Engineering Contractors, LLC | $1,279,095 | +26% |
| 3 | Blacktip Services Incorporated | $1,330,943 | +32% |
| 4 | Alexander Design + Build, LLC | $1,351,053 | +34% |
| 5 | Vector Paving LLC | $1,357,516 | +34% |
| 6 | Environmental Land Development | $1,430,686 | +41% |
| 7 | Wrangler Construction Inc. | $1,516,737 | +50% |
| 8 | Maer Homes, LLC | $1,524,517 | +51% |
| 9 | Estep Construction, Inc. | $1,584,759 | +57% |
| 10 | American Design Engineering Construction Inc. | $1,680,898 | +66% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Leon America Construction | 2. Yoroca Engineering Contractors, LLC | 3. Blacktip Services Incorporated | 4. Alexander Design + Build, LLC | 5. Vector Paving LLC | 6. Environmental Land Development |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $140,000 | $100,000 | $111,000 | $143,500 | $215,675 | $136,100 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $80,000 | $25,000 | $18,000 | $115,000 | $106,962 | $110,113 |
| 0015 | Work zone sign (0102-60) | ED | 5,700 | $0.20 | $0.19 | $0.32 | $0.52 | $0.37 | $0.30 |
| 0020 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 38,950 | $0.10 | $0.10 | $0.13 | $0.33 | $0.14 | $0.14 |
| 0025 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 3,800 | $0.11 | $0.10 | $0.11 | $0.20 | $0.10 | $0.07 |
| 0030 | Arrow board / advance warning arrow panel (0102-76) | ED | 190 | $5.00 | $10.00 | $10.50 | $15.60 | $6.45 | $5.75 |
| 0035 | Portable changeable message sign, temporary (0102-99) | ED | 394 | $10.00 | $15.00 | $21.00 | $8.00 | $14.18 | $14.00 |
| 0040 | Temporary signalization and maintenance, intersection (0102-104) | ED | 380 | $17.00 | $35.00 | $25.20 | $55.00 | $36.08 | $28.75 |
| 0045 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 380 | $13.00 | $35.00 | $27.30 | $55.00 | $37.79 | $28.75 |
| 0050 | Existing ITS maintenance (0102-112) | DA | 190 | $140.00 | $170.00 | $31.50 | $30.00 | $130.01 | $172.50 |
| 0055 | Portable regulatory, sign (0102-150-1) | ED | 380 | $4.40 | $10.00 | $10.50 | $6.50 | $5.80 | $7.00 |
| 0060 | Radar speed display unit (0102-150-2) | ED | 380 | $4.90 | $10.00 | $10.50 | $28.00 | $5.48 | $7.00 |
| 0065 | Artificial coverings /rolled erosion control products (0104-1) | SY | 113 | $7.50 | $5.00 | $10.00 | $5.85 | $17.03 | $17.75 |
| 0070 | Sediment barrier (0104-10-3) | LF | 2,487 | $2.50 | $5.00 | $2.80 | $3.50 | $4.51 | $3.25 |
| 0075 | Chemical treatment- powdered, for erosion control (0104-19) | SY | 113 | $46.00 | $55.00 | $10.00 | $7.75 | $69.48 | $17.75 |
| 0080 | Litter removal (0107-1) | ACRE | 34.26 | $24.00 | $1.00 | $40.00 | $260.00 | $85.10 | $150.00 |
| 0085 | Mowing (0107-2) | ACRE | 30.33 | $30.00 | $1.00 | $40.00 | $260.00 | $242.65 | $300.00 |
| 0090 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $80,000 | $40,000 | $156,800 | $31,200 | $19,098 | $146,200 |
| 0095 | Removal of existing concrete (0110-4-10) | SY | 68 | $40.00 | $20.00 | $55.00 | $39.00 | $50.07 | $125.00 |
| 0100 | Regular excavation (0120-1) | CY | 818.70 | $6.00 | $40.00 | $50.00 | $18.00 | $48.99 | $20.00 |
| 0105 | Embankment (0120-6) | CY | 1,139.50 | $9.00 | $40.00 | $20.00 | $37.00 | $44.93 | $45.00 |
| 0110 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 630 | $10.00 | $20.00 | $12.00 | $15.60 | $11.96 | $20.00 |
| 0115 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 51.90 | $158.00 | $250.00 | $288.00 | $325.00 | $369.44 | $615.00 |
| 0120 | Pipe culvert, optional material, round, 15"SD (0430-174115) | LF | 23 | $140.00 | $250.00 | $275.00 | $150.00 | $229.31 | $400.00 |
| 0125 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 13 | $180.00 | $250.00 | $275.00 | $169.00 | $344.13 | $415.00 |
| 0130 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 9 | $220.00 | $250.00 | $275.00 | $286.00 | $535.58 | $600.00 |
| 0135 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 2 | $220.00 | $250.00 | $275.00 | $423.00 | $1,933.08 | $2,150.00 |
| 0140 | Mitered end section, optional round, 15" CD (0430-982123) | EACH | 1 | $2,500.00 | $2,000.00 | $800.00 | $2,730.00 | $3,521.33 | $2,550.00 |
| 0145 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 1 | $3,000.00 | $2,000.00 | $800.00 | $2,990.00 | $3,786.88 | $2,550.00 |
| 0150 | Mitered end section, optional round, 15" SD (0430-984123) | EACH | 2 | $2,800.00 | $2,000.00 | $800.00 | $2,600.00 | $2,679.40 | $2,550.00 |
| 0155 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 2 | $2,800.00 | $2,000.00 | $800.00 | $3,640.00 | $3,676.11 | $2,550.00 |
| 0160 | Pipe handrail - guiderail, steel (0515-1-1) | LF | 743 | $180.00 | $220.00 | $72.00 | $148.00 | $67.85 | $90.00 |
| 0165 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 2,627 | $58.00 | $75.00 | $55.00 | $70.20 | $75.69 | $84.00 |
| 0170 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 154 | $63.00 | $80.00 | $68.00 | $98.80 | $127.36 | $140.00 |
| 0175 | Concrete ditch pavt, non reinforced, 3" (0524-1-1) | SY | 17 | $73.00 | $100.00 | $46.00 | $163.00 | $177.38 | $328.00 |
| 0180 | Detectable warnings (0527-2) | SF | 102 | $30.00 | $20.00 | $24.00 | $37.00 | $49.08 | $53.00 |
| 0185 | Performance turf, sod (0570-1-2) | SY | 11,345 | $2.80 | $4.50 | $4.50 | $5.00 | $8.18 | $6.50 |
| 0190 | Plastic erosion mat, turf reinforced mat, type 1 (0571-1-11) | SY | 2,192 | $10.00 | $20.00 | $6.45 | $9.00 | $9.15 | $9.50 |
| 0195 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0200 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 8 | $450.00 | $700.00 | $630.00 | $780.00 | $945.32 | $632.50 |
| 0205 | Single column ground sign assembly, relocate (0700-1500) | EACH | 11 | $300.00 | $550.00 | $315.00 | $500.00 | $591.85 | $373.75 |
| 0210 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 2 | $50.00 | $2,500.00 | $6,300.00 | $2,000.00 | $2,746.87 | $4,025.00 |
| 0215 | Raised pavement marker, type B (0706-1-3) | EACH | 15 | $4.80 | $5.00 | $10.50 | $10.00 | $5.95 | $23.00 |
| 0220 | Painted pavement markings, surface (0710-90) | LS | 1 | $8,000.00 | $10,000 | $2,625.00 | $15,000 | $2,140.71 | $3,615.00 |
| 0225 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 408 | $3.80 | $5.00 | $12.60 | $7.50 | $6.42 | $3.75 |
| 0230 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 82 | $7.00 | $6.00 | $12.60 | $20.00 | $11.89 | $7.50 |
| 0235 | Thermoplastic, standard, arrow (0711-11170) | EACH | 4 | $85.00 | $450.00 | $84.00 | $300.00 | $148.66 | $75.00 |
| 0240 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 12 | $5.00 | $10.00 | $17.85 | $35.00 | $9.51 | $5.50 |
| 0245 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 297 | $16.00 | $25.00 | $17.85 | $25.00 | $20.52 | $18.50 |
| 0250 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.00 | $5,500.00 | $10,000 | $8,400.00 | $15,000 | $35,680 | $10,000 |
| 0255 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.06 | $5,500.00 | $10,000 | $8,400.00 | $15,000 | $6,487.09 | $9,600.00 |
| 0260 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 16 | $1,200.00 | $1,250.00 | $3,274.00 | $1,350.00 | $1,728.47 | $1,600.00 |
| 0265 | Light pole complete, relocate (0715-68000) | EACH | 15 | $3,000.00 | $9,000.00 | $17,000 | $8,750.00 | $6,456.82 | $7,350.00 |
| 0270 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 15 | $650.00 | $1,400.00 | $1,575.00 | $1,500.00 | $962.00 | $775.00 |
| 0275 | Conduit, furnish & install, open trench (0630-2-11) | LF | 124 | $16.00 | $20.00 | $17.85 | $25.00 | $21.59 | $23.00 |
| 0280 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 541 | $33.00 | $45.00 | $36.75 | $70.00 | $49.04 | $40.50 |
| 0285 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 2 | $10.00 | $14,000 | $17,633 | $9,800.00 | $10,756 | $10,900 |
| 0290 | Fiber optic cable locator (0633-6) | DA | 160 | $151.00 | $170.00 | $158.00 | $235.00 | $128.86 | $200.00 |
| 0295 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 12 | $1,100.00 | $1,250.00 | $3,274.00 | $1,350.00 | $2,261.76 | $1,650.00 |
| 0300 | Aluminum signals pole, (0646-1-11) | EACH | 5 | $2,300.00 | $3,000.00 | $5,289.00 | $4,250.00 | $3,306.45 | $2,800.00 |
| 0305 | Aluminum signals pole, remove (0646-1-60) | EACH | 1 | $560.00 | $1,000.00 | $945.00 | $1,200.00 | $379.61 | $625.00 |
| 0310 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 5 | $1,000.00 | $2,000.00 | $1,002.00 | $2,250.00 | $1,241.04 | $1,150.00 |
| 0315 | Loop assembly, F&I, type F (0660-2106) | AS | 4 | $1,800.00 | $3,000.00 | $3,671.00 | $2,500.00 | $2,816.63 | $2,075.00 |
| 0320 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 5 | $430.00 | $1,500.00 | $1,039.00 | $1,500.00 | $429.20 | $400.00 |
| 0325 | Traffic controller assembly, modify only - no components added (0670-5710) | AS | 2 | $2,500.00 | $3,500.00 | $2,833.00 | $4,250.00 | $3,258.15 | $3,400.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.