FDOT contract T7613 bid tabulation

SR 55 (US 19 / COMMERCIAL WAY) FROM APPLEGATE DR TO E TRENTON AVE. Let by Florida DOT on August 26, 2026, Hernando, District 7. 10 bids received; low bid $1,011,974 by Leon America Construction.

Owner
Florida DOT
Letting
26 AUG 2026
Pay items
65
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Leon America Construction$1,011,974Low
2Yoroca Engineering Contractors, LLC$1,279,095+26%
3Blacktip Services Incorporated$1,330,943+32%
4Alexander Design + Build, LLC$1,351,053+34%
5Vector Paving LLC$1,357,516+34%
6Environmental Land Development$1,430,686+41%
7Wrangler Construction Inc.$1,516,737+50%
8Maer Homes, LLC$1,524,517+51%
9Estep Construction, Inc.$1,584,759+57%
10American Design Engineering Construction Inc.$1,680,898+66%
FDOT contract T7613: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Leon America Construction2. Yoroca Engineering Contractors, LLC3. Blacktip Services Incorporated4. Alexander Design + Build, LLC5. Vector Paving LLC6. Environmental Land Development
0005Mobilization (0101-1)LS1$140,000$100,000$111,000$143,500$215,675$136,100
0010Maintenance of traffic (0102-1)DA1$80,000$25,000$18,000$115,000$106,962$110,113
0015Work zone sign (0102-60)ED5,700$0.20$0.19$0.32$0.52$0.37$0.30
0020Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED38,950$0.10$0.10$0.13$0.33$0.14$0.14
0025Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD3,800$0.11$0.10$0.11$0.20$0.10$0.07
0030Arrow board / advance warning arrow panel (0102-76)ED190$5.00$10.00$10.50$15.60$6.45$5.75
0035Portable changeable message sign, temporary (0102-99)ED394$10.00$15.00$21.00$8.00$14.18$14.00
0040Temporary signalization and maintenance, intersection (0102-104)ED380$17.00$35.00$25.20$55.00$36.08$28.75
0045Temporary traffic detection and maintenance, intersection (0102-107-1)ED380$13.00$35.00$27.30$55.00$37.79$28.75
0050Existing ITS maintenance (0102-112)DA190$140.00$170.00$31.50$30.00$130.01$172.50
0055Portable regulatory, sign (0102-150-1)ED380$4.40$10.00$10.50$6.50$5.80$7.00
0060Radar speed display unit (0102-150-2)ED380$4.90$10.00$10.50$28.00$5.48$7.00
0065Artificial coverings /rolled erosion control products (0104-1)SY113$7.50$5.00$10.00$5.85$17.03$17.75
0070Sediment barrier (0104-10-3)LF2,487$2.50$5.00$2.80$3.50$4.51$3.25
0075Chemical treatment- powdered, for erosion control (0104-19)SY113$46.00$55.00$10.00$7.75$69.48$17.75
0080Litter removal (0107-1)ACRE34.26$24.00$1.00$40.00$260.00$85.10$150.00
0085Mowing (0107-2)ACRE30.33$30.00$1.00$40.00$260.00$242.65$300.00
0090Clearing & grubbing (0110-1-1)ACRE1$80,000$40,000$156,800$31,200$19,098$146,200
0095Removal of existing concrete (0110-4-10)SY68$40.00$20.00$55.00$39.00$50.07$125.00
0100Regular excavation (0120-1)CY818.70$6.00$40.00$50.00$18.00$48.99$20.00
0105Embankment (0120-6)CY1,139.50$9.00$40.00$20.00$37.00$44.93$45.00
0110Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY630$10.00$20.00$12.00$15.60$11.96$20.00
0115Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81)TN51.90$158.00$250.00$288.00$325.00$369.44$615.00
0120Pipe culvert, optional material, round, 15"SD (0430-174115)LF23$140.00$250.00$275.00$150.00$229.31$400.00
0125Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218)LF13$180.00$250.00$275.00$169.00$344.13$415.00
0130Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF9$220.00$250.00$275.00$286.00$535.58$600.00
0135Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF2$220.00$250.00$275.00$423.00$1,933.08$2,150.00
0140Mitered end section, optional round, 15" CD (0430-982123)EACH1$2,500.00$2,000.00$800.00$2,730.00$3,521.33$2,550.00
0145Mitered end section, optional round, 18" CD (0430-982125)EACH1$3,000.00$2,000.00$800.00$2,990.00$3,786.88$2,550.00
0150Mitered end section, optional round, 15" SD (0430-984123)EACH2$2,800.00$2,000.00$800.00$2,600.00$2,679.40$2,550.00
0155Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625)EACH2$2,800.00$2,000.00$800.00$3,640.00$3,676.11$2,550.00
0160Pipe handrail - guiderail, steel (0515-1-1)LF743$180.00$220.00$72.00$148.00$67.85$90.00
0165Concrete sidewalk and driveways, 4" thick (0522-1)SY2,627$58.00$75.00$55.00$70.20$75.69$84.00
0170Concrete sidewalk and driveways, 6" thick (0522-2)SY154$63.00$80.00$68.00$98.80$127.36$140.00
0175Concrete ditch pavt, non reinforced, 3" (0524-1-1)SY17$73.00$100.00$46.00$163.00$177.38$328.00
0180Detectable warnings (0527-2)SF102$30.00$20.00$24.00$37.00$49.08$53.00
0185Performance turf, sod (0570-1-2)SY11,345$2.80$4.50$4.50$5.00$8.18$6.50
0190Plastic erosion mat, turf reinforced mat, type 1 (0571-1-11)SY2,192$10.00$20.00$6.45$9.00$9.15$9.50
0195Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000$50,000
0200Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH8$450.00$700.00$630.00$780.00$945.32$632.50
0205Single column ground sign assembly, relocate (0700-1500)EACH11$300.00$550.00$315.00$500.00$591.85$373.75
0210Multi-column ground sign assembly, relocate (0700-2500)EACH2$50.00$2,500.00$6,300.00$2,000.00$2,746.87$4,025.00
0215Raised pavement marker, type B (0706-1-3)EACH15$4.80$5.00$10.50$10.00$5.95$23.00
0220Painted pavement markings, surface (0710-90)LS1$8,000.00$10,000$2,625.00$15,000$2,140.71$3,615.00
0225Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF408$3.80$5.00$12.60$7.50$6.42$3.75
0230Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF82$7.00$6.00$12.60$20.00$11.89$7.50
0235Thermoplastic, standard, arrow (0711-11170)EACH4$85.00$450.00$84.00$300.00$148.66$75.00
0240Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF12$5.00$10.00$17.85$35.00$9.51$5.50
0245Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF297$16.00$25.00$17.85$25.00$20.52$18.50
0250Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.00$5,500.00$10,000$8,400.00$15,000$35,680$10,000
0255Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.06$5,500.00$10,000$8,400.00$15,000$6,487.09$9,600.00
0260Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH16$1,200.00$1,250.00$3,274.00$1,350.00$1,728.47$1,600.00
0265Light pole complete, relocate (0715-68000)EACH15$3,000.00$9,000.00$17,000$8,750.00$6,456.82$7,350.00
0270Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH15$650.00$1,400.00$1,575.00$1,500.00$962.00$775.00
0275Conduit, furnish & install, open trench (0630-2-11)LF124$16.00$20.00$17.85$25.00$21.59$23.00
0280Conduit, furnish & install, directional bore (0630-2-12)LF541$33.00$45.00$36.75$70.00$49.04$40.50
0285Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI2$10.00$14,000$17,633$9,800.00$10,756$10,900
0290Fiber optic cable locator (0633-6)DA160$151.00$170.00$158.00$235.00$128.86$200.00
0295Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH12$1,100.00$1,250.00$3,274.00$1,350.00$2,261.76$1,650.00
0300Aluminum signals pole, (0646-1-11)EACH5$2,300.00$3,000.00$5,289.00$4,250.00$3,306.45$2,800.00
0305Aluminum signals pole, remove (0646-1-60)EACH1$560.00$1,000.00$945.00$1,200.00$379.61$625.00
0310Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS5$1,000.00$2,000.00$1,002.00$2,250.00$1,241.04$1,150.00
0315Loop assembly, F&I, type F (0660-2106)AS4$1,800.00$3,000.00$3,671.00$2,500.00$2,816.63$2,075.00
0320Pedestrian detector, furnish & install, standard (0665-1-11)EACH5$430.00$1,500.00$1,039.00$1,500.00$429.20$400.00
0325Traffic controller assembly, modify only - no components added (0670-5710)AS2$2,500.00$3,500.00$2,833.00$4,250.00$3,258.15$3,400.00
FDOT contract T7613: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way