FDOT letting results, August 26, 2026
20 contracts let by Florida DOT on August 26, 2026, $91,334,624 in low bids, a median of 5.5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 20
- Low bids, total
- $91,334,624
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T1940 | SR 25 (US 27) FROM SANTA MARIA WAY TO LAKE ISIS AVE | District 1 | 4 | Ajax Paving Industries of Florida LLC | $17,290,361 | $18,268,520 | +6.0% | FDOT |
| T1945 | SR 93 (I-75) AND I-275 FROM N OF US 301 TO N OF I-275 AND FROM S OF US 19 TO N OF | District 1 | 5 | Preferred Materials Inc. | $15,653,923 | $16,549,096 | +6.0% | FDOT |
| T4757 | SR 93 (I-75) FROM SR 869 (I-595) TO SR 25 (US 27) | District 4 | 12 | American Lighting and Signalization, LLC. | $6,106,000 | $6,241,763 | +2.0% | FDOT |
| T2A69 | SR 45 (US 27 / US 41) FROM SR 24 (ARCHER RD) TO S OF SR 26 (W NEWBERRY | District 2 | 4 | Watson Construction Company, LLC | $5,620,807 | $5,918,117 | +5.0% | FDOT |
| T2A77 | SR 53 (DUVAL AVE) FROM S OF SR 8 (I-10) TO LIVINGSTON ST | District 2 | 3 | Peavy & Son Construction Co., Inc. | $5,604,571 | $5,732,287 | +2.0% | FDOT |
| T7614 | SR 45 (US41) FROM WASHINGTON LN TO S OF COUNTY LINE RD | District 7 | 6 | Pigott Asphalt and Sitework LLC | $5,519,971 | $5,576,001 | +1.0% | FDOT |
| T5890 | SR 50 (SR 60 / US 17-92 / E COLONIAL DR) FROM IRVINGTON AVE TO MAGUIRE | District 5 | 6 | Watson Civil Construction, Inc. | $5,460,945 | $6,004,860 | +10% | FDOT |
| T3A32 | SR 10 (US 90) FROM END OF 4 LANE IN GRAND RIDGE TO APALACHICOLA RIVER | District 3 | 5 | Anderson Columbia Co., Inc. | $4,806,184 | $5,272,623 | +10% | FDOT |
| T3998 | SR 85/20 AND SR 397 FROM WOLVERINE TO EDGE AVE AND FROM SR 190 TO | District 3 | 3 | Anderson Columbia Co., Inc. | $4,722,952 | $5,179,330 | +10% | FDOT |
| T2A78 | SR 15 (US 1 / NEW KINGS RD) FROM TROUT RIVER BLVD TO SR 104 | District 2 | 3 | Duval Asphalt Products, Inc. | $4,074,392 | $4,086,676 | 0.0% | FDOT |
| T2A74 | SR 26 (W UNIVERSITY AVE) FROM SW 38TH ST TO GALE LEMERAND DR | District 2 | 3 | Preferred Materials Inc. | $3,511,852 | $3,978,256 | +13% | FDOT |
| T4773 | SR 713 TURNPIKE FEEDER RD / KINGS HWY) FROM N OF INDRIO RD TO US 1 | District 4 | 13 | Gerelco Traffic Controls, Inc. | $2,598,162 | $2,688,590 | +3.0% | FDOT |
| T4764 | SR 512 FROM E OF I-95 TO W OF 106TH AVE | District 4 | 9 | Ohla USA Inc | $2,295,224 | $2,456,988 | +7.0% | FDOT |
| T2A75 | SR 111 (TALLULAH AVE) FROM MONCRIEF CREEK BRIDGE TO SR 5 (US 17 / MAIN | District 2 | 5 | Preferred Materials Inc. | $2,092,518 | $2,164,000 | +3.0% | FDOT |
| T7604 | MIDDLE SCHOOL SIDEWALKS AT VARIOUS LOCATIONS AS SHOWN IN THE PLANS | District 7 | 9 | Leon America Construction | $1,554,537 | $1,697,037 | +9.0% | FDOT |
| T3947 | SR 30 (US 98) AT PALMS ST INTERSECTION | District 3 | 3 | Murdock Investments, LLC DBA Griffin Traffic Signals | $1,373,616 | $1,433,415 | +4.0% | FDOT |
| T7613 | SR 55 (US 19 / COMMERCIAL WAY) FROM APPLEGATE DR TO E TRENTON AVE | District 7 | 10 | Leon America Construction | $1,011,974 | $1,279,095 | +26% | FDOT |
| T7605 | SR 45 (US 41 / S FLORIDA AVE) FROM CR 480 TO E TOWER TR | District 7 | 12 | Leon America Construction | $894,226 | $1,078,070 | +21% | FDOT |
| T1948 | AT CENTRAL ELEMENTARY | District 1 | 10 | Leon America Construction | $731,641 | $844,714 | +15% | FDOT |
| T7624 | SR 93 (I-275), SR 690 AND SR 686 FROM SR 686 TO OLD TAMPA BAY, FROM SR 694 TO | District 7 | 7 | American Lighting and Signalization, LLC. | $410,768 | $457,305 | +11% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.