Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | American Lighting and Signalization, LLC. | $410,768 | Low |
| 2 | Traffic Control Products of Florida, Inc. | $457,305 | +11% |
| 3 | Chinchor Electric Inc. | $691,727 | +68% |
| 4 | New Era Electric Inc | $849,984 | +107% |
| 5 | Aum Construction Inc. | $1,073,950 | +161% |
| 6 | Blacktip Services Incorporated | $1,253,864 | +205% |
| 7 | American Design Engineering Construction Inc. | $1,388,160 | +238% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. American Lighting and Signalization, LLC. | 2. Traffic Control Products of Florida, Inc. | 3. Chinchor Electric Inc. | 4. New Era Electric Inc | 5. Aum Construction Inc. | 6. Blacktip Services Incorporated |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $9,559.31 | $5,365.00 | $16,025 | $42,687 | $25,000 | $27,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $9,559.00 | $5,365.00 | $16,025 | $42,687 | $40,000 | $27,000 |
| 0015 | Mobilization (0101-1) | LS | 1 | $9,559.00 | $5,365.00 | $16,025 | $42,687 | $25,000 | $27,000 |
| 0020 | Mobilization (0101-1) | LS | 1 | $9,559.00 | $5,365.00 | $16,025 | $42,687 | $60,000 | $27,000 |
| 0025 | Mobilization (0101-1) | LS | 1 | $9,559.00 | $5,365.00 | $16,025 | $42,687 | $60,000 | $27,000 |
| 0030 | Mobilization (0101-1) | LS | 1 | $9,559.00 | $5,365.00 | $16,025 | $42,687 | $25,000 | $27,000 |
| 0035 | Maintenance of traffic (0102-1) | DA | 1 | $3,290.15 | $21,425 | $11,931 | $11,775 | $10,000 | $25,000 |
| 0040 | Maintenance of traffic (0102-1) | DA | 1 | $6,580.31 | $21,425 | $14,806 | $21,275 | $40,000 | $25,000 |
| 0045 | Maintenance of traffic (0102-1) | DA | 1 | $6,580.31 | $21,425 | $49,148 | $56,350 | $10,000 | $25,000 |
| 0050 | Maintenance of traffic (0102-1) | DA | 1 | $11,516 | $21,425 | $50,162 | $58,650 | $80,000 | $25,000 |
| 0055 | Maintenance of traffic (0102-1) | DA | 1 | $16,451 | $21,425 | $41,213 | $63,250 | $70,000 | $25,000 |
| 0060 | Maintenance of traffic (0102-1) | DA | 1 | $4,112.69 | $21,425 | $20,154 | $39,100 | $10,000 | $25,000 |
| 0065 | Traffic control officer (0102-14) | HR | 120 | $134.49 | $150.00 | $230.00 | $45.00 | $100.00 | $90.00 |
| 0070 | Work zone sign (0102-60) | ED | 8,800 | $0.28 | $0.15 | $0.29 | $0.24 | $0.30 | $0.35 |
| 0075 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 21,600 | $0.16 | $0.05 | $0.16 | $0.14 | $0.25 | $0.15 |
| 0080 | Arrow board / advance warning arrow panel (0102-76) | ED | 240 | $6.76 | $0.70 | $5.75 | $5.30 | $12.00 | $11.00 |
| 0085 | Portable changeable message sign, temporary (0102-99) | ED | 592 | $13.52 | $1.35 | $13.80 | $10.00 | $15.00 | $22.00 |
| 0090 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $14,350 | $14,350 | $14,350 | $14,350 | $14,350 | $14,350 |
| 0095 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $8,200.00 | $8,200.00 | $8,200.00 | $8,200.00 | $8,200.00 | $8,200.00 |
| 0100 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 0105 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $15,450 | $15,450 | $15,450 | $15,450 | $15,450 | $15,450 |
| 0110 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $9,000.00 | $9,000.00 | $9,000.00 | $9,000.00 | $9,000.00 | $9,000.00 |
| 0115 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0120 | Conduit, furnish & install, open trench (0630-2-11) | LF | 10 | $20.64 | $11.80 | $146.21 | $15.77 | $200.00 | $105.00 |
| 0125 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 2 | $1,628.62 | $1,710.00 | $2,638.39 | $1,938.91 | $3,500.00 | $3,430.00 |
| 0130 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 126 | $1.91 | $2.70 | $4.17 | $13.92 | $25.00 | $36.00 |
| 0135 | Luminaire, install (0715-11300) | EACH | 79 | $346.93 | $450.25 | $718.75 | $1,219.40 | $1,000.00 | $2,968.00 |
| 0140 | Luminaire, relocate (0715-11400) | EACH | 1 | $416.32 | $580.00 | $1,437.50 | $1,704.24 | $1,500.00 | $4,000.00 |
| 0145 | Light pole complete, install (0715-67000) | EACH | 48 | $2,861.00 | $2,360.00 | $3,265.14 | $2,154.11 | $7,500.00 | $9,892.00 |
| 0150 | Light pole complete, relocate (0715-68000) | EACH | 1 | $10,044 | $8,750.00 | $10,070 | $5,371.05 | $7,500.00 | $18,000 |
| 0155 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 77 | $575.31 | $820.00 | $1,074.33 | $820.00 | $1,000.00 | $1,498.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.