FDOT contract T5890 bid tabulation

SR 50 (SR 60 / US 17-92 / E COLONIAL DR) FROM IRVINGTON AVE TO MAGUIRE. Let by Florida DOT on August 26, 2026, Orange, District 5. 6 bids received; low bid $5,460,945 by Watson Civil Construction, Inc..

Owner
Florida DOT
Letting
26 AUG 2026
Pay items
177
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Watson Civil Construction, Inc.$5,460,945Low
2Hubbard Construction Company$6,004,860+10%
3Ranger Construction Industries, Inc.$6,247,187+14%
4Granite Construction Company$6,329,266+16%
5Atlantic Civil Constructors Corp$6,489,479+19%
6Masci General Contractors, Inc$9,475,265+74%
FDOT contract T5890: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Watson Civil Construction, Inc.2. Hubbard Construction Company3. Ranger Construction Industries, Inc.4. Granite Construction Company5. Atlantic Civil Constructors Corp6. Masci General Contractors, Inc
0005Mobilization (0101-1)LS1$432,000$360,000$420,000$335,500$283,597$259,887
0010Mobilization (0101-1)LS1$54,000$155,000$190,000$181,500$292,961$259,887
0015Mobilization (0101-1)LS1$54,000$85,000$26,000$33,000$265,918$259,887
0020Maintenance of traffic (0102-1)DA1$574,000$1,326,809$120,000$301,440$167,951$75,889
0025Maintenance of traffic (0102-1)DA1$72,000$137,632$145,000$163,075$167,951$75,889
0030Maintenance of traffic (0102-1)DA1$72,000$86,830$40,000$29,650$164,751$75,889
0035Special detour- temporary pavement (0102-2200)SY1$18,600$38,190$12,400$22,600$66,758$97,854
0040Commercial material for temporary driveway maintenance (0102-3)CY71.50$110.00$394.54$119.00$160.00$96.00$214.00
0045Pedestrian or bicycle special detour (0102-4-1)SY1$9,700.00$37,931$4,250.00$4,900.06$4,994.55$28,872
0050Traffic control officer (0102-14)HR76$100.00$95.00$108.00$150.00$100.00$95.00
0055Work zone sign (0102-60)ED18,200$0.33$0.22$0.30$0.40$0.21$0.25
0060Business sign (0102-61)EACH22$23.00$25.81$31.30$46.00$25.00$251.00
0065Temporary barrier, F&I, low profile, concrete (0102-71-13)LF204$56.00$54.71$61.00$73.00$40.00$125.00
0070Temporary barrier, relocate, low profile concrete (0102-71-23)LF408$23.00$21.88$20.00$29.00$16.00$82.00
0075Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED36,145$0.16$0.10$0.10$0.20$0.10$0.20
0080Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD9,318$0.09$0.09$0.10$0.15$0.09$0.18
0085Temporary separator, F&I remove (0102-75-1)LF530$16.00$22.71$30.00$40.00$22.00$45.00
0090Arrow board / advance warning arrow panel (0102-76)ED467$7.00$5.16$6.30$9.00$5.00$20.00
0095Portable changeable message sign, temporary (0102-99)ED1,542$15.00$10.31$12.50$15.00$9.99$25.00
0100Temporary signalization and maintenance, intersection (0102-104)ED640$34.00$21.21$34.00$90.00$58.00$48.00
0105Temporary traffic detection and maintenance, intersection (0102-107-1)ED640$27.00$17.00$34.00$2.00$1.00$48.00
0110Type III barricade (0102-115)ED865$0.39$0.31$0.40$0.50$0.30$3.00
0115Removable tape, black, solid 6" (0102-913-11)GM0.98$11,800$15,054$17,400$12,600$11,500$18,750
0120Removable tape, black, 10'-30', 6'-10', or 2'-4' skip (0102-913-12)GM0.02$4,650.00$9,142.27$11,600$5,100.00$5,000.00$12,500
0125Removable tape, white, solid 6" (0102-913-21)GM0.98$11,800$15,054$17,400$12,600$11,500$18,750
0130Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22)GM0.02$4,650.00$9,142.27$11,600$5,100.00$5,000.00$12,500
0135Removable tape, white, symbol or arrow (0102-913-29)EACH2$511.00$603.41$695.00$550.00$500.00$750.00
0140Removable tape, yellow, solid, (0102-913-31)GM0.45$11,700$15,018$17,400$12,500$11,500$18,750
0145Removable tape, yellow, 10'-30', 9', 6'-10', or 2'-4' skip (0102-913-32)GM0.02$5,120.00$8,380.42$11,600$5,600.00$6,000.00$12,500
0150Sediment barrier (0104-10-3)LF278$2.15$4.63$13.00$10.00$5.83$7.00
0155Inlet protection system (0104-18)EACH19$156.00$191.48$260.00$210.00$127.71$254.00
0160Litter removal (0107-1)ACRE20.94$207.00$55.00$398.00$100.00$173.08$215.00
0165Mowing (0107-2)ACRE12.74$517.00$105.00$284.00$200.00$226.52$215.00
0170Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$2,100.00$3,750.00$13,400$25,000$30,000$35,781
0175Monitor existing structures- vibration monitoring (0108-2)LS1$16,500$6,850.00$14,500$20,000$10,000$25,224
0180Clearing & grubbing (0110-1-1)ACRE1$69,000$80,000$393,500$67,300$169,295$82,254
0185Clearing & grubbing (0110-1-1)ACRE1$8,500.00$40,000$215,000$36,400$148,964$82,254
0190Clearing & grubbing (0110-1-1)ACRE1$8,500.00$40,000$30,000$6,600.00$159,493$82,254
0195Removal of existing concrete (0110-4-10)SY1,999$26.00$27.93$48.00$31.00$45.83$58.00
0200Regular excavation (0120-1)CY232$23.00$35.61$40.00$25.00$374.71$75.00
0205Embankment (0120-6)CY18.30$15.00$2,161.37$78.00$125.00$548.46$215.00
0210Flowable fill (0121-70)CY573$463.00$190.70$235.00$200.00$214.52$554.00
0215Type B stabilization (0160-4)SY1,972$23.75$11.37$34.50$35.00$42.70$41.00
0220Optional base, base group 01 (0285-701)SY439$112.00$67.88$56.00$70.00$63.22$75.00
0225Optional base, base group 06 (0285-706)SY925$39.00$21.12$32.00$45.00$37.15$95.00
0230Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY3,867$11.25$5.62$9.50$15.00$6.00$7.00
0235Superpave asphaltic conc, traffic C (0334-1-13)TN216.50$345.00$226.45$265.00$390.00$250.00$258.00
0240Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN250.90$303.00$312.55$349.00$450.00$275.00$298.00
0245Miscellaneous asphalt (0339-1)TN1.40$2,140.00$626.74$1,870.00$2,100.00$700.00$9,884.00
0250Grinding concrete pavement (0352-70)SY439$8.00$116.83$102.00$42.00$90.00$55.00
0255Concrete pavement slab replacement (0353-70)CY108.60$1,275.00$2,853.92$1,990.00$1,550.00$2,211.00$727.00
0260Concrete class NS, gravity index 400-011 (0400-0-11)CY28.40$1,050.00$900.32$2,690.00$1,700.00$1,456.71$1,577.00
0265Inlets, curb, type 9, partial (0425-1205)EACH1$4,900.00$5,646.15$7,800.00$5,900.00$5,937.91$9,887.00
0270Inlets, curb, type P-5, <10' (0425-1351)EACH6$7,500.00$6,744.01$9,750.00$14,900$9,072.09$24,413
0275Inlets, curb, type P-5, partial (0425-1355)EACH1$3,800.00$5,504.85$12,000$6,000.00$4,631.46$11,772
0280Inlets, curb, type P-6, <10' (0425-1361)EACH2$8,300.00$7,324.47$13,100$16,400$9,989.17$25,998
0285Manholes, P-7, partial (0425-2-43)EACH1$3,600.00$5,368.16$8,490.00$4,900.00$5,472.15$10,115
0290Manholes, P-8, <10' (0425-2-61)EACH4$5,550.00$5,766.84$7,700.00$11,800$6,898.73$25,554
0295Manholes, J-8, <10' (0425-2-91)EACH20$8,400.00$9,920.45$10,800$16,000$9,303.80$25,889
0300Modify existing drainage structure (0425-11)EACH6$2,000.00$2,520.75$4,290.00$3,400.00$8,715.88$9,928.00
0305Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF31$100.00$173.26$244.00$790.00$236.11$799.00
0310Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF30$130.00$236.79$310.00$790.00$254.25$899.00
0315Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF94$142.00$578.80$242.00$450.00$164.90$715.00
0320Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF279$188.00$222.77$262.00$580.00$251.49$722.00
0325Pipe culvert, opt material, round, 36"S/CD (0430-175136)LF210$286.00$219.83$355.00$580.00$304.48$798.00
0330Pipe culvert, opt material, round, 42"S/CD (0430-175142)LF4$794.00$3,228.86$1,350.00$3,100.00$1,387.69$1,778.00
0335Pipe culvert,optional material,other-elip/arch, (0430-175218)LF132$139.00$107.92$205.00$240.00$146.61$798.00
0340Pipe culvert, opt material, shape - elip/arch, 36"S/CD (0430-175236)LF636$287.00$308.42$372.00$525.00$332.01$812.00
0345Pipe culvert, opt material, shape - elip/arch, 42"S/CD (0430-175242)LF4$932.00$1,874.16$1,650.00$3,400.00$1,717.30$2,247.00
0350Pipe culvert,optional material,round, jack & bore, 24", storm and cross drain (0430-185124)LF72$1,400.00$1,538.88$710.00$2,750.00$3,014.16$5,542.00
0355Trench drain, standard (0436-1-1)LF227$488.00$347.29$464.00$475.00$316.78$1,498.00
0360Sheet piling steel, temporary- critical (0455-133-2)SF6,781$100.00$32.85$49.00$42.00$119.59$259.00
0365Concrete curb & gutter, type F (0520-1-10)LF901$43.00$47.36$171.00$105.00$72.19$115.00
0370Concrete curb, type D (0520-2-4)LF360$44.00$26.26$151.00$98.00$57.93$118.00
0375Traffic separator - concrete, type II, 4' wide (0520-5-21)LF429$91.00$76.77$229.00$156.00$75.22$205.00
0380Traffic separator concrete- type IV, 4' wide (0520-5-41)LF18$119.00$78.79$284.00$362.00$219.71$425.00
0385Concrete traffic separator, special- variable width (0520-70)SY33$147.00$123.23$631.00$328.00$223.67$498.00
0390Concrete sidewalk and driveways, 4" thick (0522-1)SY478$82.00$75.76$195.00$146.00$76.72$115.00
0395Concrete sidewalk and driveways, 6" thick (0522-2)SY1,504$94.00$86.87$200.00$145.00$98.88$155.00
0400Detectable warnings (0527-2)SF182$47.00$36.36$45.30$73.00$137.80$78.00
0405Performance turf, sod (0570-1-2)SY912$9.50$10.75$9.40$22.00$18.75$12.00
0410Raised pavement marker, type B (0706-1-3)EACH886$5.10$5.58$6.40$7.00$5.00$6.94
0415Painted pavement markings, standard, white, solid, 6" (0710-11101)GM0.20$2,450.00$1,718.24$1,970.00$3,360.00$2,500.00$2,125.00
0420Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF11$5.10$5.03$5.80$7.00$5.00$6.25
0425Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM0.41$1,510.00$1,010.61$1,160.00$2,060.00$1,500.00$1,250.00
0430Painted pavement markings, standard, white, arrows (0710-11170)EACH13$77.00$40.23$46.30$105.00$75.00$50.00
0435Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.19$2,520.00$1,683.06$1,970.00$3,460.00$2,500.00$2,125.00
0440Painted pavement markings, standard,black, skip, 6" (0710-11331)GM0.41$1,505.00$1,010.61$1,160.00$2,060.00$1,500.00$1,250.00
0445Thermoplastic, standard, arrow (0711-11170)EACH1$154.00$120.68$139.00$216.00$150.00$150.00
0450Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF1,832$1.85$2.31$2.70$3.00$1.80$2.88
0455Initial contingency amount, DO not bid (0999-25)LS1$30,561$30,561$30,561$30,561$30,561$30,561
0460Initial contingency amount, DO not bid (0999-25)LS1$16,430$16,430$16,430$16,430$16,430$16,430
0465Local agency initial amount (DO not bid) (0999-26)LS1$3,008.90$3,008.90$3,008.90$3,008.90$3,008.90$3,008.90
0470Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH4$1,050.00$839.08$825.00$900.00$718.70$1,283.75
0475Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH4$2,600.00$2,246.34$2,080.00$3,960.00$1,812.44$3,207.50
0480Single column ground sign assembly, relocate (0700-1500)EACH1$507.00$156.96$457.00$4,400.00$397.69$625.00
0485Single column ground sign assembly, remove (0700-1600)EACH9$76.00$78.48$70.00$99.00$60.75$93.75
0490Object marker, type 1 (0705-10-1)EACH4$358.00$137.68$403.00$468.00$350.00$268.75
0495Delineator, flexible tubular (0705-11-1)EACH1$154.00$221.57$272.00$198.00$150.00$268.75
0500Raised pavement marker, type B (0706-1-3)EACH388$5.15$5.58$6.40$7.00$5.00$6.94
0505Painted pavement markings, surface (0710-90)LS1$2,560.00$2,262.76$2,610.00$3,510.00$3,750.00$2,812.50
0510Painted pavement markings, surface (0710-90)LS1$5,120.00$4,123.26$4,750.00$7,110.00$5,000.00$5,125.00
0515Painted pavement markings, surface (0710-90)LS1$2,570.00$1,568.85$1,810.00$3,510.00$3,750.00$1,950.00
0520Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF355$6.15$4.02$4.60$7.00$6.00$5.00
0525Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF224$12.30$8.05$9.30$14.00$12.00$10.00
0530Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.13$6,320.00$2,905.32$3,240.00$6,900.00$6,500.00$3,500.00
0535Thermoplastic, standard, message or symbol (0711-11160)EACH4$307.00$201.14$232.00$350.00$300.00$250.00
0540Thermoplastic, standard, arrow (0711-11170)EACH12$154.00$120.68$139.00$175.00$150.00$150.00
0545Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF10$10.25$6.03$7.00$13.00$10.00$7.50
0550Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.02$3,700.00$3,128.89$3,240.00$4,200.00$6,500.00$3,500.00
0555Thermoplastic, preformed, white, solid, 12" for crosswalk (0711-14123)LF120$15.40$10.56$12.20$20.00$15.00$13.13
0560Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF151$30.70$14.28$16.50$35.00$30.00$17.75
0565Thermoplastic, preformed, white, 2-4 dotted guideline on concrete surfaces (0711-14141)GM0.05$23,700$73,749$91,800$27,000$25,000$99,000
0570Thermoplastic, preformed, yellow, 2-4 dotted guideline on concrete surfaces (0711-14241)GM0.06$25,600$79,649$91,800$29,000$25,000$99,000
0575Thermoplastic, preformed, black, 2-4 dotted guideline on concrete surfaces (0711-14341)GM0.05$2,370.00$73,749$91,800$27,000$25,000$99,000
0580Thermoplastic, preformed, 24" white with 4" black contrast crosswalk on concrete pavement, 32" (0711-14526)LF659$31.00$28.16$32.40$35.00$30.00$35.00
0585Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527)LF158$31.00$28.16$32.40$35.00$30.00$35.00
0590Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528)LF791$16.40$14.08$16.20$20.00$16.00$17.50
0595Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570)EACH23$613.00$351.99$405.00$675.00$600.00$437.50
0600Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM1.34$7,650.00$5,547.76$6,370.00$8,500.00$7,500.00$6,875.00
0605Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.52$4,520.00$2,115.99$2,430.00$4,800.00$4,500.00$2,625.00
0610Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.79$7,670.00$5,531.20$6,370.00$8,200.00$7,500.00$6,875.00
0615Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF4,833$1.85$2.31$2.70$2.00$1.80$2.88
0620Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.58$15,200$22,472$26,200$17,800$15,000$28,255
0625Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.58$15,200$22,472$26,200$17,800$15,000$28,255
0630Conduit, furnish & install, open trench (0630-2-11)LF219$18.60$18.50$25.10$47.00$34.00$28.65
0635Conduit, furnish & install, directional bore (0630-2-12)LF641$43.50$43.06$63.00$80.00$57.50$71.79
0640Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$19,300$19,179$16,500$25,900$18,497$18,822
0645Signal cable, remove- intersection (0632-7-6)PI1$1,900.00$1,818.57$5,420.00$2,250.00$1,635.00$6,195.00
0650Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH30$2,270.00$1,237.96$2,080.00$1,800.00$1,278.00$2,376.90
0655Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH3$3,370.00$2,330.57$3,170.00$4,860.00$3,445.00$3,616.55
0660Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$3,900.00$3,876.36$5,670.00$9,720.00$6,925.00$6,481.59
0665Electrical power service, remove underground (0639-1620)AS1$1,060.00$1,054.22$903.00$1,530.00$1,066.00$1,032.50
0670Electrical service wire, & install (0639-2-1)LF208$13.40$13.30$7.70$12.00$8.05$8.78
0675Electrical service disconnect, F&I, pole mount (0639-3-11)EACH1$1,620.00$1,607.72$2,300.00$3,600.00$2,555.00$2,630.41
0680Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,800.00$2,768.36$2,620.00$3,330.00$2,378.00$2,994.73
0685Prestressed concrete pole, shallow pole removal- pole 30' and greater (0641-2-70)EACH4$5,400.00$5,341.13$12,100$25,020$17,880$13,865
0690Aluminum signals pole, (0646-1-11)EACH10$2,150.00$2,116.47$4,380.00$3,960.00$2,851.00$5,000.15
0695Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH3$87,300$86,926$102,800$95,511$85,492$117,435
0700Steel mast arm assembly, and install, single arm 78' (0649-21-21)EACH1$104,500$104,005$110,800$125,790$98,462$126,639
0705Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS22$1,750.00$1,735.90$2,350.00$2,250.00$1,588.00$2,681.06
0710Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS2$2,810.00$2,789.91$3,510.00$3,780.00$2,674.00$4,006.24
0715Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS10$1,020.00$1,008.37$1,310.00$1,260.00$919.00$1,498.94
0720Loop assembly, F&I, type F (0660-2106)AS2$1,900.00$1,850.60$1,970.00$1,710.00$1,234.00$2,255.38
0725Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH1$12,400$12,297$11,700$15,200$10,849$13,373
0730Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH8$13,700$13,527$11,600$15,200$10,890$13,201
0735Signal priority and preemption system, furnish and install, detector (0663-1122)EACH1$10,400$10,338$10,300$12,870$9,213.00$11,821
0740Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123)EACH1$9,200.00$9,077.15$12,000$14,490$10,347$13,693
0745Pedestrian detector, furnish & install, accessible (0665-1-12)EACH10$1,670.00$1,648.10$2,730.00$2,250.00$1,606.00$3,115.98
0750Traffic controller assembly, F&I, NEMA W/electronic lock, 1 preemption (0670-5171)AS1$43,100$42,892$59,300$70,000$50,068$67,725
0755Traffic controller assembly, remove controller with (0670-5600)AS1$1,500.00$3,742.29$3,360.00$2,250.00$1,596.00$3,835.00
0760Traffic controller, modify (0671-2-40)EACH1$3,300.00$3,263.96$2,530.00$2,970.00$2,118.00$2,891.74
0765ITS CCTV camera, pressurized, high definition (0682-1163)EACH1$6,950.00$6,883.51$8,770.00$11,880$8,485.00$10,023
0770Managed field ethernet switch, furnish & install (0684-1-1)EACH1$8,100.00$8,058.46$4,290.00$5,670.00$4,030.00$4,904.38
0775Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH1$12,700$12,582$14,400$19,260$13,760$16,467
0780Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH5$1,050.00$1,042.04$1,050.00$1,350.00$933.00$1,203.36
0785Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH4$5,550.00$5,512.39$6,120.00$6,750.00$4,829.00$6,987.99
0790Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360)EACH4$6,600.00$6,567.13$7,310.00$8,910.00$6,339.00$8,353.74
0795Itsfm subsurface documentation- project length (0611-1-1)MI0.09$4,200.00$4,167.10$4,520.00$5,977.00$4,441.00$5,162.50
0800Itsfm location documentation- intersection (0611-2-1)EACH1$2,800.00$2,768.17$2,900.00$2,520.00$1,777.00$3,318.75
0805Conduit, furnish & install, open trench (0630-2-11)LF39$18.60$18.50$23.80$20.00$14.00$27.18
0810Conduit, furnish & install, directional bore (0630-2-12)LF1,296$43.50$43.06$63.00$33.00$23.50$71.79
0815Conduit, furnish & install, aboveground (0630-2-14)LF40$42.50$42.12$60.00$66.00$47.50$68.81
0820Fiber optic cable, F&I, underground,13-48 fibers (0633-1122)LF762$4.05$4.00$5.20$6.00$3.95$5.98
0825Fiber optic cable, relocate, overhead (0633-1410)LF1,319$3.40$3.38$3.60$5.00$3.35$4.06
0830Fiber optic cable, relocate, underground (0633-1420)LF714$3.40$3.38$4.60$5.00$3.35$5.24
0835Fiber optic cable, remove, overhead (0633-1610)LF1,975$1.25$1.23$1.30$2.00$1.20$1.48
0840Fiber optic cable, remove, underground (0633-1620)LF11$1.25$1.23$1.30$2.00$1.20$1.48
0845Fiber optic connection, install, splice (0633-2-31)EACH180$56.00$55.37$58.00$76.00$54.50$66.38
0850Fiber optic connection, install, termination (0633-2-32)EACH24$105.00$104.57$110.00$144.00$103.00$125.38
0855Fiber optic connection hardware, F&I, splice enclosure (0633-3-11)EACH2$1,570.00$1,556.33$1,670.00$2,160.00$1,571.00$1,910.13
0860Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH2$105.00$104.57$110.00$144.00$103.00$125.38
0865Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH2$1,520.00$1,507.12$1,580.00$2,070.00$1,486.00$1,806.88
0870Telephone cable, remove (0633-4-16)LF992$1.25$1.23$0.60$2.00$1.35$0.74
0875Fiber optic cable locator (0633-6)DA320$143.00$141.48$148.00$288.00$206.00$169.63
0880Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH5$3,360.00$2,330.57$2,930.00$4,860.00$3,445.00$3,342.79
0885Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH2$5,120.00$4,076.22$4,750.00$9,810.00$7,006.00$5,425.10
FDOT contract T5890: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy