FDOT contract T5890 bid tabulation
SR 50 (SR 60 / US 17-92 / E COLONIAL DR) FROM IRVINGTON AVE TO MAGUIRE. Let by Florida DOT on August 26, 2026, Orange, District 5. 6 bids received; low bid $5,460,945 by Watson Civil Construction, Inc..
- Owner
- Florida DOT
- Letting
- 26 AUG 2026
- Pay items
- 177
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Watson Civil Construction, Inc. | $5,460,945 | Low |
| 2 | Hubbard Construction Company | $6,004,860 | +10% |
| 3 | Ranger Construction Industries, Inc. | $6,247,187 | +14% |
| 4 | Granite Construction Company | $6,329,266 | +16% |
| 5 | Atlantic Civil Constructors Corp | $6,489,479 | +19% |
| 6 | Masci General Contractors, Inc | $9,475,265 | +74% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Watson Civil Construction, Inc. | 2. Hubbard Construction Company | 3. Ranger Construction Industries, Inc. | 4. Granite Construction Company | 5. Atlantic Civil Constructors Corp | 6. Masci General Contractors, Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $432,000 | $360,000 | $420,000 | $335,500 | $283,597 | $259,887 |
| 0010 | Mobilization (0101-1) | LS | 1 | $54,000 | $155,000 | $190,000 | $181,500 | $292,961 | $259,887 |
| 0015 | Mobilization (0101-1) | LS | 1 | $54,000 | $85,000 | $26,000 | $33,000 | $265,918 | $259,887 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $574,000 | $1,326,809 | $120,000 | $301,440 | $167,951 | $75,889 |
| 0025 | Maintenance of traffic (0102-1) | DA | 1 | $72,000 | $137,632 | $145,000 | $163,075 | $167,951 | $75,889 |
| 0030 | Maintenance of traffic (0102-1) | DA | 1 | $72,000 | $86,830 | $40,000 | $29,650 | $164,751 | $75,889 |
| 0035 | Special detour- temporary pavement (0102-2200) | SY | 1 | $18,600 | $38,190 | $12,400 | $22,600 | $66,758 | $97,854 |
| 0040 | Commercial material for temporary driveway maintenance (0102-3) | CY | 71.50 | $110.00 | $394.54 | $119.00 | $160.00 | $96.00 | $214.00 |
| 0045 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $9,700.00 | $37,931 | $4,250.00 | $4,900.06 | $4,994.55 | $28,872 |
| 0050 | Traffic control officer (0102-14) | HR | 76 | $100.00 | $95.00 | $108.00 | $150.00 | $100.00 | $95.00 |
| 0055 | Work zone sign (0102-60) | ED | 18,200 | $0.33 | $0.22 | $0.30 | $0.40 | $0.21 | $0.25 |
| 0060 | Business sign (0102-61) | EACH | 22 | $23.00 | $25.81 | $31.30 | $46.00 | $25.00 | $251.00 |
| 0065 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 204 | $56.00 | $54.71 | $61.00 | $73.00 | $40.00 | $125.00 |
| 0070 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 408 | $23.00 | $21.88 | $20.00 | $29.00 | $16.00 | $82.00 |
| 0075 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 36,145 | $0.16 | $0.10 | $0.10 | $0.20 | $0.10 | $0.20 |
| 0080 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 9,318 | $0.09 | $0.09 | $0.10 | $0.15 | $0.09 | $0.18 |
| 0085 | Temporary separator, F&I remove (0102-75-1) | LF | 530 | $16.00 | $22.71 | $30.00 | $40.00 | $22.00 | $45.00 |
| 0090 | Arrow board / advance warning arrow panel (0102-76) | ED | 467 | $7.00 | $5.16 | $6.30 | $9.00 | $5.00 | $20.00 |
| 0095 | Portable changeable message sign, temporary (0102-99) | ED | 1,542 | $15.00 | $10.31 | $12.50 | $15.00 | $9.99 | $25.00 |
| 0100 | Temporary signalization and maintenance, intersection (0102-104) | ED | 640 | $34.00 | $21.21 | $34.00 | $90.00 | $58.00 | $48.00 |
| 0105 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 640 | $27.00 | $17.00 | $34.00 | $2.00 | $1.00 | $48.00 |
| 0110 | Type III barricade (0102-115) | ED | 865 | $0.39 | $0.31 | $0.40 | $0.50 | $0.30 | $3.00 |
| 0115 | Removable tape, black, solid 6" (0102-913-11) | GM | 0.98 | $11,800 | $15,054 | $17,400 | $12,600 | $11,500 | $18,750 |
| 0120 | Removable tape, black, 10'-30', 6'-10', or 2'-4' skip (0102-913-12) | GM | 0.02 | $4,650.00 | $9,142.27 | $11,600 | $5,100.00 | $5,000.00 | $12,500 |
| 0125 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.98 | $11,800 | $15,054 | $17,400 | $12,600 | $11,500 | $18,750 |
| 0130 | Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22) | GM | 0.02 | $4,650.00 | $9,142.27 | $11,600 | $5,100.00 | $5,000.00 | $12,500 |
| 0135 | Removable tape, white, symbol or arrow (0102-913-29) | EACH | 2 | $511.00 | $603.41 | $695.00 | $550.00 | $500.00 | $750.00 |
| 0140 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.45 | $11,700 | $15,018 | $17,400 | $12,500 | $11,500 | $18,750 |
| 0145 | Removable tape, yellow, 10'-30', 9', 6'-10', or 2'-4' skip (0102-913-32) | GM | 0.02 | $5,120.00 | $8,380.42 | $11,600 | $5,600.00 | $6,000.00 | $12,500 |
| 0150 | Sediment barrier (0104-10-3) | LF | 278 | $2.15 | $4.63 | $13.00 | $10.00 | $5.83 | $7.00 |
| 0155 | Inlet protection system (0104-18) | EACH | 19 | $156.00 | $191.48 | $260.00 | $210.00 | $127.71 | $254.00 |
| 0160 | Litter removal (0107-1) | ACRE | 20.94 | $207.00 | $55.00 | $398.00 | $100.00 | $173.08 | $215.00 |
| 0165 | Mowing (0107-2) | ACRE | 12.74 | $517.00 | $105.00 | $284.00 | $200.00 | $226.52 | $215.00 |
| 0170 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $2,100.00 | $3,750.00 | $13,400 | $25,000 | $30,000 | $35,781 |
| 0175 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $16,500 | $6,850.00 | $14,500 | $20,000 | $10,000 | $25,224 |
| 0180 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $69,000 | $80,000 | $393,500 | $67,300 | $169,295 | $82,254 |
| 0185 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $8,500.00 | $40,000 | $215,000 | $36,400 | $148,964 | $82,254 |
| 0190 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $8,500.00 | $40,000 | $30,000 | $6,600.00 | $159,493 | $82,254 |
| 0195 | Removal of existing concrete (0110-4-10) | SY | 1,999 | $26.00 | $27.93 | $48.00 | $31.00 | $45.83 | $58.00 |
| 0200 | Regular excavation (0120-1) | CY | 232 | $23.00 | $35.61 | $40.00 | $25.00 | $374.71 | $75.00 |
| 0205 | Embankment (0120-6) | CY | 18.30 | $15.00 | $2,161.37 | $78.00 | $125.00 | $548.46 | $215.00 |
| 0210 | Flowable fill (0121-70) | CY | 573 | $463.00 | $190.70 | $235.00 | $200.00 | $214.52 | $554.00 |
| 0215 | Type B stabilization (0160-4) | SY | 1,972 | $23.75 | $11.37 | $34.50 | $35.00 | $42.70 | $41.00 |
| 0220 | Optional base, base group 01 (0285-701) | SY | 439 | $112.00 | $67.88 | $56.00 | $70.00 | $63.22 | $75.00 |
| 0225 | Optional base, base group 06 (0285-706) | SY | 925 | $39.00 | $21.12 | $32.00 | $45.00 | $37.15 | $95.00 |
| 0230 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 3,867 | $11.25 | $5.62 | $9.50 | $15.00 | $6.00 | $7.00 |
| 0235 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 216.50 | $345.00 | $226.45 | $265.00 | $390.00 | $250.00 | $258.00 |
| 0240 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 250.90 | $303.00 | $312.55 | $349.00 | $450.00 | $275.00 | $298.00 |
| 0245 | Miscellaneous asphalt (0339-1) | TN | 1.40 | $2,140.00 | $626.74 | $1,870.00 | $2,100.00 | $700.00 | $9,884.00 |
| 0250 | Grinding concrete pavement (0352-70) | SY | 439 | $8.00 | $116.83 | $102.00 | $42.00 | $90.00 | $55.00 |
| 0255 | Concrete pavement slab replacement (0353-70) | CY | 108.60 | $1,275.00 | $2,853.92 | $1,990.00 | $1,550.00 | $2,211.00 | $727.00 |
| 0260 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 28.40 | $1,050.00 | $900.32 | $2,690.00 | $1,700.00 | $1,456.71 | $1,577.00 |
| 0265 | Inlets, curb, type 9, partial (0425-1205) | EACH | 1 | $4,900.00 | $5,646.15 | $7,800.00 | $5,900.00 | $5,937.91 | $9,887.00 |
| 0270 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 6 | $7,500.00 | $6,744.01 | $9,750.00 | $14,900 | $9,072.09 | $24,413 |
| 0275 | Inlets, curb, type P-5, partial (0425-1355) | EACH | 1 | $3,800.00 | $5,504.85 | $12,000 | $6,000.00 | $4,631.46 | $11,772 |
| 0280 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 2 | $8,300.00 | $7,324.47 | $13,100 | $16,400 | $9,989.17 | $25,998 |
| 0285 | Manholes, P-7, partial (0425-2-43) | EACH | 1 | $3,600.00 | $5,368.16 | $8,490.00 | $4,900.00 | $5,472.15 | $10,115 |
| 0290 | Manholes, P-8, <10' (0425-2-61) | EACH | 4 | $5,550.00 | $5,766.84 | $7,700.00 | $11,800 | $6,898.73 | $25,554 |
| 0295 | Manholes, J-8, <10' (0425-2-91) | EACH | 20 | $8,400.00 | $9,920.45 | $10,800 | $16,000 | $9,303.80 | $25,889 |
| 0300 | Modify existing drainage structure (0425-11) | EACH | 6 | $2,000.00 | $2,520.75 | $4,290.00 | $3,400.00 | $8,715.88 | $9,928.00 |
| 0305 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 31 | $100.00 | $173.26 | $244.00 | $790.00 | $236.11 | $799.00 |
| 0310 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 30 | $130.00 | $236.79 | $310.00 | $790.00 | $254.25 | $899.00 |
| 0315 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 94 | $142.00 | $578.80 | $242.00 | $450.00 | $164.90 | $715.00 |
| 0320 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 279 | $188.00 | $222.77 | $262.00 | $580.00 | $251.49 | $722.00 |
| 0325 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 210 | $286.00 | $219.83 | $355.00 | $580.00 | $304.48 | $798.00 |
| 0330 | Pipe culvert, opt material, round, 42"S/CD (0430-175142) | LF | 4 | $794.00 | $3,228.86 | $1,350.00 | $3,100.00 | $1,387.69 | $1,778.00 |
| 0335 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 132 | $139.00 | $107.92 | $205.00 | $240.00 | $146.61 | $798.00 |
| 0340 | Pipe culvert, opt material, shape - elip/arch, 36"S/CD (0430-175236) | LF | 636 | $287.00 | $308.42 | $372.00 | $525.00 | $332.01 | $812.00 |
| 0345 | Pipe culvert, opt material, shape - elip/arch, 42"S/CD (0430-175242) | LF | 4 | $932.00 | $1,874.16 | $1,650.00 | $3,400.00 | $1,717.30 | $2,247.00 |
| 0350 | Pipe culvert,optional material,round, jack & bore, 24", storm and cross drain (0430-185124) | LF | 72 | $1,400.00 | $1,538.88 | $710.00 | $2,750.00 | $3,014.16 | $5,542.00 |
| 0355 | Trench drain, standard (0436-1-1) | LF | 227 | $488.00 | $347.29 | $464.00 | $475.00 | $316.78 | $1,498.00 |
| 0360 | Sheet piling steel, temporary- critical (0455-133-2) | SF | 6,781 | $100.00 | $32.85 | $49.00 | $42.00 | $119.59 | $259.00 |
| 0365 | Concrete curb & gutter, type F (0520-1-10) | LF | 901 | $43.00 | $47.36 | $171.00 | $105.00 | $72.19 | $115.00 |
| 0370 | Concrete curb, type D (0520-2-4) | LF | 360 | $44.00 | $26.26 | $151.00 | $98.00 | $57.93 | $118.00 |
| 0375 | Traffic separator - concrete, type II, 4' wide (0520-5-21) | LF | 429 | $91.00 | $76.77 | $229.00 | $156.00 | $75.22 | $205.00 |
| 0380 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 18 | $119.00 | $78.79 | $284.00 | $362.00 | $219.71 | $425.00 |
| 0385 | Concrete traffic separator, special- variable width (0520-70) | SY | 33 | $147.00 | $123.23 | $631.00 | $328.00 | $223.67 | $498.00 |
| 0390 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 478 | $82.00 | $75.76 | $195.00 | $146.00 | $76.72 | $115.00 |
| 0395 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,504 | $94.00 | $86.87 | $200.00 | $145.00 | $98.88 | $155.00 |
| 0400 | Detectable warnings (0527-2) | SF | 182 | $47.00 | $36.36 | $45.30 | $73.00 | $137.80 | $78.00 |
| 0405 | Performance turf, sod (0570-1-2) | SY | 912 | $9.50 | $10.75 | $9.40 | $22.00 | $18.75 | $12.00 |
| 0410 | Raised pavement marker, type B (0706-1-3) | EACH | 886 | $5.10 | $5.58 | $6.40 | $7.00 | $5.00 | $6.94 |
| 0415 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.20 | $2,450.00 | $1,718.24 | $1,970.00 | $3,360.00 | $2,500.00 | $2,125.00 |
| 0420 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 11 | $5.10 | $5.03 | $5.80 | $7.00 | $5.00 | $6.25 |
| 0425 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.41 | $1,510.00 | $1,010.61 | $1,160.00 | $2,060.00 | $1,500.00 | $1,250.00 |
| 0430 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 13 | $77.00 | $40.23 | $46.30 | $105.00 | $75.00 | $50.00 |
| 0435 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.19 | $2,520.00 | $1,683.06 | $1,970.00 | $3,460.00 | $2,500.00 | $2,125.00 |
| 0440 | Painted pavement markings, standard,black, skip, 6" (0710-11331) | GM | 0.41 | $1,505.00 | $1,010.61 | $1,160.00 | $2,060.00 | $1,500.00 | $1,250.00 |
| 0445 | Thermoplastic, standard, arrow (0711-11170) | EACH | 1 | $154.00 | $120.68 | $139.00 | $216.00 | $150.00 | $150.00 |
| 0450 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 1,832 | $1.85 | $2.31 | $2.70 | $3.00 | $1.80 | $2.88 |
| 0455 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $30,561 | $30,561 | $30,561 | $30,561 | $30,561 | $30,561 |
| 0460 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $16,430 | $16,430 | $16,430 | $16,430 | $16,430 | $16,430 |
| 0465 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $3,008.90 | $3,008.90 | $3,008.90 | $3,008.90 | $3,008.90 | $3,008.90 |
| 0470 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 4 | $1,050.00 | $839.08 | $825.00 | $900.00 | $718.70 | $1,283.75 |
| 0475 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 4 | $2,600.00 | $2,246.34 | $2,080.00 | $3,960.00 | $1,812.44 | $3,207.50 |
| 0480 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $507.00 | $156.96 | $457.00 | $4,400.00 | $397.69 | $625.00 |
| 0485 | Single column ground sign assembly, remove (0700-1600) | EACH | 9 | $76.00 | $78.48 | $70.00 | $99.00 | $60.75 | $93.75 |
| 0490 | Object marker, type 1 (0705-10-1) | EACH | 4 | $358.00 | $137.68 | $403.00 | $468.00 | $350.00 | $268.75 |
| 0495 | Delineator, flexible tubular (0705-11-1) | EACH | 1 | $154.00 | $221.57 | $272.00 | $198.00 | $150.00 | $268.75 |
| 0500 | Raised pavement marker, type B (0706-1-3) | EACH | 388 | $5.15 | $5.58 | $6.40 | $7.00 | $5.00 | $6.94 |
| 0505 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,560.00 | $2,262.76 | $2,610.00 | $3,510.00 | $3,750.00 | $2,812.50 |
| 0510 | Painted pavement markings, surface (0710-90) | LS | 1 | $5,120.00 | $4,123.26 | $4,750.00 | $7,110.00 | $5,000.00 | $5,125.00 |
| 0515 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,570.00 | $1,568.85 | $1,810.00 | $3,510.00 | $3,750.00 | $1,950.00 |
| 0520 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 355 | $6.15 | $4.02 | $4.60 | $7.00 | $6.00 | $5.00 |
| 0525 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 224 | $12.30 | $8.05 | $9.30 | $14.00 | $12.00 | $10.00 |
| 0530 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.13 | $6,320.00 | $2,905.32 | $3,240.00 | $6,900.00 | $6,500.00 | $3,500.00 |
| 0535 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 4 | $307.00 | $201.14 | $232.00 | $350.00 | $300.00 | $250.00 |
| 0540 | Thermoplastic, standard, arrow (0711-11170) | EACH | 12 | $154.00 | $120.68 | $139.00 | $175.00 | $150.00 | $150.00 |
| 0545 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 10 | $10.25 | $6.03 | $7.00 | $13.00 | $10.00 | $7.50 |
| 0550 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.02 | $3,700.00 | $3,128.89 | $3,240.00 | $4,200.00 | $6,500.00 | $3,500.00 |
| 0555 | Thermoplastic, preformed, white, solid, 12" for crosswalk (0711-14123) | LF | 120 | $15.40 | $10.56 | $12.20 | $20.00 | $15.00 | $13.13 |
| 0560 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 151 | $30.70 | $14.28 | $16.50 | $35.00 | $30.00 | $17.75 |
| 0565 | Thermoplastic, preformed, white, 2-4 dotted guideline on concrete surfaces (0711-14141) | GM | 0.05 | $23,700 | $73,749 | $91,800 | $27,000 | $25,000 | $99,000 |
| 0570 | Thermoplastic, preformed, yellow, 2-4 dotted guideline on concrete surfaces (0711-14241) | GM | 0.06 | $25,600 | $79,649 | $91,800 | $29,000 | $25,000 | $99,000 |
| 0575 | Thermoplastic, preformed, black, 2-4 dotted guideline on concrete surfaces (0711-14341) | GM | 0.05 | $2,370.00 | $73,749 | $91,800 | $27,000 | $25,000 | $99,000 |
| 0580 | Thermoplastic, preformed, 24" white with 4" black contrast crosswalk on concrete pavement, 32" (0711-14526) | LF | 659 | $31.00 | $28.16 | $32.40 | $35.00 | $30.00 | $35.00 |
| 0585 | Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527) | LF | 158 | $31.00 | $28.16 | $32.40 | $35.00 | $30.00 | $35.00 |
| 0590 | Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528) | LF | 791 | $16.40 | $14.08 | $16.20 | $20.00 | $16.00 | $17.50 |
| 0595 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 23 | $613.00 | $351.99 | $405.00 | $675.00 | $600.00 | $437.50 |
| 0600 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.34 | $7,650.00 | $5,547.76 | $6,370.00 | $8,500.00 | $7,500.00 | $6,875.00 |
| 0605 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.52 | $4,520.00 | $2,115.99 | $2,430.00 | $4,800.00 | $4,500.00 | $2,625.00 |
| 0610 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.79 | $7,670.00 | $5,531.20 | $6,370.00 | $8,200.00 | $7,500.00 | $6,875.00 |
| 0615 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 4,833 | $1.85 | $2.31 | $2.70 | $2.00 | $1.80 | $2.88 |
| 0620 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.58 | $15,200 | $22,472 | $26,200 | $17,800 | $15,000 | $28,255 |
| 0625 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.58 | $15,200 | $22,472 | $26,200 | $17,800 | $15,000 | $28,255 |
| 0630 | Conduit, furnish & install, open trench (0630-2-11) | LF | 219 | $18.60 | $18.50 | $25.10 | $47.00 | $34.00 | $28.65 |
| 0635 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 641 | $43.50 | $43.06 | $63.00 | $80.00 | $57.50 | $71.79 |
| 0640 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $19,300 | $19,179 | $16,500 | $25,900 | $18,497 | $18,822 |
| 0645 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $1,900.00 | $1,818.57 | $5,420.00 | $2,250.00 | $1,635.00 | $6,195.00 |
| 0650 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 30 | $2,270.00 | $1,237.96 | $2,080.00 | $1,800.00 | $1,278.00 | $2,376.90 |
| 0655 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 3 | $3,370.00 | $2,330.57 | $3,170.00 | $4,860.00 | $3,445.00 | $3,616.55 |
| 0660 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $3,900.00 | $3,876.36 | $5,670.00 | $9,720.00 | $6,925.00 | $6,481.59 |
| 0665 | Electrical power service, remove underground (0639-1620) | AS | 1 | $1,060.00 | $1,054.22 | $903.00 | $1,530.00 | $1,066.00 | $1,032.50 |
| 0670 | Electrical service wire, & install (0639-2-1) | LF | 208 | $13.40 | $13.30 | $7.70 | $12.00 | $8.05 | $8.78 |
| 0675 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $1,620.00 | $1,607.72 | $2,300.00 | $3,600.00 | $2,555.00 | $2,630.41 |
| 0680 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,800.00 | $2,768.36 | $2,620.00 | $3,330.00 | $2,378.00 | $2,994.73 |
| 0685 | Prestressed concrete pole, shallow pole removal- pole 30' and greater (0641-2-70) | EACH | 4 | $5,400.00 | $5,341.13 | $12,100 | $25,020 | $17,880 | $13,865 |
| 0690 | Aluminum signals pole, (0646-1-11) | EACH | 10 | $2,150.00 | $2,116.47 | $4,380.00 | $3,960.00 | $2,851.00 | $5,000.15 |
| 0695 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 3 | $87,300 | $86,926 | $102,800 | $95,511 | $85,492 | $117,435 |
| 0700 | Steel mast arm assembly, and install, single arm 78' (0649-21-21) | EACH | 1 | $104,500 | $104,005 | $110,800 | $125,790 | $98,462 | $126,639 |
| 0705 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 22 | $1,750.00 | $1,735.90 | $2,350.00 | $2,250.00 | $1,588.00 | $2,681.06 |
| 0710 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 2 | $2,810.00 | $2,789.91 | $3,510.00 | $3,780.00 | $2,674.00 | $4,006.24 |
| 0715 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 10 | $1,020.00 | $1,008.37 | $1,310.00 | $1,260.00 | $919.00 | $1,498.94 |
| 0720 | Loop assembly, F&I, type F (0660-2106) | AS | 2 | $1,900.00 | $1,850.60 | $1,970.00 | $1,710.00 | $1,234.00 | $2,255.38 |
| 0725 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 1 | $12,400 | $12,297 | $11,700 | $15,200 | $10,849 | $13,373 |
| 0730 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 8 | $13,700 | $13,527 | $11,600 | $15,200 | $10,890 | $13,201 |
| 0735 | Signal priority and preemption system, furnish and install, detector (0663-1122) | EACH | 1 | $10,400 | $10,338 | $10,300 | $12,870 | $9,213.00 | $11,821 |
| 0740 | Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123) | EACH | 1 | $9,200.00 | $9,077.15 | $12,000 | $14,490 | $10,347 | $13,693 |
| 0745 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 10 | $1,670.00 | $1,648.10 | $2,730.00 | $2,250.00 | $1,606.00 | $3,115.98 |
| 0750 | Traffic controller assembly, F&I, NEMA W/electronic lock, 1 preemption (0670-5171) | AS | 1 | $43,100 | $42,892 | $59,300 | $70,000 | $50,068 | $67,725 |
| 0755 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $1,500.00 | $3,742.29 | $3,360.00 | $2,250.00 | $1,596.00 | $3,835.00 |
| 0760 | Traffic controller, modify (0671-2-40) | EACH | 1 | $3,300.00 | $3,263.96 | $2,530.00 | $2,970.00 | $2,118.00 | $2,891.74 |
| 0765 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 1 | $6,950.00 | $6,883.51 | $8,770.00 | $11,880 | $8,485.00 | $10,023 |
| 0770 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $8,100.00 | $8,058.46 | $4,290.00 | $5,670.00 | $4,030.00 | $4,904.38 |
| 0775 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $12,700 | $12,582 | $14,400 | $19,260 | $13,760 | $16,467 |
| 0780 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 5 | $1,050.00 | $1,042.04 | $1,050.00 | $1,350.00 | $933.00 | $1,203.36 |
| 0785 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 4 | $5,550.00 | $5,512.39 | $6,120.00 | $6,750.00 | $4,829.00 | $6,987.99 |
| 0790 | Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360) | EACH | 4 | $6,600.00 | $6,567.13 | $7,310.00 | $8,910.00 | $6,339.00 | $8,353.74 |
| 0795 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.09 | $4,200.00 | $4,167.10 | $4,520.00 | $5,977.00 | $4,441.00 | $5,162.50 |
| 0800 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $2,800.00 | $2,768.17 | $2,900.00 | $2,520.00 | $1,777.00 | $3,318.75 |
| 0805 | Conduit, furnish & install, open trench (0630-2-11) | LF | 39 | $18.60 | $18.50 | $23.80 | $20.00 | $14.00 | $27.18 |
| 0810 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,296 | $43.50 | $43.06 | $63.00 | $33.00 | $23.50 | $71.79 |
| 0815 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 40 | $42.50 | $42.12 | $60.00 | $66.00 | $47.50 | $68.81 |
| 0820 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 762 | $4.05 | $4.00 | $5.20 | $6.00 | $3.95 | $5.98 |
| 0825 | Fiber optic cable, relocate, overhead (0633-1410) | LF | 1,319 | $3.40 | $3.38 | $3.60 | $5.00 | $3.35 | $4.06 |
| 0830 | Fiber optic cable, relocate, underground (0633-1420) | LF | 714 | $3.40 | $3.38 | $4.60 | $5.00 | $3.35 | $5.24 |
| 0835 | Fiber optic cable, remove, overhead (0633-1610) | LF | 1,975 | $1.25 | $1.23 | $1.30 | $2.00 | $1.20 | $1.48 |
| 0840 | Fiber optic cable, remove, underground (0633-1620) | LF | 11 | $1.25 | $1.23 | $1.30 | $2.00 | $1.20 | $1.48 |
| 0845 | Fiber optic connection, install, splice (0633-2-31) | EACH | 180 | $56.00 | $55.37 | $58.00 | $76.00 | $54.50 | $66.38 |
| 0850 | Fiber optic connection, install, termination (0633-2-32) | EACH | 24 | $105.00 | $104.57 | $110.00 | $144.00 | $103.00 | $125.38 |
| 0855 | Fiber optic connection hardware, F&I, splice enclosure (0633-3-11) | EACH | 2 | $1,570.00 | $1,556.33 | $1,670.00 | $2,160.00 | $1,571.00 | $1,910.13 |
| 0860 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 2 | $105.00 | $104.57 | $110.00 | $144.00 | $103.00 | $125.38 |
| 0865 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 2 | $1,520.00 | $1,507.12 | $1,580.00 | $2,070.00 | $1,486.00 | $1,806.88 |
| 0870 | Telephone cable, remove (0633-4-16) | LF | 992 | $1.25 | $1.23 | $0.60 | $2.00 | $1.35 | $0.74 |
| 0875 | Fiber optic cable locator (0633-6) | DA | 320 | $143.00 | $141.48 | $148.00 | $288.00 | $206.00 | $169.63 |
| 0880 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 5 | $3,360.00 | $2,330.57 | $2,930.00 | $4,860.00 | $3,445.00 | $3,342.79 |
| 0885 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 2 | $5,120.00 | $4,076.22 | $4,750.00 | $9,810.00 | $7,006.00 | $5,425.10 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.