Atlantic Civil Constructors Corp: FDOT bid record
Atlantic Civil Constructors Corp submitted 29 bids on Florida DOT contracts in the data, from 28 MAR 2018 to 26 AUG 2026, and was the low bidder on 10 of them (34%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $36,607,866
- Latest bid
- 26 AUG 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 3 | 1 | 33% |
| 2019 | 2 | 1 | 50% |
| 2020 | 5 | 1 | 20% |
| 2021 | 4 | 3 | 75% |
| 2022 | 1 | 1 | 100% |
| 2023 | 2 | 2 | 100% |
| 2024 | 3 | 0 | 0% |
| 2025 | 4 | 1 | 25% |
| 2026 | 5 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 5 | 25 | 9 | 36% |
| District 1 | 4 | 1 | 25% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 38 | 26 (68%) | $27.67 | $30.82 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 27 | 25 (93%) | $4.00 | $5.00 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 35 | 20 (57%) | $1,205.00 | $1,150.00 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 39 | 16 (41%) | $18.00 | $16.54 |
| Work zone sign | 0102-60 | ED | 22 | 16 (73%) | $0.20 | $0.25 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 22 | 16 (73%) | $0.10 | $0.13 |
| Detectable warnings | 0527-2 | SF | 21 | 14 (67%) | $26.34 | $35.00 |
| Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron | 0711-11224 | LF | 21 | 14 (67%) | $4.00 | $4.50 |
| Portable changeable message sign, temporary | 0102-99 | ED | 20 | 13 (65%) | $9.75 | $12.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 19 | 13 (68%) | $5.00 | $5.90 |
| Thermoplastic, standard, solid, 18" for diagonals and chevrons | 0711-11124 | LF | 18 | 13 (72%) | $4.00 | $4.58 |
| Thermoplastic, standard, solid, 24" for stop line and crosswalk | 0711-11125 | LF | 21 | 12 (57%) | $5.66 | $6.09 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hubbard Construction Company | 16 | 6 of 16 |
| Ranger Construction Industries, Inc. | 16 | 7 of 16 |
| Masci General Contractors, Inc | 12 | 5 of 12 |
| Watson Civil Construction, Inc. | 10 | 3 of 10 |
| Southland Construction, Inc. | 9 | 5 of 9 |
| C.W. Roberts Contracting, Inc. | 7 | 4 of 7 |
| American Lighting and Signalization, LLC. | 4 | 1 of 4 |
| Sema Construction, Inc. | 4 | 1 of 4 |
| Preferred Materials Inc. | 3 | 1 of 3 |
| Cathcart Construction Company - Florida, LLC | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | T5890 | District 5 | SR 50 (SR 60 / US 17-92 / E COLONIAL DR) FROM IRVINGTON AVE TO MAGUIRE | 5 of 6 | $6,489,479 | +19% |
| 10 JUN 2026 | T5886 | District 5 | SR 50 (BROAD ST) FROM 2ND AVE TO SILVER EAGLE RD | 9 of 9 | $3,993,880 | +59% |
| 10 JUN 2026 | T5888 | District 5 | SR 50 / SR 33 FROM CR 565 (VILLA CITY RD) TO 2ND AVE | 7 of 8 | $34,664,306 | +29% |
| 20 MAY 2026 | T5863 | District 5 | SR 434 FROM RANGELINE RD TO W OF SR 15/600 (US 17-92) | 6 of 6 | $8,354,111 | +40% |
| 28 JAN 2026 | T5874 | District 5 | SR 426 (FAIRBANKS AVE / ALOMA AVE) FROM S PARK AVE TO N ... | 5 of 5 | $11,413,787 | +20% |
| 30 JUL 2025 | T5819 | District 5 | SR 33 (CR 33) FROM S OF EDGEWOOD BOYS RANCH RD TO S OF WRIGH | 8 of 8 | $7,452,965 | +50% |
| 11 JUN 2025 | T5855 | District 5 | SR 530 (US 192) FROM SR 25 (US 27) TO ORANGE CO LINE | 1 of 7 | $6,118,855 | Low, 1.0% under the second |
| 26 MAR 2025 | T5858 | District 5 | SR 528, SR 404, SR 520 AND US 192 AT VARIOUS BRIDGES... | 4 of 5 | $2,238,240 | +136% |
| 29 JAN 2025 | T5838 | District 5 | SR 500 (US 441) FROM WADSWORTH RD TO LAKE CO LINE | 5 of 7 | $8,460,472 | +10% |
| 12 JUN 2024 | T5823 | District 5 | SR 535 (KISSIMMEE VINELAND RD / S APOPKA VINELAND RD) FROM.. | 3 of 4 | $15,081,052 | +10% |
| 22 MAY 2024 | T5813 | District 5 | SR 19 FROM N OF STEVENS AVE TO CR 452 | 3 of 4 | $12,955,522 | +5.0% |
| 24 APR 2024 | T5824 | District 5 | SR 46 (W 1ST ST) FROM E OF I-4 TO SR 15 (US 17/92) | 4 of 7 | $20,176,257 | +21% |
| 25 OCT 2023 | T5814 | District 5 | SR 527 (ORANGE AVE) FROM CLAY AVE TO S ORLANDO AVE | 1 of 4 | $3,714,443 | Low, 0.0% under the second |
| 26 APR 2023 | T5787 | District 5 | SR 500/600/Orange Blossom Trail | 1 of 4 | $2,409,590 | Low, 23% under the second |
| 15 JUN 2022 | T5745 | District 5 | HICKS AVE (FORMERLY TERRY AVE) | 1 of 5 | $7,356,536 | Low, 32% under the second |
| 27 OCT 2021 | T1816 | District 1 | DAVENPORT COMPLETE STREET | 1 of 2 | $981,819 | Low, 20% under the second |
| 28 JUL 2021 | T5722 | District 5 | SR 44 | 1 of 4 | $1,619,760 | Low, 2.0% under the second |
| 27 JAN 2021 | T1791 | District 1 | SR 17 | 4 of 6 | $900,829 | +48% |
| 27 JAN 2021 | T5715 | District 5 | CR 532 | 1 of 6 | $8,989,133 | Low, 4.0% under the second |
| 18 NOV 2020 | T5685 | District 5 | CR 4164 (OSTEEN-MAYTOWN RD) | 4 of 5 | $1,450,035 | +27% |
| 26 AUG 2020 | T1790 | District 1 | SR 559 (BROADWAY BLVD) | 2 of 8 | $760,274 | +9.0% |
| 29 JUL 2020 | T5683 | District 5 | SR 15A | 2 of 6 | $2,907,588 | +1.0% |
| 29 JUL 2020 | T5714 | District 5 | SR 19 | 1 of 5 | $531,915 | Low, 9.0% under the second |
| 29 JAN 2020 | T5618 | District 5 | CLARCONA-OCOEE CONNECTOR TRAIL | 3 of 4 | $276,933 | +11% |
| 27 MAR 2019 | T5647 | District 5 | SR 482 (SAND LAKE RD) | 1 of 4 | $2,009,090 | Low, 8.0% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.