FDOT contract T5863 bid tabulation
SR 434 FROM RANGELINE RD TO W OF SR 15/600 (US 17-92). Let by Florida DOT on May 20, 2026, Seminole, District 5. 6 bids received; low bid $5,972,774 by Masci General Contractors, Inc.
- Owner
- Florida DOT
- Letting
- 20 MAY 2026
- Pay items
- 188
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Masci General Contractors, Inc | $5,972,774 | Low |
| 2 | Garcia Civil Contractors | $6,631,483 | +11% |
| 3 | Chinchor Electric Inc. | $6,946,158 | +16% |
| 4 | Hubbard Construction Company | $6,995,762 | +17% |
| 5 | Southland Construction, Inc. | $7,555,556 | +26% |
| 6 | Atlantic Civil Constructors Corp | $8,354,111 | +40% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Masci General Contractors, Inc | 2. Garcia Civil Contractors | 3. Chinchor Electric Inc. | 4. Hubbard Construction Company | 5. Southland Construction, Inc. | 6. Atlantic Civil Constructors Corp |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $149,852 | $505,895 | $453,383 | $838,343 | $420,000 | $974,402 |
| 0010 | Mobilization (0101-1) | LS | 1 | $49,852 | $111,425 | $134,744 | $170,950 | $576,800 | $325,724 |
| 0015 | Mobilization (0101-1) | LS | 1 | $129,852 | $71,425 | $134,146 | $113,030 | $9,000.00 | $65,656 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $58,422 | $191,473 | $153,792 | $242,471 | $634,000 | $539,041 |
| 0025 | Maintenance of traffic (0102-1) | DA | 1 | $58,422 | $18,884 | $93,081 | $34,728 | $222,300 | $326,387 |
| 0030 | Maintenance of traffic (0102-1) | DA | 1 | $58,422 | $16,324 | $41,996 | $19,758 | $23,000 | $217,236 |
| 0035 | Special detour- temporary pavement (0102-2200) | SY | 1 | $22,578 | $24,227 | $80,449 | $46,525 | $31,000 | $6,408.55 |
| 0040 | Traffic control officer (0102-14) | HR | 392 | $85.00 | $96.81 | $107.35 | $98.37 | $95.00 | $100.00 |
| 0045 | Work zone sign (0102-60) | ED | 37,334 | $0.25 | $0.23 | $0.25 | $0.25 | $0.25 | $0.20 |
| 0050 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 1,541 | $25.00 | $52.24 | $76.84 | $45.96 | $45.00 | $40.00 |
| 0055 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 2,706 | $7.00 | $21.25 | $20.34 | $19.06 | $13.40 | $12.00 |
| 0060 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 26,930 | $0.14 | $0.11 | $0.12 | $0.12 | $0.12 | $0.09 |
| 0065 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 12,804 | $0.14 | $0.09 | $0.09 | $0.09 | $0.06 | $0.08 |
| 0070 | Temporary separator, F&I remove (0102-75-1) | LF | 530 | $10.24 | $25.25 | $18.08 | $24.38 | $23.46 | $16.00 |
| 0075 | Arrow board / advance warning arrow panel (0102-76) | ED | 360 | $5.21 | $5.46 | $5.37 | $5.60 | $4.97 | $4.75 |
| 0080 | Portable changeable message sign, temporary (0102-99) | ED | 2,172 | $11.00 | $11.12 | $11.30 | $12.32 | $11.20 | $9.50 |
| 0085 | Temporary signalization and maintenance, intersection (0102-104) | ED | 1,240 | $11.21 | $71.63 | $22.20 | $65.15 | $69.00 | $62.29 |
| 0090 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 1,240 | $11.21 | $1.15 | $22.20 | $1.05 | $1.10 | $1.00 |
| 0095 | Type III barricade (0102-115) | ED | 866 | $0.30 | $0.33 | $0.32 | $0.31 | $0.29 | $0.28 |
| 0100 | Sediment barrier (0104-10-3) | LF | 511 | $15.00 | $3.38 | $3.96 | $1.24 | $8.00 | $12.31 |
| 0105 | Inlet protection system (0104-18) | EACH | 39 | $54.00 | $325.20 | $197.75 | $226.63 | $145.00 | $149.42 |
| 0110 | Litter removal (0107-1) | ACRE | 76.62 | $45.00 | $191.63 | $39.55 | $36.24 | $39.00 | $176.24 |
| 0115 | Mowing (0107-2) | ACRE | 61.64 | $225.00 | $704.99 | $50.85 | $181.21 | $106.00 | $176.24 |
| 0120 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $32,238 | $62,504 | $39,550 | $73,773 | $75,000 | $290,512 |
| 0125 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $32,238 | $46,015 | $39,550 | $7,904.26 | $12,605 | $199,997 |
| 0130 | Removal of existing concrete (0110-4-10) | SY | 4,191 | $25.00 | $27.38 | $32.77 | $57.96 | $18.00 | $31.16 |
| 0135 | Regular excavation (0120-1) | CY | 3,770.50 | $14.00 | $37.21 | $50.85 | $36.89 | $18.00 | $64.61 |
| 0140 | Embankment (0120-6) | CY | 42 | $78.00 | $53.22 | $81.36 | $79.04 | $26.00 | $391.06 |
| 0145 | Type B stabilization (0160-4) | SY | 3,776 | $29.23 | $23.11 | $40.68 | $27.40 | $30.00 | $36.11 |
| 0150 | Optional base, base group 02 (0285-702) | SY | 219 | $49.47 | $44.14 | $51.98 | $27.40 | $31.95 | $70.40 |
| 0155 | Optional base, base group 11 (0285-711) | SY | 2,584 | $50.99 | $47.43 | $40.68 | $46.03 | $51.40 | $57.63 |
| 0160 | Optional base, base group 15 (0285-715) | SY | 427 | $85.25 | $129.28 | $71.19 | $129.48 | $105.80 | $76.96 |
| 0165 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 13,507 | $2.51 | $7.30 | $8.05 | $7.04 | $9.15 | $6.00 |
| 0170 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 8,734 | $2.21 | $12.02 | $6.68 | $5.62 | $7.30 | $7.00 |
| 0175 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 1,613.50 | $135.42 | $258.16 | $242.43 | $202.74 | $265.50 | $250.00 |
| 0180 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 2,164.70 | $158.93 | $246.46 | $263.82 | $199.59 | $258.40 | $260.00 |
| 0185 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 15 | $5,542.00 | $957.88 | $1,118.70 | $2,529.36 | $2,010.00 | $1,230.51 |
| 0190 | Inlets, curb, type 9, <10' (0425-1201) | EACH | 3 | $12,782 | $6,887.85 | $10,390 | $13,911 | $7,780.00 | $6,661.31 |
| 0195 | Inlets, curb, type 9, J bot, <10' (0425-1203) | EACH | 2 | $18,455 | $8,798.46 | $20,566 | $18,443 | $13,700 | $8,250.09 |
| 0200 | Inlets, curb, type P-1, <10' (0425-1311) | EACH | 2 | $14,002 | $8,274.69 | $9,605.00 | $14,544 | $12,650 | $10,841 |
| 0205 | Inlets, curb, type P-4, <10' (0425-1341) | EACH | 1 | $15,822 | $9,069.06 | $8,644.50 | $18,759 | $11,800 | $9,748.61 |
| 0210 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 1 | $13,521 | $8,740.86 | $9,831.00 | $13,911 | $10,450 | $8,712.06 |
| 0215 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 2 | $16,881 | $4,705.73 | $10,260 | $13,701 | $13,700 | $10,173 |
| 0220 | Inlets, curb, type P-6, partial (0425-1365) | EACH | 1 | $15,825 | $4,289.54 | $7,780.05 | $14,755 | $7,150.00 | $7,932.77 |
| 0225 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $16,992 | $7,100.42 | $12,430 | $11,593 | $11,800 | $7,296.71 |
| 0230 | Manholes, J-7, <10' (0425-2-71) | EACH | 3 | $14,825 | $10,116 | $20,058 | $15,809 | $16,700 | $8,042.26 |
| 0235 | Manholes, J-7, partial (0425-2-73) | EACH | 2 | $11,873 | $3,322.62 | $12,091 | $12,647 | $9,540.00 | $4,813.37 |
| 0240 | Junction box, drainage, P-7, <10' (0425-3-41) | EACH | 1 | $14,889 | $5,850.50 | $11,187 | $18,970 | $8,600.00 | $6,314.40 |
| 0245 | Manhole, adjust (0425-5) | EACH | 11 | $825.00 | $2,187.87 | $1,412.50 | $1,580.85 | $2,245.00 | $1,497.54 |
| 0250 | Manhole, adjust, utilities (0425-5-1) | EACH | 7 | $254.00 | $2,929.55 | $2,203.50 | $1,053.90 | $2,275.00 | $1,497.54 |
| 0255 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 68 | $257.00 | $372.67 | $197.75 | $189.70 | $571.00 | $297.87 |
| 0260 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 323 | $287.00 | $162.16 | $152.55 | $189.70 | $373.30 | $206.13 |
| 0265 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 4 | $954.00 | $826.93 | $192.10 | $843.12 | $2,062.00 | $690.18 |
| 0270 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 91 | $258.00 | $183.87 | $237.30 | $210.78 | $340.00 | $199.68 |
| 0275 | Pipe filling and plugging- place out of service (0430-830) | CY | 2.80 | $884.00 | $1,146.52 | $632.80 | $1,897.02 | $1,050.00 | $1,350.40 |
| 0280 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 1 | $4,225.00 | $3,289.98 | $5,480.50 | $3,688.65 | $2,700.00 | $2,177.97 |
| 0285 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 66 | $90.28 | $130.68 | $113.00 | $79.00 | $65.00 | $57.37 |
| 0290 | Concrete curb & gutter, type E (0520-1-7) | LF | 773 | $45.42 | $47.25 | $45.20 | $42.16 | $50.00 | $47.02 |
| 0295 | Concrete curb & gutter, type F (0520-1-10) | LF | 3,506 | $46.23 | $32.52 | $40.68 | $42.16 | $48.70 | $49.79 |
| 0300 | Valley gutter- concrete (0520-3) | LF | 114 | $115.58 | $56.58 | $92.66 | $68.50 | $46.90 | $45.64 |
| 0305 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 369 | $95.47 | $55.54 | $63.28 | $94.85 | $38.60 | $77.49 |
| 0310 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 574 | $97.45 | $45.94 | $59.89 | $94.85 | $38.60 | $50.00 |
| 0315 | Concrete traffic separator, special- variable width (0520-70) | SY | 156 | $159.24 | $100.47 | $162.72 | $189.70 | $81.00 | $93.49 |
| 0320 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 1,299 | $89.23 | $64.57 | $73.45 | $79.04 | $68.30 | $56.31 |
| 0325 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,422 | $125.41 | $99.26 | $96.05 | $100.12 | $82.70 | $110.39 |
| 0330 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 12 | $352.84 | $119.65 | $197.75 | $263.48 | $87.00 | $133.00 |
| 0335 | Detectable warnings (0527-2) | SF | 694 | $41.00 | $27.63 | $44.07 | $47.43 | $30.00 | $28.02 |
| 0340 | Fencing, type B, 5.1-6.0', standard (0550-10220) | LF | 277 | $37.84 | $24.91 | $46.33 | $31.33 | $26.70 | $23.43 |
| 0345 | Performance turf (0570-1-1) | SY | 1,039 | $7.00 | $5.53 | $19.21 | $3.11 | $3.62 | $16.67 |
| 0350 | Performance turf, sod (0570-1-2) | SY | 1,814 | $7.00 | $6.34 | $14.69 | $3.11 | $3.62 | $16.08 |
| 0355 | Conduit, furnish & install, open trench (0630-2-11) | LF | 60 | $33.11 | $28.18 | $18.99 | $25.63 | $27.30 | $24.50 |
| 0360 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 118 | $32.35 | $49.45 | $29.26 | $44.97 | $48.00 | $43.00 |
| 0365 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 3 | $2,114.00 | $1,313.30 | $1,766.14 | $1,194.44 | $1,276.00 | $1,142.00 |
| 0370 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 4 | $3,512.00 | $2,427.65 | $2,829.03 | $2,207.93 | $2,350.00 | $2,111.00 |
| 0375 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 4 | $2,198.00 | $2,370.15 | $3,012.53 | $2,155.63 | $2,300.00 | $2,061.00 |
| 0380 | Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132) | EACH | 2 | $8,588.00 | $6,988.55 | $7,032.39 | $6,356.04 | $6,780.00 | $6,077.00 |
| 0385 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 1 | $915.00 | $1,242.00 | $1,184.24 | $1,129.59 | $1,200.00 | $1,080.00 |
| 0390 | Raised pavement marker, type B (0706-1-3) | EACH | 1,432 | $4.97 | $5.22 | $5.09 | $4.81 | $5.05 | $4.50 |
| 0395 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 1.77 | $3,990.00 | $2,595.94 | $4,520.00 | $2,350.65 | $4,500.00 | $2,200.00 |
| 0400 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,911 | $2.28 | $1.15 | $2.26 | $1.07 | $2.23 | $1.00 |
| 0405 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 60 | $2.85 | $2.88 | $2.83 | $2.67 | $2.79 | $2.50 |
| 0410 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 980 | $3.42 | $3.45 | $3.39 | $3.21 | $3.35 | $3.00 |
| 0415 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.81 | $741.00 | $1,276.20 | $960.50 | $1,175.20 | $950.00 | $1,100.00 |
| 0420 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 6 | $51.30 | $57.50 | $50.85 | $53.49 | $51.00 | $50.00 |
| 0425 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 1.39 | $3,990.00 | $2,530.66 | $4,520.00 | $2,351.62 | $4,465.00 | $2,200.00 |
| 0430 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $45,000 | $45,000 | $45,000 | $45,000 | $45,000 | $45,000 |
| 0435 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $15,000 | $15,000 | $15,000 | $15,000 | $15,000 | $15,000 |
| 0440 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 0445 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 38 | $701.00 | $696.05 | $1,020.19 | $657.88 | $630.00 | $629.00 |
| 0450 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 12 | $2,155.00 | $2,300.00 | $2,486.39 | $2,400.38 | $2,230.00 | $2,295.00 |
| 0455 | Single column ground sign assembly, relocate (0700-1500) | EACH | 4 | $324.00 | $345.00 | $592.12 | $562.70 | $335.00 | $538.00 |
| 0460 | Single column ground sign assembly, remove (0700-1600) | EACH | 34 | $75.00 | $74.41 | $296.06 | $112.96 | $72.00 | $108.00 |
| 0465 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 1 | $4,112.00 | $4,025.00 | $1,776.36 | $13,890 | $3,900.00 | $13,280 |
| 0470 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 13 | $145.00 | $132.69 | $164.69 | $209.18 | $128.00 | $200.00 |
| 0475 | Enhanced highway sign AC powered, F&I ground mount, highlighted sign <12 SF (0700-141140) | EACH | 6 | $9,552.00 | $9,008.33 | $7,285.05 | $8,069.25 | $8,600.00 | $7,715.00 |
| 0480 | Object marker, type 1 (0705-10-1) | EACH | 3 | $427.00 | $230.00 | $529.96 | $314.82 | $223.46 | $301.00 |
| 0485 | Raised pavement marker, type B (0706-1-3) | EACH | 828 | $5.13 | $5.18 | $5.09 | $4.81 | $5.05 | $4.50 |
| 0490 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 49 | $5.70 | $9.20 | $5.65 | $8.56 | $5.60 | $8.00 |
| 0495 | Painted pavement markings, surface (0710-90) | LS | 1 | $19,950 | $27,600 | $23,391 | $25,672 | $23,000 | $24,000 |
| 0500 | Painted pavement markings, surface (0710-90) | LS | 1 | $7,752.00 | $6,900.00 | $11,187 | $6,418.13 | $11,000 | $6,000.00 |
| 0505 | Painted pavement markings, surface (0710-90) | LS | 1 | $3,420.00 | $6,900.00 | $3,390.00 | $6,418.13 | $3,350.00 | $6,000.00 |
| 0510 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 2,284 | $4.56 | $4.03 | $4.52 | $3.74 | $4.47 | $3.50 |
| 0515 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 60 | $5.70 | $5.75 | $5.65 | $5.35 | $5.59 | $5.00 |
| 0520 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 711 | $7.87 | $9.20 | $7.80 | $8.56 | $7.71 | $8.00 |
| 0525 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.26 | $2,850.00 | $1,610.00 | $2,825.00 | $1,491.80 | $2,800.00 | $1,400.00 |
| 0530 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 6 | $171.00 | $287.50 | $169.50 | $267.42 | $167.60 | $250.00 |
| 0535 | Thermoplastic, standard, arrow (0711-11170) | EACH | 33 | $114.00 | $115.00 | $113.00 | $106.97 | $111.73 | $100.00 |
| 0540 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 70 | $5.70 | $5.75 | $5.65 | $5.35 | $5.60 | $5.00 |
| 0545 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,399 | $15.96 | $18.91 | $15.82 | $17.11 | $15.60 | $16.00 |
| 0550 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 7 | $256.50 | $373.75 | $254.25 | $347.65 | $252.00 | $325.00 |
| 0555 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 5 | $108.30 | $201.25 | $107.35 | $187.20 | $107.00 | $175.00 |
| 0560 | Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191) | LF | 86 | $6.84 | $5.75 | $6.78 | $5.35 | $6.70 | $5.00 |
| 0565 | Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193) | LF | 1,433 | $11.40 | $10.35 | $11.30 | $9.63 | $11.20 | $9.00 |
| 0570 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.61 | $6,384.00 | $9,159.93 | $6,328.00 | $8,435.02 | $6,230.00 | $7,920.00 |
| 0575 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.68 | $1,824.00 | $1,840.00 | $1,808.00 | $1,696.32 | $1,770.00 | $1,600.00 |
| 0580 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.50 | $6,384.00 | $9,108.00 | $6,328.00 | $8,471.93 | $6,250.00 | $7,920.00 |
| 0585 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.20 | $1,824.00 | $1,843.38 | $1,808.00 | $1,677.94 | $1,750.00 | $1,600.00 |
| 0590 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 5 | $2,122.00 | $2,417.30 | $1,766.14 | $2,198.52 | $2,340.00 | $2,102.00 |
| 0595 | Lighting conductors, F&I, insulated, no. 10 or < (0715-1-11) | LF | 96 | $1.55 | $2.88 | $1.90 | $2.61 | $2.80 | $2.50 |
| 0600 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 646 | $2.51 | $3.16 | $2.30 | $2.88 | $3.00 | $2.75 |
| 0605 | Luminaire & bracket arm- galv steel, furnish & install new luminaire and arm on new/existing pole (0715-5-32) | EACH | 4 | $2,710.00 | $4,180.25 | $2,993.92 | $3,801.91 | $4,060.00 | $3,635.00 |
| 0610 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 4 | $1,241.00 | $948.75 | $988.79 | $862.88 | $920.00 | $825.00 |
| 0615 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.60 | $3,712.00 | $4,892.10 | $3,955.00 | $4,449.32 | $4,700.00 | $4,254.00 |
| 0620 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $2,781.00 | $1,957.30 | $2,994.50 | $1,780.15 | $1,900.00 | $1,702.00 |
| 0625 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,163 | $28.32 | $22.71 | $21.53 | $20.66 | $22.00 | $19.75 |
| 0630 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 7,945 | $37.25 | $40.14 | $31.79 | $36.50 | $39.00 | $34.90 |
| 0635 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 20 | $62.42 | $104.94 | $71.76 | $95.44 | $102.00 | $91.25 |
| 0640 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 6 | $15,557 | $11,867 | $13,386 | $10,793 | $11,500 | $10,319 |
| 0645 | Signal cable, remove- intersection (0632-7-6) | PI | 6 | $1,896.00 | $1,800.90 | $5,033.02 | $1,637.91 | $1,740.00 | $1,566.00 |
| 0650 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 165 | $3.95 | $5.51 | $4.24 | $4.97 | $5.30 | $4.75 |
| 0655 | Fiber optic cable, F&I, underground,49-96 fibers (0633-1123) | LF | 4,770 | $4.51 | $6.27 | $4.80 | $5.60 | $5.98 | $5.35 |
| 0660 | Fiber optic cable, install, underground (0633-1320) | LF | 100 | $3.12 | $4.34 | $3.39 | $3.94 | $4.20 | $3.77 |
| 0665 | Fiber optic cable, relocate, overhead (0633-1410) | LF | 130 | $3.12 | $4.31 | $3.39 | $3.92 | $4.19 | $3.75 |
| 0670 | Fiber optic cable, relocate, underground (0633-1420) | LF | 100 | $3.12 | $4.34 | $3.39 | $3.94 | $4.20 | $3.77 |
| 0675 | Fiber optic cable, remove, overhead (0633-1610) | LF | 2,245 | $1.41 | $1.78 | $1.41 | $1.62 | $1.70 | $1.55 |
| 0680 | Fiber optic connection, install, splice (0633-2-31) | EACH | 224 | $48.00 | $64.98 | $50.85 | $59.09 | $63.00 | $56.50 |
| 0685 | Fiber optic connection, install, termination (0633-2-32) | EACH | 24 | $85.00 | $108.10 | $84.75 | $98.32 | $105.00 | $94.00 |
| 0690 | Fiber optic connection hardware, F&I, splice enclosure (0633-3-11) | EACH | 5 | $1,450.00 | $1,851.50 | $1,446.40 | $1,683.92 | $1,798.00 | $1,610.00 |
| 0695 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 21 | $57.00 | $71.30 | $56.50 | $64.85 | $69.20 | $62.00 |
| 0700 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 1 | $1,441.00 | $1,814.70 | $1,418.15 | $1,650.46 | $1,760.00 | $1,578.00 |
| 0705 | Telephone cable, furnish & install (0633-4-11) | LF | 525 | $3.55 | $13.57 | $13.19 | $12.34 | $13.18 | $11.80 |
| 0710 | Fiber optic cable locator (0633-6) | DA | 590 | $95.00 | $226.55 | $222.05 | $206.05 | $220.00 | $197.00 |
| 0715 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 103 | $1,888.00 | $1,317.48 | $1,766.14 | $1,195.48 | $1,277.00 | $1,143.00 |
| 0720 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 10 | $3,199.00 | $3,392.50 | $3,035.17 | $3,062.44 | $3,270.00 | $2,928.00 |
| 0725 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 3 | $5,841.00 | $7,314.00 | $5,655.29 | $6,652.03 | $7,100.00 | $6,360.00 |
| 0730 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $5,442.00 | $7,627.95 | $5,366.05 | $6,937.56 | $7,400.00 | $6,633.00 |
| 0735 | Electrical power service, remove underground (0639-1620) | AS | 1 | $1,555.00 | $1,174.15 | $888.18 | $1,067.88 | $1,140.00 | $1,021.00 |
| 0740 | Electrical service wire, & install (0639-2-1) | LF | 115 | $11.00 | $8.92 | $6.20 | $8.11 | $8.60 | $7.75 |
| 0745 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,442.00 | $3,001.50 | $2,736.31 | $2,728.79 | $2,915.00 | $2,609.00 |
| 0750 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 7 | $1,282.00 | $359.79 | $1,184.24 | $327.37 | $349.00 | $313.00 |
| 0755 | Aluminum signals pole, (0646-1-11) | EACH | 45 | $3,448.00 | $3,168.89 | $3,966.69 | $2,873.13 | $3,069.00 | $2,747.00 |
| 0760 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 1 | $1,445.00 | $2,235.60 | $3,925.68 | $2,033.27 | $2,172.00 | $1,944.00 |
| 0765 | Aluminum signals pole, remove (0646-1-60) | EACH | 19 | $711.00 | $363.16 | $888.18 | $327.37 | $350.00 | $313.00 |
| 0770 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 1 | $105,554 | $101,123 | $84,331 | $91,971 | $98,200 | $87,933 |
| 0775 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 3 | $155,447 | $108,551 | $88,772 | $98,726 | $105,400 | $94,392 |
| 0780 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 4 | $7,441.00 | $16,011 | $11,544 | $14,562 | $15,550 | $13,923 |
| 0785 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 16 | $724.00 | $1,751.45 | $2,179.28 | $1,592.93 | $1,700.00 | $1,523.00 |
| 0790 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 15 | $725.00 | $658.95 | $805.03 | $599.31 | $640.00 | $573.00 |
| 0795 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 46 | $1,224.00 | $1,037.30 | $987.51 | $943.42 | $1,007.00 | $902.00 |
| 0800 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 13 | $85.00 | $120.75 | $148.03 | $109.82 | $117.30 | $105.00 |
| 0805 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 33 | $815.00 | $418.60 | $326.50 | $380.71 | $406.70 | $364.00 |
| 0810 | Loop detector inductive, F&I, type 10 (0660-1110) | EACH | 19 | $815.00 | $497.95 | $391.86 | $452.88 | $483.00 | $433.00 |
| 0815 | Loop assembly- F&I, type A (0660-2101) | AS | 2 | $2,114.00 | $1,748.00 | $1,821.12 | $1,589.80 | $1,698.00 | $1,520.00 |
| 0820 | Loop assembly, F&I, type B (0660-2102) | AS | 102 | $1,599.00 | $1,629.55 | $1,651.62 | $1,482.06 | $1,583.00 | $1,417.00 |
| 0825 | Loop assembly, F&I, type F (0660-2106) | AS | 89 | $1,994.00 | $1,735.35 | $1,990.62 | $1,578.29 | $1,685.00 | $1,509.00 |
| 0830 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 2 | $45,558 | $38,097 | $34,394 | $34,649 | $37,000 | $33,128 |
| 0835 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 6 | $9,982.00 | $6,811.45 | $6,774.14 | $6,194.96 | $6,615.00 | $5,923.00 |
| 0840 | Vehicle detection system- avi, bluetooth, furnish & install, cabinet equipment (0660-6121) | EACH | 1 | $999.00 | $1,649.10 | $5,296.40 | $1,499.84 | $1,600.00 | $1,434.00 |
| 0845 | Vehicle detection system- avi, bluetooth, furnish & install, above ground equipment (0660-6122) | EACH | 1 | $9,335.00 | $9,812.95 | $10,699 | $8,924.80 | $9,530.00 | $8,533.00 |
| 0850 | Signal priority and preemption system, F&I, optical, detector (0663-1112) | EACH | 4 | $12,442 | $2,732.40 | $3,778.29 | $2,485.10 | $2,650.00 | $2,376.00 |
| 0855 | Signal priority and preemption system, furnish and install, detector (0663-1122) | EACH | 1 | $12,442 | $9,057.40 | $7,018.29 | $8,237.64 | $8,800.00 | $7,876.00 |
| 0860 | Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123) | EACH | 1 | $12,998 | $11,683 | $8,638.29 | $10,625 | $11,350 | $10,159 |
| 0865 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 39 | $435.00 | $310.50 | $661.97 | $282.40 | $301.60 | $270.00 |
| 0870 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 8 | $1,999.00 | $1,873.35 | $2,014.75 | $1,703.80 | $1,820.00 | $1,629.00 |
| 0875 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 6 | $42.00 | $218.50 | $148.03 | $198.73 | $212.00 | $190.00 |
| 0880 | Traffic controller assembly, F&I, NEMA W/electronic lock, 2 preemption (0670-5172) | AS | 1 | $71,141 | $61,956 | $55,511 | $56,349 | $60,100 | $53,875 |
| 0885 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $925.00 | $1,758.35 | $2,516.51 | $1,599.20 | $1,700.00 | $1,529.00 |
| 0890 | Traffic controller, modify (0671-2-40) | EACH | 5 | $2,599.00 | $2,332.20 | $3,552.72 | $2,121.12 | $2,265.00 | $2,028.00 |
| 0895 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 1 | $7,114.00 | $10,886 | $7,565.35 | $9,900.65 | $10,570 | $9,466.00 |
| 0900 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $3,771.00 | $4,471.20 | $3,836.35 | $4,066.52 | $4,340.00 | $3,888.00 |
| 0905 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $17,722 | $20,012 | $13,507 | $18,201 | $19,440 | $17,402 |
| 0910 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 1 | $1,444.00 | $2,190.75 | $815.13 | $1,992.47 | $2,128.00 | $1,905.00 |
| 0915 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 6 | $315.00 | $128.80 | $148.03 | $117.14 | $125.00 | $112.00 |
| 0920 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 2 | $315.00 | $240.35 | $444.09 | $218.60 | $233.00 | $209.00 |
| 0925 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 12 | $4,991.00 | $4,069.85 | $5,332.29 | $3,701.50 | $3,950.00 | $3,539.00 |
| 0930 | Internally illuminated sign, remove (0700-5-60) | EACH | 4 | $515.00 | $359.95 | $740.15 | $327.37 | $350.00 | $313.00 |
| 0935 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 972 | $0.55 | $1.15 | $1.18 | $1.05 | $1.12 | $1.00 |
| 0940 | Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51) | EACH | 4 | $355.00 | $813.05 | $1,110.23 | $739.47 | $790.00 | $707.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of May 20, 2026. Compiled by Mirage Metrics.