FDOT contract T5863 bid tabulation

SR 434 FROM RANGELINE RD TO W OF SR 15/600 (US 17-92). Let by Florida DOT on May 20, 2026, Seminole, District 5. 6 bids received; low bid $5,972,774 by Masci General Contractors, Inc.

Owner
Florida DOT
Letting
20 MAY 2026
Pay items
188
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Masci General Contractors, Inc$5,972,774Low
2Garcia Civil Contractors$6,631,483+11%
3Chinchor Electric Inc.$6,946,158+16%
4Hubbard Construction Company$6,995,762+17%
5Southland Construction, Inc.$7,555,556+26%
6Atlantic Civil Constructors Corp$8,354,111+40%
FDOT contract T5863: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Masci General Contractors, Inc2. Garcia Civil Contractors3. Chinchor Electric Inc.4. Hubbard Construction Company5. Southland Construction, Inc.6. Atlantic Civil Constructors Corp
0005Mobilization (0101-1)LS1$149,852$505,895$453,383$838,343$420,000$974,402
0010Mobilization (0101-1)LS1$49,852$111,425$134,744$170,950$576,800$325,724
0015Mobilization (0101-1)LS1$129,852$71,425$134,146$113,030$9,000.00$65,656
0020Maintenance of traffic (0102-1)DA1$58,422$191,473$153,792$242,471$634,000$539,041
0025Maintenance of traffic (0102-1)DA1$58,422$18,884$93,081$34,728$222,300$326,387
0030Maintenance of traffic (0102-1)DA1$58,422$16,324$41,996$19,758$23,000$217,236
0035Special detour- temporary pavement (0102-2200)SY1$22,578$24,227$80,449$46,525$31,000$6,408.55
0040Traffic control officer (0102-14)HR392$85.00$96.81$107.35$98.37$95.00$100.00
0045Work zone sign (0102-60)ED37,334$0.25$0.23$0.25$0.25$0.25$0.20
0050Temporary barrier, F&I, low profile, concrete (0102-71-13)LF1,541$25.00$52.24$76.84$45.96$45.00$40.00
0055Temporary barrier, relocate, low profile concrete (0102-71-23)LF2,706$7.00$21.25$20.34$19.06$13.40$12.00
0060Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED26,930$0.14$0.11$0.12$0.12$0.12$0.09
0065Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD12,804$0.14$0.09$0.09$0.09$0.06$0.08
0070Temporary separator, F&I remove (0102-75-1)LF530$10.24$25.25$18.08$24.38$23.46$16.00
0075Arrow board / advance warning arrow panel (0102-76)ED360$5.21$5.46$5.37$5.60$4.97$4.75
0080Portable changeable message sign, temporary (0102-99)ED2,172$11.00$11.12$11.30$12.32$11.20$9.50
0085Temporary signalization and maintenance, intersection (0102-104)ED1,240$11.21$71.63$22.20$65.15$69.00$62.29
0090Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,240$11.21$1.15$22.20$1.05$1.10$1.00
0095Type III barricade (0102-115)ED866$0.30$0.33$0.32$0.31$0.29$0.28
0100Sediment barrier (0104-10-3)LF511$15.00$3.38$3.96$1.24$8.00$12.31
0105Inlet protection system (0104-18)EACH39$54.00$325.20$197.75$226.63$145.00$149.42
0110Litter removal (0107-1)ACRE76.62$45.00$191.63$39.55$36.24$39.00$176.24
0115Mowing (0107-2)ACRE61.64$225.00$704.99$50.85$181.21$106.00$176.24
0120Clearing & grubbing (0110-1-1)ACRE1$32,238$62,504$39,550$73,773$75,000$290,512
0125Clearing & grubbing (0110-1-1)ACRE1$32,238$46,015$39,550$7,904.26$12,605$199,997
0130Removal of existing concrete (0110-4-10)SY4,191$25.00$27.38$32.77$57.96$18.00$31.16
0135Regular excavation (0120-1)CY3,770.50$14.00$37.21$50.85$36.89$18.00$64.61
0140Embankment (0120-6)CY42$78.00$53.22$81.36$79.04$26.00$391.06
0145Type B stabilization (0160-4)SY3,776$29.23$23.11$40.68$27.40$30.00$36.11
0150Optional base, base group 02 (0285-702)SY219$49.47$44.14$51.98$27.40$31.95$70.40
0155Optional base, base group 11 (0285-711)SY2,584$50.99$47.43$40.68$46.03$51.40$57.63
0160Optional base, base group 15 (0285-715)SY427$85.25$129.28$71.19$129.48$105.80$76.96
0165Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY13,507$2.51$7.30$8.05$7.04$9.15$6.00
0170Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY8,734$2.21$12.02$6.68$5.62$7.30$7.00
0175Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN1,613.50$135.42$258.16$242.43$202.74$265.50$250.00
0180Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN2,164.70$158.93$246.46$263.82$199.59$258.40$260.00
0185Concrete class NS, gravity index 400-011 (0400-0-11)CY15$5,542.00$957.88$1,118.70$2,529.36$2,010.00$1,230.51
0190Inlets, curb, type 9, <10' (0425-1201)EACH3$12,782$6,887.85$10,390$13,911$7,780.00$6,661.31
0195Inlets, curb, type 9, J bot, <10' (0425-1203)EACH2$18,455$8,798.46$20,566$18,443$13,700$8,250.09
0200Inlets, curb, type P-1, <10' (0425-1311)EACH2$14,002$8,274.69$9,605.00$14,544$12,650$10,841
0205Inlets, curb, type P-4, <10' (0425-1341)EACH1$15,822$9,069.06$8,644.50$18,759$11,800$9,748.61
0210Inlets, curb, type P-5, <10' (0425-1351)EACH1$13,521$8,740.86$9,831.00$13,911$10,450$8,712.06
0215Inlets, curb, type P-6, <10' (0425-1361)EACH2$16,881$4,705.73$10,260$13,701$13,700$10,173
0220Inlets, curb, type P-6, partial (0425-1365)EACH1$15,825$4,289.54$7,780.05$14,755$7,150.00$7,932.77
0225Inlets, DT bot, type D, <10' (0425-1541)EACH1$16,992$7,100.42$12,430$11,593$11,800$7,296.71
0230Manholes, J-7, <10' (0425-2-71)EACH3$14,825$10,116$20,058$15,809$16,700$8,042.26
0235Manholes, J-7, partial (0425-2-73)EACH2$11,873$3,322.62$12,091$12,647$9,540.00$4,813.37
0240Junction box, drainage, P-7, <10' (0425-3-41)EACH1$14,889$5,850.50$11,187$18,970$8,600.00$6,314.40
0245Manhole, adjust (0425-5)EACH11$825.00$2,187.87$1,412.50$1,580.85$2,245.00$1,497.54
0250Manhole, adjust, utilities (0425-5-1)EACH7$254.00$2,929.55$2,203.50$1,053.90$2,275.00$1,497.54
0255Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF68$257.00$372.67$197.75$189.70$571.00$297.87
0260Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF323$287.00$162.16$152.55$189.70$373.30$206.13
0265Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF4$954.00$826.93$192.10$843.12$2,062.00$690.18
0270Pipe culvert,optional material,other-elip/arch, (0430-175218)LF91$258.00$183.87$237.30$210.78$340.00$199.68
0275Pipe filling and plugging- place out of service (0430-830)CY2.80$884.00$1,146.52$632.80$1,897.02$1,050.00$1,350.40
0280Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625)EACH1$4,225.00$3,289.98$5,480.50$3,688.65$2,700.00$2,177.97
0285Pipe handrail - guiderail, aluminum (0515-1-2)LF66$90.28$130.68$113.00$79.00$65.00$57.37
0290Concrete curb & gutter, type E (0520-1-7)LF773$45.42$47.25$45.20$42.16$50.00$47.02
0295Concrete curb & gutter, type F (0520-1-10)LF3,506$46.23$32.52$40.68$42.16$48.70$49.79
0300Valley gutter- concrete (0520-3)LF114$115.58$56.58$92.66$68.50$46.90$45.64
0305Traffic separator concrete- type I, 4' wide (0520-5-11)LF369$95.47$55.54$63.28$94.85$38.60$77.49
0310Traffic separator concrete- type IV, 4' wide (0520-5-41)LF574$97.45$45.94$59.89$94.85$38.60$50.00
0315Concrete traffic separator, special- variable width (0520-70)SY156$159.24$100.47$162.72$189.70$81.00$93.49
0320Concrete sidewalk and driveways, 4" thick (0522-1)SY1,299$89.23$64.57$73.45$79.04$68.30$56.31
0325Concrete sidewalk and driveways, 6" thick (0522-2)SY1,422$125.41$99.26$96.05$100.12$82.70$110.39
0330Concrete ditch pavement, non reinforced, 4" (0524-1-2)SY12$352.84$119.65$197.75$263.48$87.00$133.00
0335Detectable warnings (0527-2)SF694$41.00$27.63$44.07$47.43$30.00$28.02
0340Fencing, type B, 5.1-6.0', standard (0550-10220)LF277$37.84$24.91$46.33$31.33$26.70$23.43
0345Performance turf (0570-1-1)SY1,039$7.00$5.53$19.21$3.11$3.62$16.67
0350Performance turf, sod (0570-1-2)SY1,814$7.00$6.34$14.69$3.11$3.62$16.08
0355Conduit, furnish & install, open trench (0630-2-11)LF60$33.11$28.18$18.99$25.63$27.30$24.50
0360Conduit, furnish & install, directional bore (0630-2-12)LF118$32.35$49.45$29.26$44.97$48.00$43.00
0365Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH3$2,114.00$1,313.30$1,766.14$1,194.44$1,276.00$1,142.00
0370Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH4$3,512.00$2,427.65$2,829.03$2,207.93$2,350.00$2,111.00
0375Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH4$2,198.00$2,370.15$3,012.53$2,155.63$2,300.00$2,061.00
0380Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132)EACH2$8,588.00$6,988.55$7,032.39$6,356.04$6,780.00$6,077.00
0385Traffic monitoring site cabinet, remove existing cabinet (0695-7600)EACH1$915.00$1,242.00$1,184.24$1,129.59$1,200.00$1,080.00
0390Raised pavement marker, type B (0706-1-3)EACH1,432$4.97$5.22$5.09$4.81$5.05$4.50
0395Painted pavement markings, standard, white, solid, 6" (0710-11101)GM1.77$3,990.00$2,595.94$4,520.00$2,350.65$4,500.00$2,200.00
0400Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF1,911$2.28$1.15$2.26$1.07$2.23$1.00
0405Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF60$2.85$2.88$2.83$2.67$2.79$2.50
0410Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF980$3.42$3.45$3.39$3.21$3.35$3.00
0415Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM0.81$741.00$1,276.20$960.50$1,175.20$950.00$1,100.00
0420Painted pavement markings, standard, white, arrows (0710-11170)EACH6$51.30$57.50$50.85$53.49$51.00$50.00
0425Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM1.39$3,990.00$2,530.66$4,520.00$2,351.62$4,465.00$2,200.00
0430Initial contingency amount, DO not bid (0999-25)LS1$45,000$45,000$45,000$45,000$45,000$45,000
0435Initial contingency amount, DO not bid (0999-25)LS1$15,000$15,000$15,000$15,000$15,000$15,000
0440Initial contingency amount, DO not bid (0999-25)LS1$500.00$500.00$500.00$500.00$500.00$500.00
0445Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH38$701.00$696.05$1,020.19$657.88$630.00$629.00
0450Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH12$2,155.00$2,300.00$2,486.39$2,400.38$2,230.00$2,295.00
0455Single column ground sign assembly, relocate (0700-1500)EACH4$324.00$345.00$592.12$562.70$335.00$538.00
0460Single column ground sign assembly, remove (0700-1600)EACH34$75.00$74.41$296.06$112.96$72.00$108.00
0465Multi-column ground sign assembly, relocate (0700-2500)EACH1$4,112.00$4,025.00$1,776.36$13,890$3,900.00$13,280
0470Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH13$145.00$132.69$164.69$209.18$128.00$200.00
0475Enhanced highway sign AC powered, F&I ground mount, highlighted sign <12 SF (0700-141140)EACH6$9,552.00$9,008.33$7,285.05$8,069.25$8,600.00$7,715.00
0480Object marker, type 1 (0705-10-1)EACH3$427.00$230.00$529.96$314.82$223.46$301.00
0485Raised pavement marker, type B (0706-1-3)EACH828$5.13$5.18$5.09$4.81$5.05$4.50
0490Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF49$5.70$9.20$5.65$8.56$5.60$8.00
0495Painted pavement markings, surface (0710-90)LS1$19,950$27,600$23,391$25,672$23,000$24,000
0500Painted pavement markings, surface (0710-90)LS1$7,752.00$6,900.00$11,187$6,418.13$11,000$6,000.00
0505Painted pavement markings, surface (0710-90)LS1$3,420.00$6,900.00$3,390.00$6,418.13$3,350.00$6,000.00
0510Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF2,284$4.56$4.03$4.52$3.74$4.47$3.50
0515Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF60$5.70$5.75$5.65$5.35$5.59$5.00
0520Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF711$7.87$9.20$7.80$8.56$7.71$8.00
0525Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.26$2,850.00$1,610.00$2,825.00$1,491.80$2,800.00$1,400.00
0530Thermoplastic, standard, message or symbol (0711-11160)EACH6$171.00$287.50$169.50$267.42$167.60$250.00
0535Thermoplastic, standard, arrow (0711-11170)EACH33$114.00$115.00$113.00$106.97$111.73$100.00
0540Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF70$5.70$5.75$5.65$5.35$5.60$5.00
0545Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,399$15.96$18.91$15.82$17.11$15.60$16.00
0550Thermoplastic, preformed, white, message (0711-14160)EACH7$256.50$373.75$254.25$347.65$252.00$325.00
0555Thermoplastic, preformed, white, arrow (0711-14170)EACH5$108.30$201.25$107.35$187.20$107.00$175.00
0560Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191)LF86$6.84$5.75$6.78$5.35$6.70$5.00
0565Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193)LF1,433$11.40$10.35$11.30$9.63$11.20$9.00
0570Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM1.61$6,384.00$9,159.93$6,328.00$8,435.02$6,230.00$7,920.00
0575Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.68$1,824.00$1,840.00$1,808.00$1,696.32$1,770.00$1,600.00
0580Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.50$6,384.00$9,108.00$6,328.00$8,471.93$6,250.00$7,920.00
0585Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.20$1,824.00$1,843.38$1,808.00$1,677.94$1,750.00$1,600.00
0590Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH5$2,122.00$2,417.30$1,766.14$2,198.52$2,340.00$2,102.00
0595Lighting conductors, F&I, insulated, no. 10 or < (0715-1-11)LF96$1.55$2.88$1.90$2.61$2.80$2.50
0600Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF646$2.51$3.16$2.30$2.88$3.00$2.75
0605Luminaire & bracket arm- galv steel, furnish & install new luminaire and arm on new/existing pole (0715-5-32)EACH4$2,710.00$4,180.25$2,993.92$3,801.91$4,060.00$3,635.00
0610Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH4$1,241.00$948.75$988.79$862.88$920.00$825.00
0615Itsfm subsurface documentation- project length (0611-1-1)MI0.60$3,712.00$4,892.10$3,955.00$4,449.32$4,700.00$4,254.00
0620Itsfm location documentation- intersection (0611-2-1)EACH1$2,781.00$1,957.30$2,994.50$1,780.15$1,900.00$1,702.00
0625Conduit, furnish & install, open trench (0630-2-11)LF1,163$28.32$22.71$21.53$20.66$22.00$19.75
0630Conduit, furnish & install, directional bore (0630-2-12)LF7,945$37.25$40.14$31.79$36.50$39.00$34.90
0635Conduit, furnish & install, aboveground (0630-2-14)LF20$62.42$104.94$71.76$95.44$102.00$91.25
0640Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI6$15,557$11,867$13,386$10,793$11,500$10,319
0645Signal cable, remove- intersection (0632-7-6)PI6$1,896.00$1,800.90$5,033.02$1,637.91$1,740.00$1,566.00
0650Fiber optic cable, F&I, underground,13-48 fibers (0633-1122)LF165$3.95$5.51$4.24$4.97$5.30$4.75
0655Fiber optic cable, F&I, underground,49-96 fibers (0633-1123)LF4,770$4.51$6.27$4.80$5.60$5.98$5.35
0660Fiber optic cable, install, underground (0633-1320)LF100$3.12$4.34$3.39$3.94$4.20$3.77
0665Fiber optic cable, relocate, overhead (0633-1410)LF130$3.12$4.31$3.39$3.92$4.19$3.75
0670Fiber optic cable, relocate, underground (0633-1420)LF100$3.12$4.34$3.39$3.94$4.20$3.77
0675Fiber optic cable, remove, overhead (0633-1610)LF2,245$1.41$1.78$1.41$1.62$1.70$1.55
0680Fiber optic connection, install, splice (0633-2-31)EACH224$48.00$64.98$50.85$59.09$63.00$56.50
0685Fiber optic connection, install, termination (0633-2-32)EACH24$85.00$108.10$84.75$98.32$105.00$94.00
0690Fiber optic connection hardware, F&I, splice enclosure (0633-3-11)EACH5$1,450.00$1,851.50$1,446.40$1,683.92$1,798.00$1,610.00
0695Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH21$57.00$71.30$56.50$64.85$69.20$62.00
0700Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH1$1,441.00$1,814.70$1,418.15$1,650.46$1,760.00$1,578.00
0705Telephone cable, furnish & install (0633-4-11)LF525$3.55$13.57$13.19$12.34$13.18$11.80
0710Fiber optic cable locator (0633-6)DA590$95.00$226.55$222.05$206.05$220.00$197.00
0715Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH103$1,888.00$1,317.48$1,766.14$1,195.48$1,277.00$1,143.00
0720Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH10$3,199.00$3,392.50$3,035.17$3,062.44$3,270.00$2,928.00
0725Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH3$5,841.00$7,314.00$5,655.29$6,652.03$7,100.00$6,360.00
0730Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$5,442.00$7,627.95$5,366.05$6,937.56$7,400.00$6,633.00
0735Electrical power service, remove underground (0639-1620)AS1$1,555.00$1,174.15$888.18$1,067.88$1,140.00$1,021.00
0740Electrical service wire, & install (0639-2-1)LF115$11.00$8.92$6.20$8.11$8.60$7.75
0745Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,442.00$3,001.50$2,736.31$2,728.79$2,915.00$2,609.00
0750Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH7$1,282.00$359.79$1,184.24$327.37$349.00$313.00
0755Aluminum signals pole, (0646-1-11)EACH45$3,448.00$3,168.89$3,966.69$2,873.13$3,069.00$2,747.00
0760Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH1$1,445.00$2,235.60$3,925.68$2,033.27$2,172.00$1,944.00
0765Aluminum signals pole, remove (0646-1-60)EACH19$711.00$363.16$888.18$327.37$350.00$313.00
0770Steel mast arm assembly, and install, single arm 60' (0649-21-10)EACH1$105,554$101,123$84,331$91,971$98,200$87,933
0775Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH3$155,447$108,551$88,772$98,726$105,400$94,392
0780Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3)EACH4$7,441.00$16,011$11,544$14,562$15,550$13,923
0785Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS16$724.00$1,751.45$2,179.28$1,592.93$1,700.00$1,523.00
0790Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH15$725.00$658.95$805.03$599.31$640.00$573.00
0795Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS46$1,224.00$1,037.30$987.51$943.42$1,007.00$902.00
0800Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS13$85.00$120.75$148.03$109.82$117.30$105.00
0805Loop detector inductive, F&I, type 9 (0660-1109)EACH33$815.00$418.60$326.50$380.71$406.70$364.00
0810Loop detector inductive, F&I, type 10 (0660-1110)EACH19$815.00$497.95$391.86$452.88$483.00$433.00
0815Loop assembly- F&I, type A (0660-2101)AS2$2,114.00$1,748.00$1,821.12$1,589.80$1,698.00$1,520.00
0820Loop assembly, F&I, type B (0660-2102)AS102$1,599.00$1,629.55$1,651.62$1,482.06$1,583.00$1,417.00
0825Loop assembly, F&I, type F (0660-2106)AS89$1,994.00$1,735.35$1,990.62$1,578.29$1,685.00$1,509.00
0830Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH2$45,558$38,097$34,394$34,649$37,000$33,128
0835Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH6$9,982.00$6,811.45$6,774.14$6,194.96$6,615.00$5,923.00
0840Vehicle detection system- avi, bluetooth, furnish & install, cabinet equipment (0660-6121)EACH1$999.00$1,649.10$5,296.40$1,499.84$1,600.00$1,434.00
0845Vehicle detection system- avi, bluetooth, furnish & install, above ground equipment (0660-6122)EACH1$9,335.00$9,812.95$10,699$8,924.80$9,530.00$8,533.00
0850Signal priority and preemption system, F&I, optical, detector (0663-1112)EACH4$12,442$2,732.40$3,778.29$2,485.10$2,650.00$2,376.00
0855Signal priority and preemption system, furnish and install, detector (0663-1122)EACH1$12,442$9,057.40$7,018.29$8,237.64$8,800.00$7,876.00
0860Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123)EACH1$12,998$11,683$8,638.29$10,625$11,350$10,159
0865Pedestrian detector, furnish & install, standard (0665-1-11)EACH39$435.00$310.50$661.97$282.40$301.60$270.00
0870Pedestrian detector, furnish & install, accessible (0665-1-12)EACH8$1,999.00$1,873.35$2,014.75$1,703.80$1,820.00$1,629.00
0875Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH6$42.00$218.50$148.03$198.73$212.00$190.00
0880Traffic controller assembly, F&I, NEMA W/electronic lock, 2 preemption (0670-5172)AS1$71,141$61,956$55,511$56,349$60,100$53,875
0885Traffic controller assembly, remove controller with (0670-5600)AS1$925.00$1,758.35$2,516.51$1,599.20$1,700.00$1,529.00
0890Traffic controller, modify (0671-2-40)EACH5$2,599.00$2,332.20$3,552.72$2,121.12$2,265.00$2,028.00
0895ITS CCTV camera, pressurized, high definition (0682-1163)EACH1$7,114.00$10,886$7,565.35$9,900.65$10,570$9,466.00
0900Managed field ethernet switch, furnish & install (0684-1-1)EACH1$3,771.00$4,471.20$3,836.35$4,066.52$4,340.00$3,888.00
0905Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH1$17,722$20,012$13,507$18,201$19,440$17,402
0910Remote power management rpmu, furnish and install (0685-2-1)EACH1$1,444.00$2,190.75$815.13$1,992.47$2,128.00$1,905.00
0915Sign panel, remove, UP to 12 SF (0700-3601)EACH6$315.00$128.80$148.03$117.14$125.00$112.00
0920Sign panel, remove, 12-20 SF (0700-3602)EACH2$315.00$240.35$444.09$218.60$233.00$209.00
0925Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH12$4,991.00$4,069.85$5,332.29$3,701.50$3,950.00$3,539.00
0930Internally illuminated sign, remove (0700-5-60)EACH4$515.00$359.95$740.15$327.37$350.00$313.00
0935Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF972$0.55$1.15$1.18$1.05$1.12$1.00
0940Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51)EACH4$355.00$813.05$1,110.23$739.47$790.00$707.00
FDOT contract T5863: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of May 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy