FDOT letting results, June 11, 2025
13 contracts let by Florida DOT on June 11, 2025, $102,022,135 in low bids, a median of 5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 13
- Low bids, total
- $102,022,135
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T5851 | SR 500 (US 441) FROM N OF SR 50 TO SR 414 INTERCHANGE RAMPS | District 5 | 5 | JR. Davis Construction Co., Inc. | $35,181,705 | $38,677,299 | +10% | FDOT |
| T3852 | SR 30 (US 98 / US 319) FROM S OF FRANKLIN ST TO CARRABELLE.. | District 3 | 6 | American Sand & X-Cavation, Inc. DBA American Sand & Asphalt | $14,957,494 | $17,083,185 | +14% | FDOT |
| T1904 | SR 789 FROM E OF SUNSET DR TO BIRD KEY DR | District 1 | 2 | Russell Engineering, Inc. | $12,326,518 | $14,720,754 | +19% | FDOT |
| T5852 | SR 500 (US 441) FROM MILLS ST TO COLLEGE DR | District 5 | 5 | C.W. Roberts Contracting, Inc. | $8,337,454 | $8,394,558 | +1.0% | FDOT |
| T7563 | SR 39 (JAMES L REDMAN PKWY) AT TRAPNELL RD | District 7 | 5 | Webber, LLC | $8,023,564 | $8,347,298 | +4.0% | FDOT |
| T5855 | SR 530 (US 192) FROM SR 25 (US 27) TO ORANGE CO LINE | District 5 | 7 | Atlantic Civil Constructors Corp | $6,118,855 | $6,196,436 | +1.0% | FDOT |
| T7542 | SR 687 (4TH ST N) FROM SR 694 (GANDY BLVD) TO BIG ISLAND GAP | District 7 | 9 | Gosalia Concrete Constructors, Inc. | $4,497,500 | $4,637,401 | +3.0% | FDOT |
| T2A26 | SR A1A FROM S OF OCEAN SANDS TO S OF CARCABA RD | District 2 | 6 | Superior Construction Company Southeast, LLC | $3,740,629 | $4,242,712 | +13% | FDOT |
| T7564 | SR 60 FROM E OF BUCKINGHAM PLACE TO E OF LITHIA PINECREST RD | District 7 | 5 | Hubbard Construction Company | $3,729,122 | $3,754,002 | +1.0% | FDOT |
| T1914 | SR 35 (US 17) FROM REA RD TO SR 62 | District 1 | 6 | Sun Civil LLC | $2,078,979 | $2,103,069 | +1.0% | FDOT |
| T2A25 | SR A1A FROM GATE 5 NAVAL STATION MAYPORT TO S OF US COAST... | District 2 | 5 | Coxwell, J.B. Contracting, Inc. | $1,482,455 | $1,529,811 | +3.0% | FDOT |
| T3950 | SR 85 (N FERDON BLVD) AT JONES RD | District 3 | 3 | Anderson Columbia Co., Inc. | $998,662 | $1,221,464 | +22% | FDOT |
| T5856 | HIGH BRIDGE AND MAIN STREET BRIDGE FROM EB DRAWBRIDGE SIG... | District 5 | 5 | Traffic Control Devices, Inc. | $549,199 | $624,557 | +14% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way