American Sand & X-Cavation, Inc. DBA American Sand & Asphalt: FDOT bid record

American Sand & X-Cavation, Inc. DBA American Sand & Asphalt submitted 13 bids on Florida DOT contracts in the data, from 13 SEP 2023 to 11 JUN 2025, and was the low bidder on 3 of them (23%). When it was not low, its total sat a median +15% above the low bid.

Owner
Florida DOT
Low bid volume
$19,565,495
Latest bid
11 JUN 2025
Data through
28 OCT 2026
13Bids
3Low bids
23Win rate, percent
+15%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
2023400%
20244250%
20255120%
American Sand & X-Cavation, Inc. DBA American Sand & Asphalt, FDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Raised pavement marker, type B0706-1-3EACH246 (25%)$6.00$5.00
Removal of existing concrete0110-4-10SY106 (60%)$23.50$33.96
Miscellaneous asphalt0339-1TN86 (75%)$350.00$375.00
Milling existing asphalt pavement, 1 1/2" avg depth0327-70-6SY85 (63%)$3.00$4.61
Object marker, type 10705-10-1EACH75 (71%)$270.00$225.00
Work zone sign0102-60ED134 (31%)$0.38$0.25
Thermoplastic, standard, solid, 24" for stop line and crosswalk0711-11125LF124 (33%)$8.50$6.09
Thermoplastic, standard, arrow0711-11170EACH124 (33%)$112.62$80.00
Concrete curb & gutter, type F0520-1-10LF94 (44%)$55.00$42.32
Type B stabilization0160-4SY84 (50%)$17.00$15.00
Borrow excavation, truck measure0120-2-2CY84 (50%)$32.00$38.80
Superpave asphaltic concrete, traffic B, PG76-220334-1-52TN64 (67%)$160.00$169.09
American Sand & X-Cavation, Inc. DBA American Sand & Asphalt, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
C.W. Roberts Contracting, Inc.139 of 13
Anderson Columbia Co., Inc.114 of 11
Roberts and Roberts, Inc.63 of 6
Southeast Construction Company LLC32 of 3
Pigott Asphalt and Sitework LLC21 of 2
Capital Asphalt Inc10 of 1
American Sand & X-Cavation, Inc. DBA American Sand & Asphalt, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
11 JUN 2025T3852District 3SR 30 (US 98 / US 319) FROM S OF FRANKLIN ST TO CARRABELLE..1 of 6$14,957,494Low, 14% under the second
28 MAY 2025T3938District 3SR 10 (US 90) AND SR 79 FROM E OF BANFILL AVE TO E OF...3 of 4$5,439,420+20%
26 MAR 2025T3942District 3SR 8 (I-10) FROM W OF SR 81 TO CHOCTAWHATCHEE RIVER BRIDGE2 of 3$12,160,048+14%
26 MAR 2025T3972District 3SR 77 FROM S OF SR 273 TO JACKSON CO LINE4 of 4$2,264,741+15%
29 JAN 2025T3917District 3SR 71 FROM S OF CR 275 TO SR 69 (PEAR ST)3 of 4$7,572,756+11%
28 AUG 2024T3913District 3SR 77 (COTTON ST) FROM S OF BROWN ST TO N OF COLLEGE DR1 of 4$2,531,784Low, 0.0% under the second
12 JUN 2024T3871District 3SR 30 (US 98) FROM W OF CANAL PKWY TO GULF CO LINE3 of 5$3,569,123+15%
24 APR 2024T3893District 3CR 389 (E 12TH ST) FROM SR 390 TO PENNSYLVANIA AVE1 of 4$2,076,217Low, 7.0% under the second
24 APR 2024T3894District 3SR 30/30A (US 98/15TH ST) FROM E OF 23RD ST FLYOVER TO JENKS3 of 3$13,063,012+19%
06 DEC 2023T3876District 3SR 10 (US 90) FROM WALTON CO LINE TO E OF CSX RAILROAD3 of 3$5,968,574+3.0%
25 OCT 2023T3880District 3SR 71 FROM S OF BRITT AVE TO THE CALHOUN COUNTY LINE3 of 3$4,133,104+22%
27 SEP 2023T3881District 3SR 20 FROM E OF APALACHICOLA RIVER BRIDGE TO E OF NW REV...3 of 3$2,798,402+31%
13 SEP 2023T3875District 3SR 75 (US 231) FROM N OF BROCK RD TO S OF DILMORE RD2 of 3$5,386,736+11%
American Sand & X-Cavation, Inc. DBA American Sand & Asphalt: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy