American Sand & X-Cavation, Inc. DBA American Sand & Asphalt: FDOT bid record
American Sand & X-Cavation, Inc. DBA American Sand & Asphalt submitted 13 bids on Florida DOT contracts in the data, from 13 SEP 2023 to 11 JUN 2025, and was the low bidder on 3 of them (23%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $19,565,495
- Latest bid
- 11 JUN 2025
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 4 | 0 | 0% |
| 2024 | 4 | 2 | 50% |
| 2025 | 5 | 1 | 20% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Raised pavement marker, type B | 0706-1-3 | EACH | 24 | 6 (25%) | $6.00 | $5.00 |
| Removal of existing concrete | 0110-4-10 | SY | 10 | 6 (60%) | $23.50 | $33.96 |
| Miscellaneous asphalt | 0339-1 | TN | 8 | 6 (75%) | $350.00 | $375.00 |
| Milling existing asphalt pavement, 1 1/2" avg depth | 0327-70-6 | SY | 8 | 5 (63%) | $3.00 | $4.61 |
| Object marker, type 1 | 0705-10-1 | EACH | 7 | 5 (71%) | $270.00 | $225.00 |
| Work zone sign | 0102-60 | ED | 13 | 4 (31%) | $0.38 | $0.25 |
| Thermoplastic, standard, solid, 24" for stop line and crosswalk | 0711-11125 | LF | 12 | 4 (33%) | $8.50 | $6.09 |
| Thermoplastic, standard, arrow | 0711-11170 | EACH | 12 | 4 (33%) | $112.62 | $80.00 |
| Concrete curb & gutter, type F | 0520-1-10 | LF | 9 | 4 (44%) | $55.00 | $42.32 |
| Type B stabilization | 0160-4 | SY | 8 | 4 (50%) | $17.00 | $15.00 |
| Borrow excavation, truck measure | 0120-2-2 | CY | 8 | 4 (50%) | $32.00 | $38.80 |
| Superpave asphaltic concrete, traffic B, PG76-22 | 0334-1-52 | TN | 6 | 4 (67%) | $160.00 | $169.09 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| C.W. Roberts Contracting, Inc. | 13 | 9 of 13 |
| Anderson Columbia Co., Inc. | 11 | 4 of 11 |
| Roberts and Roberts, Inc. | 6 | 3 of 6 |
| Southeast Construction Company LLC | 3 | 2 of 3 |
| Pigott Asphalt and Sitework LLC | 2 | 1 of 2 |
| Capital Asphalt Inc | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 JUN 2025 | T3852 | District 3 | SR 30 (US 98 / US 319) FROM S OF FRANKLIN ST TO CARRABELLE.. | 1 of 6 | $14,957,494 | Low, 14% under the second |
| 28 MAY 2025 | T3938 | District 3 | SR 10 (US 90) AND SR 79 FROM E OF BANFILL AVE TO E OF... | 3 of 4 | $5,439,420 | +20% |
| 26 MAR 2025 | T3942 | District 3 | SR 8 (I-10) FROM W OF SR 81 TO CHOCTAWHATCHEE RIVER BRIDGE | 2 of 3 | $12,160,048 | +14% |
| 26 MAR 2025 | T3972 | District 3 | SR 77 FROM S OF SR 273 TO JACKSON CO LINE | 4 of 4 | $2,264,741 | +15% |
| 29 JAN 2025 | T3917 | District 3 | SR 71 FROM S OF CR 275 TO SR 69 (PEAR ST) | 3 of 4 | $7,572,756 | +11% |
| 28 AUG 2024 | T3913 | District 3 | SR 77 (COTTON ST) FROM S OF BROWN ST TO N OF COLLEGE DR | 1 of 4 | $2,531,784 | Low, 0.0% under the second |
| 12 JUN 2024 | T3871 | District 3 | SR 30 (US 98) FROM W OF CANAL PKWY TO GULF CO LINE | 3 of 5 | $3,569,123 | +15% |
| 24 APR 2024 | T3893 | District 3 | CR 389 (E 12TH ST) FROM SR 390 TO PENNSYLVANIA AVE | 1 of 4 | $2,076,217 | Low, 7.0% under the second |
| 24 APR 2024 | T3894 | District 3 | SR 30/30A (US 98/15TH ST) FROM E OF 23RD ST FLYOVER TO JENKS | 3 of 3 | $13,063,012 | +19% |
| 06 DEC 2023 | T3876 | District 3 | SR 10 (US 90) FROM WALTON CO LINE TO E OF CSX RAILROAD | 3 of 3 | $5,968,574 | +3.0% |
| 25 OCT 2023 | T3880 | District 3 | SR 71 FROM S OF BRITT AVE TO THE CALHOUN COUNTY LINE | 3 of 3 | $4,133,104 | +22% |
| 27 SEP 2023 | T3881 | District 3 | SR 20 FROM E OF APALACHICOLA RIVER BRIDGE TO E OF NW REV... | 3 of 3 | $2,798,402 | +31% |
| 13 SEP 2023 | T3875 | District 3 | SR 75 (US 231) FROM N OF BROCK RD TO S OF DILMORE RD | 2 of 3 | $5,386,736 | +11% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.