FDOT contract T3917 bid tabulation
SR 71 FROM S OF CR 275 TO SR 69 (PEAR ST). Let by Florida DOT on January 29, 2025, Calhoun, District 3. 4 bids received; low bid $6,818,033 by Roberts and Roberts, Inc..
- Owner
- Florida DOT
- Letting
- 29 JAN 2025
- Pay items
- 117
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Roberts and Roberts, Inc. | $6,818,033 | Low |
| 2 | C.W. Roberts Contracting, Inc. | $7,483,272 | +10% |
| 3 | American Sand & X-Cavation, Inc. DBA American Sand & Asphalt | $7,572,756 | +11% |
| 4 | Anderson Columbia Co., Inc. | $8,151,538 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Roberts and Roberts, Inc. | 2. C.W. Roberts Contracting, Inc. | 3. American Sand & X-Cavation, Inc. DBA American Sand & Asphalt | 4. Anderson Columbia Co., Inc. |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $365,000 | $431,500 | $150,000 | $360,603 |
| 0010 | Mobilization (0101-1) | LS | 1 | $55,000 | $46,000 | $150,000 | $100,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $175,000 | $339,000 | $125,000 | $322,164 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $20,000 | $44,000 | $125,000 | $141,552 |
| 0025 | Special detour- temporary pavement (0102-2200) | SY | 1 | $65,000 | $93,000 | $20,000 | $137,053 |
| 0030 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $120,000 | $89,000 | $20,000 | $143,356 |
| 0035 | Traffic control officer (0102-14) | HR | 64 | $100.00 | $100.00 | $120.00 | $106.92 |
| 0040 | Work zone sign (0102-60) | ED | 15,148 | $0.50 | $0.35 | $0.42 | $0.39 |
| 0045 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 184 | $51.80 | $48.00 | $54.00 | $50.48 |
| 0050 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 1,263 | $34.50 | $32.00 | $36.00 | $33.65 |
| 0055 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 63,745 | $0.20 | $0.10 | $0.12 | $0.11 |
| 0060 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 10,485 | $0.20 | $0.15 | $0.18 | $0.17 |
| 0065 | Arrow board / advance warning arrow panel (0102-76) | ED | 1,560 | $8.00 | $7.40 | $8.40 | $7.85 |
| 0070 | Temporary crash cushion, redirective option (0102-89-1) | LO | 8 | $1,380.00 | $1,300.00 | $1,440.00 | $1,346.16 |
| 0075 | Portable changeable message sign, temporary (0102-99) | ED | 801 | $20.70 | $19.00 | $21.60 | $20.19 |
| 0080 | Temporary signalization and maintenance, intersection (0102-104) | ED | 780 | $18.40 | $17.00 | $19.20 | $16.83 |
| 0085 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 780 | $18.40 | $17.00 | $19.20 | $16.83 |
| 0090 | Type III barricade (0102-115) | ED | 17 | $11.50 | $11.00 | $12.00 | $11.22 |
| 0095 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 390 | $36.80 | $32.00 | $36.00 | $33.65 |
| 0100 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.44 | $10,600 | $8,900.00 | $10,200 | $10,377 |
| 0105 | Removable tape, white, 24" stop bar (0102-913-23) | LF | 24 | $5.80 | $11.00 | $12.00 | $5.61 |
| 0110 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.24 | $10,600 | $9,800.00 | $11,400 | $10,377 |
| 0115 | Sediment barrier (0104-10-3) | LF | 1,156 | $4.90 | $6.35 | $6.00 | $4.44 |
| 0120 | Floating turbidity barrier (0104-11) | LF | 297 | $33.70 | $20.00 | $29.39 | $41.58 |
| 0125 | Inlet protection system (0104-18) | EACH | 20 | $370.00 | $430.00 | $500.00 | $309.83 |
| 0130 | Litter removal (0107-1) | ACRE | 381.81 | $69.00 | $63.00 | $72.00 | $44.87 |
| 0135 | Mowing (0107-2) | ACRE | 373.23 | $46.00 | $42.00 | $48.00 | $67.31 |
| 0140 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $80,000 | $196,000 | $40,000 | $172,601 |
| 0145 | Removal of existing concrete (0110-4-10) | SY | 827 | $50.00 | $34.00 | $20.00 | $54.49 |
| 0150 | Regular excavation (0120-1) | CY | 161 | $16.00 | $33.00 | $24.00 | $43.17 |
| 0155 | Borrow excavation, truck measure (0120-2-2) | CY | 256 | $21.00 | $32.00 | $22.00 | $50.59 |
| 0160 | Subsoil excavation (0120-4) | CY | 158 | $41.00 | $29.00 | $29.00 | $39.85 |
| 0165 | Type B stabilization (0160-4) | SY | 653 | $8.00 | $21.00 | $15.00 | $33.66 |
| 0170 | Optional base, base group 01 (0285-701) | SY | 2,585 | $18.00 | $19.00 | $22.00 | $48.19 |
| 0175 | Optional base, base group 06 (0285-706) | SY | 446 | $57.70 | $42.00 | $32.00 | $83.27 |
| 0180 | Optional base, base group 15 (0285-715) | SY | 226 | $81.60 | $150.00 | $100.00 | $190.17 |
| 0185 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 51,262 | $2.05 | $2.00 | $2.00 | $3.60 |
| 0190 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 20,435 | $2.05 | $3.30 | $2.75 | $7.42 |
| 0195 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 129,260 | $2.05 | $1.15 | $2.75 | $2.93 |
| 0200 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 12,570.10 | $130.00 | $144.00 | $150.00 | $139.33 |
| 0205 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 16,629.30 | $132.00 | $141.00 | $165.00 | $140.34 |
| 0210 | Concrete class IV, culverts (0400-4-1) | CY | 3.30 | $5,400.00 | $6,400.00 | $4,500.00 | $2,970.12 |
| 0215 | Restore spalled areas, latex modified mortar- acrylic (0401-70-3) | CF | 0.70 | $5,750.00 | $1,900.00 | $6,000.00 | $6,534.28 |
| 0220 | Restore spalled areas, shotcrete (0401-70-7) | CF | 143.40 | $290.00 | $610.00 | $204.40 | $425.91 |
| 0225 | Epoxy material for crack injection- structures rehab (0411-1) | GA | 20 | $345.00 | $1,700.00 | $360.00 | $314.83 |
| 0230 | Cracks inject & seal- structures rehab (0411-2) | LF | 11 | $522.80 | $430.00 | $545.46 | $196.03 |
| 0235 | Material for crack injection, water reactive polyurethane grout (0412-1-1) | GA | 39 | $116.00 | $630.00 | $121.80 | $534.63 |
| 0240 | Inject & seal crack, other materials (0412-2) | LF | 76 | $116.00 | $360.00 | $121.80 | $371.26 |
| 0245 | Manhole, adjust (0425-5) | EACH | 4 | $1,760.00 | $6,300.00 | $4,000.00 | $4,930.21 |
| 0250 | Valve boxes, adjust (0425-6) | EACH | 5 | $1,560.00 | $300.00 | $3,000.00 | $4,831.61 |
| 0255 | Pipe culvert, optional material, round, 24"SD (0430-174124) | LF | 44 | $264.00 | $130.00 | $140.00 | $699.08 |
| 0260 | Mitered end section, optional round, 24" SD (0430-984129) | EACH | 2 | $2,223.00 | $2,800.00 | $3,386.21 | $4,904.53 |
| 0265 | Concrete curb & gutter, type F (0520-1-10) | LF | 811 | $57.50 | $53.00 | $55.00 | $50.48 |
| 0270 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 430 | $143.00 | $79.00 | $70.00 | $123.40 |
| 0275 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 258 | $200.00 | $94.00 | $90.00 | $168.27 |
| 0280 | Detectable warnings (0527-2) | SF | 419 | $33.00 | $40.00 | $33.00 | $40.85 |
| 0285 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 11.20 | $400.00 | $240.00 | $300.00 | $421.09 |
| 0290 | Performance turf, sod (0570-1-2) | SY | 31,448 | $1.65 | $3.55 | $6.00 | $3.20 |
| 0295 | Raised pavement marker, type B (0706-1-3) | EACH | 3,968 | $6.40 | $4.20 | $12.00 | $6.17 |
| 0300 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 19.25 | $1,150.00 | $1,600.00 | $1,800.00 | $1,121.80 |
| 0305 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.09 | $977.00 | $1,500.00 | $1,850.00 | $953.53 |
| 0310 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,422 | $1.20 | $2.80 | $3.18 | $1.12 |
| 0315 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 327 | $0.30 | $2.85 | $2.24 | $0.28 |
| 0320 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 573 | $2.30 | $3.00 | $3.42 | $2.24 |
| 0325 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 11.68 | $1,955.00 | $1,500.00 | $1,740.00 | $1,907.06 |
| 0330 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 5.51 | $920.00 | $1,200.00 | $1,320.00 | $897.44 |
| 0335 | Two component polyurethane injection (0906-173200) | LB | 3,009 | $11.70 | $30.75 | $12.18 | $15.99 |
| 0340 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $80,742 | $80,742 | $80,742 | $80,742 |
| 0345 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $2,332.02 | $2,332.02 | $2,332.02 | $2,332.02 |
| 0350 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 25.01 | $1,900.00 | $2,300.00 | $2,414.00 | $2,702.39 |
| 0355 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 18 | $500.00 | $460.00 | $600.00 | $487.98 |
| 0360 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $230.00 | $210.00 | $72.00 | $487.98 |
| 0365 | Single column ground sign assembly, remove (0700-1600) | EACH | 9 | $57.50 | $53.00 | $120.00 | $56.09 |
| 0370 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 9 | $242.00 | $220.00 | $240.00 | $235.58 |
| 0375 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 2 | $86.00 | $79.00 | $60.00 | $84.13 |
| 0380 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 9 | $40.00 | $37.00 | $30.00 | $39.26 |
| 0385 | Object marker, type 1 (0705-10-1) | EACH | 15 | $345.00 | $320.00 | $300.00 | $336.54 |
| 0390 | Delineator, flexible tubular (0705-11-1) | EACH | 39 | $75.00 | $69.00 | $180.00 | $72.92 |
| 0395 | Raised pavement marker, type B (0706-1-3) | EACH | 2,253 | $6.40 | $4.20 | $4.74 | $6.17 |
| 0400 | Painted pavement markings, surface (0710-90) | LS | 1 | $102,000 | $69,000 | $78,000 | $99,728 |
| 0405 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,422 | $5.80 | $5.30 | $6.00 | $5.61 |
| 0410 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 327 | $6.90 | $6.35 | $7.20 | $6.73 |
| 0415 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 628 | $9.20 | $7.40 | $8.40 | $8.97 |
| 0420 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 1 | $230.00 | $370.00 | $420.00 | $224.36 |
| 0425 | Thermoplastic, standard, arrow (0711-11170) | EACH | 14 | $115.00 | $85.00 | $96.00 | $112.18 |
| 0430 | Thermoplastic, standard, yield line (0711-11180) | LF | 41 | $6.90 | $16.00 | $18.00 | $6.73 |
| 0435 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 493 | $6.90 | $6.35 | $7.20 | $6.73 |
| 0440 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.12 | $3,000.00 | $7,900.00 | $9,000.00 | $2,916.68 |
| 0445 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 423 | $18.40 | $13.00 | $14.40 | $17.95 |
| 0450 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 19.36 | $6,325.00 | $5,500.00 | $6,240.00 | $6,169.89 |
| 0455 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.04 | $6,670.00 | $13,000 | $18,000 | $6,506.43 |
| 0460 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 11.82 | $6,325.00 | $5,500.00 | $6,240.00 | $6,169.89 |
| 0465 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 5.63 | $3,000.00 | $2,600.00 | $3,000.00 | $2,916.68 |
| 0470 | Conduit, furnish & install, open trench (0630-2-11) | LF | 54 | $18.40 | $17.00 | $19.20 | $22.44 |
| 0475 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 481 | $36.80 | $34.00 | $38.40 | $39.26 |
| 0480 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 11 | $1,840.00 | $1,700.00 | $1,920.00 | $1,738.79 |
| 0485 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 3 | $3,680.00 | $3,400.00 | $3,840.00 | $5,048.09 |
| 0490 | Electrical service wire, & install (0639-2-1) | LF | 150 | $5.80 | $5.30 | $6.00 | $11.22 |
| 0495 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 3 | $2,500.00 | $2,300.00 | $2,640.00 | $2,467.96 |
| 0500 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 2,289 | $3.80 | $3.45 | $3.90 | $5.61 |
| 0505 | Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51) | EACH | 1 | $575.00 | $530.00 | $600.00 | $336.54 |
| 0510 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 3 | $20,700 | $19,000 | $21,600 | $15,705 |
| 0515 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 3 | $2,300.00 | $2,100.00 | $2,400.00 | $1,458.34 |
| 0520 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 8' arm length (0715-61111) | EACH | 1 | $13,225 | $12,000 | $13,800 | $12,340 |
| 0525 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 8' arm length (0715-61211) | EACH | 6 | $13,800 | $12,700 | $14,400 | $13,462 |
| 0530 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 7 | $920.00 | $850.00 | $960.00 | $1,009.62 |
| 0535 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 80 | $36.80 | $34.00 | $38.40 | $56.09 |
| 0540 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $9,200.00 | $8,500.00 | $9,600.00 | $11,218 |
| 0545 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $1,840.00 | $1,700.00 | $1,920.00 | $1,570.52 |
| 0550 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 4 | $862.00 | $790.00 | $900.00 | $2,243.60 |
| 0555 | Aluminum signals pole, (0646-1-11) | EACH | 4 | $3,200.00 | $3,000.00 | $3,360.00 | $4,487.19 |
| 0560 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 4 | $862.00 | $790.00 | $900.00 | $712.34 |
| 0565 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 4 | $2,500.00 | $2,300.00 | $2,640.00 | $2,467.96 |
| 0570 | Loop assembly, F&I, type B (0660-2102) | AS | 2 | $1,600.00 | $1,500.00 | $1,680.00 | $1,682.70 |
| 0575 | Loop assembly, F&I, type F (0660-2106) | AS | 4 | $1,950.00 | $1,800.00 | $2,040.00 | $2,804.50 |
| 0580 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 8 | $405.00 | $370.00 | $420.00 | $1,076.93 |
| 0585 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 3 | $9,200.00 | $8,500.00 | $9,600.00 | $4,487.19 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.