FDOT contract T3852 bid tabulation
SR 30 (US 98 / US 319) FROM S OF FRANKLIN ST TO CARRABELLE.. Let by Florida DOT on June 11, 2025, Franklin, District 3. 6 bids received; low bid $14,957,494 by American Sand & X-Cavation, Inc. DBA American Sand & Asphalt.
- Owner
- Florida DOT
- Letting
- 11 JUN 2025
- Pay items
- 147
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | American Sand & X-Cavation, Inc. DBA American Sand & Asphalt | $14,957,494 | Low |
| 2 | Roberts and Roberts, Inc. | $17,083,185 | +14% |
| 3 | C.W. Roberts Contracting, Inc. | $17,847,745 | +19% |
| 4 | Anderson Columbia Co., Inc. | $18,812,944 | +26% |
| 5 | Pigott Asphalt and Sitework LLC | $19,924,200 | +33% |
| 6 | Capital Asphalt Inc | $24,147,983 | +61% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. American Sand & X-Cavation, Inc. DBA American Sand & Asphalt | 2. Roberts and Roberts, Inc. | 3. C.W. Roberts Contracting, Inc. | 4. Anderson Columbia Co., Inc. | 5. Pigott Asphalt and Sitework LLC | 6. Capital Asphalt Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Geosynthetic reinforced foundation over soft soil (0145-2) | SY | 414 | $116.89 | $6.40 | $38.00 | $226.02 | $200.00 | $125.00 |
| 0010 | Concrete class IV, culverts (0400-4-1) | CY | 420.30 | $2,136.49 | $1,719.00 | $1,800.00 | $4,507.94 | $2,000.00 | $2,300.00 |
| 0015 | Fiber reinforced polymer bars, #3 bar (0415-10-3) | LF | 1,197 | $2.55 | $3.20 | $3.00 | $4.03 | $2.85 | $2.75 |
| 0020 | Fiber reinforced polymer bars, #4 bar (0415-10-4) | LF | 37,674 | $1.83 | $4.20 | $3.95 | $3.92 | $3.69 | $2.00 |
| 0025 | Fiber reinforced polymer bars, #5 bar (0415-10-5) | LF | 18,077 | $2.52 | $4.40 | $4.20 | $4.40 | $3.95 | $2.75 |
| 0030 | Fiber reinforced polymer bars, #6 bar (0415-10-6) | LF | 6,038 | $2.47 | $5.40 | $5.05 | $5.05 | $4.79 | $2.50 |
| 0035 | Fiber reinforced polymer bars, #7 bar (0415-10-7) | LF | 6,143 | $3.07 | $5.80 | $5.50 | $5.91 | $5.19 | $3.25 |
| 0040 | Fiber reinforced polymer bars, #8 bar (0415-10-8) | LF | 5,576 | $3.63 | $6.10 | $5.80 | $6.39 | $5.50 | $4.00 |
| 0045 | Fiber reinforced polymer bars, #10 bar (0415-10-10) | LF | 28,142 | $8.11 | $9.40 | $6.60 | $7.02 | $6.25 | $9.00 |
| 0050 | Sheet piling steel, temporary- critical (0455-133-2) | SF | 4,838 | $84.57 | $64.70 | $62.00 | $99.50 | $62.50 | $91.50 |
| 0055 | Bedding stone (0530-74) | TN | 537.90 | $195.61 | $149.20 | $130.00 | $263.67 | $195.00 | $210.00 |
| 0060 | Retaining wall system,temporary, excluding barrier (0548-13) | SF | 1,014 | $141.00 | $73.10 | $70.00 | $88.65 | $100.00 | $150.00 |
| 0065 | Mobilization (0101-1) | LS | 1 | $300,000 | $1,310,000 | $1,115,000 | $873,578 | $2,500,000 | $2,750,000 |
| 0070 | Mobilization (0101-1) | LS | 1 | $400,000 | $35,000 | $15,000 | $50,000 | $325,000 | $50,000 |
| 0075 | Mobilization (0101-1) | LS | 1 | $400,000 | $320,000 | $360,000 | $692,447 | $150,000 | $550,000 |
| 0080 | Maintenance of traffic (0102-1) | DA | 1 | $200,000 | $200,000 | $830,000 | $474,064 | $690,000 | $1,475,000 |
| 0085 | Maintenance of traffic (0102-1) | DA | 1 | $200,000 | $20,000 | $4,000.00 | $25,000 | $250,000 | $25,000 |
| 0090 | Maintenance of traffic (0102-1) | DA | 1 | $200,000 | $410,000 | $420,000 | $25,000 | $184,000 | $375,000 |
| 0095 | Special detour- temporary pavement (0102-2200) | SY | 1 | $150,000 | $10,000 | $1,100.00 | $17,031 | $75,000 | $200,000 |
| 0100 | Special detour- temporary pavement (0102-2200) | SY | 1 | $100,000 | $50,000 | $78,000 | $80,082 | $75,000 | $100,000 |
| 0105 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $100,000 | $155,000 | $140,000 | $19,788 | $250,000 | $150,000 |
| 0110 | Commercial material for temporary driveway maintenance (0102-3) | CY | 1,040.90 | $80.00 | $116.00 | $37.00 | $40.64 | $40.00 | $140.00 |
| 0115 | Work zone sign (0102-60) | ED | 45,558 | $0.38 | $0.50 | $0.40 | $0.44 | $0.30 | $0.40 |
| 0120 | Barrier mounted work zone sign- index 700-013 (0102-62-13) | ED | 70 | $5.40 | $5.80 | $5.50 | $6.35 | $10.00 | $5.50 |
| 0125 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 684 | $59.40 | $63.30 | $61.00 | $69.81 | $56.00 | $60.00 |
| 0130 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 1,836 | $21.60 | $23.00 | $22.00 | $25.38 | $22.00 | $22.00 |
| 0135 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 64,851 | $0.14 | $0.20 | $0.15 | $0.16 | $0.10 | $0.15 |
| 0140 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 936 | $1.08 | $1.20 | $1.10 | $1.27 | $1.00 | $1.25 |
| 0145 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 10,836 | $4.40 | $4.60 | $4.35 | $5.08 | $5.00 | $4.50 |
| 0150 | Portable changeable message sign, temporary (0102-99) | ED | 1,282 | $20.00 | $17.30 | $17.00 | $19.04 | $16.00 | $17.00 |
| 0155 | Type III barricade (0102-115) | ED | 1,030 | $0.54 | $0.60 | $0.55 | $0.63 | $1.00 | $1.00 |
| 0160 | Temporary traffic signals for lane closures on way roadways (0102-120) | ED | 236 | $162.00 | $172.50 | $170.00 | $190.39 | $160.00 | $165.00 |
| 0165 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 1,456 | $1.00 | $40.00 | $4.35 | $73.15 | $25.00 | $75.00 |
| 0170 | Sediment barrier (0104-10-3) | LF | 2,411 | $5.00 | $4.30 | $6.90 | $3.94 | $3.00 | $5.00 |
| 0175 | Floating turbidity barrier (0104-11) | LF | 117 | $120.00 | $28.90 | $23.00 | $25.38 | $150.00 | $50.00 |
| 0180 | Inlet protection system (0104-18) | EACH | 13 | $200.00 | $460.00 | $250.00 | $190.39 | $200.00 | $2,000.00 |
| 0185 | Litter removal (0107-1) | ACRE | 2,022.32 | $60.00 | $69.00 | $40.00 | $63.46 | $10.00 | $100.00 |
| 0190 | Mowing (0107-2) | ACRE | 1,363.14 | $60.00 | $57.50 | $55.00 | $50.77 | $30.00 | $80.00 |
| 0195 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $120,000 | $205,000 | $770,000 | $94,327 | $195,000 | $350,000 |
| 0200 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $150,000 | $172,000 | $140,000 | $117,832 | $140,000 | $225,000 |
| 0205 | Removal of existing concrete (0110-4-10) | SY | 532 | $18.00 | $31.60 | $43.00 | $30.67 | $65.00 | $70.00 |
| 0210 | Mailbox, F&I single (0110-7-1) | EACH | 6 | $200.00 | $460.00 | $140.00 | $317.31 | $350.00 | $400.00 |
| 0215 | Regular excavation (0120-1) | CY | 450.30 | $30.00 | $33.30 | $65.00 | $35.78 | $80.65 | $110.00 |
| 0220 | Borrow excavation, truck measure (0120-2-2) | CY | 4,819.90 | $26.00 | $29.80 | $32.00 | $43.79 | $1.00 | $65.00 |
| 0225 | Subsoil excavation (0120-4) | CY | 245.50 | $45.00 | $43.80 | $51.00 | $92.16 | $150.00 | $55.00 |
| 0230 | Optional base, base group 01 (0285-701) | SY | 1,391 | $22.00 | $20.00 | $20.00 | $25.40 | $25.00 | $55.00 |
| 0235 | Optional base, base group 02 (0285-702) | SY | 364 | $30.00 | $34.80 | $26.00 | $23.18 | $30.00 | $50.00 |
| 0240 | Optional base, base group 11 (0285-711) | SY | 6,994 | $40.00 | $75.60 | $88.00 | $91.76 | $83.75 | $100.00 |
| 0245 | Turnout base- optional materials (0286-1) | SY | 63 | $120.00 | $50.00 | $33.00 | $29.26 | $100.00 | $130.00 |
| 0250 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 228,865 | $1.50 | $2.40 | $1.85 | $1.79 | $2.00 | $4.50 |
| 0255 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 736 | $3.50 | $2.40 | $15.00 | $13.90 | $10.00 | $25.00 |
| 0260 | Milling existing asphalt pavement, 1 3/4" avg depth (0327-70-13) | SY | 1,216 | $3.50 | $2.40 | $9.70 | $9.44 | $10.00 | $15.00 |
| 0265 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 20,369.70 | $127.80 | $147.00 | $160.00 | $151.64 | $175.00 | $190.00 |
| 0270 | Asphalt concrete friction course,traffic B, FC-9.5, PG 76-22 (0337-7-80) | TN | 23,235.80 | $137.21 | $150.00 | $160.00 | $152.84 | $181.50 | $190.00 |
| 0275 | Miscellaneous asphalt (0339-1) | TN | 318.20 | $185.00 | $402.10 | $340.00 | $324.87 | $200.00 | $300.00 |
| 0280 | Inlets, curb, type P-3, partial (0425-1335) | EACH | 1 | $8,000.00 | $8,356.00 | $5,600.00 | $5,769.40 | $8,500.00 | $8,000.00 |
| 0285 | Inlets, DT bot, type C, modify (0425-1529) | EACH | 2 | $4,500.00 | $5,135.00 | $4,900.00 | $5,151.51 | $6,500.00 | $7,750.00 |
| 0290 | Inlets, ditch bottom, type C modified- back of sidewalk, <10' (0425-1531) | EACH | 1 | $8,000.00 | $9,450.50 | $5,600.00 | $7,907.57 | $8,000.00 | $9,250.00 |
| 0295 | Inlets, DT bot, type F, <10' (0425-1561) | EACH | 1 | $6,000.00 | $6,200.00 | $5,700.00 | $6,138.80 | $8,500.00 | $7,750.00 |
| 0300 | Inlets, closed flume (0425-1910) | EACH | 1 | $4,000.00 | $9,100.00 | $6,300.00 | $11,862 | $10,000 | $9,250.00 |
| 0305 | Manhole, adjust (0425-5) | EACH | 1 | $3,000.00 | $2,200.00 | $2,900.00 | $4,100.87 | $2,500.00 | $3,000.00 |
| 0310 | Valve boxes, adjust (0425-6) | EACH | 6 | $1,500.00 | $1,155.00 | $880.00 | $1,586.57 | $1,500.00 | $1,200.00 |
| 0315 | Pipe culvert, optional material, round, 15"SD (0430-174115) | LF | 9 | $200.00 | $250.00 | $120.00 | $145.21 | $300.00 | $950.00 |
| 0320 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 30 | $82.00 | $155.00 | $160.00 | $109.37 | $175.00 | $325.00 |
| 0325 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 108 | $135.00 | $144.20 | $200.00 | $144.23 | $165.00 | $165.00 |
| 0330 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 146 | $85.00 | $155.00 | $120.00 | $124.04 | $150.00 | $180.00 |
| 0335 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 201 | $82.00 | $230.10 | $160.00 | $486.06 | $275.00 | $500.00 |
| 0340 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 623 | $115.00 | $241.40 | $180.00 | $452.89 | $375.00 | $430.00 |
| 0345 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 258 | $170.00 | $319.90 | $300.00 | $661.54 | $400.00 | $630.00 |
| 0350 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 67 | $210.00 | $409.80 | $380.00 | $587.63 | $500.00 | $535.00 |
| 0355 | Pipe culvert, opt material, shape - elip/arch, 30"S/CD (0430-175230) | LF | 25 | $225.00 | $579.10 | $560.00 | $968.99 | $1,250.00 | $775.00 |
| 0360 | Straight concrete endwalls, single, 0 degrees, round (0430-518100) | EACH | 5 | $4,000.00 | $6,100.00 | $4,400.00 | $4,497.70 | $5,000.00 | $5,570.00 |
| 0365 | Straight concrete endwalls, single, 0 degrees, round (0430-524100) | EACH | 11 | $6,000.00 | $6,600.00 | $5,000.00 | $4,822.44 | $6,500.00 | $5,800.00 |
| 0370 | Straight concrete endwalls, single, 0 degrees, round (0430-530100) | EACH | 6 | $1,450.00 | $7,300.00 | $8,000.00 | $6,866.73 | $7,500.00 | $7,700.00 |
| 0375 | Straight concrete endwalls, single, 0 degrees, elliptical (0430-530102) | EACH | 1 | $6,200.00 | $8,800.00 | $6,600.00 | $5,978.48 | $8,500.00 | $6,700.00 |
| 0380 | Straight concrete endwalls, single, 0 degrees, round (0430-536100) | EACH | 2 | $10,500 | $8,200.00 | $10,000 | $10,328 | $10,000 | $9,700.00 |
| 0385 | U-endwall, with grate,index 260/430-010, 1:4 slope, 18" (0430-602125) | EACH | 1 | $5,000.00 | $7,300.00 | $3,700.00 | $4,081.87 | $10,000 | $7,300.00 |
| 0390 | U-endwall, with grate, index 260/430-010, 1:4 slope, 24" (0430-602129) | EACH | 5 | $6,200.00 | $8,500.00 | $3,700.00 | $4,081.87 | $12,000 | $7,700.00 |
| 0395 | U-endwall, with grate, index 260/430-010, 1:4 slope, 30" (0430-602133) | EACH | 2 | $14,000 | $9,000.00 | $7,000.00 | $7,931.11 | $15,000 | $7,000.00 |
| 0400 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 2 | $3,200.00 | $3,345.00 | $3,800.00 | $4,839.55 | $4,000.00 | $3,500.00 |
| 0405 | Mitered end section, optional round, 15" SD (0430-984123) | EACH | 3 | $2,400.00 | $2,435.00 | $4,000.00 | $3,372.05 | $3,000.00 | $3,000.00 |
| 0410 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 30 | $2,850.00 | $2,470.00 | $4,400.00 | $3,787.08 | $3,200.00 | $3,100.00 |
| 0415 | Mitered end section, optional round, 24" SD (0430-984129) | EACH | 12 | $3,200.00 | $3,320.00 | $5,600.00 | $4,237.81 | $3,600.00 | $3,500.00 |
| 0420 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 4 | $3,800.00 | $2,810.00 | $3,400.00 | $4,169.59 | $4,000.00 | $3,500.00 |
| 0425 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 181 | $90.00 | $63.30 | $60.00 | $69.81 | $100.00 | $60.00 |
| 0430 | Concrete curb & gutter, type F (0520-1-10) | LF | 135 | $75.00 | $60.00 | $86.00 | $102.17 | $56.00 | $125.00 |
| 0435 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 539 | $90.00 | $77.00 | $160.00 | $117.88 | $90.00 | $180.00 |
| 0440 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 179 | $115.00 | $120.00 | $160.00 | $203.09 | $110.00 | $270.00 |
| 0445 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 3 | $117.00 | $500.00 | $310.00 | $122.23 | $250.00 | $320.00 |
| 0450 | Concrete ditch pavement, non reinforced, 6" (0524-1-4) | SY | 103 | $115.00 | $151.00 | $190.00 | $131.50 | $115.00 | $220.00 |
| 0455 | Detectable warnings (0527-2) | SF | 304 | $37.00 | $39.10 | $37.00 | $63.46 | $35.00 | $40.00 |
| 0460 | Riprap- rubble, bank and shore (0530-3-3) | TN | 2,224.80 | $178.33 | $195.00 | $170.00 | $209.74 | $175.00 | $190.00 |
| 0465 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 43.20 | $200.00 | $224.90 | $150.00 | $164.85 | $250.00 | $270.00 |
| 0470 | Articulating concrete block revetment system, thickness 9" (0530-4-9) | SY | 3,327 | $198.73 | $248.00 | $190.00 | $238.19 | $200.00 | $215.00 |
| 0475 | Bedding stone (0530-74) | TN | 1,823.70 | $222.77 | $147.00 | $130.00 | $242.28 | $190.00 | $240.00 |
| 0480 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 540 | $32.00 | $32.20 | $31.00 | $35.54 | $39.00 | $30.00 |
| 0485 | Guardrail -roadway, general (0536-1-1) | LF | 308 | $37.80 | $34.50 | $33.00 | $38.08 | $39.00 | $33.00 |
| 0490 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-2 (0536-8111) | EACH | 2 | $4,400.00 | $14,265 | $3,900.00 | $4,569.33 | $5,000.00 | $4,000.00 |
| 0495 | Guardrail removal (0536-73) | LF | 1,462 | $3.25 | $2.30 | $2.20 | $2.54 | $2.50 | $2.50 |
| 0500 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 8 | $3,400.00 | $3,450.00 | $3,300.00 | $3,807.78 | $3,200.00 | $3,300.00 |
| 0505 | Guardrail reset (0538-1) | LF | 420 | $14.00 | $13.80 | $13.00 | $15.23 | $15.00 | $13.00 |
| 0510 | Performance turf, sod (0570-1-2) | SY | 40,372 | $4.75 | $6.00 | $3.40 | $4.44 | $3.50 | $6.50 |
| 0515 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 1,022 | $5.50 | $8.00 | $18.00 | $6.75 | $10.00 | $9.00 |
| 0520 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 4 | $810.00 | $862.50 | $710.00 | $1,269.26 | $750.00 | $1,900.00 |
| 0525 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 31.60 | $1,870.00 | $1,955.30 | $1,900.00 | $2,157.74 | $1,750.00 | $1,900.00 |
| 0530 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.05 | $1,964.00 | $2,231.30 | $2,100.00 | $2,265.64 | $2,000.00 | $2,000.00 |
| 0535 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 979 | $2.75 | $2.90 | $2.75 | $3.17 | $3.00 | $2.75 |
| 0540 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 421 | $3.30 | $3.50 | $3.30 | $3.81 | $5.00 | $3.50 |
| 0545 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 712 | $4.40 | $4.60 | $4.35 | $5.08 | $5.00 | $4.50 |
| 0550 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.10 | $1,595.00 | $1,667.50 | $1,700.00 | $1,842.97 | $1,500.00 | $1,600.00 |
| 0555 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 7 | $57.20 | $59.80 | $57.00 | $63.46 | $56.00 | $60.00 |
| 0560 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 21 | $55.00 | $57.50 | $55.00 | $66.00 | $50.00 | $55.00 |
| 0565 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 21.11 | $1,870.00 | $1,955.50 | $1,900.00 | $2,157.74 | $1,800.00 | $1,800.00 |
| 0570 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 442 | $3.30 | $3.50 | $3.30 | $3.81 | $4.50 | $3.50 |
| 0575 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 6.79 | $1,397.00 | $1,460.80 | $1,400.00 | $1,611.96 | $1,350.00 | $1,400.00 |
| 0580 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.01 | $1,446.50 | $1,512.30 | $1,300.00 | $1,669.08 | $2,000.00 | $1,500.00 |
| 0585 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $109,032 | $109,032 | $109,032 | $109,032 | $109,032 | $109,032 |
| 0590 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $1,007.08 | $1,007.08 | $1,007.08 | $1,007.08 | $1,007.08 | $1,007.08 |
| 0595 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $39,961 | $39,961 | $39,961 | $39,961 | $39,961 | $39,961 |
| 0600 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 30.99 | $1,500.00 | $1,788.60 | $2,000.00 | $2,872.53 | $1,600.00 | $2,200.00 |
| 0605 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 69 | $432.00 | $569.30 | $440.00 | $507.70 | $500.00 | $440.00 |
| 0610 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 8 | $2,430.00 | $2,127.50 | $2,500.00 | $2,855.83 | $1,950.00 | $2,500.00 |
| 0615 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 5 | $2,750.00 | $2,875.00 | $2,700.00 | $3,173.15 | $2,700.00 | $2,750.00 |
| 0620 | Single column ground sign assembly, remove (0700-1600) | EACH | 1 | $55.00 | $57.50 | $60.00 | $69.81 | $100.00 | $60.00 |
| 0625 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 69 | $70.20 | $126.50 | $71.00 | $82.50 | $125.00 | $70.00 |
| 0630 | Tubular marker, 36" white post (0704-1-3) | EACH | 7 | $140.40 | $241.50 | $140.00 | $165.01 | $250.00 | $140.00 |
| 0635 | Object marker, type 1 (0705-10-1) | EACH | 24 | $270.00 | $310.50 | $270.00 | $317.31 | $300.00 | $275.00 |
| 0640 | Raised pavement marker, type B (0706-1-3) | EACH | 9,464 | $4.40 | $4.60 | $4.35 | $5.08 | $4.50 | $4.50 |
| 0645 | Painted pavement markings, surface (0710-90) | LS | 1 | $115,000 | $121,095 | $110,000 | $133,653 | $120,000 | $115,000 |
| 0650 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 979 | $5.50 | $5.80 | $5.45 | $6.35 | $5.00 | $5.50 |
| 0655 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 421 | $6.70 | $6.90 | $6.55 | $7.62 | $6.00 | $6.50 |
| 0660 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 664 | $8.80 | $9.20 | $8.75 | $10.15 | $9.00 | $9.00 |
| 0665 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.10 | $5,335.00 | $5,577.50 | $5,200.00 | $6,155.91 | $5,000.00 | $5,300.00 |
| 0670 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 4 | $300.00 | $310.50 | $290.00 | $342.70 | $250.00 | $300.00 |
| 0675 | Thermoplastic, standard, arrow (0711-11170) | EACH | 18 | $96.80 | $101.20 | $96.00 | $111.70 | $100.00 | $100.00 |
| 0680 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 442 | $6.70 | $6.90 | $6.55 | $7.62 | $7.00 | $6.50 |
| 0685 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.01 | $4,570.00 | $4,772.50 | $4,100.00 | $5,267.43 | $5,000.00 | $5,000.00 |
| 0690 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 50 | $17.60 | $18.40 | $17.00 | $20.31 | $20.00 | $20.00 |
| 0695 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 3 | $176.00 | $184.00 | $170.00 | $203.09 | $175.00 | $175.00 |
| 0700 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 3 | $110.00 | $115.00 | $110.00 | $126.93 | $150.00 | $110.00 |
| 0705 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 30.36 | $6,850.00 | $7,131.00 | $6,800.00 | $7,869.41 | $6,300.00 | $6,800.00 |
| 0710 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.05 | $8,675.00 | $9,856.30 | $9,400.00 | $10,008 | $10,000 | $8,700.00 |
| 0715 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 20.34 | $6,655.00 | $6,957.50 | $6,600.00 | $7,679.03 | $6,200.00 | $6,600.00 |
| 0720 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 6.74 | $2,650.00 | $2,762.10 | $2,600.00 | $3,046.22 | $2,500.00 | $2,650.00 |
| 0725 | Integrated multi-polymer pavement markings, white, solid 6" (0918-712100) | GM | 0.75 | $26,800 | $29,135 | $28,000 | $31,985 | $25,500 | $27,750 |
| 0730 | Integrated multi-polymer pavement markings, yellow, solid 6" (0918-712110) | GM | 0.72 | $26,850 | $29,038 | $28,000 | $31,985 | $25,500 | $27,750 |
| 0735 | Integrated multi-polymer pavement markings, yellow, skip 6" (0918-712115) | GM | 0.01 | $56,200 | $60,720 | $48,000 | $67,017 | $50,000 | $58,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of June 11, 2025. Compiled by Mirage Metrics.