| 0005 | Mobilization (0101-1) | LS | 1 | $100,000 | $115,000 | $40,000 | $185,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $4,000.00 | $95,000 | $40,000 | $25,000 |
| 0015 | Mobilization (0101-1) | LS | 1 | $100,000 | $99,500 | $40,000 | $197,563 |
| 0020 | Mobilization (0101-1) | LS | 1 | $15,000 | $65,000 | $40,000 | $37,277 |
| 0025 | Maintenance of traffic (0102-1) | DA | 1 | $140,000 | $42,500 | $45,000 | $71,905 |
| 0030 | Maintenance of traffic (0102-1) | DA | 1 | $11,000 | $35,000 | $45,000 | $2,500.00 |
| 0035 | Maintenance of traffic (0102-1) | DA | 1 | $140,000 | $42,500 | $45,000 | $67,543 |
| 0040 | Maintenance of traffic (0102-1) | DA | 1 | $30,000 | $35,000 | $45,000 | $2,500.00 |
| 0045 | Commercial material for temporary driveway maintenance (0102-3) | CY | 2 | $140.00 | $1,250.00 | $250.00 | $404.39 |
| 0050 | Traffic control officer (0102-14) | HR | 464 | $72.00 | $75.00 | $100.00 | $95.33 |
| 0055 | Work zone sign (0102-60) | ED | 55,216 | $0.30 | $0.34 | $0.25 | $0.36 |
| 0060 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 72,945 | $0.10 | $0.14 | $0.12 | $0.05 |
| 0065 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 11,052 | $0.10 | $0.11 | $0.60 | $0.12 |
| 0070 | Arrow board / advance warning arrow panel (0102-76) | ED | 160 | $6.15 | $6.90 | $12.00 | $7.15 |
| 0075 | Portable changeable message sign, temporary (0102-99) | ED | 1,616 | $15.00 | $15.50 | $26.40 | $17.88 |
| 0080 | Temporary signalization and maintenance, intersection (0102-104) | ED | 1,652 | $18.00 | $11.00 | $20.40 | $11.92 |
| 0085 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 1,652 | $18.00 | $11.00 | $20.40 | $11.92 |
| 0090 | Type III barricade (0102-115) | ED | 3,074 | $0.25 | $0.25 | $0.60 | $0.30 |
| 0095 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 413 | $36.00 | $28.00 | $75.00 | $211.36 |
| 0100 | Sediment barrier (0104-10-3) | LF | 1,381 | $6.05 | $3.00 | $4.00 | $2.09 |
| 0105 | Floating turbidity barrier (0104-11) | LF | 24 | $5.10 | $15.00 | $80.00 | $50.25 |
| 0110 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 125 | $5.10 | $15.00 | $125.00 | $27.63 |
| 0115 | Soil tracking prevention device (0104-15) | EACH | 5 | $3,600.00 | $3,500.00 | $4,000.00 | $1,191.60 |
| 0120 | Inlet protection system (0104-18) | EACH | 42 | $360.00 | $250.00 | $350.00 | $297.91 |
| 0125 | Litter removal (0107-1) | ACRE | 252.10 | $82.00 | $45.00 | $94.00 | $119.16 |
| 0130 | Mowing (0107-2) | ACRE | 201.56 | $82.00 | $65.00 | $94.00 | $119.16 |
| 0135 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $14,500 | $30,000 | $45,000 | $17,078 |
| 0140 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $50,000 | $35,000 | $45,000 | $34,999 |
| 0145 | Removal of existing concrete (0110-4-10) | SY | 1,600 | $34.00 | $25.00 | $20.00 | $34.65 |
| 0150 | Mailbox, F&I single (0110-7-1) | EACH | 1 | $310.00 | $400.00 | $200.00 | $297.91 |
| 0155 | Tree root and branch pruning (0110-22) | EACH | 3 | $2,100.00 | $2,500.00 | $350.00 | $2,457.69 |
| 0160 | Regular excavation (0120-1) | CY | 199.50 | $31.00 | $45.00 | $48.00 | $100.40 |
| 0165 | Borrow excavation, truck measure (0120-2-2) | CY | 87.10 | $75.00 | $50.00 | $35.00 | $17.88 |
| 0175 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $6,900.00 | $9,500.00 | $20,000 | $20,402 |
| 0188 | Optional base, base group 04 (0285-704) | SY | 372 | $33.00 | $46.00 | $22.00 | $29.15 |
| 0190 | Optional base, base group 06 (0285-706) | SY | 132 | $45.00 | $50.00 | $30.00 | $73.89 |
| 0192 | Optional base, base group 11 (0285-711) | SY | 357 | $49.00 | $62.00 | $50.00 | $31.81 |
| 0195 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 107,843 | $1.10 | $2.25 | $1.85 | $2.50 |
| 0200 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 25,476 | $1.65 | $2.00 | $3.00 | $2.50 |
| 0205 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 308.80 | $130.00 | $150.00 | $200.00 | $182.17 |
| 0210 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 14,059.40 | $140.75 | $139.00 | $165.00 | $148.32 |
| 0215 | Miscellaneous asphalt (0339-1) | TN | 6.50 | $310.00 | $500.00 | $400.00 | $753.63 |
| 0220 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 27.30 | $1,500.00 | $1,850.00 | $2,000.00 | $1,787.42 |
| 0225 | Concrete class II, endwalls (0400-2-2) | CY | 12.50 | $2,000.00 | $1,850.00 | $2,000.00 | $1,787.42 |
| 0230 | Reinforcing steel- retaining wall (0415-1-3) | LB | 1,250 | $7.50 | $4.50 | $4.00 | $0.30 |
| 0235 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 1 | $9,100.00 | $7,500.00 | $13,000 | $16,607 |
| 0240 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 1 | $5,400.00 | $4,500.00 | $5,700.00 | $10,811 |
| 0245 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $6,200.00 | $5,000.00 | $9,000.00 | $14,820 |
| 0250 | Inlets, DT bot, type H, <10' (0425-1581) | EACH | 1 | $9,500.00 | $8,850.00 | $18,000 | $18,694 |
| 0255 | Inlets, closed flume (0425-1910) | EACH | 1 | $5,400.00 | $4,000.00 | $12,000 | $22,566 |
| 0260 | Manholes, P-7, <10' (0425-2-41) | EACH | 2 | $6,100.00 | $5,000.00 | $10,200 | $10,728 |
| 0265 | Manholes, J-7, <10' (0425-2-71) | EACH | 6 | $13,000 | $9,000.00 | $28,000 | $23,825 |
| 0270 | Manhole, adjust, utilities (0425-5-1) | EACH | 18 | $2,800.00 | $1,500.00 | $1,500.00 | $2,750.00 |
| 0275 | Valve boxes, adjust (0425-6) | EACH | 2 | $990.00 | $900.00 | $1,000.00 | $2,206.81 |
| 0280 | Yard drain (0425-10) | EACH | 1 | $4,200.00 | $4,200.00 | $1,500.00 | $5,000.00 |
| 0285 | Modify existing drainage structure (0425-11) | EACH | 1 | $1,500.00 | $7,500.00 | $4,500.00 | $7,105.46 |
| 0290 | Replace grate (0425-82) | EACH | 1 | $970.00 | $1,500.00 | $1,200.00 | $1,548.34 |
| 0295 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 60 | $100.00 | $225.00 | $65.00 | $142.46 |
| 0300 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 39 | $210.00 | $185.00 | $52.00 | $540.68 |
| 0305 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 10 | $290.00 | $230.00 | $85.00 | $574.47 |
| 0310 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 291 | $160.00 | $200.00 | $220.00 | $543.90 |
| 0315 | Pipe culvert,optional material,other shape-elip/arch, 24"S/CD (0430-175224) | LF | 109 | $190.00 | $200.00 | $235.00 | $617.31 |
| 0320 | Pipe culvert, opt material, shape - elip/arch, 48"S/CD (0430-175248) | LF | 295 | $450.00 | $500.00 | $920.00 | $865.88 |
| 0325 | Pipe culvert, opt material, shape - elip/arch, 54"S/CD (0430-175254) | LF | 15 | $660.00 | $650.00 | $1,200.00 | $2,055.12 |
| 0330 | PVC pipe for back of sidewalk, (0430-963-1) | LF | 110 | $31.00 | $50.00 | $20.00 | $51.81 |
| 0335 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 4 | $2,000.00 | $2,500.00 | $3,250.00 | $3,270.80 |
| 0340 | Pipe liner, cured in place, 18" (0431-1118) | LF | 34 | $500.00 | $300.00 | $585.42 | $686.93 |
| 0345 | Pipe handrail - guiderail, steel (0515-1-1) | LF | 113 | $120.00 | $95.00 | $90.00 | $252.74 |
| 0350 | Concrete curb & gutter, type F (0520-1-10) | LF | 962 | $55.00 | $100.00 | $38.00 | $122.12 |
| 0355 | Concrete curb, type B (0520-2-2) | LF | 155 | $48.00 | $95.00 | $60.00 | $117.92 |
| 0360 | Concrete curb, type D (0520-2-4) | LF | 174 | $57.00 | $95.00 | $60.00 | $124.50 |
| 0365 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 706 | $82.00 | $179.00 | $90.00 | $110.32 |
| 0370 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 984 | $91.00 | $192.00 | $115.00 | $183.56 |
| 0375 | Concrete ditch pavement, non reinforced, 6" (0524-1-4) | SY | 12 | $240.00 | $300.00 | $125.00 | $315.08 |
| 0380 | Detectable warnings (0527-2) | SF | 653 | $28.00 | $27.50 | $90.00 | $86.09 |
| 0385 | Guardrail -roadway, general (0536-1-1) | LF | 188 | $26.00 | $28.00 | $456.00 | $29.79 |
| 0390 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 3 | $51.00 | $55.00 | $300.00 | $59.58 |
| 0395 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $3,300.00 | $3,500.00 | $5,040.00 | $3,813.15 |
| 0400 | Performance turf, sod (0570-1-2) | SY | 8,625 | $3.75 | $5.25 | $4.50 | $4.29 |
| 0405 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 4,502 | $3.75 | $7.00 | $5.00 | $4.78 |
| 0410 | Raised pavement marker, type B (0706-1-3) | EACH | 4,642 | $3.05 | $3.45 | $6.00 | $3.58 |
| 0415 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 8.30 | $720.00 | $800.00 | $1,800.00 | $834.12 |
| 0420 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 3,236 | $0.50 | $0.55 | $2.52 | $0.60 |
| 0425 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 1,108 | $0.50 | $0.55 | $2.76 | $0.60 |
| 0430 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,122 | $1.55 | $1.70 | $2.88 | $1.79 |
| 0435 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 6.55 | $720.00 | $800.00 | $1,320.00 | $834.12 |
| 0440 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.09 | $650.00 | $725.00 | $2,400.00 | $774.55 |
| 0445 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 8 | $26.00 | $28.00 | $60.00 | $29.79 |
| 0450 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 182 | $20.00 | $23.00 | $48.00 | $23.83 |
| 0455 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 7.66 | $1,400.00 | $1,700.00 | $1,800.00 | $1,668.26 |
| 0460 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 1.03 | $710.00 | $800.00 | $1,320.00 | $834.12 |
| 0465 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 1.05 | $510.00 | $550.00 | $1,440.00 | $595.81 |
| 0470 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $19,062 | $19,062 | $19,062 | $19,062 |
| 0475 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $5,385.77 | $5,385.77 | $5,385.77 | $5,385.77 |
| 0480 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $25,399 | $25,399 | $25,399 | $25,399 |
| 0485 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $4,420.01 | $4,420.01 | $4,420.01 | $4,420.01 |
| 0490 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 4.53 | $2,800.00 | $2,300.00 | $3,257.27 | $1,787.42 |
| 0495 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 12 | $480.00 | $525.00 | $720.00 | $554.10 |
| 0500 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $2,200.00 | $2,500.00 | $2,640.00 | $2,595.44 |
| 0505 | Single column ground sign assembly, relocate (0700-1500) | EACH | 9 | $72.00 | $80.00 | $78.00 | $83.41 |
| 0510 | Single column ground sign assembly, remove (0700-1600) | EACH | 5 | $41.00 | $45.00 | $60.00 | $47.66 |
| 0515 | Delineator, non-flexible (0705-11-2) | EACH | 14 | $56.00 | $60.00 | $132.00 | $65.53 |
| 0520 | Raised pavement marker, type B (0706-1-3) | EACH | 3,398 | $6.15 | $6.90 | $6.00 | $7.15 |
| 0525 | Painted pavement markings, surface (0710-90) | LS | 1 | $35,000 | $41,000 | $48,000 | $40,753 |
| 0530 | Painted pavement markings, surface (0710-90) | LS | 1 | $27,000 | $31,000 | $39,000 | $30,982 |
| 0535 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 4,327 | $5.10 | $5.75 | $5.04 | $5.96 |
| 0540 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 147 | $6.15 | $6.90 | $6.00 | $7.15 |
| 0545 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,043 | $7.15 | $9.00 | $7.20 | $8.34 |
| 0550 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.05 | $2,500.00 | $3,500.00 | $5,400.00 | $3,276.92 |
| 0555 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 12 | $150.00 | $170.00 | $300.00 | $178.74 |
| 0560 | Thermoplastic, standard, arrow (0711-11170) | EACH | 136 | $100.00 | $120.00 | $102.00 | $119.16 |
| 0565 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 887 | $6.15 | $6.90 | $6.00 | $7.15 |
| 0570 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.52 | $2,800.00 | $3,250.00 | $4,680.00 | $3,276.92 |
| 0575 | Thermoplastic, standard, blue, solid,6" (0711-11421) | LF | 50 | $4.10 | $4.60 | $12.00 | $4.77 |
| 0580 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,276 | $16.00 | $22.00 | $14.40 | $19.07 |
| 0585 | Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193) | LF | 274 | $10.00 | $11.00 | $7.20 | $11.92 |
| 0590 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 10.51 | $5,900.00 | $6,800.00 | $6,120.00 | $6,911.32 |
| 0595 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 3.30 | $2,600.00 | $3,000.00 | $2,520.00 | $2,979.02 |
| 0600 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 9.33 | $5,900.00 | $6,200.00 | $6,000.00 | $6,911.32 |
| 0605 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.64 | $2,500.00 | $3,200.00 | $2,520.00 | $2,979.02 |
| 0610 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 428 | $40.00 | $44.00 | $45.60 | $47.67 |
| 0615 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $11,000 | $11,250 | $12,000 | $11,916 |
| 0620 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 11 | $1,800.00 | $1,750.00 | $2,040.00 | $1,906.57 |
| 0625 | Prestressed concrete pole, type P-II pedestal (0641-2-11) | EACH | 1 | $2,100.00 | $3,300.00 | $2,400.00 | $3,574.82 |
| 0630 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 7 | $900.00 | $900.00 | $1,020.00 | $953.29 |
| 0635 | Aluminum signals pole, (0646-1-11) | EACH | 6 | $3,200.00 | $4,400.00 | $3,600.00 | $4,766.43 |
| 0640 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 4 | $2,200.00 | $1,700.00 | $2,520.00 | $1,787.42 |
| 0645 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 14 | $790.00 | $700.00 | $900.00 | $786.45 |
| 0650 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 4 | $1,400.00 | $1,700.00 | $1,560.00 | $1,787.42 |
| 0655 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 5 | $2,300.00 | $2,700.00 | $2,640.00 | $2,979.02 |
| 0660 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 2 | $210.00 | $110.00 | $240.00 | $119.16 |
| 0665 | Loop assembly- F&I, type A (0660-2101) | AS | 13 | $1,800.00 | $1,700.00 | $2,040.00 | $1,787.42 |
| 0670 | Loop assembly, F&I, type B (0660-2102) | AS | 4 | $1,600.00 | $2,200.00 | $1,800.00 | $2,383.22 |
| 0675 | Loop assembly, F&I, type F (0660-2106) | AS | 8 | $2,000.00 | $5,500.00 | $2,280.00 | $5,958.04 |
| 0680 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 14 | $480.00 | $600.00 | $540.00 | $655.39 |
| 0685 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 2 | $80.00 | $110.00 | $90.00 | $119.16 |
| 0690 | Traffic controller, modify (0671-2-40) | EACH | 2 | $2,600.00 | $5,500.00 | $3,000.00 | $5,958.04 |