| 0005 | Mobilization (0101-1) | LS | 1 | $173,617 | $96,151 | $152,500 | $85,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $20,201 | $143,140 | $72,500 | $100,000 |
| 0015 | Traffic control officer (0102-14) | HR | 32 | $108.57 | $77.70 | $100.00 | $110.00 |
| 0020 | Work zone sign (0102-60) | ED | 7,072 | $0.30 | $0.26 | $0.30 | $0.30 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 34,728 | $0.06 | $0.05 | $0.06 | $0.18 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 800 | $1.21 | $1.04 | $1.25 | $1.50 |
| 0035 | Portable changeable message sign, temporary (0102-99) | ED | 762 | $21.72 | $18.65 | $22.00 | $18.00 |
| 0040 | Temporary signalization and maintenance, intersection (0102-104) | ED | 144 | $12.06 | $12.43 | $12.00 | $24.00 |
| 0045 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 144 | $12.06 | $12.43 | $12.00 | $24.00 |
| 0050 | Type III barricade (0102-115) | ED | 864 | $0.30 | $0.47 | $2.50 | $1.26 |
| 0055 | Radar speed display unit (0102-150-2) | ED | 288 | $12.06 | $7.25 | $25.00 | $6.00 |
| 0060 | Sediment barrier (0104-10-3) | LF | 12,804 | $2.25 | $2.24 | $3.50 | $5.00 |
| 0065 | Floating turbidity barrier (0104-11) | LF | 42 | $18.10 | $17.61 | $20.00 | $35.00 |
| 0070 | Inlet protection system (0104-18) | EACH | 14 | $180.95 | $207.21 | $305.00 | $200.00 |
| 0075 | Litter removal (0107-1) | ACRE | 120.54 | $78.41 | $67.34 | $55.00 | $90.00 |
| 0080 | Mowing (0107-2) | ACRE | 17.76 | $422.23 | $362.61 | $80.00 | $90.00 |
| 0085 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $4,708.60 | $22,015 | $15,000 | $30,000 |
| 0090 | Regular excavation (0120-1) | CY | 130.90 | $61.96 | $41.88 | $55.00 | $21.00 |
| 0095 | Type B stabilization (0160-4) | SY | 588 | $15.62 | $12.96 | $20.00 | $16.00 |
| 0100 | Optional base, base group 04 (0285-704) | SY | 588 | $15.62 | $19.98 | $30.00 | $30.00 |
| 0105 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 1,296 | $5.68 | $8.95 | $3.00 | $4.00 |
| 0110 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 39,932 | $1.54 | $2.83 | $2.50 | $2.00 |
| 0115 | Milling existing asphalt pavement, 1/2" avg depth (0327-70-16) | SY | 14,684 | $1.76 | $1.55 | $1.75 | $2.50 |
| 0120 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 4,558.80 | $133.23 | $136.82 | $142.00 | $155.00 |
| 0125 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 4,670.40 | $140.00 | $146.52 | $155.00 | $170.00 |
| 0130 | Manhole, adjust, utilities (0425-5-1) | EACH | 8 | $3,128.98 | $1,664.55 | $1,500.00 | $1,000.00 |
| 0135 | Valve boxes, adjust (0425-6) | EACH | 11 | $2,354.11 | $962.65 | $975.00 | $1,000.00 |
| 0140 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 31 | $115.36 | $160.02 | $200.00 | $90.00 |
| 0145 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 2 | $3,808.19 | $2,323.46 | $2,000.00 | $2,500.00 |
| 0150 | Concrete curb & gutter, type F (0520-1-10) | LF | 31 | $120.64 | $110.19 | $75.00 | $48.00 |
| 0155 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 41 | $120.64 | $131.86 | $125.00 | $153.00 |
| 0160 | Performance turf, sod (0570-1-2) | SY | 10,013 | $3.62 | $3.99 | $6.00 | $4.00 |
| 0165 | Raised pavement marker, type B (0706-1-3) | EACH | 547 | $7.24 | $6.22 | $7.38 | $6.00 |
| 0170 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 5.64 | $1,146.07 | $983.00 | $1,167.40 | $1,800.00 |
| 0175 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 66 | $1.81 | $1.55 | $1.85 | $2.52 |
| 0180 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 127 | $1.81 | $1.55 | $1.85 | $2.76 |
| 0185 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 2 | $48.26 | $41.44 | $49.22 | $54.00 |
| 0190 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 2.05 | $2,412.79 | $2,072.05 | $2,460.73 | $1,800.00 |
| 0195 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 1.97 | $1,085.76 | $929.58 | $1,103.95 | $1,200.00 |
| 0200 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.02 | $1,025.42 | $880.50 | $1,046.00 | $3,000.00 |
| 0205 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0210 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 5.21 | $3,016.24 | $3,083.13 | $3,662.76 | $5,802.28 |
| 0215 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 6 | $603.20 | $518.01 | $615.18 | $600.00 |
| 0220 | Single column ground sign assembly, remove (0700-1600) | EACH | 1 | $60.31 | $51.80 | $61.52 | $54.00 |
| 0225 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 5 | $241.28 | $207.20 | $246.07 | $240.00 |
| 0230 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 5 | $30.16 | $25.90 | $30.76 | $120.00 |
| 0235 | Object marker, type 1 (0705-10-1) | EACH | 6 | $265.41 | $227.93 | $270.68 | $180.00 |
| 0240 | Raised pavement marker, type B (0706-1-3) | EACH | 547 | $7.24 | $6.22 | $7.38 | $6.00 |
| 0245 | Painted pavement markings, surface (0710-90) | LS | 1 | $23,706 | $20,358 | $24,300 | $30,000 |
| 0250 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 66 | $6.03 | $5.18 | $7.38 | $6.00 |
| 0255 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 127 | $9.65 | $8.29 | $9.84 | $7.20 |
| 0260 | Thermoplastic, standard, arrow (0711-11170) | EACH | 2 | $150.80 | $129.51 | $184.56 | $120.00 |
| 0265 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.02 | $3,015.97 | $2,590.00 | $3,076.00 | $6,600.00 |
| 0270 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 45 | $18.10 | $15.54 | $19.69 | $14.40 |
| 0275 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 5.64 | $6,454.22 | $5,691.06 | $6,709.06 | $5,820.00 |
| 0280 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 2.05 | $6,454.22 | $5,698.14 | $6,705.49 | $5,820.00 |
| 0285 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 1.97 | $2,835.03 | $2,478.87 | $3,020.53 | $3,000.00 |
| 0290 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 440 | $3.02 | $2.59 | $3.08 | $1.80 |
| 0295 | Integrated multi-polymer pavement markings, white, solid 6" (0918-712100) | GM | 0.08 | $27,144 | $22,742 | $25,000 | $30,000 |
| 0300 | Integrated multi-polymer pavement markings, yellow, solid 6" (0918-712110) | GM | 0.08 | $27,144 | $22,742 | $25,000 | $30,000 |
| 0305 | Loop assembly, F&I, type F (0660-2106) | AS | 3 | $7,238.37 | $1,243.23 | $7,000.00 | $2,280.00 |