FDOT contract T1914 bid tabulation

SR 35 (US 17) FROM REA RD TO SR 62. Let by Florida DOT on June 11, 2025, Hardee, District 1. 6 bids received; low bid $2,078,979 by Sun Civil LLC.

Owner
Florida DOT
Letting
11 JUN 2025
Pay items
100
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Sun Civil LLC$2,078,979Low
2Carr Construction, LLC$2,103,069+1.0%
3Traffic Management Solutions, LLC$2,342,923+13%
4Blacktip Services Incorporated$2,504,694+20%
5Signal Technology and Installation Corp.$2,719,013+31%
6Ajax Paving Industries of Florida LLC$3,026,854+46%
FDOT contract T1914: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sun Civil LLC2. Carr Construction, LLC3. Traffic Management Solutions, LLC4. Blacktip Services Incorporated5. Signal Technology and Installation Corp.6. Ajax Paving Industries of Florida LLC
0005Mobilization (0101-1)LS1$147,694$169,200$173,130$165,000$165,704$200,000
0010Mobilization (0101-1)LS1$21,929$24,802$40,049$165,000$183,153$97,000
0015Maintenance of traffic (0102-1)DA1$39,862$76,372$173,589$10,000$43,481$290,000
0020Maintenance of traffic (0102-1)DA1$5,239.30$14,881$205,175$10,000$46,380$191,000
0025Traffic control officer (0102-14)HR80$133.69$100.00$106.80$70.00$100.29$131.86
0030Work zone sign (0102-60)ED10,008$0.31$0.20$0.40$0.27$0.33$0.34
0035Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED32,132$0.15$0.10$0.15$0.15$0.15$0.13
0040Arrow board / advance warning arrow panel (0102-76)ED296$6.68$4.50$0.60$5.00$7.08$8.06
0045Portable changeable message sign, temporary (0102-99)ED436$14.71$9.90$14.02$12.00$15.58$16.12
0050Temporary signalization and maintenance, intersection (0102-104)ED190$7.83$32.75$19.15$31.00$28.99$42.19
0055Temporary traffic detection and maintenance, intersection (0102-107-1)ED190$21.32$32.75$19.15$26.00$28.99$28.76
0060Portable regulatory, sign (0102-150-1)ED296$8.02$4.50$0.53$5.00$8.50$4.00
0065Radar speed display unit (0102-150-2)ED296$8.02$4.50$0.60$5.00$8.50$4.00
0070Sediment barrier (0104-10-3)LF3,232$2.61$5.80$6.67$10.00$2.78$1.88
0075Inlet protection system (0104-18)EACH2$179.53$574.00$250.00$65.00$135.43$125.58
0080Litter removal (0107-1)ACRE9.29$100.00$413.00$204.42$50.00$102.12$50.00
0085Mowing (0107-2)ACRE6.84$100.00$620.00$204.42$50.00$95.85$75.00
0090Clearing & grubbing (0110-1-1)ACRE1$23,132$5,565.00$30,171$200,000$31,422$45,900
0095Removal of existing concrete (0110-4-10)SY56$86.58$129.00$93.20$100.00$110.33$51.73
0100Regular excavation (0120-1)CY336.70$103.06$56.00$60.87$100.00$63.38$47.31
0105Embankment (0120-6)CY45.90$131.82$104.00$137.50$45.00$143.07$106.58
0110Type B stabilization (0160-4)SY516$63.32$58.00$83.30$65.00$90.39$64.84
0115Optional base, base group 09 (0285-709)SY373$121.58$111.00$106.26$75.00$115.26$82.65
0120Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY396$53.48$36.00$34.17$34.00$35.57$26.58
0125Superpave asphaltic conc, traffic C (0334-1-13)TN107.70$721.93$411.00$444.55$328.00$463.31$345.67
0130Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN29.70$1,069.52$872.00$920.47$918.00$958.70$715.55
0135Inlets, DT bot, type D, modify (0425-1549)EACH1$10,959$17,475$9,878.87$12,000$10,296$7,670.81
0140Pipe culvert, optional material, round, 18"SD (0430-174118)LF4$446.24$785.00$2,736.71$500.00$2,807.90$2,102.27
0145Pipe culvert, optional material, round, 24"SD (0430-174124)LF39$338.15$360.00$618.10$500.00$643.15$479.87
0150Mitered end section, optional round, 24" SD (0430-984129)EACH1$4,953.04$5,000.00$4,605.69$500.00$4,813.54$3,581.05
0155Concrete curb & gutter, type E (0520-1-7)LF41$55.14$145.00$66.75$50.00$253.30$154.19
0160Concrete sidewalk and driveways, 6" thick (0522-2)SY72$134.00$247.00$207.85$90.00$368.37$168.38
0165Concrete ditch pavement, 4", reinforced (0524-1-29)SY18$193.52$262.00$274.60$90.00$669.22$499.39
0170Detectable warnings (0527-2)SF80$31.75$32.00$75.02$30.00$78.22$58.39
0175Performance turf, sod (0570-1-2)SY396$9.15$11.00$13.22$10.00$13.51$10.07
0180Painted pavement markings, standard, white, solid, 6" (0710-11101)GM0.11$6,684.49$4,955.00$4,666.67$6,000.00$7,078.83$6,278.98
0185Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.06$6,684.49$5,556.00$4,666.67$6,000.00$7,079.05$6,278.98
0190Initial contingency amount, DO not bid (0999-25)LS1$30,000$30,000$30,000$30,000$30,000$30,000
0195Initial contingency amount, DO not bid (0999-25)LS1$20,000$20,000$20,000$20,000$20,000$20,000
0200Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH4$588.24$650.00$867.74$770.00$823.37$816.27
0205Single column ground sign assembly, remove (0700-1600)EACH8$66.84$25.00$33.37$55.00$35.40$31.39
0210Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH3$8,652.41$11,500$15,352$10,450$14,567$14,442
0215Object marker, type 1 (0705-10-1)EACH5$260.70$225.00$300.37$220.00$318.55$282.55
0220Raised pavement marker, type B (0706-1-3)EACH117$13.37$10.00$5.34$7.00$14.16$12.56
0225Painted pavement markings, surface (0710-90)LS1$6,684.49$5,000.00$11,677$5,500.00$7,078.74$6,278.98
0230Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF348$8.02$6.00$5.34$7.00$8.50$7.53
0235Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF26$10.70$8.00$8.01$9.00$11.33$10.05
0240Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF123$13.37$10.00$10.68$12.00$14.16$12.56
0245Thermoplastic, standard, arrow (0711-11170)EACH4$200.53$150.00$200.25$88.00$212.37$188.37
0250Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.04$6,016.04$4,488.00$4,338.75$6,600.00$6,371.22$5,651.08
0255Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF275$29.41$22.00$21.45$22.00$31.15$27.63
0260Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM0.11$13,369$9,910.00$20,025$9,900.00$14,158$12,558
0265Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102)GM0.02$16,043$12,000$26,700$11,000$16,990$15,070
0270Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM0.06$13,369$11,111$20,025$9,900.00$14,158$12,558
0275Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF650$8.02$6.00$6.68$8.00$8.50$7.53
0280Conduit, furnish & install, open trench (0630-2-11)LF2,355$11.73$14.50$16.43$18.00$28.29$23.42
0285Conduit, furnish & install, directional bore (0630-2-12)LF1,649$30.06$32.75$28.18$28.00$57.01$53.06
0290Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH52$2,070.52$2,001.00$1,100.22$2,750.00$2,044.71$2,116.02
0295Electrical power service, F&I, underground, meter by contractor (0639-1122)AS3$22,879$4,980.00$16,332$5,100.00$7,453.56$9,242.66
0300Electrical service wire, & install (0639-2-1)LF103$14.24$10.25$20.11$50.00$7.86$19.15
0305Prestressed concrete pole, type P-II service pole (0641-2-12)EACH3$2,633.02$2,292.00$2,453.32$2,900.00$2,820.06$3,108.09
0310Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF15,993$2.00$2.80$2.10$7.00$3.69$4.33
0315Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 0' arm length (0715-61300)EACH26$10,372$11,244$9,795.91$11,955$11,886$12,244
0320Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342)EACH4$9,345.92$11,584$8,473.82$9,447.00$12,791$12,244
0325Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266)EACH1$10,526$12,277$9,980.82$11,000$14,518$12,401
0330Light pole complete, F&I, utility conflict pole standard foundation, 40' mounting height, 16' arm length (0715-65366)EACH1$10,884$12,629$9,845.11$10,900$14,374$12,495
0335Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH32$867.98$1,321.00$803.15$1,162.00$1,230.11$1,048.59
0340Itsfm location documentation- intersection (0611-2-1)EACH1$3,542.78$3,890.00$4,672.44$3,800.00$4,493.06$4,545.98
0345Conduit, furnish & install, open trench (0630-2-11)LF1,607$16.84$24.25$13.74$18.00$33.36$23.42
0350Conduit, furnish & install, directional bore (0630-2-12)LF275$57.27$44.75$41.28$28.00$70.79$58.77
0355Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$13,107$27,333$12,289$18,594$12,160$17,895
0360Signal cable, remove- intersection (0632-7-6)PI1$1,131.02$1,860.00$737.09$6,233.00$2,174.07$2,373.45
0365Fiber optic cable locator (0633-6)DA190$546.09$177.00$291.84$273.00$289.88$533.71
0370Span wire assembly, F&I, two point, box or drop box (0634-4153)PI1$11,605$15,298$8,054.87$13,169$17,747$16,011
0375Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH28$1,407.42$1,907.00$1,825.04$2,876.00$1,899.77$2,116.02
0380Electrical power service, F&I, overhead, meter furnished by power company (0639-1111)AS1$3,705.88$5,702.00$4,634.11$5,600.00$6,771.88$7,754.54
0385Electrical power service, remove underground (0639-1620)AS1$754.01$775.00$455.28$623.00$869.64$2,072.06
0390Electrical service wire, & install (0639-2-1)LF285$7.12$10.25$13.02$5.00$10.62$18.84
0395Prestressed concrete pole, type P-II pedestal (0641-2-11)EACH1$2,633.02$2,292.00$1,781.23$2,983.00$2,986.70$3,861.57
0400Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80)EACH2$12,620$10,478$12,269$541.00$5,797.49$21,035
0405Aluminum signals pole, (0646-1-11)EACH6$2,652.25$3,211.00$1,877.47$2,625.00$3,746.11$3,629.25
0410Steel strain pole, F&I, type PS- X (0649-1-17)EACH4$76,550$81,484$81,714$98,500$114,788$120,870
0415Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS7$2,306.08$2,665.00$2,252.58$2,608.00$2,853.89$2,342.06
0420Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS1$2,635.09$2,990.00$2,482.55$2,945.00$3,562.90$2,574.38
0425Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS2$3,042.78$3,518.00$3,744.99$3,342.00$1,456.94$3,290.18
0430Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS6$992.11$1,126.00$738.41$746.00$1,456.94$1,236.96
0435Loop detector inductive, F&I, type 9 (0660-1109)EACH6$288.20$567.00$361.11$275.00$323.33$640.46
0440Loop detector inductive, F&I, type 10 (0660-1110)EACH2$359.73$567.00$432.53$350.00$372.42$521.16
0445Loop assembly, F&I, type B (0660-2102)AS12$1,900.07$1,648.00$1,739.62$865.00$4,237.86$1,789.51
0450Loop assembly, F&I, type F (0660-2106)AS4$1,973.65$2,087.00$2,006.62$1,150.00$4,995.29$2,712.52
0455Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111)EACH1$8,335.56$11,850$8,163.89$8,115.00$10,154$13,186
0460Signal priority and preemption system, F&I, optical, detector (0663-1112)EACH2$2,745.24$4,450.00$2,801.81$3,900.00$14,392$3,999.71
0465Pedestrian detector, furnish & install, standard (0665-1-11)EACH6$533.09$278.00$256.88$240.00$448.94$533.71
0470Traffic controller assembly, install (0670-5300)AS1$6,669.79$5,376.00$7,949.88$8,050.00$3,623.44$10,863
0475ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113)EACH1$9,351.60$7,928.00$7,522.72$6,850.00$8,314.62$9,267.77
0480Managed field ethernet switch, furnish & install (0684-1-1)EACH1$9,258.02$3,865.00$3,729.50$8,400.00$15,050$9,569.16
0485Wireless communication device, furnish & install ethernet subscriber unit (0684-6-12)EACH1$10,421$6,696.00$3,927.00$9,400.00$10,571$11,629
0490Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH1$12,100$11,272$9,358.32$13,300$15,416$14,630
0495Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH6$877.67$1,055.00$867.04$798.00$699.38$1,569.74
0500Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH3$6,137.70$4,888.00$7,255.74$5,541.00$6,186.16$8,319.65
FDOT contract T1914: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of June 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy