FDOT contract T1914 bid tabulation
SR 35 (US 17) FROM REA RD TO SR 62. Let by Florida DOT on June 11, 2025, Hardee, District 1. 6 bids received; low bid $2,078,979 by Sun Civil LLC.
- Owner
- Florida DOT
- Letting
- 11 JUN 2025
- Pay items
- 100
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sun Civil LLC | $2,078,979 | Low |
| 2 | Carr Construction, LLC | $2,103,069 | +1.0% |
| 3 | Traffic Management Solutions, LLC | $2,342,923 | +13% |
| 4 | Blacktip Services Incorporated | $2,504,694 | +20% |
| 5 | Signal Technology and Installation Corp. | $2,719,013 | +31% |
| 6 | Ajax Paving Industries of Florida LLC | $3,026,854 | +46% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sun Civil LLC | 2. Carr Construction, LLC | 3. Traffic Management Solutions, LLC | 4. Blacktip Services Incorporated | 5. Signal Technology and Installation Corp. | 6. Ajax Paving Industries of Florida LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $147,694 | $169,200 | $173,130 | $165,000 | $165,704 | $200,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $21,929 | $24,802 | $40,049 | $165,000 | $183,153 | $97,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $39,862 | $76,372 | $173,589 | $10,000 | $43,481 | $290,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $5,239.30 | $14,881 | $205,175 | $10,000 | $46,380 | $191,000 |
| 0025 | Traffic control officer (0102-14) | HR | 80 | $133.69 | $100.00 | $106.80 | $70.00 | $100.29 | $131.86 |
| 0030 | Work zone sign (0102-60) | ED | 10,008 | $0.31 | $0.20 | $0.40 | $0.27 | $0.33 | $0.34 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 32,132 | $0.15 | $0.10 | $0.15 | $0.15 | $0.15 | $0.13 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 296 | $6.68 | $4.50 | $0.60 | $5.00 | $7.08 | $8.06 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 436 | $14.71 | $9.90 | $14.02 | $12.00 | $15.58 | $16.12 |
| 0050 | Temporary signalization and maintenance, intersection (0102-104) | ED | 190 | $7.83 | $32.75 | $19.15 | $31.00 | $28.99 | $42.19 |
| 0055 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 190 | $21.32 | $32.75 | $19.15 | $26.00 | $28.99 | $28.76 |
| 0060 | Portable regulatory, sign (0102-150-1) | ED | 296 | $8.02 | $4.50 | $0.53 | $5.00 | $8.50 | $4.00 |
| 0065 | Radar speed display unit (0102-150-2) | ED | 296 | $8.02 | $4.50 | $0.60 | $5.00 | $8.50 | $4.00 |
| 0070 | Sediment barrier (0104-10-3) | LF | 3,232 | $2.61 | $5.80 | $6.67 | $10.00 | $2.78 | $1.88 |
| 0075 | Inlet protection system (0104-18) | EACH | 2 | $179.53 | $574.00 | $250.00 | $65.00 | $135.43 | $125.58 |
| 0080 | Litter removal (0107-1) | ACRE | 9.29 | $100.00 | $413.00 | $204.42 | $50.00 | $102.12 | $50.00 |
| 0085 | Mowing (0107-2) | ACRE | 6.84 | $100.00 | $620.00 | $204.42 | $50.00 | $95.85 | $75.00 |
| 0090 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $23,132 | $5,565.00 | $30,171 | $200,000 | $31,422 | $45,900 |
| 0095 | Removal of existing concrete (0110-4-10) | SY | 56 | $86.58 | $129.00 | $93.20 | $100.00 | $110.33 | $51.73 |
| 0100 | Regular excavation (0120-1) | CY | 336.70 | $103.06 | $56.00 | $60.87 | $100.00 | $63.38 | $47.31 |
| 0105 | Embankment (0120-6) | CY | 45.90 | $131.82 | $104.00 | $137.50 | $45.00 | $143.07 | $106.58 |
| 0110 | Type B stabilization (0160-4) | SY | 516 | $63.32 | $58.00 | $83.30 | $65.00 | $90.39 | $64.84 |
| 0115 | Optional base, base group 09 (0285-709) | SY | 373 | $121.58 | $111.00 | $106.26 | $75.00 | $115.26 | $82.65 |
| 0120 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 396 | $53.48 | $36.00 | $34.17 | $34.00 | $35.57 | $26.58 |
| 0125 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 107.70 | $721.93 | $411.00 | $444.55 | $328.00 | $463.31 | $345.67 |
| 0130 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 29.70 | $1,069.52 | $872.00 | $920.47 | $918.00 | $958.70 | $715.55 |
| 0135 | Inlets, DT bot, type D, modify (0425-1549) | EACH | 1 | $10,959 | $17,475 | $9,878.87 | $12,000 | $10,296 | $7,670.81 |
| 0140 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 4 | $446.24 | $785.00 | $2,736.71 | $500.00 | $2,807.90 | $2,102.27 |
| 0145 | Pipe culvert, optional material, round, 24"SD (0430-174124) | LF | 39 | $338.15 | $360.00 | $618.10 | $500.00 | $643.15 | $479.87 |
| 0150 | Mitered end section, optional round, 24" SD (0430-984129) | EACH | 1 | $4,953.04 | $5,000.00 | $4,605.69 | $500.00 | $4,813.54 | $3,581.05 |
| 0155 | Concrete curb & gutter, type E (0520-1-7) | LF | 41 | $55.14 | $145.00 | $66.75 | $50.00 | $253.30 | $154.19 |
| 0160 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 72 | $134.00 | $247.00 | $207.85 | $90.00 | $368.37 | $168.38 |
| 0165 | Concrete ditch pavement, 4", reinforced (0524-1-29) | SY | 18 | $193.52 | $262.00 | $274.60 | $90.00 | $669.22 | $499.39 |
| 0170 | Detectable warnings (0527-2) | SF | 80 | $31.75 | $32.00 | $75.02 | $30.00 | $78.22 | $58.39 |
| 0175 | Performance turf, sod (0570-1-2) | SY | 396 | $9.15 | $11.00 | $13.22 | $10.00 | $13.51 | $10.07 |
| 0180 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.11 | $6,684.49 | $4,955.00 | $4,666.67 | $6,000.00 | $7,078.83 | $6,278.98 |
| 0185 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.06 | $6,684.49 | $5,556.00 | $4,666.67 | $6,000.00 | $7,079.05 | $6,278.98 |
| 0190 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $30,000 | $30,000 | $30,000 | $30,000 | $30,000 | $30,000 |
| 0195 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 |
| 0200 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 4 | $588.24 | $650.00 | $867.74 | $770.00 | $823.37 | $816.27 |
| 0205 | Single column ground sign assembly, remove (0700-1600) | EACH | 8 | $66.84 | $25.00 | $33.37 | $55.00 | $35.40 | $31.39 |
| 0210 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 3 | $8,652.41 | $11,500 | $15,352 | $10,450 | $14,567 | $14,442 |
| 0215 | Object marker, type 1 (0705-10-1) | EACH | 5 | $260.70 | $225.00 | $300.37 | $220.00 | $318.55 | $282.55 |
| 0220 | Raised pavement marker, type B (0706-1-3) | EACH | 117 | $13.37 | $10.00 | $5.34 | $7.00 | $14.16 | $12.56 |
| 0225 | Painted pavement markings, surface (0710-90) | LS | 1 | $6,684.49 | $5,000.00 | $11,677 | $5,500.00 | $7,078.74 | $6,278.98 |
| 0230 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 348 | $8.02 | $6.00 | $5.34 | $7.00 | $8.50 | $7.53 |
| 0235 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 26 | $10.70 | $8.00 | $8.01 | $9.00 | $11.33 | $10.05 |
| 0240 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 123 | $13.37 | $10.00 | $10.68 | $12.00 | $14.16 | $12.56 |
| 0245 | Thermoplastic, standard, arrow (0711-11170) | EACH | 4 | $200.53 | $150.00 | $200.25 | $88.00 | $212.37 | $188.37 |
| 0250 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.04 | $6,016.04 | $4,488.00 | $4,338.75 | $6,600.00 | $6,371.22 | $5,651.08 |
| 0255 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 275 | $29.41 | $22.00 | $21.45 | $22.00 | $31.15 | $27.63 |
| 0260 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.11 | $13,369 | $9,910.00 | $20,025 | $9,900.00 | $14,158 | $12,558 |
| 0265 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.02 | $16,043 | $12,000 | $26,700 | $11,000 | $16,990 | $15,070 |
| 0270 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.06 | $13,369 | $11,111 | $20,025 | $9,900.00 | $14,158 | $12,558 |
| 0275 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 650 | $8.02 | $6.00 | $6.68 | $8.00 | $8.50 | $7.53 |
| 0280 | Conduit, furnish & install, open trench (0630-2-11) | LF | 2,355 | $11.73 | $14.50 | $16.43 | $18.00 | $28.29 | $23.42 |
| 0285 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,649 | $30.06 | $32.75 | $28.18 | $28.00 | $57.01 | $53.06 |
| 0290 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 52 | $2,070.52 | $2,001.00 | $1,100.22 | $2,750.00 | $2,044.71 | $2,116.02 |
| 0295 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 3 | $22,879 | $4,980.00 | $16,332 | $5,100.00 | $7,453.56 | $9,242.66 |
| 0300 | Electrical service wire, & install (0639-2-1) | LF | 103 | $14.24 | $10.25 | $20.11 | $50.00 | $7.86 | $19.15 |
| 0305 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 3 | $2,633.02 | $2,292.00 | $2,453.32 | $2,900.00 | $2,820.06 | $3,108.09 |
| 0310 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 15,993 | $2.00 | $2.80 | $2.10 | $7.00 | $3.69 | $4.33 |
| 0315 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 0' arm length (0715-61300) | EACH | 26 | $10,372 | $11,244 | $9,795.91 | $11,955 | $11,886 | $12,244 |
| 0320 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342) | EACH | 4 | $9,345.92 | $11,584 | $8,473.82 | $9,447.00 | $12,791 | $12,244 |
| 0325 | Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266) | EACH | 1 | $10,526 | $12,277 | $9,980.82 | $11,000 | $14,518 | $12,401 |
| 0330 | Light pole complete, F&I, utility conflict pole standard foundation, 40' mounting height, 16' arm length (0715-65366) | EACH | 1 | $10,884 | $12,629 | $9,845.11 | $10,900 | $14,374 | $12,495 |
| 0335 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 32 | $867.98 | $1,321.00 | $803.15 | $1,162.00 | $1,230.11 | $1,048.59 |
| 0340 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $3,542.78 | $3,890.00 | $4,672.44 | $3,800.00 | $4,493.06 | $4,545.98 |
| 0345 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,607 | $16.84 | $24.25 | $13.74 | $18.00 | $33.36 | $23.42 |
| 0350 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 275 | $57.27 | $44.75 | $41.28 | $28.00 | $70.79 | $58.77 |
| 0355 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $13,107 | $27,333 | $12,289 | $18,594 | $12,160 | $17,895 |
| 0360 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $1,131.02 | $1,860.00 | $737.09 | $6,233.00 | $2,174.07 | $2,373.45 |
| 0365 | Fiber optic cable locator (0633-6) | DA | 190 | $546.09 | $177.00 | $291.84 | $273.00 | $289.88 | $533.71 |
| 0370 | Span wire assembly, F&I, two point, box or drop box (0634-4153) | PI | 1 | $11,605 | $15,298 | $8,054.87 | $13,169 | $17,747 | $16,011 |
| 0375 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 28 | $1,407.42 | $1,907.00 | $1,825.04 | $2,876.00 | $1,899.77 | $2,116.02 |
| 0380 | Electrical power service, F&I, overhead, meter furnished by power company (0639-1111) | AS | 1 | $3,705.88 | $5,702.00 | $4,634.11 | $5,600.00 | $6,771.88 | $7,754.54 |
| 0385 | Electrical power service, remove underground (0639-1620) | AS | 1 | $754.01 | $775.00 | $455.28 | $623.00 | $869.64 | $2,072.06 |
| 0390 | Electrical service wire, & install (0639-2-1) | LF | 285 | $7.12 | $10.25 | $13.02 | $5.00 | $10.62 | $18.84 |
| 0395 | Prestressed concrete pole, type P-II pedestal (0641-2-11) | EACH | 1 | $2,633.02 | $2,292.00 | $1,781.23 | $2,983.00 | $2,986.70 | $3,861.57 |
| 0400 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 2 | $12,620 | $10,478 | $12,269 | $541.00 | $5,797.49 | $21,035 |
| 0405 | Aluminum signals pole, (0646-1-11) | EACH | 6 | $2,652.25 | $3,211.00 | $1,877.47 | $2,625.00 | $3,746.11 | $3,629.25 |
| 0410 | Steel strain pole, F&I, type PS- X (0649-1-17) | EACH | 4 | $76,550 | $81,484 | $81,714 | $98,500 | $114,788 | $120,870 |
| 0415 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 7 | $2,306.08 | $2,665.00 | $2,252.58 | $2,608.00 | $2,853.89 | $2,342.06 |
| 0420 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 1 | $2,635.09 | $2,990.00 | $2,482.55 | $2,945.00 | $3,562.90 | $2,574.38 |
| 0425 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 2 | $3,042.78 | $3,518.00 | $3,744.99 | $3,342.00 | $1,456.94 | $3,290.18 |
| 0430 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 6 | $992.11 | $1,126.00 | $738.41 | $746.00 | $1,456.94 | $1,236.96 |
| 0435 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 6 | $288.20 | $567.00 | $361.11 | $275.00 | $323.33 | $640.46 |
| 0440 | Loop detector inductive, F&I, type 10 (0660-1110) | EACH | 2 | $359.73 | $567.00 | $432.53 | $350.00 | $372.42 | $521.16 |
| 0445 | Loop assembly, F&I, type B (0660-2102) | AS | 12 | $1,900.07 | $1,648.00 | $1,739.62 | $865.00 | $4,237.86 | $1,789.51 |
| 0450 | Loop assembly, F&I, type F (0660-2106) | AS | 4 | $1,973.65 | $2,087.00 | $2,006.62 | $1,150.00 | $4,995.29 | $2,712.52 |
| 0455 | Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111) | EACH | 1 | $8,335.56 | $11,850 | $8,163.89 | $8,115.00 | $10,154 | $13,186 |
| 0460 | Signal priority and preemption system, F&I, optical, detector (0663-1112) | EACH | 2 | $2,745.24 | $4,450.00 | $2,801.81 | $3,900.00 | $14,392 | $3,999.71 |
| 0465 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 6 | $533.09 | $278.00 | $256.88 | $240.00 | $448.94 | $533.71 |
| 0470 | Traffic controller assembly, install (0670-5300) | AS | 1 | $6,669.79 | $5,376.00 | $7,949.88 | $8,050.00 | $3,623.44 | $10,863 |
| 0475 | ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113) | EACH | 1 | $9,351.60 | $7,928.00 | $7,522.72 | $6,850.00 | $8,314.62 | $9,267.77 |
| 0480 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $9,258.02 | $3,865.00 | $3,729.50 | $8,400.00 | $15,050 | $9,569.16 |
| 0485 | Wireless communication device, furnish & install ethernet subscriber unit (0684-6-12) | EACH | 1 | $10,421 | $6,696.00 | $3,927.00 | $9,400.00 | $10,571 | $11,629 |
| 0490 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $12,100 | $11,272 | $9,358.32 | $13,300 | $15,416 | $14,630 |
| 0495 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 6 | $877.67 | $1,055.00 | $867.04 | $798.00 | $699.38 | $1,569.74 |
| 0500 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 3 | $6,137.70 | $4,888.00 | $7,255.74 | $5,541.00 | $6,186.16 | $8,319.65 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of June 11, 2025. Compiled by Mirage Metrics.