Traffic Management Solutions, LLC: FDOT bid record

Traffic Management Solutions, LLC submitted 24 bids on Florida DOT contracts in the data, from 25 APR 2018 to 26 AUG 2026, and was the low bidder on 7 of them (29%). When it was not low, its total sat a median +13% above the low bid.

Owner
Florida DOT
Low bid volume
$34,557,643
Latest bid
26 AUG 2026
Data through
28 OCT 2026
24Bids
7Low bids
29Win rate, percent
+13%Median gap to the low bid when not low, 17 bids

By year

YearBidsLow bidsWin rate
2018300%
20203133%
2021100%
202211100%
20233133%
202411100%
20255240%
20267114%
Traffic Management Solutions, LLC, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 413215%
District 53133%
District 13133%
StateWide2150%
District 2100%
District 311100%
District 711100%
Traffic Management Solutions, LLC, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Conduit, furnish & install, open trench0630-2-11LF2916 (55%)$13.12$16.54
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH3410 (29%)$1,146.38$1,150.00
Prestressed concrete pole, type P-II service pole0641-2-12EACH239 (39%)$1,583.55$2,200.00
Conduit, furnish & install, aboveground0630-2-14LF139 (69%)$41.16$36.00
Conduit, furnish & install, directional bore0630-2-12LF368 (22%)$29.29$30.82
Lighting conductors, F&I, insulated, no.8 - 60715-1-12LF156 (40%)$2.10$2.40
Pull & splice box, F&I, 24" X 36" cover size0635-2-12EACH156 (40%)$2,589.12$2,231.27
Managed field ethernet switch, furnish & install0684-1-1EACH135 (38%)$4,589.26$4,489.00
Conduit, furnish & install, mount0630-2-15LF95 (56%)$41.76$42.40
Pull & splice box, F&I, 30" X 60" rectangular or 36" round size0635-2-13EACH94 (44%)$3,280.31$4,300.00
Pedestrian signal, furnish & install LED countdown, 1 way0653-1-11AS84 (50%)$835.18$900.00
Itsfm location documentation- ITS site0611-2-2EACH64 (67%)$1,895.08$2,115.00
Traffic Management Solutions, LLC, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Traffic Management Solutions, LLC, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
26 AUG 2026T4757District 4SR 93 (I-75) FROM SR 869 (I-595) TO SR 25 (US 27)2 of 12$6,241,763+2.0%
26 AUG 2026T4764District 4SR 512 FROM E OF I-95 TO W OF 106TH AVE9 of 9$3,347,802+46%
26 AUG 2026T4773District 4SR 713 TURNPIKE FEEDER RD / KINGS HWY) FROM N OF INDRIO RD TO US 15 of 13$3,031,997+17%
20 MAY 2026T4666District 4SR 9 (I-95) AT CR 809A (NORTHLAKE BLVD)2 of 8$57,939,604+6.0%
20 MAY 2026T4737District 4SR 9 (I-95) AND SR 862 (I-595) AT VARIOUS LOCATIONS AS...1 of 7$2,856,391Low, 7.0% under the second
25 MAR 2026T4734District 4SR A1A, SR 816, SR 845, SR 810 AND SR 870 AT VARIOUS...7 of 7$2,047,121+21%
28 JAN 2026T4750District 4SR 5 (US 1) FROM MIDWAY RD TO S OF EDWARDS RD6 of 11$2,102,867+13%
29 OCT 2025T4743District 4SR 805 (US 1/N DIXIE HWY) FROM N OF LUCERNE AVE TO WPB CANAL9 of 10$3,333,481+34%
24 SEP 2025T1929District 1SR 70 (15TH ST E) FROM 30TH AVE E TO 26TH AVE E3 of 4$1,411,790+22%
30 JUL 2025T7574District 7SR 93 (I-75), 93A (I-275) and SR 400 (I-4) FROM MANATEE/PI..1 of 6$4,370,000Low, 8.0% under the second
11 JUN 2025T1914District 1SR 35 (US 17) FROM REA RD TO SR 623 of 6$2,342,923+13%
28 MAY 2025T1900District 1SR 45 (US 41) FROM 63RD AVE TO 53RD AVE1 of 4$4,662,927Low, 8.0% under the second
31 JAN 2024T4654District 4SR 9 (I-95), SR 93 (I-75) AND SR 862 (I-595) AT VARIOUS ..1 of 5$5,626,066Low, 1.0% under the second
15 NOV 2023T3882District 3SR 83 (US 331) AND SR 30 (US 98) AT VARIOUS LOCATIONS AS ...1 of 2$10,161,964Low, 10% under the second
15 NOV 2023T4652District 4SR 68 (ORANGE AVE) FROM N 32ND ST TO W OF SR 5 (US 1)4 of 5$6,497,362+20%
25 OCT 2023T9030StateWideSR 9 (I-95) AT FLAGLER WEIGH STATION2 of 5$5,922,297+7.0%
26 JAN 2022T9028StateWideWILDWOOD VIRTUAL WIEGH-IN-MOTION STATION1 of 4$4,468,000Low, 3.0% under the second
08 DEC 2021T4566District 4SR 9 (I-95) NB AND SB OFF-RAMPS3 of 6$5,601,560+21%
20 MAY 2020T5712District 5WRONG WAY DRIVING SIGNS BUNDLE A -1 of 5$2,412,295Low, 13% under the second
29 APR 2020T5684District 5SR 5, SR 500 AND SR 5073 of 6$1,804,995+1.0%
26 FEB 2020T4537District 4SR 9 (I-95)3 of 7$12,718,958+4.0%
05 DEC 2018T4489District 4SR 9 (I-95)2 of 5$6,082,890+2.0%
26 SEP 2018T2716District 2SR 162 of 9$4,914,636+1.0%
25 APR 2018T5617District 5SR 9 (I-95)11 of 12$4,898,587+28%
Traffic Management Solutions, LLC: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy