FDOT contract T7574 bid tabulation

SR 93 (I-75), 93A (I-275) and SR 400 (I-4) FROM MANATEE/PI.. Let by Florida DOT on July 30, 2025, Hillsborough,, District 7. 6 bids received; low bid $4,370,000 by Traffic Management Solutions, LLC.

Owner
Florida DOT
Letting
30 JUL 2025
Pay items
68
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Traffic Management Solutions, LLC$4,370,000Low
2Sice Inc$4,701,504+8.0%
3Transportation Systems Inc.$4,900,042+12%
4Chinchor Electric Inc.$5,082,251+16%
5Traffic Control Devices, Inc.$5,127,127+17%
6Sun Civil LLC$5,779,441+32%
FDOT contract T7574: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Traffic Management Solutions, LLC2. Sice Inc3. Transportation Systems Inc.4. Chinchor Electric Inc.5. Traffic Control Devices, Inc.6. Sun Civil LLC
0005Mobilization (0101-1)LS1$132,713$157,387$25,000$126,608$125,000$193,268
0010Mobilization (0101-1)LS1$44,292$78,693$125,000$125,003$60,500$107,668
0015Mobilization (0101-1)LS1$181,195$183,618$75,000$125,819$113,300$187,486
0020Mobilization (0101-1)LS1$44,292$52,462$25,000$125,819$50,500$68,674
0025Maintenance of traffic (0102-1)DA1$87,713$42,780$20,000$76,948$44,835$95,428
0030Maintenance of traffic (0102-1)DA1$29,238$29,763$75,000$76,948$25,900$47,714
0035Maintenance of traffic (0102-1)DA1$119,608$58,927$35,000$76,948$59,930$111,566
0040Maintenance of traffic (0102-1)DA1$29,238$16,089$20,000$76,948$9,701.20$30,878
0045Traffic control officer (0102-14)HR296$112.52$115.93$103.00$123.05$157.00$111.02
0050Work zone sign (0102-60)ED1,204$0.67$1.08$0.60$0.54$1.00$0.37
0055Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED889$0.12$0.58$0.50$0.10$0.20$0.20
0060Arrow board / advance warning arrow panel (0102-76)ED7$20.15$57.97$22.00$16.05$26.00$19.59
0065Portable changeable message sign, temporary (0102-99)ED160$33.59$57.97$22.00$26.75$48.00$19.59
0070Existing ITS maintenance (0102-112)DA290$310.51$106.00$475.00$294.25$237.00$236.46
0075Type III barricade (0102-115)ED130$0.67$1.35$0.70$0.54$1.00$0.46
0080Removal of existing concrete (0110-4-10)SY85$201.53$154.58$140.00$187.25$106.00$55.80
0085Concrete sidewalk and driveways, 6" thick (0522-2)SY85$235.11$257.63$460.00$518.95$335.00$210.40
0090Initial contingency amount, DO not bid (0999-25)LS1$14,000$14,000$14,000$14,000$14,000$14,000
0095Initial contingency amount, DO not bid (0999-25)LS1$15,000$15,000$15,000$15,000$15,000$15,000
0100Initial contingency amount, DO not bid (0999-25)LS1$15,000$15,000$15,000$15,000$15,000$15,000
0105Initial contingency amount, DO not bid (0999-25)LS1$8,000.00$8,000.00$8,000.00$8,000.00$8,000.00$8,000.00
0110Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH17$932.21$1,118.44$995.00$615.25$724.00$979.62
0115Single column ground sign assembly, F&I barrier less than 12 SF (0700-1311)EACH5$1,749.06$6,807.91$4,525.00$3,132.45$3,930.00$4,571.58
0120Single column ground sign assembly, relocate (0700-1500)EACH22$1,547.10$243.14$675.00$476.15$157.00$653.08
0125Single column ground sign assembly, remove (0700-1600)EACH13$155.89$126.43$215.00$42.80$82.00$130.62
0130Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH1$383.10$612.71$2,220.00$343.74$396.00$587.77
0135Sign panel, remove, UP to 12 SF (0700-3601)EACH3$91.90$97.26$660.00$101.65$63.00$130.62
0140Retroreflective sign strip- furnish and install, 2' (0700-13-12)EACH22$94.52$136.16$175.00$101.65$88.00$163.27
0145Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH60$147.17$194.51$200.00$160.50$126.00$228.58
0150Enhanced highway sign AC powered, F&I ground mount, highlighted sign <12 SF (0700-141140)EACH58$5,672.95$8,977.06$8,000.00$7,164.55$7,495.00$9,980.51
0155Enhanced highway sign AC powered, F&I overhead highlighted sign <12 SF (0700-141340)EACH2$3,606.87$8,772.99$5,000.00$6,592.10$2,915.00$8,281.57
0160Enhanced highway sign AC powered, F&I barrier side mount, highlighted sign <12 SF (0700-141440)EACH3$5,862.77$8,840.42$7,000.00$9,415.42$14,090$13,920
0165Enhanced highway sign solar powered, F&I ground mount, highlighted sign <12 SF (0700-142140)EACH2$6,228.53$9,245.33$7,500.00$11,081$7,493.00$10,172
0170Raised pavement marker, type B (0706-1-3)EACH646$13.43$23.70$15.00$10.70$12.60$13.06
0175Thermoplastic, standard, arrow (0711-11170)EACH24$503.81$888.83$300.00$401.25$471.00$261.23
0180Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570)EACH12$2,015.23$3,555.31$1,935.00$1,605.00$1,885.00$1,959.25
0185Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF689$13.44$23.70$65.00$10.70$12.60$65.31
0190Itsfm subsurface documentation- project length (0611-1-1)MI4.10$3,828.94$3,832.78$4,400.00$3,049.50$3,585.00$3,720.76
0195Itsfm location documentation- ITS site (0611-2-2)EACH18$2,451.86$2,454.32$2,340.00$1,952.75$2,331.00$2,383.75
0200Conduit, furnish & install, open trench (0630-2-11)LF16,430$14.02$16.28$20.00$16.62$27.60$29.77
0205Conduit, furnish & install, directional bore (0630-2-12)LF10,272$34.25$27.59$30.00$27.32$37.65$35.12
0210Conduit, furnish & install, aboveground (0630-2-14)LF620$44.11$64.41$54.00$51.13$46.60$61.13
0215Conduit, furnish & install, mount (0630-2-15)LF3,582$45.16$82.33$50.00$60.24$47.10$84.32
0220Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF24,085$5.04$3.75$4.50$4.58$4.70$4.90
0225Fiber optic connection, install, splice (0633-2-31)EACH52$60.46$60.52$60.00$48.15$57.00$58.78
0230Fiber optic connection, install, termination (0633-2-32)EACH204$114.20$114.31$105.00$90.95$107.00$111.02
0235Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH17$114.20$114.31$115.00$90.95$107.00$111.02
0240Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH16$1,538.30$1,539.84$1,400.00$1,225.15$1,440.00$1,495.56
0245Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH1$134.35$134.48$405.00$107.00$125.53$130.62
0250Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51)EACH10$1,068.07$1,069.14$970.00$850.65$1,000.00$1,038.40
0255Fiber optic cable locator (0633-6)DA290$166.32$278.24$330.00$294.25$228.00$359.20
0260Multi-conductor cable, furnish & install, cat 6 (0633-8-11)LF70$3.03$9.47$10.00$6.97$2.80$13.62
0265Multi-conductor cable, furnish & install, composite (0633-8-12)LF6,062$8.20$6.44$20.00$10.18$3.85$13.62
0270Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH149$1,353.30$1,384.77$2,500.00$1,579.08$1,200.00$1,439.13
0275Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH41$2,788.42$2,447.50$3,000.00$2,406.74$3,265.00$2,682.86
0280Junction box, furnish & install, mounted (0635-3-12)EACH16$996.29$450.85$715.00$1,905.63$525.00$1,320.47
0285Electrical service wire, & install (0639-2-1)LF31,383$10.39$7.87$12.00$8.93$9.20$8.70
0290Electrical service disconnect, F&I, pole mount (0639-3-11)EACH26$3,215.55$2,464.89$3,225.00$2,425.75$3,175.00$4,660.40
0295Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60)EACH10$602.52$741.98$975.00$728.67$500.00$481.97
0300Electrical power service- transformer, F&I, 5-10 kva, phase, copper windings (0639-6121)EACH17$2,733.59$2,327.05$4,625.00$2,773.98$3,045.00$2,389.63
0305Prestressed concrete pole, type P-II service pole (0641-2-12)EACH16$1,583.55$3,017.96$2,875.00$2,104.04$2,562.00$2,710.95
0310Aluminum pole- index 695-001, furnish & install, 12' (0646-2112)EACH1$2,746.67$4,746.71$6,400.00$4,497.73$7,377.00$13,458
0315Vehicle detection system- wrong way for exit ramp, 1 or 2 lanes, AC powered (0660-7-21)EACH11$42,461$50,190$35,000$52,843$56,175$60,569
0320Vehicle detection system- wrong way for exit ramp, 3 or more lanes, AC powered (0660-7-22)EACH7$42,461$50,190$40,000$52,843$56,175$70,979
0325ITS cabinet, furnish & install, pole mount with sunshield, 24" W X 46" H X 22" D (0676-2122)EACH16$8,084.25$9,986.35$12,500$12,058$11,350$8,385.58
0330Managed field ethernet switch, furnish & install (0684-1-1)EACH16$4,589.26$4,586.83$9,500.00$13,081$12,490$3,815.44
0335Uninterruptible power supply, furnish and install, line interactive (0685-1-11)EACH16$4,605.71$4,013.52$6,500.00$7,964.83$15,520$7,113.38
0340Remote power management rpmu, furnish and install (0685-2-1)EACH17$741.67$1,032.59$1,650.00$1,267.58$1,930.00$719.70
FDOT contract T7574: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of July 30, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way