FDOT letting results, October 29, 2025
15 contracts let by Florida DOT on October 29, 2025, $93,465,642 in low bids, a median of 4 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 15
- Low bids, total
- $93,465,642
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T5869 | SR 40 (E SILVER SPRINGS BLVD) FROM US 441 TO SE 196 TERRACE | District 5 | 3 | Anderson Columbia Co., Inc. | $16,582,343 | $16,727,102 | +1.0% | FDOT |
| T1924 | SR 776 FROM CHARLOTTE CO LINE TO S OF US 41 | District 1 | 4 | Preferred Materials Inc. | $14,626,388 | $14,745,650 | +1.0% | FDOT |
| T5861 | SR A1A (OCEAN SHORE BLVD) FROM N OF ROBERTA RD TO FLAGLER... | District 5 | 4 | Masci General Contractors, Inc | $12,993,380 | $13,556,130 | +4.0% | FDOT |
| T1917 | SR 17 FROM S OF CR 17 (KENILWORTH BLVD) TO E OF SR 25 (US 98 | District 1 | 4 | Ohla USA Inc | $10,727,844 | $11,093,296 | +3.0% | FDOT |
| T2A41 | SR 45 (US 27) FROM N OF SR 26 (W NEWBERRY RD) TO SR 25 (US | District 2 | 4 | Anderson Columbia Co., Inc. | $7,201,600 | $7,651,964 | +6.0% | FDOT |
| T2A34 | SR 200 (US 301) FROM ALLIGATOR CREEK TO CARTER RD | District 2 | 2 | Anderson Columbia Co., Inc. | $6,481,621 | $7,369,822 | +14% | FDOT |
| T2A44 | SR 45 (US 27) FROM SR 500 (US 27) TO ALACHUA CO LINE | District 2 | 5 | Anderson Columbia Co., Inc. | $5,635,431 | $5,903,343 | +5.0% | FDOT |
| T4727 | SR A1A (NE OCEAN BLVD) FROM NE SHORE VILLAGE TER TO SR 732 ( | District 4 | 13 | I N C USA Corporation | $4,898,324 | $5,752,508 | +17% | FDOT |
| T6621 | SR 5 (US 1 / BISCAYNE BLVD) AT VARIOUS LOCATIONS AS SHOWN IN | District 6 | 6 | Florida Engineering & Development Corp | $3,567,363 | $3,722,534 | +4.0% | FDOT |
| T3984 | SR 77 FROM 23RD ST TO CR 2312 (BALDWIN RD) | District 3 | 4 | Phoenix Construction Services, Inc. | $2,787,910 | $2,790,079 | 0.0% | FDOT |
| T4743 | SR 805 (US 1/N DIXIE HWY) FROM N OF LUCERNE AVE TO WPB CANAL | District 4 | 10 | Sice Inc | $2,487,603 | $2,575,000 | +4.0% | FDOT |
| T3946 | SR 87 FROM N OF SR 4 TO ALABAMA STATE LINE | District 3 | 4 | Anderson Columbia Co., Inc. | $2,162,098 | $2,813,248 | +30% | FDOT |
| T3975 | SR 71 (CECIL G COSTINS BLVD) FROM SR 30 (US 98) TO S OF... | District 3 | 5 | C.W. Roberts Contracting, Inc. | $2,080,106 | $2,091,900 | +1.0% | FDOT |
| T5873 | SR 200 (SW COLLEGE RD) AT SW 60TH AVE | District 5 | 2 | Chinchor Electric Inc. | $1,014,097 | $1,072,250 | +6.0% | FDOT |
| T3983 | SR 20 FROM E OF CR 275 TO E OF MATTHEW WOOD RD | District 3 | 3 | Yoroca Engineering Contractors, LLC | $219,533 | $274,394 | +25% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.