FDOT contract T2A34 bid tabulation

SR 200 (US 301) FROM ALLIGATOR CREEK TO CARTER RD. Let by Florida DOT on October 29, 2025, Bradford, District 2. 2 bids received; low bid $6,481,621 by Anderson Columbia Co., Inc..

Owner
Florida DOT
Letting
29 OCT 2025
Pay items
116
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Anderson Columbia Co., Inc.$6,481,621Low
2Preferred Materials Inc.$7,369,822+14%
FDOT contract T2A34: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Anderson Columbia Co., Inc.2. Preferred Materials Inc.
0005Mobilization (0101-1)LS1$721,361$461,177
0010Maintenance of traffic (0102-1)DA1$413,387$504,942
0015Special detour- temporary pavement (0102-2200)SY1$33,271$70,190
0020Special detour- temporary earthwork/base (0102-2300)CY1$15,102$11,278
0025Pedestrian or bicycle special detour (0102-4-1)SY1$7,451.27$44,004
0030Pedestrian escort/flagger (0102-5)HR592$40.34$85.28
0035Traffic control officer (0102-14)HR108$134.47$100.00
0040Work zone sign (0102-60)ED14,841$0.27$0.20
0045Business sign (0102-61)EACH8$33.62$25.00
0050Temporary barrier, F&I, low profile, concrete (0102-71-13)LF2,640$52.44$39.00
0055Temporary barrier, relocate, low profile concrete (0102-71-23)LF2,184$21.52$16.00
0060Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED35,933$0.12$0.09
0065Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD204,264$0.04$0.03
0070Temporary separator, F&I remove (0102-75-1)LF5,439$21.52$16.00
0075Arrow board / advance warning arrow panel (0102-76)ED510$6.72$5.00
0080Portable changeable message sign, temporary (0102-99)ED634$12.10$9.00
0085Temporary signalization and maintenance, intersection (0102-104)ED240$98.78$24.96
0090Temporary traffic detection and maintenance, intersection (0102-107-1)ED240$7.93$12.96
0095Type III barricade (0102-115)ED3,465$0.27$0.20
0100Sediment barrier (0104-10-3)LF555$6.94$4.06
0105Inlet protection system (0104-18)EACH17$201.71$100.00
0110Litter removal (0107-1)ACRE124.33$201.71$145.00
0115Mowing (0107-2)ACRE100.36$201.71$145.00
0120Clearing & grubbing (0110-1-1)ACRE1$83,865$147,459
0125Removal of existing concrete (0110-4-10)SY692$46.16$45.50
0130Mailbox, F&I single (0110-7-1)EACH4$470.65$200.00
0135Borrow excavation, truck measure (0120-2-2)CY15.50$332.88$249.45
0140Regular excavation (3-R projects only) (0120-71)LS1$75,385$45,567
0145Geosynthetic reinforced embankment (0145-3)SY6,574$6.24$8.65
0150Type B stabilization (0160-4)SY753$11.98$55.06
0155Optional base, base group 02 (0285-702)SY473$64.92$61.77
0160Optional base, base group 09 (0285-709)SY6,574$74.00$71.46
0165Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY34,097$3.16$5.97
0170Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY4,250$6.43$11.92
0175Milling exist asphalt pavement and limerock 6" (0327-70112)SY19,713$7.85$9.96
0180Superpave asphaltic concrete, traffic E, high polymer (0334-1-59)TN11,518$197.23$256.99
0185Asphalt concrete friction course, inc bit, FC-5, high polymer (0337-7-26)TN1,791$226.66$365.46
0190Asphalt concrete friction course,traffic E, FC-12.5, high polymer (0337-7-95)TN1,325.90$199.40$274.49
0195Inlets, curb, type P-3, partial (0425-1335)EACH1$13,747$11,640
0200Inlets, curb, type J-4, partial (0425-1445)EACH1$14,510$18,200
0205Manhole, adjust (0425-5)EACH1$1,271.87$1,800.00
0210Pipe culvert, optional material, round, 18"SD (0430-174118)LF16$337.13$450.00
0215Mitered end section, optional round, 18" SD (0430-984125)EACH7$8,292.18$2,500.00
0220Concrete curb & gutter, type E (0520-1-7)LF251$50.06$57.00
0225Concrete curb & gutter, type F (0520-1-10)LF227$55.32$57.00
0230Concrete curb, type A (0520-2-1)LF315$48.77$45.00
0235Traffic separator concrete- type I, 6' wide (0520-5-12)LF434$116.73$205.00
0240Concrete sidewalk and driveways, 4" thick (0522-1)SY119$68.79$64.00
0245Concrete sidewalk and driveways, 6" thick (0522-2)SY64$109.20$72.00
0250Detectable warnings (0527-2)SF194$51.17$37.50
0255Performance turf, sod (0570-1-2)SY6,842$3.62$4.65
0260Raised pavement marker, type B (0706-1-3)EACH5,858$6.79$5.05
0265Painted pavement markings, standard, white, solid, 6" (0710-11101)GM11.57$2,286.03$1,700.00
0270Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF1,178$2.96$2.20
0275Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF2,014$3.63$2.70
0280Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM6.89$571.51$425.00
0285Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.72$981.65$730.00
0290Painted pavement markings, standard, white, message or symbol (0710-11160)EACH44$80.68$60.00
0295Painted pavement markings, standard, white, arrows (0710-11170)EACH132$53.79$40.00
0300Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM7.89$2,218.79$1,650.00
0305Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF1,200$3.03$2.25
0310Painted pavement markings, standard, yellow, skip, 6" (0710-11231)GM0.28$571.51$425.00
0315Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM1.13$995.10$740.00
0320Initial contingency amount, DO not bid (0999-25)LS1$66,115$66,115
0325Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM2.82$4,901.50$6,252.92
0330Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH20$1,178.01$500.00
0335Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH7$1,981.87$2,400.00
0340Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114)EACH1$3,462.45$2,900.00
0345Single column ground sign assembly, remove (0700-1600)EACH23$317.35$50.00
0350Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH12$828.09$175.00
0355Sign panel, furnish & install ground mount, 12-20 SF (0700-3102)EACH12$1,399.45$400.00
0360Sign panel, furnish & install overhead mount, 31-50 SF (0700-3204)EACH2$3,535.87$2,000.00
0365Sign panel, remove, UP to 12 SF (0700-3601)EACH9$317.35$40.00
0370Sign panel, remove, 12-20 SF (0700-3602)EACH14$476.03$50.00
0375Sign panel, remove, 31-50 SF (0700-3604)EACH2$952.07$200.00
0380Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH7$190.94$90.00
0385Tubular marker, 36" yellow (0704-1-4)EACH14$444.70$140.00
0390Object marker, type 1 (0705-10-1)EACH10$399.80$260.00
0395Raised pavement marker, type B (0706-1-3)EACH1,339$6.72$5.00
0400Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF698$8.07$6.00
0405Painted pavement markings, surface (0710-90)LS1$49,755$37,000
0410Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF589$5.38$4.00
0415Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF448$12.10$9.00
0420Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.32$3,395.42$2,525.00
0425Thermoplastic, standard, message or symbol (0711-11160)EACH13$235.33$175.00
0430Thermoplastic, standard, arrow (0711-11170)EACH56$96.82$72.00
0435Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF240$7.06$5.25
0440Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.31$3,267.67$2,430.00
0445Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF433$19.50$14.50
0450Thermoplastic, preformed, white, message (0711-14160)EACH5$342.90$255.00
0455Thermoplastic, preformed, white, arrow (0711-14170)EACH5$262.22$195.00
0460Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM2.76$6,118.48$4,550.00
0465Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM1.24$3,563.51$2,650.00
0470Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM1.59$6,118.48$4,550.00
0475Thermoplastic, standard-open graded asphalt surfaces, yellow, skip, 6" (0711-15231)GM0.20$3,563.51$2,650.00
0480Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM1.17$5,378.88$4,000.00
0485Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM1.71$1,882.61$1,400.00
0490Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.32$5,378.88$4,000.00
0495Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF26$8.74$6.50
0500Conduit, furnish & install, open trench (0630-2-11)LF17$54.07$16.78
0505Conduit, furnish & install, directional bore (0630-2-12)LF898$55.37$39.15
0510Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$13,406$11,777
0515Signal cable, remove- intersection (0632-7-6)PI1$5,712.37$1,865.78
0520Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH7$2,328.88$1,614.09
0525Aluminum signals pole, (0646-1-11)EACH2$4,191.84$2,975.67
0530Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH10$882.24$780.63
0535Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS3$1,128.01$1,144.41
0540Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS2$317.35$208.42
0545Loop detector inductive, F&I, type 9 (0660-1109)EACH8$595.04$470.96
0550Loop detector inductive, F&I, type 10 (0660-1110)EACH2$755.31$532.43
0555Loop detector inductive, remove- cabinet to remain (0660-1600)EACH10$634.71$79.70
0560Loop assembly, F&I, type B (0660-2102)AS8$2,657.84$1,295.00
0565Loop assembly, F&I, type F (0660-2106)AS6$3,927.26$1,495.00
0570Pedestrian detector, furnish & install, standard (0665-1-11)EACH2$676.39$897.98
0575Pedestrian detector, adjust/modify on existing pole (0665-1-50)EACH1$476.03$785.62
0580Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH2$158.68$108.65
FDOT contract T2A34: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of October 29, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way