FDOT contract T6621 bid tabulation
SR 5 (US 1 / BISCAYNE BLVD) AT VARIOUS LOCATIONS AS SHOWN IN. Let by Florida DOT on October 29, 2025, Miami-Dade, District 6. 6 bids received; low bid $3,567,363 by Florida Engineering & Development Corp.
- Owner
- Florida DOT
- Letting
- 29 OCT 2025
- Pay items
- 103
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Florida Engineering & Development Corp | $3,567,363 | Low |
| 2 | Aum Construction Inc. | $3,722,534 | +4.0% |
| 3 | Signal Technology and Installation Corp. | $3,725,405 | +4.0% |
| 4 | Horsepower Electric, Inc. | $3,853,017 | +8.0% |
| 5 | Jva Engineering Contractor, Inc | $3,949,493 | +11% |
| 6 | Weekley Asphalt Paving, Inc. | $4,068,413 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Florida Engineering & Development Corp | 2. Aum Construction Inc. | 3. Signal Technology and Installation Corp. | 4. Horsepower Electric, Inc. | 5. Jva Engineering Contractor, Inc | 6. Weekley Asphalt Paving, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $315,000 | $300,000 | $342,095 | $300,000 | $419,000 | $320,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $275,000 | $200,000 | $135,748 | $200,000 | $252,000 | $486,670 |
| 0015 | Traffic control officer (0102-14) | HR | 160 | $92.31 | $80.00 | $100.29 | $100.00 | $87.30 | $89.00 |
| 0020 | Work zone sign (0102-60) | ED | 9,440 | $0.19 | $0.30 | $0.27 | $0.23 | $0.25 | $0.20 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 12,800 | $0.08 | $0.20 | $1.50 | $0.14 | $0.13 | $0.09 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 11,520 | $0.05 | $0.10 | $1.42 | $0.07 | $0.06 | $0.03 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 870 | $4.57 | $8.00 | $7.09 | $6.10 | $6.25 | $7.00 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 668 | $9.14 | $15.00 | $13.64 | $11.73 | $11.20 | $12.00 |
| 0045 | Type III barricade (0102-115) | ED | 640 | $0.25 | $1.00 | $0.74 | $0.63 | $0.37 | $0.23 |
| 0050 | Inlet protection system (0104-18) | EACH | 10 | $93.64 | $250.00 | $174.66 | $100.00 | $214.85 | $155.00 |
| 0055 | Litter removal (0107-1) | ACRE | 6.96 | $0.13 | $500.00 | $47.16 | $30.00 | $295.30 | $100.00 |
| 0060 | Mowing (0107-2) | ACRE | 1.79 | $0.61 | $1,000.00 | $53.90 | $500.00 | $503.00 | $150.00 |
| 0065 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $5,481.00 | $15,000 | $7,220.31 | $13,685 | $21,000 | $13,500 |
| 0070 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $76,500 | $20,000 | $13,304 | $17,250 | $9,000.00 | $101,647 |
| 0075 | Removal of existing concrete (0110-4-10) | SY | 1,530 | $45.77 | $40.00 | $26.68 | $40.25 | $40.90 | $53.00 |
| 0080 | Tree protection barrier (0110-21) | LF | 615 | $8.95 | $10.00 | $12.71 | $7.00 | $9.90 | $16.00 |
| 0085 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $2,471.32 | $10,000 | $13,304 | $8,625.00 | $4,200.00 | $13,000 |
| 0090 | Type B stabilization (0160-4) | SY | 35 | $45.32 | $120.00 | $254.05 | $109.25 | $58.20 | $75.00 |
| 0095 | Optional base, base group 09 (0285-709) | SY | 35 | $141.97 | $250.00 | $254.05 | $241.50 | $116.40 | $173.81 |
| 0100 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 2,500 | $12.65 | $10.00 | $7.96 | $11.50 | $13.30 | $20.00 |
| 0105 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 1,844 | $10.29 | $10.00 | $6.62 | $5.75 | $12.00 | $15.00 |
| 0110 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 175.80 | $225.66 | $270.00 | $395.34 | $230.00 | $252.25 | $300.00 |
| 0115 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 301 | $266.13 | $340.00 | $369.68 | $287.50 | $365.00 | $325.00 |
| 0120 | Inlets, curb, type P-6, partial (0425-1365) | EACH | 1 | $4,612.84 | $15,000 | $7,955.71 | $10,063 | $8,500.00 | $9,800.00 |
| 0125 | Manhole, adjust (0425-5) | EACH | 13 | $967.50 | $2,000.00 | $1,637.94 | $1,978.00 | $1,100.00 | $1,200.00 |
| 0130 | Concrete curb & gutter, type F (0520-1-10) | LF | 521 | $68.55 | $80.00 | $66.86 | $78.20 | $51.00 | $80.00 |
| 0135 | Concrete curb, type D (0520-2-4) | LF | 65 | $274.17 | $80.00 | $66.86 | $112.70 | $120.00 | $75.00 |
| 0140 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 560 | $65.46 | $120.00 | $102.29 | $115.00 | $82.00 | $76.00 |
| 0145 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 543 | $78.12 | $150.00 | $153.77 | $150.00 | $93.00 | $90.00 |
| 0150 | Patterned pavement (0523-3) | SY | 80 | $609.00 | $750.00 | $334.28 | $575.00 | $310.00 | $667.00 |
| 0155 | Detectable warnings (0527-2) | SF | 146 | $42.68 | $50.00 | $46.80 | $43.13 | $37.25 | $42.00 |
| 0160 | Performance turf, sod (0570-1-2) | SY | 94 | $9.02 | $35.00 | $16.72 | $10.00 | $17.50 | $15.00 |
| 0165 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $9,000.00 | $9,000.00 | $9,000.00 | $9,000.00 | $9,000.00 | $9,000.00 |
| 0170 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0175 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 16 | $603.93 | $750.00 | $568.27 | $731.00 | $700.00 | $725.00 |
| 0180 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 2 | $2,633.93 | $2,000.00 | $1,537.66 | $1,951.00 | $3,020.00 | $2,900.00 |
| 0185 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $431.38 | $500.00 | $394.45 | $575.00 | $500.00 | $1,625.00 |
| 0190 | Single column ground sign assembly, remove (0700-1600) | EACH | 21 | $10.15 | $150.00 | $127.03 | $230.00 | $12.00 | $50.00 |
| 0195 | Tubular marker, 36" yellow (0704-1-4) | EACH | 6 | $96.43 | $500.00 | $200.57 | $150.00 | $115.00 | $300.00 |
| 0200 | Raised pavement marker, type B (0706-1-3) | EACH | 188 | $5.08 | $10.00 | $6.69 | $4.60 | $5.80 | $5.00 |
| 0205 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 35 | $2.03 | $20.00 | $4.02 | $6.60 | $2.30 | $2.00 |
| 0210 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,701.97 | $15,000 | $13,304 | $6,862.00 | $3,100.00 | $2,662.04 |
| 0215 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 857 | $2.44 | $6.00 | $3.48 | $2.60 | $2.80 | $2.40 |
| 0220 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 214 | $4.87 | $10.00 | $6.96 | $4.72 | $5.60 | $4.80 |
| 0225 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.01 | $2,334.29 | $20,000 | $9,248.58 | $2,588.00 | $2,680.00 | $2,300.00 |
| 0230 | Thermoplastic, standard, arrow (0711-11170) | EACH | 10 | $81.20 | $200.00 | $73.54 | $115.00 | $95.00 | $80.00 |
| 0235 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 58 | $3.65 | $15.00 | $5.22 | $3.90 | $4.20 | $3.60 |
| 0240 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.05 | $2,334.51 | $15,000 | $2,313.34 | $2,588.00 | $2,680.00 | $2,300.00 |
| 0245 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 791 | $19.29 | $24.00 | $26.08 | $21.00 | $22.10 | $19.00 |
| 0250 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.28 | $6,431.02 | $12,000 | $9,247.40 | $4,986.00 | $7,375.00 | $6,336.00 |
| 0255 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.08 | $2,334.44 | $15,000 | $2,313.34 | $1,553.00 | $2,645.00 | $2,300.00 |
| 0260 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.25 | $6,431.07 | $12,000 | $9,251.47 | $4,986.00 | $7,375.00 | $6,336.00 |
| 0265 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.04 | $2,334.55 | $20,000 | $2,313.64 | $1,553.00 | $2,680.00 | $2,300.00 |
| 0270 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 71 | $35.74 | $25.00 | $6.69 | $5.60 | $41.00 | $2,500.00 |
| 0275 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,937 | $27.91 | $35.00 | $36.84 | $30.00 | $35.00 | $30.00 |
| 0280 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 38 | $1,266.72 | $2,000.00 | $1,748.92 | $2,000.00 | $1,980.00 | $1,700.00 |
| 0285 | Pull & splice box, install (0635-2-30) | EACH | 3 | $819.21 | $1,500.00 | $1,427.02 | $1,000.00 | $1,400.00 | $1,200.00 |
| 0290 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 3 | $6,317.46 | $8,000.00 | $5,879.87 | $6,000.00 | $7,220.00 | $6,200.00 |
| 0295 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 3 | $3,160.30 | $3,000.00 | $3,279.67 | $3,500.00 | $3,610.00 | $3,100.00 |
| 0300 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 3 | $688.27 | $750.00 | $808.28 | $1,000.00 | $875.00 | $750.00 |
| 0305 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 15,541 | $3.25 | $3.00 | $3.81 | $3.00 | $4.07 | $3.50 |
| 0310 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 558 | $4.57 | $10.00 | $7.66 | $5.00 | $5.80 | $5.00 |
| 0315 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 12,802 | $0.20 | $0.25 | $1.35 | $0.50 | $0.60 | $0.50 |
| 0320 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 3 | $17,044 | $20,000 | $19,326 | $25,000 | $18,860 | $16,200 |
| 0325 | Load center, remove, voltage (0715-7-41) | EACH | 3 | $917.66 | $1,500.00 | $1,616.55 | $600.00 | $25,025 | $21,500 |
| 0330 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pole top (0715-11213) | EACH | 12 | $1,544.73 | $1,600.00 | $1,754.94 | $1,600.00 | $1,750.00 | $1,500.00 |
| 0335 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pendant/teardrop (0715-11216) | EACH | 13 | $2,808.71 | $3,000.00 | $2,920.95 | $2,500.00 | $1,750.00 | $1,500.00 |
| 0340 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 1 | $688.27 | $2,000.00 | $1,347.13 | $3,000.00 | $2,330.00 | $2,000.00 |
| 0345 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 42 | $748.87 | $750.00 | $1,399.67 | $1,200.00 | $873.00 | $750.00 |
| 0350 | Light pole complete- special design, F&I, single arm shoulder mount, aluminum, 40' (0715-511140) | EACH | 5 | $37,526 | $42,000 | $45,646 | $35,000 | $16,295 | $14,000 |
| 0355 | Light pole complete-special design, F&I, pole top mount, aluminum, 15' (0715-516115) | EACH | 3 | $12,648 | $15,000 | $17,961 | $15,000 | $15,365 | $13,200 |
| 0360 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 3,050 | $58.06 | $45.00 | $49.12 | $40.00 | $46.50 | $40.00 |
| 0365 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 5 | $16,415 | $13,000 | $13,224 | $25,000 | $13,976 | $12,000 |
| 0370 | Fiber optic cable locator (0633-6) | DA | 320 | $258.11 | $150.00 | $168.40 | $150.00 | $270.00 | $250.00 |
| 0375 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 93 | $1,351.07 | $2,000.00 | $1,748.92 | $2,000.00 | $1,979.00 | $1,700.00 |
| 0380 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 5 | $2,452.75 | $3,500.00 | $2,662.16 | $2,500.00 | $3,375.00 | $2,900.00 |
| 0385 | Pull & splice box, install (0635-2-30) | EACH | 5 | $1,048.60 | $1,500.00 | $1,696.44 | $1,000.00 | $1,280.00 | $1,100.00 |
| 0390 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 5 | $9,719.54 | $8,000.00 | $5,610.45 | $6,000.00 | $6,870.00 | $5,900.00 |
| 0395 | Electrical service wire, & install (0639-2-1) | LF | 1,331 | $11.67 | $10.00 | $7.39 | $20.00 | $11.60 | $10.00 |
| 0400 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 5 | $2,955.68 | $3,000.00 | $3,279.67 | $3,500.00 | $3,490.00 | $3,000.00 |
| 0405 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 2 | $688.27 | $750.00 | $808.29 | $600.00 | $990.00 | $850.00 |
| 0410 | Aluminum signals pole, (0646-1-11) | EACH | 15 | $2,700.41 | $3,000.00 | $4,935.36 | $3,500.00 | $2,910.00 | $2,500.00 |
| 0415 | Steel mast arm assembly, and install, single arm 30' (0649-21-1) | EACH | 1 | $54,248 | $55,000 | $52,003 | $60,000 | $59,360 | $51,000 |
| 0420 | Steel mast arm assembly, and install, single arm 40' (0649-21-3) | EACH | 3 | $58,006 | $60,000 | $57,562 | $68,000 | $63,400 | $54,500 |
| 0425 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 2 | $63,714 | $65,000 | $61,775 | $75,000 | $69,600 | $59,800 |
| 0430 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 2 | $72,567 | $75,000 | $69,525 | $98,000 | $84,300 | $72,500 |
| 0435 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 2 | $81,106 | $85,000 | $77,041 | $106,000 | $87,200 | $75,000 |
| 0440 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 21 | $1,360.81 | $2,000.00 | $1,740.25 | $2,500.00 | $2,210.00 | $1,900.00 |
| 0445 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 4 | $1,777.98 | $2,300.00 | $2,192.22 | $3,000.00 | $2,680.00 | $2,300.00 |
| 0450 | Vehicular traffic signal, furnish & install aluminum, 5 section straight, 1 way (0650-1-18) | AS | 3 | $1,993.66 | $3,000.00 | $2,553.26 | $3,250.00 | $2,900.00 | $2,490.00 |
| 0455 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 16 | $747.65 | $1,800.00 | $947.76 | $1,000.00 | $1,746.00 | $1,500.00 |
| 0460 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 2 | $1,600.45 | $2,500.00 | $1,736.62 | $2,000.00 | $2,445.00 | $2,100.00 |
| 0465 | Midblock crosswalk: rectangular rapid flashing beacon, remove complete sign assembly (0654-2-60) | AS | 12 | $4,129.22 | $500.00 | $808.28 | $600.00 | $1,400.00 | $1,200.00 |
| 0470 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 3 | $9,270.10 | $6,500.00 | $9,437.98 | $13,000 | $24,790 | $21,300 |
| 0475 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 3 | $9,463.66 | $12,000 | $28,515 | $12,000 | $22,800 | $19,600 |
| 0480 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 1 | $6,800.20 | $12,000 | $8,327.16 | $17,000 | $8,260.00 | $7,100.00 |
| 0485 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 4 | $6,347.00 | $7,000.00 | $8,929.29 | $8,500.00 | $9,660.00 | $8,300.00 |
| 0490 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 20 | $248.37 | $450.00 | $430.38 | $500.00 | $407.00 | $350.00 |
| 0495 | Traffic controller assembly, F&I, caltrans W/standard lock (0670-5180) | AS | 5 | $46,345 | $50,000 | $49,457 | $50,000 | $60,500 | $52,000 |
| 0500 | Cellular modem, furnish and install (0684-8-1) | EACH | 5 | $2,090.80 | $2,500.00 | $2,491.75 | $3,500.00 | $3,030.00 | $2,600.00 |
| 0505 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 1 | $1,054.79 | $1,200.00 | $1,403.69 | $1,000.00 | $1,420.00 | $1,220.00 |
| 0510 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 7 | $2,830.23 | $3,500.00 | $4,334.86 | $6,500.00 | $4,075.00 | $3,500.00 |
| 0515 | Enhanced highway sign AC powered, F&I ground mount, blank out sign <12 SF (0700-141160) | EACH | 1 | $11,824 | $8,500.00 | $13,980 | $10,000 | $16,500 | $14,200 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of October 29, 2025. Compiled by Mirage Metrics.