FDOT contract T1917 bid tabulation
SR 17 FROM S OF CR 17 (KENILWORTH BLVD) TO E OF SR 25 (US 98. Let by Florida DOT on October 29, 2025, Highlands, District 1. 4 bids received; low bid $10,727,844 by Ohla USA Inc.
- Owner
- Florida DOT
- Letting
- 29 OCT 2025
- Pay items
- 142
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ohla USA Inc | $10,727,844 | Low |
| 2 | Ajax Paving Industries of Florida LLC | $11,093,296 | +3.0% |
| 3 | C.W. Roberts Contracting, Inc. | $11,125,640 | +4.0% |
| 4 | Watson Civil Construction, Inc. | $12,283,909 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ohla USA Inc | 2. Ajax Paving Industries of Florida LLC | 3. C.W. Roberts Contracting, Inc. | 4. Watson Civil Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $1,070,000 | $160,300 | $250,000 | $146,400 |
| 0010 | Mobilization (0101-1) | LS | 1 | $1.00 | $775,400 | $566,000 | $1,073,600 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $750,000 | $46,220 | $9,000.00 | $65,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $550,000 | $754,020 | $418,000 | $750,000 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $0.01 | $3,961.76 | $10,000 | $6,100.00 |
| 0030 | Traffic control officer (0102-14) | HR | 3,070 | $110.00 | $80.00 | $89.00 | $120.00 |
| 0035 | Work zone sign (0102-60) | ED | 23,981 | $0.21 | $0.23 | $0.25 | $0.30 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 17,790 | $0.09 | $0.10 | $0.10 | $0.13 |
| 0045 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 5,310 | $0.05 | $0.06 | $0.05 | $0.08 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 714 | $9.00 | $9.93 | $10.50 | $13.00 |
| 0055 | Type III barricade (0102-115) | ED | 810 | $0.30 | $0.33 | $0.35 | $0.40 |
| 0060 | Sediment barrier (0104-10-3) | LF | 9,653 | $3.00 | $0.94 | $4.25 | $1.75 |
| 0065 | Floating turbidity barrier (0104-11) | LF | 284 | $16.50 | $13.24 | $16.50 | $15.00 |
| 0070 | Inlet protection system (0104-18) | EACH | 139 | $215.00 | $148.90 | $152.50 | $135.00 |
| 0075 | Litter removal (0107-1) | ACRE | 447.09 | $0.01 | $65.00 | $54.35 | $47.00 |
| 0080 | Mowing (0107-2) | ACRE | 446.39 | $0.01 | $65.00 | $106.50 | $92.00 |
| 0085 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $100,000 | $20,000 | $19,000 | $13,000 |
| 0090 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $10,000 | $5,500.00 | $4,600.00 | $25,000 |
| 0095 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $500,000 | $37,277 | $57,500 | $60,000 |
| 0100 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $500,000 | $87,943 | $10,000 | $80,000 |
| 0105 | Removal of existing concrete (0110-4-10) | SY | 944 | $40.00 | $49.13 | $41.00 | $32.00 |
| 0110 | Regular excavation (0120-1) | CY | 7.90 | $1.00 | $984.15 | $973.00 | $350.00 |
| 0115 | Borrow excavation, truck measure (0120-2-2) | CY | 622 | $25.00 | $64.45 | $35.00 | $35.00 |
| 0120 | Embankment (0120-6) | CY | 116.60 | $36.00 | $107.04 | $137.50 | $30.00 |
| 0125 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $16,000 | $23,239 | $4,000.00 | $30,000 |
| 0130 | Type B stabilization (0160-4) | SY | 829 | $0.01 | $90.13 | $35.50 | $34.00 |
| 0135 | Optional base, base group 09 (0285-709) | SY | 566 | $65.00 | $164.81 | $76.35 | $175.00 |
| 0140 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 260,167 | $2.60 | $3.21 | $3.70 | $3.45 |
| 0145 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 360.80 | $190.00 | $334.59 | $357.00 | $356.00 |
| 0150 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 21,625.10 | $160.00 | $184.09 | $202.00 | $197.00 |
| 0155 | Concrete class II, bulkhead (0400-2-8) | CY | 48.50 | $0.01 | $3,805.28 | $2,450.00 | $1,800.00 |
| 0160 | Reinforcing steel- bulkhead (0415-1-8) | LB | 7,001 | $0.01 | $3.31 | $2.15 | $2.90 |
| 0165 | Inlets, curb, type 9, <10' (0425-1201) | EACH | 1 | $10,000 | $11,030 | $11,750 | $7,300.00 |
| 0170 | Inlets, ditch bottom, type C, partial (0425-1525) | EACH | 1 | $6,000.00 | $5,184.01 | $5,500.00 | $8,300.00 |
| 0175 | Inlets, DT bot, type C, modify (0425-1529) | EACH | 2 | $10,000 | $5,404.60 | $5,700.00 | $4,200.00 |
| 0180 | Inlets, closed flume (0425-1910) | EACH | 1 | $10,000 | $12,133 | $13,000 | $9,200.00 |
| 0185 | Manholes, J-7, partial (0425-2-73) | EACH | 1 | $8,000.00 | $9,926.82 | $10,500 | $6,700.00 |
| 0190 | Manholes, J-8, <10' (0425-2-91) | EACH | 1 | $17,500 | $16,545 | $17,500 | $8,500.00 |
| 0195 | Manholes, J-8, >10' (0425-2-92) | EACH | 2 | $25,000 | $25,479 | $27,000 | $14,000 |
| 0200 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 4 | $900.00 | $1,500.05 | $1,600.00 | $345.00 |
| 0205 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 28 | $250.00 | $683.85 | $723.00 | $324.00 |
| 0210 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 8 | $600.00 | $1,433.87 | $1,600.00 | $443.00 |
| 0215 | Pipe culvert, opt material, round, 42"S/CD (0430-175142) | LF | 13 | $500.00 | $1,323.58 | $1,400.00 | $531.00 |
| 0220 | Pipe culvert, opt material, round, 48"S/CD (0430-175148) | LF | 34 | $600.00 | $1,654.47 | $1,700.00 | $600.00 |
| 0225 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 39 | $240.00 | $529.43 | $570.00 | $250.00 |
| 0230 | PVC pipe for back of sidewalk, (0430-963-1) | LF | 48 | $125.00 | $386.04 | $156.00 | $210.00 |
| 0235 | Sheet piling steel, F&I (0455-133-3) | SF | 2,912 | $0.01 | $169.86 | $160.00 | $425.00 |
| 0240 | Concrete curb & gutter, type F (0520-1-10) | LF | 1,444 | $70.00 | $35.84 | $72.00 | $50.00 |
| 0245 | Valley gutter- concrete (0520-3) | LF | 88 | $95.00 | $52.10 | $95.00 | $85.00 |
| 0250 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 358 | $130.00 | $92.01 | $154.00 | $69.00 |
| 0255 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 401 | $150.00 | $107.46 | $160.00 | $89.00 |
| 0257 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 6 | $350.00 | $1,497.14 | $1,300.00 | $555.00 |
| 0260 | Detectable warnings (0527-2) | SF | 2,862 | $25.00 | $28.49 | $34.00 | $38.00 |
| 0265 | Articulating concrete block revetment system, thickness 9" (0530-4-9) | SY | 79 | $600.00 | $1,036.80 | $1,100.00 | $660.00 |
| 0270 | Performance turf (0570-1-1) | SY | 868 | $6.50 | $10.46 | $10.00 | $7.00 |
| 0275 | Performance turf, sod (0570-1-2) | SY | 24,690 | $6.80 | $5.68 | $7.25 | $7.70 |
| 0280 | Irrigation system- modify existing system (0590-70-5) | LS | 1 | $10,000 | $54,873 | $520.00 | $13,000 |
| 0285 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 32 | $6.25 | $4.41 | $4.50 | $4.20 |
| 0290 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.02 | $3,000.00 | $3,860.43 | $3,900.00 | $3,500.00 |
| 0295 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $30,000 | $30,000 | $30,000 | $30,000 |
| 0300 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $54,458 | $54,458 | $54,458 | $54,458 |
| 0305 | Utility pipe- high density polyethylene, furnish & install, casing/conduit, 6" (1050-42106) | LF | 8 | $1,000.00 | $496.34 | $525.00 | $333.00 |
| 0310 | Midblock crosswalk: rec rapid flashing beacon, solar, sign assembly- back-back accessible detector (0654-2-28) | AS | 12 | $11,500 | $12,574 | $13,800 | $11,800 |
| 0315 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 21 | $550.00 | $606.64 | $590.00 | $570.00 |
| 0320 | Single column ground sign assembly, relocate (0700-1500) | EACH | 5 | $500.00 | $595.61 | $495.00 | $560.00 |
| 0325 | Single column ground sign assembly, remove (0700-1600) | EACH | 13 | $35.00 | $49.63 | $60.00 | $47.00 |
| 0330 | Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912) | EACH | 3 | $4,300.00 | $4,632.52 | $3,450.00 | $4,400.00 |
| 0335 | Single column ground sign assembly, F&I cantilever mount, 20.1-30.0 SF (0700-1913) | EACH | 1 | $3,400.00 | $4,191.32 | $4,600.00 | $4,000.00 |
| 0340 | Single column ground sign assembly, F&I cantilever mount, 30.1+ SF (0700-1914) | EACH | 1 | $3,500.00 | $4,411.92 | $5,100.00 | $4,200.00 |
| 0345 | Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112) | EACH | 2 | $5,000.00 | $6,066.39 | $5,800.00 | $5,700.00 |
| 0350 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 2 | $5,500.00 | $6,397.28 | $7,400.00 | $6,000.00 |
| 0355 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 1 | $8,250.00 | $9,375.33 | $8,400.00 | $8,800.00 |
| 0360 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 11 | $325.00 | $386.04 | $340.00 | $361.00 |
| 0365 | Sign panel, furnish & install ground mount, 12-20 SF (0700-3102) | EACH | 1 | $350.00 | $441.19 | $625.00 | $415.00 |
| 0370 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 10 | $40.00 | $49.63 | $48.00 | $47.00 |
| 0375 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 2 | $40.00 | $49.63 | $65.00 | $47.00 |
| 0380 | Delineator, flexible tubular (0705-11-1) | EACH | 24 | $135.00 | $165.45 | $226.00 | $92.00 |
| 0385 | Raised pavement marker, type B (0706-1-3) | EACH | 4,631 | $4.00 | $4.41 | $4.70 | $4.20 |
| 0390 | Painted pavement markings, surface (0710-90) | LS | 1 | $105,000 | $123,977 | $132,000 | $110,000 |
| 0395 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 5,986 | $3.00 | $3.39 | $3.50 | $3.20 |
| 0400 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 6,571 | $4.25 | $5.07 | $5.50 | $4.85 |
| 0405 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 4,281 | $5.50 | $6.77 | $7.20 | $6.50 |
| 0410 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.75 | $2,500.00 | $2,481.71 | $2,600.00 | $2,370.00 |
| 0415 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 40 | $115.00 | $137.87 | $146.75 | $131.00 |
| 0420 | Thermoplastic, standard, arrow (0711-11170) | EACH | 83 | $48.00 | $59.56 | $63.50 | $57.00 |
| 0425 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 3,273 | $5.00 | $4.62 | $5.00 | $4.40 |
| 0430 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.12 | $4,250.00 | $2,481.71 | $2,500.00 | $2,300.00 |
| 0435 | Thermoplastic, standard, blue, solid,6" (0711-11421) | LF | 324 | $6.50 | $6.51 | $7.00 | $6.20 |
| 0440 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 2,924 | $14.00 | $17.63 | $18.50 | $17.00 |
| 0445 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 44 | $300.00 | $292.29 | $311.00 | $277.00 |
| 0450 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 26 | $75.00 | $95.96 | $102.00 | $91.00 |
| 0455 | Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191) | LF | 364 | $6.00 | $4.96 | $5.25 | $4.70 |
| 0460 | Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193) | LF | 386 | $12.00 | $8.82 | $9.40 | $8.40 |
| 0465 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.03 | $8,000.00 | $7,278.57 | $7,300.00 | $6,500.00 |
| 0470 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.04 | $10,500 | $6,671.93 | $7,000.00 | $6,200.00 |
| 0475 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 22.63 | $4,250.00 | $5,174.08 | $5,500.00 | $4,900.00 |
| 0480 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.26 | $6,500.00 | $6,898.04 | $7,150.00 | $6,400.00 |
| 0485 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.70 | $4,500.00 | $1,293.80 | $1,400.00 | $1,220.00 |
| 0490 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 22.11 | $4,500.00 | $4,756.05 | $5,050.00 | $4,500.00 |
| 0495 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.91 | $2,500.00 | $1,189.01 | $1,250.00 | $1,120.00 |
| 0500 | Conduit, furnish & install, open trench (0630-2-11) | LF | 338 | $20.00 | $27.57 | $25.00 | $19.00 |
| 0505 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,580 | $25.00 | $32.54 | $35.00 | $38.00 |
| 0510 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 44 | $1,250.00 | $1,654.47 | $2,150.00 | $1,200.00 |
| 0515 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 8 | $6,500.00 | $4,136.18 | $6,500.00 | $5,420.00 |
| 0520 | Electrical service wire, & install (0639-2-1) | LF | 176 | $3.50 | $24.27 | $5.85 | $13.00 |
| 0525 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 8 | $1,500.00 | $2,095.66 | $1,675.00 | $3,420.00 |
| 0530 | Prestressed concrete pole, install (0641-2-30) | EACH | 8 | $1,700.00 | $2,316.26 | $1,525.00 | $3,400.00 |
| 0535 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 7,652 | $2.25 | $2.32 | $2.25 | $4.30 |
| 0540 | Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51) | EACH | 1 | $250.00 | $242.66 | $420.00 | $233.00 |
| 0545 | Load center, F&I, primary voltage (0715-7-12) | EACH | 8 | $9,950.00 | $18,751 | $14,000 | $17,000 |
| 0550 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 8' arm length (0715-61111) | EACH | 11 | $6,500.00 | $10,754 | $8,900.00 | $7,400.00 |
| 0555 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 12' arm length (0715-61142) | EACH | 4 | $7,500.00 | $10,809 | $9,200.00 | $11,300 |
| 0560 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 8' arm length (0715-61311) | EACH | 3 | $8,500.00 | $11,361 | $9,400.00 | $7,500.00 |
| 0565 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 4 | $1,650.00 | $1,009.23 | $2,100.00 | $697.00 |
| 0570 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 18 | $650.00 | $954.08 | $775.00 | $815.00 |
| 0575 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $20,000 | $20,000 | $20,000 | $20,000 |
| 0580 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,002 | $20.00 | $36.95 | $26.00 | $54.50 |
| 0585 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,480 | $44.00 | $51.84 | $58.00 | $54.50 |
| 0590 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 6 | $8,900.00 | $4,687.67 | $7,500.00 | $13,400 |
| 0595 | Signal cable, remove- intersection (0632-7-6) | PI | 6 | $3,500.00 | $623.18 | $2,900.00 | $930.00 |
| 0600 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 86 | $1,135.00 | $1,875.07 | $2,100.00 | $1,200.00 |
| 0605 | Aluminum signals pole, (0646-1-11) | EACH | 26 | $2,500.00 | $2,592.00 | $3,300.00 | $2,450.00 |
| 0610 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 4 | $1,250.00 | $722.45 | $1,700.00 | $2,400.00 |
| 0615 | Aluminum signals pole, remove (0646-1-60) | EACH | 16 | $900.00 | $319.86 | $950.00 | $700.00 |
| 0620 | Vehicular traffic signal, furnish & install aluminum, 1 section, 1 way (0650-1-11) | AS | 10 | $1,500.00 | $920.99 | $1,100.00 | $900.00 |
| 0625 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 1 | $3,000.00 | $2,095.66 | $1,800.00 | $1,520.00 |
| 0630 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 1 | $4,000.00 | $2,757.45 | $2,400.00 | $1,950.00 |
| 0635 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 12 | $55.00 | $154.42 | $35.00 | $117.00 |
| 0640 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- black with reflect border (0650-2102) | EACH | 30 | $500.00 | $860.32 | $750.00 | $543.00 |
| 0645 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 24 | $780.00 | $909.96 | $960.00 | $800.00 |
| 0650 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 2 | $3,000.00 | $1,764.77 | $1,900.00 | $1,680.00 |
| 0655 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 9 | $150.00 | $132.36 | $111.50 | $117.00 |
| 0660 | Loop detector inductive , F&I, type 6, 2 CH,SS,S,TD (0660-1106) | EACH | 13 | $900.00 | $1,102.98 | $1,150.00 | $1,020.00 |
| 0665 | Loop detector inductive, F&I, type 12, 4 CH, SS, RM, TD (0660-1112) | EACH | 25 | $350.00 | $628.70 | $650.00 | $621.00 |
| 0670 | Loop assembly, F&I, type B (0660-2102) | AS | 11 | $850.00 | $2,040.51 | $1,330.00 | $1,300.00 |
| 0675 | Loop assembly, F&I, type E (0660-2105) | AS | 2 | $1,900.00 | $2,592.00 | $1,750.00 | $1,900.00 |
| 0680 | Loop assembly, F&I, type F (0660-2106) | AS | 25 | $2,200.00 | $1,819.92 | $2,750.00 | $2,200.00 |
| 0685 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 28 | $500.00 | $408.10 | $411.00 | $270.00 |
| 0690 | Traffic controller, modify (0671-2-40) | EACH | 6 | $650.00 | $2,150.81 | $900.00 | $8,100.00 |
| 0695 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 6 | $7,500.00 | $7,279.67 | $10,300 | $5,600.00 |
| 0700 | Cellular modem, furnish and install (0684-8-1) | EACH | 5 | $5,500.00 | $5,404.60 | $5,700.00 | $4,200.00 |
| 0705 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 1 | $1,000.00 | $1,378.73 | $1,375.00 | $1,150.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of October 29, 2025. Compiled by Mirage Metrics.