FDOT contract T3975 bid tabulation
SR 71 (CECIL G COSTINS BLVD) FROM SR 30 (US 98) TO S OF... Let by Florida DOT on October 29, 2025, Gulf, District 3. 5 bids received; low bid $2,080,106 by C.W. Roberts Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 29 OCT 2025
- Pay items
- 71
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C.W. Roberts Contracting, Inc. | $2,080,106 | Low |
| 2 | Anderson Columbia Co., Inc. | $2,091,900 | +1.0% |
| 3 | Gosalia Concrete Constructors, Inc. | $2,157,000 | +4.0% |
| 4 | Roberts and Roberts, Inc. | $2,223,683 | +7.0% |
| 5 | Marshall Brothers Construction & Engineering, Inc. | $2,370,872 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C.W. Roberts Contracting, Inc. | 2. Anderson Columbia Co., Inc. | 3. Gosalia Concrete Constructors, Inc. | 4. Roberts and Roberts, Inc. | 5. Marshall Brothers Construction & Engineering, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $220,000 | $211,000 | $200,000 | $265,000 | $250,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $91,500 | $34,467 | $113,131 | $56,000 | $221,964 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $16,000 | $13,939 | $50,000 | $9,500.00 | $13,859 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $24,000 | $10,451 | $5,500.00 | $9,500.00 | $21,872 |
| 0025 | Work zone sign (0102-60) | ED | 6,250 | $0.30 | $0.30 | $0.28 | $0.40 | $0.34 |
| 0030 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 354 | $55.00 | $30.48 | $50.00 | $57.50 | $50.71 |
| 0035 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 354 | $22.00 | $18.25 | $20.00 | $23.00 | $16.91 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 38,480 | $0.10 | $0.12 | $0.11 | $0.20 | $0.17 |
| 0045 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 130,763 | $0.10 | $0.12 | $0.07 | $0.10 | $0.12 |
| 0050 | Temporary separator, F&I remove (0102-75-1) | LF | 5,160 | $21.00 | $24.33 | $19.00 | $21.90 | $56.34 |
| 0055 | Arrow board / advance warning arrow panel (0102-76) | ED | 180 | $5.65 | $5.96 | $5.15 | $6.00 | $11.27 |
| 0060 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 410 | $5.80 | $6.08 | $5.00 | $5.80 | $5.64 |
| 0065 | Portable changeable message sign, temporary (0102-99) | ED | 832 | $14.00 | $14.90 | $12.15 | $14.40 | $28.17 |
| 0070 | Temporary signalization and maintenance, intersection (0102-104) | ED | 180 | $43.00 | $79.09 | $25.00 | $17.30 | $28.17 |
| 0075 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 180 | $43.00 | $60.84 | $25.00 | $17.30 | $22.54 |
| 0080 | Type III barricade (0102-115) | ED | 720 | $1.10 | $0.30 | $1.00 | $1.20 | $0.57 |
| 0085 | Sediment barrier (0104-10-3) | LF | 82 | $12.00 | $3.65 | $10.00 | $15.00 | $5.64 |
| 0090 | Inlet protection system (0104-18) | EACH | 15 | $430.00 | $425.88 | $150.00 | $500.00 | $281.68 |
| 0095 | Litter removal (0107-1) | ACRE | 17.94 | $220.00 | $243.36 | $50.00 | $230.00 | $112.68 |
| 0100 | Mowing (0107-2) | ACRE | 17.54 | $220.00 | $243.36 | $50.00 | $230.00 | $84.51 |
| 0105 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $40,000 | $12,365 | $8,500.00 | $170,000 | $46,296 |
| 0110 | Removal of existing concrete (0110-4-10) | SY | 3,028 | $72.00 | $101.13 | $127.00 | $97.50 | $88.29 |
| 0115 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $9,000.00 | $15,036 | $18,848 | $14,000 | $30,318 |
| 0120 | Flowable fill (0121-70) | CY | 5 | $1,100.00 | $1,681.34 | $174.95 | $500.00 | $1,176.40 |
| 0125 | Optional base, base group 03 (0285-703) | SY | 527 | $63.00 | $108.09 | $42.93 | $48.00 | $66.70 |
| 0130 | Optional base, base group 11 (0285-711) | SY | 100 | $130.00 | $208.94 | $108.14 | $85.00 | $153.80 |
| 0135 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 13.80 | $640.00 | $1,005.04 | $350.00 | $307.00 | $281.70 |
| 0140 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 8.30 | $910.00 | $1,569.76 | $350.00 | $445.00 | $309.90 |
| 0145 | Cleaning & sealing joints- concrete pavement (0350-5) | LF | 21,519 | $2.80 | $7.15 | $5.00 | $7.00 | $7.33 |
| 0150 | Concrete pavement slab replacement (0353-70) | CY | 617.20 | $1,100.00 | $860.97 | $1,150.00 | $955.00 | $670.40 |
| 0155 | Inlets, curb, type P-3, <10' (0425-1331) | EACH | 1 | $12,000 | $15,286 | $15,238 | $11,000 | $16,258 |
| 0160 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $8,700.00 | $12,165 | $13,591 | $9,800.00 | $13,861 |
| 0165 | Manhole, adjust (0425-5) | EACH | 1 | $1,900.00 | $3,860.14 | $900.00 | $1,850.00 | $4,833.30 |
| 0170 | Manhole, adjust, utilities (0425-5-1) | EACH | 3 | $2,500.00 | $3,452.84 | $900.00 | $1,850.00 | $4,833.30 |
| 0175 | Valve boxes, adjust (0425-6) | EACH | 7 | $740.00 | $1,714.75 | $250.00 | $1,500.00 | $4,833.30 |
| 0180 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 4 | $1,100.00 | $890.36 | $761.00 | $855.00 | $2,181.80 |
| 0185 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 4 | $1,100.00 | $890.36 | $469.00 | $875.00 | $2,203.40 |
| 0190 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 8 | $1,200.00 | $445.18 | $263.00 | $755.00 | $1,125.70 |
| 0195 | Underdrain outlet pipe, 6" (0440-73-2) | LF | 36 | $98.00 | $107.62 | $128.00 | $210.00 | $268.20 |
| 0200 | Concrete curb & gutter, type F (0520-1-10) | LF | 279 | $71.00 | $130.19 | $46.00 | $38.00 | $124.00 |
| 0205 | Concrete curb, type D (0520-2-4) | LF | 51 | $49.00 | $138.93 | $62.00 | $50.00 | $124.00 |
| 0210 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 184 | $170.00 | $190.04 | $102.00 | $150.00 | $152.20 |
| 0215 | Patterned pavement (0523-3) | SY | 55 | $820.00 | $327.32 | $173.35 | $400.00 | $281.70 |
| 0220 | Detectable warnings (0527-2) | SF | 255 | $25.00 | $27.37 | $22.50 | $22.90 | $39.50 |
| 0225 | Performance turf, sod (0570-1-2) | SY | 1,609 | $9.85 | $6.85 | $10.00 | $5.90 | $6.80 |
| 0230 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 2.64 | $1,600.00 | $1,609.16 | $1,350.00 | $1,552.50 | $2,816.80 |
| 0235 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,526 | $1.15 | $1.19 | $1.00 | $1.20 | $2.30 |
| 0240 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 18 | $3.45 | $3.58 | $3.00 | $3.50 | $5.70 |
| 0245 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 2.67 | $1,600.00 | $1,609.16 | $1,350.00 | $1,552.50 | $2,816.80 |
| 0250 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.07 | $750.00 | $834.38 | $646.15 | $867.00 | $1,690.10 |
| 0255 | Painted pavement markings, removal of non-conflicting (0710-17-1) | SF | 15,748 | $1.15 | $1.19 | $1.00 | $1.20 | $1.70 |
| 0260 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0265 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 24 | $590.00 | $650.99 | $535.00 | $615.30 | $647.90 |
| 0270 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 9 | $1,100.00 | $1,216.81 | $1,000.00 | $1,150.00 | $1,887.30 |
| 0275 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 6 | $2,700.00 | $3,042.02 | $2,500.00 | $2,875.00 | $2,676.00 |
| 0280 | Single column ground sign assembly, remove (0700-1600) | EACH | 3 | $55.00 | $60.84 | $50.00 | $57.50 | $56.40 |
| 0285 | Delineator, flexible tubular (0705-11-1) | EACH | 8 | $71.00 | $42.59 | $65.00 | $74.80 | $281.70 |
| 0290 | Raised pavement marker, type B (0706-1-3) | EACH | 710 | $5.80 | $5.96 | $5.00 | $5.80 | $5.70 |
| 0295 | Painted pavement markings, surface (0710-90) | LS | 1 | $7,600.00 | $7,822.55 | $6,562.70 | $7,547.20 | $7,323.70 |
| 0300 | Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527) | LF | 176 | $28.00 | $28.61 | $24.00 | $27.60 | $17.00 |
| 0305 | Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528) | LF | 781 | $17.00 | $17.88 | $15.00 | $17.30 | $11.30 |
| 0310 | Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560) | EACH | 56 | $58.00 | $59.60 | $50.00 | $57.50 | $112.70 |
| 0315 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 20 | $1,400.00 | $1,430.37 | $1,200.00 | $1,380.00 | $1,690.10 |
| 0320 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.93 | $6,900.00 | $7,151.83 | $5,941.87 | $6,907.50 | $7,323.70 |
| 0325 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.01 | $11,000 | $11,920 | $9,090.91 | $11,500 | $16,901 |
| 0330 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.81 | $6,900.00 | $7,151.83 | $5,992.60 | $6,900.00 | $7,323.70 |
| 0335 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 14,364 | $1.95 | $2.03 | $1.70 | $2.00 | $1.70 |
| 0340 | Permanent tape, white, solid W/contrast, 6" primary line width, for concrete surfaces (0713-103121) | GM | 0.02 | $24,000 | $47,679 | $21,053 | $48,421 | $33,802 |
| 0345 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.69 | $35,000 | $35,759 | $24,892 | $34,500 | $16,901 |
| 0350 | Permanent tape, yellow, 6-10 dotted extension, 6" wide, for concrete surfaces (0713-103241) | GM | 0.13 | $44,000 | $47,679 | $38,400 | $47,840 | $33,802 |
| 0355 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.69 | $35,000 | $35,759 | $24,892 | $34,500 | $16,901 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of October 29, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.