FDOT contract T3975 bid tabulation

SR 71 (CECIL G COSTINS BLVD) FROM SR 30 (US 98) TO S OF... Let by Florida DOT on October 29, 2025, Gulf, District 3. 5 bids received; low bid $2,080,106 by C.W. Roberts Contracting, Inc..

Owner
Florida DOT
Letting
29 OCT 2025
Pay items
71
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.W. Roberts Contracting, Inc.$2,080,106Low
2Anderson Columbia Co., Inc.$2,091,900+1.0%
3Gosalia Concrete Constructors, Inc.$2,157,000+4.0%
4Roberts and Roberts, Inc.$2,223,683+7.0%
5Marshall Brothers Construction & Engineering, Inc.$2,370,872+14%
FDOT contract T3975: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.W. Roberts Contracting, Inc.2. Anderson Columbia Co., Inc.3. Gosalia Concrete Constructors, Inc.4. Roberts and Roberts, Inc.5. Marshall Brothers Construction & Engineering, Inc.
0005Mobilization (0101-1)LS1$220,000$211,000$200,000$265,000$250,000
0010Maintenance of traffic (0102-1)DA1$91,500$34,467$113,131$56,000$221,964
0015Special detour- temporary pavement (0102-2200)SY1$16,000$13,939$50,000$9,500.00$13,859
0020Special detour- temporary earthwork/base (0102-2300)CY1$24,000$10,451$5,500.00$9,500.00$21,872
0025Work zone sign (0102-60)ED6,250$0.30$0.30$0.28$0.40$0.34
0030Temporary barrier, F&I, low profile, concrete (0102-71-13)LF354$55.00$30.48$50.00$57.50$50.71
0035Temporary barrier, relocate, low profile concrete (0102-71-23)LF354$22.00$18.25$20.00$23.00$16.91
0040Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED38,480$0.10$0.12$0.11$0.20$0.17
0045Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD130,763$0.10$0.12$0.07$0.10$0.12
0050Temporary separator, F&I remove (0102-75-1)LF5,160$21.00$24.33$19.00$21.90$56.34
0055Arrow board / advance warning arrow panel (0102-76)ED180$5.65$5.96$5.15$6.00$11.27
0060Temporary raised/retroreflective pavement marker, type D (0102-78-1)EACH410$5.80$6.08$5.00$5.80$5.64
0065Portable changeable message sign, temporary (0102-99)ED832$14.00$14.90$12.15$14.40$28.17
0070Temporary signalization and maintenance, intersection (0102-104)ED180$43.00$79.09$25.00$17.30$28.17
0075Temporary traffic detection and maintenance, intersection (0102-107-1)ED180$43.00$60.84$25.00$17.30$22.54
0080Type III barricade (0102-115)ED720$1.10$0.30$1.00$1.20$0.57
0085Sediment barrier (0104-10-3)LF82$12.00$3.65$10.00$15.00$5.64
0090Inlet protection system (0104-18)EACH15$430.00$425.88$150.00$500.00$281.68
0095Litter removal (0107-1)ACRE17.94$220.00$243.36$50.00$230.00$112.68
0100Mowing (0107-2)ACRE17.54$220.00$243.36$50.00$230.00$84.51
0105Clearing & grubbing (0110-1-1)ACRE1$40,000$12,365$8,500.00$170,000$46,296
0110Removal of existing concrete (0110-4-10)SY3,028$72.00$101.13$127.00$97.50$88.29
0115Regular excavation (3-R projects only) (0120-71)LS1$9,000.00$15,036$18,848$14,000$30,318
0120Flowable fill (0121-70)CY5$1,100.00$1,681.34$174.95$500.00$1,176.40
0125Optional base, base group 03 (0285-703)SY527$63.00$108.09$42.93$48.00$66.70
0130Optional base, base group 11 (0285-711)SY100$130.00$208.94$108.14$85.00$153.80
0135Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN13.80$640.00$1,005.04$350.00$307.00$281.70
0140Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN8.30$910.00$1,569.76$350.00$445.00$309.90
0145Cleaning & sealing joints- concrete pavement (0350-5)LF21,519$2.80$7.15$5.00$7.00$7.33
0150Concrete pavement slab replacement (0353-70)CY617.20$1,100.00$860.97$1,150.00$955.00$670.40
0155Inlets, curb, type P-3, <10' (0425-1331)EACH1$12,000$15,286$15,238$11,000$16,258
0160Inlets, DT bot, type D, <10' (0425-1541)EACH1$8,700.00$12,165$13,591$9,800.00$13,861
0165Manhole, adjust (0425-5)EACH1$1,900.00$3,860.14$900.00$1,850.00$4,833.30
0170Manhole, adjust, utilities (0425-5-1)EACH3$2,500.00$3,452.84$900.00$1,850.00$4,833.30
0175Valve boxes, adjust (0425-6)EACH7$740.00$1,714.75$250.00$1,500.00$4,833.30
0180Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF4$1,100.00$890.36$761.00$855.00$2,181.80
0185Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF4$1,100.00$890.36$469.00$875.00$2,203.40
0190Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF8$1,200.00$445.18$263.00$755.00$1,125.70
0195Underdrain outlet pipe, 6" (0440-73-2)LF36$98.00$107.62$128.00$210.00$268.20
0200Concrete curb & gutter, type F (0520-1-10)LF279$71.00$130.19$46.00$38.00$124.00
0205Concrete curb, type D (0520-2-4)LF51$49.00$138.93$62.00$50.00$124.00
0210Concrete sidewalk and driveways, 6" thick (0522-2)SY184$170.00$190.04$102.00$150.00$152.20
0215Patterned pavement (0523-3)SY55$820.00$327.32$173.35$400.00$281.70
0220Detectable warnings (0527-2)SF255$25.00$27.37$22.50$22.90$39.50
0225Performance turf, sod (0570-1-2)SY1,609$9.85$6.85$10.00$5.90$6.80
0230Painted pavement markings, standard, white, solid, 6" (0710-11101)GM2.64$1,600.00$1,609.16$1,350.00$1,552.50$2,816.80
0235Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF1,526$1.15$1.19$1.00$1.20$2.30
0240Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF18$3.45$3.58$3.00$3.50$5.70
0245Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM2.67$1,600.00$1,609.16$1,350.00$1,552.50$2,816.80
0250Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.07$750.00$834.38$646.15$867.00$1,690.10
0255Painted pavement markings, removal of non-conflicting (0710-17-1)SF15,748$1.15$1.19$1.00$1.20$1.70
0260Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000
0265Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH24$590.00$650.99$535.00$615.30$647.90
0270Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH9$1,100.00$1,216.81$1,000.00$1,150.00$1,887.30
0275Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH6$2,700.00$3,042.02$2,500.00$2,875.00$2,676.00
0280Single column ground sign assembly, remove (0700-1600)EACH3$55.00$60.84$50.00$57.50$56.40
0285Delineator, flexible tubular (0705-11-1)EACH8$71.00$42.59$65.00$74.80$281.70
0290Raised pavement marker, type B (0706-1-3)EACH710$5.80$5.96$5.00$5.80$5.70
0295Painted pavement markings, surface (0710-90)LS1$7,600.00$7,822.55$6,562.70$7,547.20$7,323.70
0300Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527)LF176$28.00$28.61$24.00$27.60$17.00
0305Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528)LF781$17.00$17.88$15.00$17.30$11.30
0310Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560)EACH56$58.00$59.60$50.00$57.50$112.70
0315Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570)EACH20$1,400.00$1,430.37$1,200.00$1,380.00$1,690.10
0320Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.93$6,900.00$7,151.83$5,941.87$6,907.50$7,323.70
0325Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.01$11,000$11,920$9,090.91$11,500$16,901
0330Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.81$6,900.00$7,151.83$5,992.60$6,900.00$7,323.70
0335Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF14,364$1.95$2.03$1.70$2.00$1.70
0340Permanent tape, white, solid W/contrast, 6" primary line width, for concrete surfaces (0713-103121)GM0.02$24,000$47,679$21,053$48,421$33,802
0345Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.69$35,000$35,759$24,892$34,500$16,901
0350Permanent tape, yellow, 6-10 dotted extension, 6" wide, for concrete surfaces (0713-103241)GM0.13$44,000$47,679$38,400$47,840$33,802
0355Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.69$35,000$35,759$24,892$34,500$16,901
FDOT contract T3975: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of October 29, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy